Error during approval of customized Work Schedule Substitution Request

Hi Gurus,
Good day!
Just wanted to check your inputs on an error encountered during execution of a customized application done for the MSS approval of a work schedule substitution request
  Application error occurred during request processing.
  Details:   com.sap.tc.webdynpro.services.sal.core.DispatcherException: Wrong WebDynpro-URL: no application name specified
Exception id: [E41F13C50EFA007600000227000011180004AAD57AFD5474]
In simple terms, what does this error mean and what are the items that we need to check?
Regards,

The error means the dispatcher can't find the WebDynpro application.
1. Make sure the Business package which contains the application is installed properly (most likely not).
2. Make sure the PCD-Path / Folder which contains the iView has end user permissions.
3. Also check whether the System ID the iView corresponds with has end user permissions.
Also, please always post the entire error log, most of the time the errors are nested and analyzing an error with only the thrown error (which isn't the root cause) is like pulling teeth :-S
regards, Lukas

Similar Messages

  • ICal yields "Error during PUT for mailto:valid@email: iMIP request failed"

    Hello,
    I'm trying to bring up an iCal server (using Mac OS X Lion 10.7.3 Server on a Mac Mini). The basic configuration runs fine. But when I tried to enable eMail invitations, I got stuck with those messages in the error log:
    [twistedcaldav.scheduling.imip#error] Could not do server-to-imip request : <twistedcaldav.scheduling.imip.ScheduleViaIMip object at 0x10075e5d0> User timeout caused connection failure.
    [twistedcaldav.scheduling.scheduler.ScheduleResponseQueue#error] Error during PUT for mailto:valid@email: iMIP request failed
    My configuration settings:
    calendar:Scheduling:CalDAV:EmailDomain = ""
    calendar:Scheduling:CalDAV:HTTPDomain = ""
    calendar:Scheduling:CalDAV:AddressPatterns = _empty_array
    calendar:Scheduling:iMIP:Sending:Server = "valid.mail.server"
    calendar:Scheduling:iMIP:Sending:UseSSL = no
    calendar:Scheduling:iMIP:Sending:Username = "valid@email"
    calendar:Scheduling:iMIP:Sending:Address = "valid@email"
    calendar:Scheduling:iMIP:Sending:Password = "safe_password"
    calendar:Scheduling:iMIP:Sending:Port = 25
    calendar:Scheduling:iMIP:Enabled = yes
    calendar:Scheduling:iMIP:MailGatewayPort = 62310
    calendar:Scheduling:iMIP:Receiving:Server = "valid.mail.server"
    calendar:Scheduling:iMIP:Receiving:UseSSL = yes
    calendar:Scheduling:iMIP:Receiving:Username = "valid_email"
    calendar:Scheduling:iMIP:Receiving:PollingSeconds = 30
    calendar:Scheduling:iMIP:Receiving:Type = "imap"
    calendar:Scheduling:iMIP:Receiving:Password = "safe_password"
    calendar:Scheduling:iMIP:Receiving:Port = 993
    calendar:Scheduling:iMIP:AddressPatterns:_array_index:0 = "mailto:.*"
    calendar:Scheduling:iMIP:MailGatewayServer = "valid.mail.server"
    calendar:Scheduling:iSchedule:Enabled = no
    calendar:Scheduling:iSchedule:Servers = "servertoserver.xml"
    calendar:Scheduling:iSchedule:AddressPatterns = _empty_array
    It does not even try to connect to the given smtp server. How do I proceed?

    I dug into the sources, and am now smarter
    the above settings are invalid, because of the gateway (this has to be iCal itself):
    calendar:Scheduling:iMIP:MailGatewayServer = "localhost"
    Now the IMAP server is being asked, but now I have the next problem:
    [mailgateway] 2012-03-27 11:14:37+0200 [IMAP4DownloadProtocol,client] [twistedcaldav.mail.IMAP4DownloadFactory#debug] Scheduling next IMAP4 poll
    [mailgateway] 2012-03-27 11:15:07+0200 [IMAP4DownloadProtocol,client] [twistedcaldav.mail.IMAP4DownloadProtocol#debug] RECEIVED: * OK [CAPABILITY IMAP4rev1 LITERAL+ SASL-IR LOGIN-REFERRALS ID ENABLE AUTH=PLAIN AUTH=LOGIN] Dovecot ready.
    [mailgateway] 2012-03-27 11:15:07+0200 [IMAP4DownloadProtocol,client] [twistedcaldav.mail.IMAP4DownloadProtocol#debug] IMAP servergreeting
    [mailgateway] 2012-03-27 11:15:07+0200 [IMAP4DownloadProtocol,client] [twistedcaldav.mail.IMAP4DownloadProtocol#debug] SENDING: 0001 AUTHENTICATE PLAIN
    [mailgateway] 2012-03-27 11:15:07+0200 [IMAP4DownloadProtocol,client] [twistedcaldav.mail.IMAP4DownloadProtocol#debug] RECEIVED: +
    [mailgateway] 2012-03-27 11:15:07+0200 [IMAP4DownloadProtocol,client] [twistedcaldav.mail.IMAP4DownloadProtocol#debug] SENDING: 1GNhbEwhZHNwZXJ0LmRlAFlpZXE5YW==
    [mailgateway] 2012-03-27 11:15:09+0200 [IMAP4DownloadProtocol,client] [twistedcaldav.mail.IMAP4DownloadProtocol#debug] RECEIVED: 0001 NO [AUTHENTICATIONFAILED] Authentication failed.
    [mailgateway] 2012-03-27 11:15:09+0200 [IMAP4DownloadProtocol,client] [twistedcaldav.mail.IMAP4DownloadProtocol#debug] IMAP authenticate failed for valid@email, trying login
    [mailgateway] 2012-03-27 11:15:09+0200 [IMAP4DownloadProtocol,client] [twistedcaldav.mail.IMAP4DownloadProtocol#debug] SENDING: 0002 LOGIN "valid@email" "valid_password"
    [mailgateway] 2012-03-27 11:15:16+0200 [IMAP4DownloadProtocol,client] [twistedcaldav.mail.IMAP4DownloadProtocol#debug] RECEIVED: 0002 NO [AUTHENTICATIONFAILED] Authentication failed.
    [mailgateway] 2012-03-27 11:15:16+0200 [IMAP4DownloadProtocol,client] [twistedcaldav.mail.IMAP4DownloadProtocol#error] IMAP login failed for valid@email
    [mailgateway] 2012-03-27 11:15:16+0200 [IMAP4DownloadProtocol,client] [twistedcaldav.mail.IMAP4DownloadFactory#debug] IMAP factory connection lost

  • Work Schedule Substitution for Mass employees

    Hi,
    We have the following scenario in our HR Time Management
    Monday to Friday is flexi (8 hours)
    Saturday to Sunday is Off (0 hours)
    Work Schedule has been generated and has been assigned to all the employees
    Through substitution, we are making,
    Saturday as a working day (convering Off to Flexi)
    This is happening through PA30 for individual employees.
    (Accordingly the leave applied is getting updated in IT 2001)
    We wanted to do the same for a group of employees.
    Let me know your the way to do.
    Thanks in advance,
    Vijay

    Thanks all for your interest and valuable inputs. Have rewarded points to the respondeds.
    May be I missed to high-light the complications of our scenario.
    Consider, we are changing the work schedule, from "off" to "flexi" during a period.
    The employees who have already applied leave during that period, should be deducted the newly introduced "flexi" day from their leave quota.
    The same is happening when we do the change in PA30 individually.
    We wanted to do the automatic quato adjustments for a group of employees, upon changing the future work-schedule.
    Example:
    An employee had already applied leave for the future period , in which we are changing the 'off' as 'working day'.The counting in the absence days should change automatically. This happing when we do it for one employee, but not for a group of employees.

  • Duet has encountered an error during Approve , Reject Reassign the workflow

    Hi,
    We have implemented DUET with two scenario (LEMA & WOMA) in our organization. When try Approve , Reject or Reassign the Duet work flow Item  Duet has encountered an error . The scenario was working fine earlier. Suddenly the error has start coming. The error is coming in a pop up window. I am attaching the error details from event log.
    Event Type:     Error
    Event Source:     Duet Diagnostics
    Event Category:     None
    Event ID:     0
    Date:          1/04/2010
    Time:          10:49:37 AM
    User:          N/A
    Computer:     xxxxxxxxxxx001
    Description:
    Error in Approve/Reject from Approver Mail.
    Exception message: Attempted to read or write protected memory. This is often an indication that other memory is corrupt.
    Method: Close
    StackTrace:   at Microsoft.Office.Interop.Outlook._MailItem.Close(OlInspectorClose SaveMode)
       at SAP.Office.Apps.Leave.Outlook.LeaveApproverMailInspectorCodeBehind.AfterOnSelectControl(String name, String param)
         =====Additional Information=====
    oba://oba.microsoft.com/outlook?boundItemId=
    Bound Item ID:
    Bound Item Type:
    Correlation ID:
    Process Name: C:\PROGRA1\MICROS3\Office12\OUTLOOK.EXE
    User Name: xx\99901
    For more information, see Help and Support Center at http://go.microsoft.com/fwlink/events.asp.
    Thanks in advance,
    Monirul Islam

    HI Monirul,
    You can get better advice and help in another forum dedicated to Duet only.
    Regards,
    Sangvir

  • Error during approval Process flow in Process controlled workflow

    Hello Experts,
    We are in SRM 7.0 classic scenario using Process controlled workflow.WE recently connected a new backend R/3 system to our SRM system i.e we now have 2 R/3 backend system connected to SRM system
    It is regarding the two new additional account assignment categories that came into picture when we connected the new R/3 backend system to our SRM system, i.e. Asset and Network.
    There seems to be some problem with the approval workflow for those SHC, that have such Acc *** Cats.
    Please find below my obeservations:
    - if you have just one line item in the SHC, and this item is either booked on Asset or on Network, than everything goes fine. After the Acc *** approval, the PR is created in R/3
    - if you have SC with a mix between an "old" Acc *** Cat (Cost Centre, WBS and Order) and one of the "new" Acc *** Cats, than the workflow is not working as required --- the manager, that is responsible for the accounting approval of the two positions (e.g Cost Centre and Asset) gets only one work item in his approval overview --- in that work item, the two positions are there, but the Asset one is grayed out --- so, the Manager approves only the Cost Centre positions and than the SC is no longer with the approver --- if you observe the SC now from the requisitioner point of view, the status of the line items in the approval process overview of both(!) lines is "approved", but the overall status of the SC is still "in approval"
    Can you all experts plz let us know why this is happening and how this can be resolved?
    Any pointers will be highly appreciated.
    Thanks & Regards,
    RKS

    Hi,
    What is Resp. Resolver Name and Decision Type in your Process Level Definition? Did you create custom agent BADI implementation?
    Regards,
    Masa

  • Oracle Service Registry --HTTP 404 Error During Approval & Account activity

    Hello,
    Environment: OSR 11.1.1.2 ; Database : 11g Database ; Embedded HTTP Server; Windows 7 (1 Discover Node and 1 Publisher node).
    I have done the installation of Discovery node and Publishing node . I could access BSC and registry control and could login with admin user and demo users. However, in publishing node, when I try to create account or promote a published provider/service, I am getting a fatal error displayed in the web page.
    Error while creating account in Publish node:
    Fatal error occurs in account management.
    Error while promoting providers,services in Publish node:
    RequestDenied.Automatic context checking has failed. Your approval request has been unsuccessful.
    For both the errors , errorEvents.log shows the following error
    Caused by: javax.xml.messaging.JAXMException: org.systinet.wasp.client.XMLInvocationException: Exception while processing incoming message message. Unable to read server response. Server returned status code: 404 (Not found) (Content-type:text/html):
    *<HTML>*
    *<HEAD>*
    *<TITLE>Error 404 Not Found</TITLE>*
    *<BODY>*
    *<H2>HTTP ERROR: 404 Not Found</H2>*
    *<!-- Padding for IE --><!-*
    I tried to capture the SSL traffic between Publish node and Discover node for the above two activities. Following the is the trace
    POST //uddi/production HTTP/1.1
    User-Agent: Systinet Server for Java/6.0 (Java/1.6.0_18; Windows XP/5.1; build SSJ-6.0-20091204-1155)
    Connection: keep-alive
    SOAPAction: ""
    Content-Type: text/xml;charset=UTF-8
    Content-Length: 230
    *<?xml version="1.0" encoding="UTF-8"?>*
    *<Envelope xmlns="http://schemas.xmlsoap.org/soap/envelope/"><Body><get_userAccount xmlns="http://systinet.com/uddi/account/5.0"><loginName>rews</loginName></get_userAccount></Body></Envelope>HTTP/1.1 404 Not Found*
    Server: Systinet Server for Java/6.0 (Java/1.6.0_18; Windows 7/6.1; build SSJ-6.0-20091204-1155)
    Content-Type: text/html
    Content-Length: 818
    It is trying to post it to the URL "/uddi/production", which seems to be unavailble. Not sure whether this is a configurable entry or is it missing in my installation.
    Appreciate any help in understanding and resolving the problem.
    Thanks

    I tried using Weblogic application server instead of Embedded HTTP server. However the issue remains the same. Followng is the packet capture of traffic when account creation or approval acitivity is carried out in Publish node
    The issue seems to be with *//* before *'uddi/production'* string in the POST request.
    ##Packet capture -- Start##
    POST /registry//uddi/production HTTP/1.1_
    User-Agent: Systinet Server for Java/6.0 (Java/1.6.0_18; Windows XP/5.1; build SSJ-6.0-20091204-1155)
    Connection: keep-alive
    SOAPAction: ""
    Content-Type: text/xml;charset=UTF-8
    Content-Length: 231
    <?xml version="1.0" encoding="UTF-8"?>
    <Envelope xmlns="http://schemas.xmlsoap.org/soap/envelope/"><Body><get_userAccount xmlns="http://systinet.com/uddi/account/5.0"><loginName>test1</loginName></get_userAccount></Body></Envelope>HTTP/1.1 404 Not Found
    Date: Mon, 28 Feb 2011 19:37:09 GMT
    Server: Systinet Server for Java/6.0 (Java/1.6.0_18; Windows 7/6.1; build SSJ-6.0-20091204-1155)
    Content-Length: 0
    X-Powered-By: Servlet/2.5 JSP/2.1
    ##Packet capture -- END##
    Anybody have come across this problem?

  • MDM 5.5 SP02 Error during import of Customer Data

    Hello,
    I am a beginner in MDM 5.5.
    I tried to import the customer data via the import manager. I got the error message:
    <b>" E1KNA1M wasn't found in the source "</b>
    What's wrong with this repository ? I used the DEBMDM06 for extraction out of an R/3 4.7. The XML-file includes this segment !
    Can someone help me ?
    Thanks in advance.
    Michael

    Ronen,
    Thanks for quick response.
    Let me fill you in with the my environment info. I am using MDM SP 02 with SQL Server on Windows XP.
    I am following the SAP NetWeaver MDM 5.5 SP02
    Scenario Configuration Guide to import customer Data from R/3 to MDM repository via XI, idoc.
    According to guide I was able to extract the Customer data from R/3, and using XI (and FTP) I was able to get the data file customer.dat (which is in XML format).
    In console I tried to setup the client system as a you specified, but here is what I see in my MDM console
    Name: MDC (R/3 4.6 DEBMDM05)
    Code: MDC (R/3 4.6 DEBMDM05)
    Client System:  Import [ for this field it shows me Import, Export, Import/Export options only and not the inbound/outbound as you specified]. If I select option Import then only it will show this Client System while defining the Port.
    For port definition it shows following fields
    [Port]
    Name : R3Import
    Code : R3Import
    Type : Inbound
    Data Definition:  [ dropdown options are Access, Excel, XML, Flat Text, XML Schema. Were you referring this field as the 'Format' field.]
    XML Schema: I selected DEBMDM05 from dropdown.
    Client System : MDC (R/3 4.6 DEBMDM05)
    Map:  [ dropdown does not have any values to select and I can not type in that field]
    If you are still with me, what are the correct settings for Client system and port?
    How those settings are being used in Import Manager?
    On Connect to Source dialogue screen what should I select/enter for following fields?
    Type :  [options are Access, Excel, ODBC, Oracle, Port, SQL Server, XML, XML Schema]
    Should I be using Client System and Port or  XML/XML Schema????
    Client System: MDC (R/3 4.6 DEBMDM05)
    Port :  [ Why this value 'R3Import' is grayed out??? ]
    Please help.
    Abhay

  • Cannot Create ramdisk error during Upgrade (Scratchconfig isnt working?)

    I am trying to use Update Manager to upgrade ESXi 5.1 to ESXi5.5. I am getting the error "Cannot create a ramdisk of the size 333mb to store the upgrade image."
    The ESXi has plenty of disk/ram left.
    I have researched and found an issue where the scratchconfig was pointing at a non-existent device. I set the scratchconfig and rebooted.
    After the reboot in the new folder I did see the various var,core,logs etc folders, however  I still get this Cannot create ramdisk error when trying to upgrade.
    I tried from various articles /vmfs/volumes/datastore uuid/.locker-host and /vmfs/volumes/datastore uuid/scratch, both with the same result.
    I confirmed I can write in these new folders.
    Everytime the log still says  ERROR', test 'SPACE_AVAIL_ISO', expected '349773754', found '0' despite the scracthconfig.
    What I am doing wrong?

    It turns out another group had created another administrator account and removed administrator access from the root account.
    /etc/vmware/hostd/authorization.xml shows that the root user has lost the 'Administrator' role:
    <ACEData id="10">
    <ACEDataEntity>ha-folder-root</ACEDataEntity>
    <ACEDataId>10</ACEDataId>
    <ACEDataIsGroup>false</ACEDataIsGroup>
    <ACEDataPropagate>true</ACEDataPropagate>
    <ACEDataRoleId>-5</ACEDataRoleId>
    <ACEDataUser>root</ACEDataUser>
      </ACEData>
      When ACEDataRoleId is set to '-1' this indicates Administrator. In your case, the Role has been set to -5 which is not a defined role and likely hardened to do nothing.

  • Customizing Error in Work Schedule

    Hello Experts,
    I am getting the following error when running time evaluation, "Customizing error in work schedule rule 4 w1 52 REG1/2UP", 2 personnel numbers are being rejected.  These two employees work during the summer.  We reorg them to put them on leave, Inactive,  so no acurals occur during the time they are not on the payroll.  When these employees return, we reorg them back to Active. This time when we brought them back to active, we get the above error during time eval.  I do not have  a work schedule rule 4 w1 52 REG 1/2UP in table T508a.  I do have work schedule rules 1 and 2 with w1 52 REG 1/2UP. These two emmployees  have work schedule rule 1 w1 52 REG 1/2UP.  I have changed the payroll status for retro calculation and I've checked that the employees do have IT0007.  Does anyone know where to look to see how the system is coming up with work scheudule rule 4 and how to resolve this issue?  Any suggestions are appreciated and points will be awarded to a solution provider.  Thanks.

    I have ran into this many times at work.  Generally for us, this happens when an employee is moved into a new personnel area on infotype 1, where they require a different work schedule rule.  However, infotype 7 was not updated for that same validity period and they have the incorrect work schedule.
    Example:
    Pers Area HYDZ
    requires work schedule ZIND
    Pers Area PSCC
    requires work schedule ZDTA
    The employee is in pers area PSCC until 12/31/9999 (with ZDTA on infotype 7).  They transfer the employee into HYDZ effective 6/1/2008.  However, infotype 7 was not updated and still has ZDTA.  As a result, the customizing work schedule error appears during time evaluation.  We have to create the infotype 7 record effective 6/1/2008 with the ZIND work schedule rule.
    John.

  • Error during Parforeach dynamic processing!

    Hello All:
    Hope to have some input to an unsolvable error in the workflow template that I have developed.
    I have developed a workflow in which I am using a block with “parforeach” dynamic parallel processing and in that block I am displaying notification of absence. IN the block I have created a task which displays notification of absence.
    I have maintained User_ID(this is a multiline container element which has multiple user ids) as my parallel processing multi-line element so that all the users entered in the User_ID element can access the workitem. Now I was able to create different work items for all the users entered , but when any one of the user is accessing the work-item, the work flow is getting in the error status with the following error log messages.
    Flow item Test Worflow for dynamic block (Workflow 000000033121) has the status "Error" 
    Error when starting work item 000000033121                                              
    JOIN entry missing for fork on node 0000000008                                          
    Error when loading the callback component (work item 000000033126)                      
    Error during result processing of work item 000000033126                                
    Work item 000000033121: Object FLOWITEM method EXECUTE cannot be executed               
    Error when loading the callback component (work item 000000033126)                      
    Error when loading the callback component (work item 000000033126)                      
    User_ID is entered as Multiline element.
    In the control tab of block, (Note: USER_ID is the multielement)
    &USER_ID[&_WF_PARFOREACH_INDEX&]&    ->    &_USER_ID_LINE&
    In the “display absence” step of block, I am assigning in the “Agents” area of the control tab as: &_USER_ID_LINE&
    Now, when I execute the workflow, I am able to see that the work-items are sent to the respective agent inboxes given in the USER_ID element and when I execute(display absence form) any one of it , the workflow is set to error status giving the above mentioned errors.
    Please help me. I am missing any binding elements??
    Do I need to add any JOIN in my dynamic step??
    Regards,

    Hi Satya,
    Hmmmm.... well you've correctly assigned the multiline container element and the binding between workflow and container.  However the way you have assigned the agents is a little suspicious - as it relies on a guaranteed order of processing.  That might be what is confusing the workflow.
    Try the following instead.
    a) Put your task into a subflow.
    b) Call the subflow using the parforeach processing
    I think you'll find this less problematic.
    Also be careful to watch what you are passing back from the task to the workflow - you don't want any deadlocks here.  Either don't pass anything back, or pass back the values into  a table using the APPEND binding option rather than the usual assign (just select the arrow button in the binding).
    Regards,
    Jocelyn

  • HR and Personal Work Schedules

    Hi Gurus
    I am new to BW and I am supporting a new BW installation. I have been on the course BW310 and so understand basic concepts.
    The problem is that the BW process chain hangs each day because one of the processes doesnt finish. The error is that a 'Personal Work Schedule for personnel xxxx was not found'. It started with one person but has risen to 3 people. I have been shown the work schedules in R/3 and they are setup correctly (allegedly).
    I want to trace the path the data takes from R/3 to BW and the place where it errors. I would like to run the packages/DTPs by hand (not thru process chain) to recreate the error. Can someone tell what to look for in SBIW and the corresponding datasource in BW please.
    All help appreciated.
    Thanx
    Asif

    Somebody must have an idea of where to start debugging this problem.
    Regards
    Asif

  • Generate period work schedule

    Hi All,
    While uploading data through bdc in foreground for infotype 14, i have got error message as " Generate period work schedule G2DH for 2/M3/01 in 01/2011 " . due to this error data is not getting uploaded but when i uplaod the same data through pa30 it is getting uploaded properly. Can you please tell me how to sort out this error ?.
    thanks.

    GNRLWSR for 2/I1/50 in 11/2010
    here 2 is ESG  I1 is holiday Calendar 50 is PGA  GNRL
    Check dates along with the groupings in the configuration properly
               Type this error in search forum you will find lot of threads

  • The Question about mess "Customizing Error in Work Schedule Rule ..."

    Dear all,
    I run the Start-Payroll  and I getting an error " Customizing Error In WSR for that Personal Number"
    I configuration all of Time Management with start date is 01.01.2000 and when I run Payroll on Payroll period is 01/2000 with start date is 01.01.2000 to 31.01.2000 for Employees hiring on 01.01.2000 then I have an error " Customizing error in work schedule rule .. .. ... ..".
    But I can run the payroll period on 02/2000 with start date is 01.02.2000 to 29.02.2000 for Employees hiring on 01.02.2000.  form 02/2000 it is okies.
    Please help me  solve about my problem
    Thank for your answers
    Regds
    Huyen Nguyen

    Customizing Error in Work Schedule Rule
    where are u getting this error
    if it  is PY  log
    Check GENPS this error will come under this Function
    it is the combination of
    ur Holiday calendar
    Employee Sub Group
    Personal Sub area Grouping
    and ur Daily work Schedule Rule
    Check the Start dats an end dates fo all the above Settings along with their Groupings in table V_T508A

  • Customizing error in Work Schedule Rule

    Dear Consultant,
    One of the employee left on 25th of a month. His termination process was run from 26th. Thereafter his Time sheet was uploaded upto 25th. The system accepts his attendance upto 24th but for 25th it gives error as "Customizing Error in Work Schedule Rule XXXXX". When his Personal work schedule was checked it shows expected working hours as 8. Then why it does not accept the attendance through time sheet?
    Nothing can be wrong with WS Rule as it is still working fine for all others. Also when the time sheet is uploaded first & then the employee is terminated, it works fine. then why time sheet gives error only for the last day?
    Regards
    Bindumadhav

    Hi
    Pls check the action infotype 0000 for him
    normally the if person is going to releive on say 25th ,then we have to give the leaving action date as 26 th as per SAP
    Scenario.
    consider his doj is 01.05.2006
    if u done the leaving action on 26th by mentioning the date 25.09.2009
    sap close him by 24th
    and the record stored as below
    01.05.2006  to 24.09.2009
    delete the action and perform w.e.f 26 th  then it will take as below
    01.05.2006 to 25.09.2009
    then u can upload time events
    hope it will solve
    with regards
    partha
    keep sharing and learning

  • Customizing error in work schedule rule 2 D2 40 RRTHOLR2

    Hello Experts,
    While simulating payroll , I am getting this error.
    Customizing error in work schedule rule 2 D2 40 RRTHOLR2
    esgrouping - 2
    Holiday Calender - D2
    Personnel Sub area grouping - 40
    WSR - RRTHOLR2
    my dws are starting with 1.4.2004
    my pws are starting with 1.4.2004
    my calender is between 2004-2015
    and created Work schedule for 2004-2015
    still getting the same error
    Will you please help me out to solve this ?
    Thanks And regards
    Jaydeep Jadhav

    Hi All,
    I too faced the same type of error. Below are the steps for the solution.
    1. The error comes due to retro run with incorrect workschedule rule in IT0007.
    2. You can check table  V_T508A or V_001P_ALL to view the complete groupings of your personnel area/subarea,workschedule rule, Holiday cal,
    3. Copy the existing record of IT0007>give the retro effective period as start date and enter the end date>select the populated workschedule rule from the drop down option-->save the record.
    4. Run the psyroll in simulation mode and check the status.
    Hope it may help you..
    Best Regards
    Satya

Maybe you are looking for