Error in cProjects 4.0

Hi all ABAP experts..
I am working on cProjects 4.0.I have created project in it and trying to do costing.but when i click on Costing button, error is appearing as:
"Internal error: Calling costing leads to exception"
and when checked in ST22, it says: CALL FUNCTION_NOT_FOUND and
Function module "CRM_MKTPL_OL_LOAD_OBJECTS" not found.
Plz. help asap
Tim
[email protected]

Hi Tim
I do not find this function in our xRPM system. So it looks like the program is probably doing an RFC call to another SAP system. In ST22, look at the 'Source code extract' to see the statement where it is short dumping.
Regards

Similar Messages

  • Status Report Preview Error in cProjects

    Hi Experts,
    I have created one Project Type in cProjects, with reference to Project Type i have created Project with all the elements. Next step is i want to see the Status Report of my Project. When i press Preview button i am getting the following error message:
    "Error occurred when generating the print preview (function module: /1BCDWB/SM00000010)
    ADS: SOAP Runtime Exception: CSoapExceptionTransport :(100101)  "
    Kindly help me in resolving the above issue. Thanks in Advance.
    regards,
    Sridhar.
    Edited by: SridarReddy on Dec 1, 2009 9:33 AM

    Hi Daniel,
    I have the same problem.
    When i press Preview button i am getting the following error message:
    "Error occurred when generating the print preview (function module: /1BCDWB/SM00000010)"
    Could you please tell me what configuration changes you have done on ADS server?
    Regards
    Ramesh

  • Accounting Error in cProjects

    Hi,
    When i calculate the costs i get the following error - -
    1) An exception with the type CX_SY_DYN_CALL_ILLEGAL_ TYPE occurred, but was neither handled locally, no r declared in a RAIS.
    2) Costing data may not be up-to-date.
    3) Internal error: Calling costing leads to exception.
    When i checked in the transaction ST22 i get the error as -
    a) CRM_MKTPL_OL_LOAD_OBJECTS not found in the library.
    b) An error in the ABAP application program.
    c) current ABAP application program ' SAPMSSY1' had to be terminated.
    What could be the possible reason and the solution to it.
    Regards,
    Amit
    [email protected]
    9820502246

    Hi,
    Please check the settings made in the -
    1) Connection to external systems - Accounting Integration -
    Make Settings in ERP System.
    2) If you are using Multilevel Controlling for your project type - choose the correct Costing Variant ( choose - PS06) in the transaction - Create and Change Controlling Scenario.
    3) In the settings for Easy Cost Planning enter the valid Costing Variant.
    Regards,
    Amit

  • CProject - The settings for Accounting integration contain errors

    Hi,
    I got error message "The settings for Accounting integration contain errors"  from cProject page when I choose controlling method  (Project Role, Automatic).
    If I choose other controlling method then this the error message disappear.
    Maybe some thing wrong while setup Role Type?.
    Please help!
    Thank you
    Long Nguyen

    Hi,
    Are you using MULTILEVEL CONTROLLING ( PROJECT ROLE , AUTOMATIC)
    that means
    Multilevel Controlling (Project Role, <b>Automatic</b>): In this method, the system automatically creates a PS project definition for the project definition and a WBS billing element at the first level of the hierarchy. More WBS elements are created for the project roles of the cProjects projects.
    Multilevel Controlling (Project Role, <b>Manua</b>l): In this method, a user has to create the PS project in the ERP system. The user then has to assign the project roles of a cProjects project to the WBS elements of this PS project manually in cProjects.
    thanks
    sunil

  • Error occurred in accounting - check the costing in the ERP system

    Hi Experts,
    i am experiencing error in cproject preliminary costing. please refer below error.
    i have the choosed the costing variant as ad hoc cost estimation in controlling for easy cost planning. i need to create a quotation from cproject.
    Please sugeest me what is missing?
    thanks in advance,
    Prabu
    Error occurred in accounting - check the costing in the ERP system
    Message no. DPR_FIN_GECCO026
    Diagnosis
    Errors occurred in costing in the ERP system.
    Procedure
    Check the costing log for costing in the ERP system:
    Call costing:
    If it is preliminary costing, the hyperlink for calling the ad hoc cost estimate can be found in the Costing view.
    If it is costing for an account assignment object (after transfer), the hyperlink for calling Easy Cost Planning can be found in the Services view.
    In costing, choose Revaluate All Items. The costing log is then generated with the error messages.
    Procedure for System Administration
    This message has the number DPR_FIN_GECCO026.

    Hi,
    Check the configuration.
    Create and Change Controlling Scenario
    Define Controlling Scenario
    Settings for Easy Cost Planning
    Assign Cost Elements and Activity Types
    Regards
    Ravindra

  • Object Project Definition could not be created

    Hi Experts,
    I am facing some trouble with multilevel controlling integration. Whenever I transfer a project I am getting the following error in cProjects:
    Costing data may not be up-to-date  Display Help
    Error occurred in accounting - see controlling cockpit (cProjects)  Display Help
    In the Controlling Cockpit I find the following error:
    Message Text
    Object Project Definition TEST_01 could not be created
    Technical Data
    Message type__________ E (Error)
    Message class_________ CNIF_PI (BAPI Notifications of Project System)
    Message number________ 007
    Message variable 1____ Project Definition
    Message variable 2____ TEST_01
    Message variable 3____ 
    Message variable 4____ 
    Message Attributes
    Level of detail_______ 
    Problem class_________ 
    Sort criterion________ 
    Number________________
    Could you please provide some ideas on this?
    Thanks a lot!!
    Neil
    Edit: Any idea on this?
    Edited by: Neil Billqvist on Nov 6, 2009 2:28 PM

    Hi all,
    I have reviewed the customizing and I cannot find anything missing.
    Just to add some more information, if I go to the controlling cockpit, select the "Definition could not be created" error, and click in the autocheck option the PS project IS correctly created!!!
    Do you have any ideas on this or on how can I track down the root error?
    Thanks!
    Neil

  • Erros while staffing with WFD

    Hi guys,
    I'm trying to use WFD for resource staffing but I always get the following error messages:
    Error icon - Error in cProjects; Maximum allowed required capac ity was exceeded
    Warning icon - cProject warning; Time was converted from 5,00 MIN to 0,01 FTE - rounding errors are possible
    Warning icon - Required/Planned capacity of Demand Developer does not match
    In the above case I was staffing a person for 5 minutes (to be sure that I wasn't overstaffing), while the required capacity of the Demand in WFD shows me 4 FTE's (consulting days of 8 hours each day). I tried that with two persons, one that has 10:29 hours of availability and one that has 0:00 hours of availability, and in both cases I get the same messages.
    In cProjects I had set the "Required Capacity" of role Developer to "4,0 Con.Day" (which was reflected to WFD). And I assigned the role a task with 3 FTE's of work, so the "Total Work" of that role shows me "3,0 Con.Day".
    Does anyone know what's wrong? Required capacity of the demand is 4 FTE, and I was trying to staff someone for 5 minutes, which was converted to 0,01 FTE and is way smaller than 4 FTE. So I didn't understand why I got the first error message in this case. And looking at the third error message, what does it mean?
    Thanks!

    Hi!
    Check SAP Note 866776:
    <h6>The time units that can be transferred from RPA to cProjects must be defined as allowed time units in cProjects. You must specify at least those time units in cProjects that are marked as primary units of measurement for the ISO code.
    Checking primary units of measurement and ISO code:
    Transaction cuni:
    On the detail screen under ALE/EDI, check the primary source code selection for each time unit.
    Allowed time units in cProjects:
    Customizing:
    Collaboration Projects > Basic Settings > Define Time Units</h6>
    We have such problem, when we used time unit "H - Hour". After we have set "Hr - Hours" the issue have solved.
    Regards,
    Konstantin Melnik

  • Error while opening the projects in cProjects

    Hi,
        I am encountering a problem while opening the already created projects in cProjects. The error type is
    The following error text was processed in the system DVR : Type conflict when calling a function module.
    The error occurred on the application server and in the work process 0 .
    The termination type was: RABAX_STATE
    The ABAP call stack was:
    Method: IF_DPR_OBL_PROXY~LOAD_OBJECT_LINKS of program CL_DPR_OLR3_EASYDMS===========CP
    Method: IF_CGPL_ASSIGNMENT_PERSISTENCY~FETCH of program CL_DPR_OBL_PERSISTENCY========CP
    Method: LOAD of program CL_CGPL_ASSIGNMENTS===========CP
    Method: LOAD of program CL_CGPL_PROJECTS==============CP
    Method: LOAD of program CL_CGPL_ENTITIES==============CP
    Method: LOAD_PROJECTS of program CL_DPR_APPL_OBJECT_MANAGER====CP
    Method: LOAD_OBJECTS_OF_OBJECT_TYPE of program CL_DPR_BAPI_SERVICES==========CP
    I request you all to help me out solve this issue if you know.
    Regards
    Nachimuthu Ramesh

    Hi Vivek,
       Thanks for responding to my question. I made changes as per your suggestion and now I am not getting the error message whatever I forwarded. But I am getting another error message 'You require authorization to display Project`. Pls help me out to solve this issue.
                   Thanking you
    Regards,
    N.Ramesh

  • Error while saving project in cProjects

    Hello,
    I am getting following error while saving a project in cProjects-
    Access via 'NULL' object reference not possible.
    Details of the error are given below-
    Can somebody please help me resolve this error?
    Thanks and regards,
    Milind Dumbre
    Error analysis
         An exception occurred that is explained in detail below.
         The exception, which is assigned to class 'CX_SY_REF_IS_INITIAL', was not
          caught in    procedure "FINALIZE_OBJECT_BEFORE_SAVE" "(METHOD)", nor was it propagated by a
         RAISING clause.
        Since the caller of the procedure could not have anticipated that the
        exception would occur, the current program is terminated.
        The reason for the exception is:
        You attempted to use a 'NULL' object reference (points to 'nothing')
        access a component (variable: "LR_CALC").
        An object reference must point to an object (an instance of a class)
        before it can be used to access components.
        Either the reference was never set or it was set to 'NULL' using the
        CLEAR statement.

    Hi Milind,
    You may check the settings by navigating to the following path
    IMG --> Collaboration Projects --> Connection to external systems --> Accounting Integration
    -->  Define Object Links for Accounting Integration.
    Check if the RFC destination has been correctly maintained. You may check the correctness of the RFC settings via SM59.
    Let me know if  this helps.
    Regards,
    Vivek Pandey

  • Error while creating projects in SAP-PS from cProjects

    Hi,
    Need suggestion on creating projects in SAP-PS from cProjects. There is cProjects & SAP-PS interface.The requirment is to create project in SAP-PS from cProjects. All the configuration has done in cProjects & PS module also. While saving the projects & checking the accouting the following error & project is n't creating.
    1.Combination company / CO area is invalid Message no. KO124
    2.Acct assignment determination is not poss.in the account assgnmnt manager
    Message no. IAOM220
    3.Only one error message is transferred from the log to the cockpit
    Message no. IAOM_CPROJECTS029
    I would like to request all to suggest in fixing the issue.
    Thank you for your coopearation.
    Regards,
    Ranjan

    Hi Ranjan,
    If the companay code does not belong to the Co area,  the system will certainly raise an error message. The question is, where do the values come from.
    Woud you please check the customizing in ERP system, if you can find the inconsistence:
    1. Customizing of the Proj.Profile under 'Create Project Profile' , SAP standard delivered is CPR0001, may be replaced by customer,
    Which Co-area & company code are used. In Tab 'organization'
    2. Which responsible Org.unit is maitained at involved cProject, to which co-area or company codes is this org.unit assigned.
    3. If the Badi under the
    Integration with Other mySAP.com Components ->
    Collaboration Projects -> Controlling ->  Business Add-Ins (BAdIs),
    which set the org. information hardly via Badi method.
    Kind regards,
    Zhenbo

  • Error while creating project automatically from cProjects

    Hi,
    Need suggestion on creating projects in SAP-PS from cProjects. There is cProjects & SAP-PS interface.The requirment is to create project in SAP-PS from cProjects. All the configuration has done in cProjects & PS module also. While saving the projects & checking the accouting the following error & project is n't creating.
    1.Combination company / CO area is invalid Message no. KO124
    2.Acct assignment determination is not poss.in the account assgnmnt manager
    Message no. IAOM220
    3.Only one error message is transferred from the log to the cockpit
    Message no. IAOM_CPROJECTS029
    I would like to request all to suggest in fixing the issue.
    Thank you for your coopearation.
    Regards,
    Ranjan

    Hi,
    The neccesary configuration for cProjects & SAP-PS interface are as follows.
    1. Project Types in cProjects, Object types, Organisation unit with Org structure in line with project profile
    2. Activate Accounting integration
    3. Object types for object link (WBSE in this case)
    4. Accounting integration using cost collector
    5. Easy cost planing settings both in R/3 systems & cProjects
    6. Project profile configuration in R/3 (cProjects standard)
    7. CO Scenario maintainance view determination (Multi level controlling-Project role, automatic)
    All the enterprise structure assignments should be same in cProjects & R/3.
    Hope this may help you.
    Regards,
    Rakesh Pradhan

  • Error when attaching checklist reference to cProject structure

    Hi,
    I have created a checklist template for cProjects. When attaching the checklist reference to a cProject project I am able to select the checklist, but when pressing the continue button, I get an error message:
    The following error text was processed in the system: Invalid parameters were transferred when calling.
    The termination type was: RABAX_STATE
    When checking the runtime error in ST22 the Exeption is CX_DPR_FATAL_ERROR.
    The ABAP call stack was:
    Method: CHECK_TEMPLATE_FOR_REFERENCING of program CL_DPR_CHECKLIST_T============CP
    Method: DO_ACTION_SET_REF_CHECKLIST of program CL_DPR_API_CHECKLIST_R========CP
    Method: DO_ACTION of program CL_DPR_API_CHECKLIST_R========CP
    Method: IF_DPR_PROVIDER_ACTION~DO_ACTION of program CL_DPR_API_APPLICATION_OBJECT=CP
    Method: DO_ACTION of program CL_DPR_API_BUSINESS_OBJECT====CP
    Method: IF_DPR_PROVIDER_ACTION~DO_ACTION of program CL_DPR_API_BUSINESS_OBJECT====CP
    Method: IF_DPR_CORE_SERVICE_PROVIDER~DO_ACTION of program CL_DPR_API_CPROJECTS_CSP======CP
    Method: IF_DPR_CORE_SERVICE_ACCESSOR~DO_ACTION of program CL_DPR_API_CORE_SERVICE_MNGR==CP
    Method: REPORT_ACTIONS of program CL_DPR_UI_CHANGE_MANAGER======CP
    Method: REPORT_ACTION of program CL_DPR_UI_LOG_DETAIL==========CP
    What could cause this problem? I have checked the SAP notes related to this. There seem to be some problems with summary tasks (note 1014441) and roles (notes 1023248, 878905), but my error messages seem to be different.
    Iu2019m using SAP RPM 4.5 (CPR xRPM 450_700: Support package 0009)
    Any help appreciated

    Did you replicate the datasource ?

  • Error while clicking the phase in Standard collaboration link of Cprojects

    Hi,
    We are facing a problem in SAP Cproject Tool. When ever we are clicking on a phase,the following error text was processed in the system:
    'An exception with the type CX_SY_CONVERSION_OVERFLOW occurred, but was neither handled locally, nor declared in a RAISING clause'. Please let me know how to proceed.
    Thanks.

    See Error display in Room Administration

  • Error while importing MS project into cProject

    Hi
    I am getting the below error while importing MS project client file or XML file into cProjects.
    dpr_shared087
    Logon language becomes original language
    Message no. DPR_SHARED087
    Diagnosis
    The logon language is defined as a possible text language in Customizing for Collaboration Projects under Specify Text Languages. Therefore, it is valid.
    System Response
    The logon language becomes the original language of the new object that was created.
    Kindly suggest what configuration data if any is missing.
    Regards
    Srikrishna

    Hi
    I am getting the below error while importing MS project into cProject.
    Error occurred when importing from Microsoft Project
    Message no. DPR_UI_BSP116
    Diagnosis
    When a project is imported from Microsoft Project, the system generates an XML string during internal processing. A project is then created in cProjects from this string.
    The XML string contains errors because the values from Microsoft Project were transferred without verification.
    Procedure for System Administration
    Notify SAP or call the cProjects application with the "DebugMode=X" query string and carry out the import again.
    The XML string that was generated temporarily is then validated against the cProjects XML schema. The error message from the XML parser is then displayed in the popup.
    Kindly suggest, if the below steps for importing MS project is ok or not?
    step 1: Create project in MS project with tasks.
    step 2: Maintain maping fields of MSP in cProject configurat
    step 3: Import MPP file into cProject using "Import" button.
    step 4: I am getting the above error while importing the MPP file.
    Regards
    Srikrishna

  • CProjects: Error when check in a big document (100 and more MB )

    Hello,
    when I try to check in a big document (in my case I made my own document which is about 100 MB) in cProjects the current cProject webpage turns to "This page could not be displayed...".
    The exact path where I tried to check in the document is:
    Projects -> Structure -> Documents -> New Document
    To see if its an abap coding error I set a breakpoint at Web Dynpro Comp. "DPR_Document" View: "VI_UPLOADDETAIL" Method: "ONACTIONUPLOAD". Further I tried it in the Method "new_doc_create( )" of the component-controller.
    The point is:
    The abap coding which is called if you click on the "Check in"-button is NOT called if the document is about 100 or more MB. (I don't tried it with smaller documents e.g. 60 MB, but never mind about this because document with a size of 100 or more MB should work too.)
    Furthermore I had a look at the trace file which can be found at SMICM -> Goto -> Trace File -> Display All. Every time I tried to check in such a big document three error messages appear there with the following content:
    [Thr 1396738992] *** ERROR => request too big {00047108} [http_plg_mt.c 1969]             
    [Thr 1396738992] Address    Offset  REQUEST:                                              
    [Thr 1396738992]                                                                          
    [Thr 1396738992] 0x4d78895c  000000  504f5354 202f7361 702f6263 2f776562  POST /sap/bc/web
    [Thr 1396738992] 0x4d78896c  000016  64796e70 726f2f73 61702f63 70726f6a  dynpro/sap/cproj
    [Thr 1396738992] 0x4d78897c  000032  65637473 2f3f7361 702d636f 6e746578  ects/?sap-contex
    [Thr 1396738992] 0x4d78898c  000048  7469643d 53494425 xxxxxxxx xxxx2533  tid=SID%xxxxxx%3
    [Thr 1396738992] 0x4d78899c  000064  xxxxxxxx xxxxxxxx xxxxxxxx xxxxxxxx  xxxxxxxxxxxxxx%3
    [Thr 1396738992] 0x4d7889ac  000080  6130314f 4e6d6551 61724445 767a6978  a01ONmeQarDEvzix
    [Thr 1396738992] 0x4d7889bc  000096  525a7a45 48536763 58637863 76325738  RZzEHSgcXcxcv2W8
    [Thr 1396738992] 0x4d7889cc  000112  45786f73 302d5835 6a2d4e45 57204854  Exos0-X5j-NEW HT
    [Thr 1396738992] 0x4d7889dc  000128  54502f31 2e310d0a 61636365 70743a20  TP/1.1..accept: 
    [Thr 1396738992] 0x4d7889ec  000144  696d6167 652f6769 662c2069 6d616765  image/gif, image
    [Thr 1396738992] 0x4d7889fc  000160  2f782d78 6269746d 61702c20 696d6167  /x-xbitmap, imag
    [Thr 1396738992] 0x4d788a0c  000176  652f6a70 65672c20 696d6167 652f706a  e/jpeg, image/pj
    [Thr 1396738992] 0x4d788a1c  000192  7065672c 20617070 6c696361 74696f6e  peg, application
    [Thr 1396738992] 0x4d788a2c  000208  2f782d73 686f636b 77617665 2d666c61  /x-shockwave-fla
    [Thr 1396738992] 0x4d788a3c  000224  73682c20 6170706c 69636174 696f6e2f  sh, application/
    [Thr 1396738992] 0x4d788a4c  000240  766e642e 6d732d65 7863656c 2c206170  vnd.ms-excel, ap
    [Thr 1396738992]                                                                          
    [Thr 1398135728] Mon May 26 09:19:17 2008                                                 
    [Thr 1398135728] *** ERROR => request too big {00087109} [http_plg_mt.c 1969]             
    [Thr 1398135728] Address    Offset  REQUEST:                                              
    [Thr 1398135728]                                                                          
    [Thr 1398135728] 0x4d7688ec  000000  504f5354 202f7361 702f6263 2f776562  POST /sap/bc/web
    [Thr 1398135728] 0x4d7688fc  000016  64796e70 726f2f73 61702f63 70726f6a  dynpro/sap/cproj
    [Thr 1398135728] 0x4d76890c  000032  65637473 2f3f7361 702d636f 6e746578  ects/?sap-contex
    [Thr 1398135728] 0x4d76891c  000048  7469643d 53494425 xxxxxxxx xxxx2533  tid=SID%xxxxxx%3
    [Thr 1398135728] 0x4d76892c  000064  xxxxxxxxx xxxxxxxx xxxxxxxx xxxxxxxx  xxxxxxxxxxxxxx%3
    [Thr 1398135728] 0x4d76893c  000080  6130314f 4e6d6551 61724445 767a6978  a01ONmeQarDEvzix
    [Thr 1398135728] 0x4d76894c  000096  525a7a45 48536763 58637863 76325738  RZzEHSgcXcxcv2W8
    [Thr 1398135728] 0x4d76895c  000112  45786f73 302d5835 6a2d4e45 57204854  Exos0-X5j-NEW HT
    [Thr 1398135728] 0x4d76896c  000128  54502f31 2e310d0a 61636365 70743a20  TP/1.1..accept: 
    [Thr 1398135728] 0x4d76897c  000144  2a2f2a0d 0a726566 65726572 3a206874  */*..referer: ht
    [Thr 1398135728] 0x4d76898c  000160  74703a2f xxxxxxxx xxxxxxxx 7764662e  tp://xxxxxx.wdf.
    [Thr 1398135728] 0x4d76899c  000176  7361702e 636f7270 3a353030 36362f73  sap.corp:50066/s
    [Thr 1398135728] 0x4d7689ac  000192  61702f62 632f7765 6264796e 70726f2f  ap/bc/webdynpro/
    [Thr 1398135728] 0x4d7689bc  000208  7361702f 6370726f 6a656374 732f3f73  sap/cprojects/?s
    [Thr 1398135728] 0x4d7689cc  000224  61702d63 6f6e7465 78746964 3d534944  ap-contextid=SID
    [Thr 1398135728] 0x4d7689dc  000240  xxxxxxxx xxxxxxxx xxxxxxxx xxxxxxxx  %xxxxxx%xxxxxxxx
    [Thr 1398135728]                                                                          
    [Thr 1395682224] Mon May 26 09:19:18 2008                                                 
    [Thr 1395682224] *** ERROR => request too big {0008710c} [http_plg_mt.c 1969]             
    [Thr 1395682224] Address    Offset  REQUEST:                                              
    [Thr 1395682224]                                                                          
    [Thr 1395682224] 0x4d7688ec  000000  504f5354 202f7361 702f6263 2f776562  POST /sap/bc/web
    [Thr 1395682224] 0x4d7688fc  000016  64796e70 726f2f73 61702f63 70726f6a  dynpro/sap/cproj
    [Thr 1395682224] 0x4d76890c  000032  65637473 2f3f7361 702d636f 6e746578  ects/?sap-contex
    [Thr 1395682224] 0x4d76891c  000048  7469643d 53494425 xxxxxxxx xxxx2533  tid=SID%xxxxxx%3
    [Thr 1395682224] 0x4d76892c  000064  xxxxxxxx xxxxxxxx xxxxxxxx xxxx2533  xxxxxxxxxxxxxx%3
    [Thr 1395682224] 0x4d76893c  000080  6130314f 4e6d6551 61724445 767a6978  a01ONmeQarDEvzix
    [Thr 1395682224] 0x4d76894c  000096  525a7a45 48536763 58637863 76325738  RZzEHSgcXcxcv2W8
    [Thr 1395682224] 0x4d76895c  000112  45786f73 302d5835 6a2d4e45 57204854  Exos0-X5j-NEW HT
    [Thr 1395682224] 0x4d76896c  000128  54502f31 2e310d0a 61636365 70743a20  TP/1.1..accept: 
    [Thr 1395682224] 0x4d76897c  000144  2a2f2a0d 0a726566 65726572 3a206874  */*..referer: ht
    [Thr 1395682224] 0x4d76898c  000160  74703a2f 2fxxxxxx xxxxxxxx xxxx662e  tp://xxxxxx.wdf.
    [Thr 1395682224] 0x4d76899c  000176  7361702e 636f7270 3a353030 36362f73  sap.corp:50066/s
    [Thr 1395682224] 0x4d7689ac  000192  61702f62 632f7765 6264796e 70726f2f  ap/bc/webdynpro/
    [Thr 1395682224] 0x4d7689bc  000208  7361702f 6370726f 6a656374 732f3f73  sap/cprojects/?s
    [Thr 1395682224] 0x4d7689cc  000224  61702d63 6f6e7465 78746964 3d534944  ap-contextid=SID
    [Thr 1395682224] 0x4d7689dc  000240  2533xxxx xxxxxxxx 33xxxxxx xxxxxxxx  %xxxxxx%3xxxxxxx
    [Thr 1395682224]                                                                          
    As you can see this error sais that the request is too big. A look into the coding of this cProjects webpage (where you can check in documents (look above)) the document is sent with the http method POST. Usually every webserver has an option where you can restrict the size for uploading files. But in that case the won't be an error out of a piece of c-coding (-> http_plg_mt.c).
    Has anybody have an idea about a solution?
    Edited by: Johannes Gilbert on May 26, 2008 12:25 PM

    Hi,
    this is handled by the profile parameters of the R/3 System. Look at
    icm/HTTP/max_request_size_KB or something like this.
    Best regards, Stefan

Maybe you are looking for

  • IMac 2.4G Startup fails after Memory upgrade

    Help Please! I have tried to install two new RAM modules with 2 GB of memory from same manufacturer (Kingston). Having either bank installed with one new 2 GB DIMM and any one of the original 1 GB module in any slot will start up the iMac. The System

  • BAPI_ACC_INVOICE_RECEIPT_POST - State Withholding

    Hello All, I call BAPI_ACC_INVOICE_RECEIPT_POST and pass it tax withholding information in the EXTENSION.  This is then used to populate Structure ACCIT_WT.  When there is Federal withholding, the BAPI works correctly and automatically creates the Fe

  • How to select data before a date

    in previous I need to select data from invoice between date 01-10-2007 and 01-11-2007 it is work fine. select sum(invoice_total) total from invoice where com_id = 356 and invoice_date between TO_DATE('01-10-2007','DD-MM-YYYY') and ADD_MONTHS(TO_DATE(

  • How to get the table with no. of records after filter in webdynpro

    Dear Gurus, How to get the table with no. of records after filter in webdynpro? Thanks in advance. Sankar

  • Gray out latest GR date field in delivery tab of me21n

    Hi all.. I have done a enhancement where the delivery date showed be flowed to latest GR date. It works fine , but the user wants to gray out the latest GR date field. When the Functional makes the setting to gray out the field in SPRO then the value