Exc reg updation for trading material

Hi experts,
        I have a trading material, at the time of purchase RG23A reg is updating both quantity and value.
        But while sales, RG1 reg is not updating.
        As Excise is concerned, at the time of sales the quantity in RG23A should be deducted and RG1 also should be deducted.
       Is there any specific configuration required for this kind of scenerio.
      for eg.  if i am purchasing 100 quantity.
                       RG23A part 1      RG23A part 11               RG1
                             +100                   Value                        +100
                   if i am selling  100 quantity
                       RG23A part 1                   RG1
                             -100                          -100
can anybody help.

hi..
        to achieve this...
              when u receive material from vendor RG23A reg both quantity and value will be updated..
for eg- rg23 a part i  shows a quantity of 100
              then u have to create some mov type copying existing and issue material to finished store, and assign in specify mov type for excise invoice in tax on goods movement, which should update both rg23a part 1 and rg1
for eg-  rg23 a part 1 should show 000 quantity and rg1 should show 100
then u sell the material which will update rg1 reg...
         anybody who can suggest which mov type should be copied....

Similar Messages

  • Excise Duty Calculation on Depot for Trading Material

    Hi,
    Following are the details about my client requirement:
    1. My client has a depot plant dealing with trading material and no manufacturing activity.
    2. Present Scenario:
    Material Purchase price: 100
    Excise Duty: 14
    Sec E.D: 2
    Hr.Sec E.D: 1
    Material Sales Price: 200
    Excise Duty: 28
    Sec E.D: 4
    Hr.Sec E.D: 2
    3. Expected Scenario:
    Material Purchase price: 100
    Excise Duty: 14
    Sec E.D: 2
    Hr.Sec E.D: 1
    Material Sales Price: 200
    Excise Duty: 14
    Sec E.D: 2
    Hr.Sec E.D: 1
    For the above the price will be changed at a Condition record level.
    There are no standard functionality available in standard SAP kindly advice on some workaround for the above requirement.
    Thanks in advance.
    Madhan

    Hi Prakash & Sandip,
    Let me thank you for the response. The excise calculation as pointed by you is right. For material price of 100 (BED = 14; SE Cess  = 0.28 & Hr.Sec Edu Cess = 0.14).
    Now my query is when there is a Material price increase in case of trading material Which is 200 (BED = 28; SE Cess = 0.56 & Hr,Sec Cess = 0.28). Presently system calculates Excise duty on 200.
    Since it is a trading material there is no value addition to the material Excise duty should calculate on Rs. 100.
    Is there any workaround available?
    Thanks & Regards
    Madhan Kumar

  • Wrong Register Updation for consumable material

    Hello Gurus,
    I am getting problem for consumable material for which excise duty is applicable. Normally after making GR for these type of material RG23A Part I and RG23A part II registers should get updated but I am facing problem that for these material currently RG23C register is getting updated.
    Kindly help me to resolve this issue.
    Warm Regards
    Kishor Hole

    Hello, I have already checked this scenario with material code and without material code. I am taking care of Material type in J1ID and it is consumable only. Also at the time of GR in Excise Item tab I am verifying for material type and chapter id but it is still updating to RG23C register.
          Please help me out for the solution
    Warm Regards
    Kishor Hole

  • Import for Trading Material Pricing Procedure

    Hi Everybody.
    My client have a scenario that, they want to make import for a trading materials,(Pricing control is Standard Price) The customs duties like CVD, ECess & Addnl Duty will be Non Modvat. Since it is a Non modvat it will add to the Material cost in actual process. But for my client it should not add to the Material cost and Exchange rate in PO Header level it should not fixed while making PO and posting GR, since exchange diff. rate will add to another account because of STD price.
    Please let me know the solution for this scenrio if anybody experienced.
    regds,
    Dhanu

    Yes, that I understood,
    How to avoid Non Modvatable condition values to add Material Cost if it is Standard Price in Import.
    regds.

  • Standard cost update for configurable material- CU50

    Hi,
    I am trying to update standard cost for a configurable material using CU50 with reference to the sales order.
    System gives a warning message :- Configuration of raw material still not included in price determination
    Message no. CK784
    Also the save tab is greyed out.
    this is the case with all config material
    A solution to this would be highly appreciated.
    Thanks

    Hi,
       Refer note 362193 and check if that helps.
    regards
    Waman

  • Contract updation for Delivered material quantity

    Hi All,
    I have a problem related, contract and release order updating with reference to delivered material quantity.
    for example let's say contract is created for 1000 units of material A, after that sales order with reference to contract is created for 500 units and delivery is created for 300 units then remaining order quantity cannot be delivered as  customer master is maintained so.
    Now I want to create sales order for 700 units of 'A' but system is not allowing to do so saying the 500 units are already referenced.
    If i use rejection reason in sales order still system is not allowing to create a new sales order with 700 units.
    How to solve this issue?
    Please Help
    Thanks and regards
    Amit

    Hi Manam,
    thank you very much for your immediate reply.
    But the issue is a sales order will have only one delivery as the sales order contains freight amount at header level which helps calculate the excise duties as the prices quoted to customer include freight and duties.
    So now is that possible to update the delivered quantity at contract level so that undelivered quantity can be referenced to create another sales order and can be delivered.
    To describe the process:
    A contract will be created, a sales order will be created for required delivery quantity then delivery will be created. In case due to some problems if delivery quantity is less than sales order then the undelivered quantity will be getting updated in sales order. and the sales order undelivered quantity will be rejected and the contract will get updated.
    Please help.
    Regards
    Amit

  • How RG1 reg update for export sales?

    Hi,
    Iam doing the Export sales. Iam doing it export under bond. Is it necessary for update RG1 for Export sales? Wt is the process for updating RG1 for export sales?
    regards,
    jyothi.

    RG1 for exports will be updated, similar to regular domestic sale. The process to update register is provided in link & menupath below:
    Link: http://help.sap.com/
    Path: SAP Best Practices --> Baseline Packages --> Based on SAP ECC 5.00 --> Select Country: for eg, Localized for India --> Technical Information --> Building Blocks --> Select Country for eg, India --> Excise Periodic Processing
    Hope the above is helpful.
    Regards,
    Rajesh Banka
    Reward points if helpful

  • RG1 Updation for new material

    Dear Guru's,
    It means that every time when ever users produce new material he must update RG1 material in table J_2IRG1BAL only. Is there any other option to maintain through other process?
    Here we are using the ECC 6. Initially we uploaded the data of all materials through using ABAP programmer. My question is that when ever users produce new material he must update through  table J_2IRG1BAL only or any other option.
    I tried in DEV client that i created new material and initially I posted the stock using MB1C T-code with movement type 561 to pre-bonded storage location after that I transferred the stock MB1B T-code with movement type 311 to bonded storage location.
    Then I created SO, DEL, INVOICE, EXCISE INVOICE, after this I have updated RG1 using T-code J1I5 with classification RMA and IDH, system is showing the QTY, Material after this i have done Extracted Using T-Code J2I5. When I am taking print out through excel it not showing the opening balance and closing balance.
    Please suggest me the correct one.
    Best Regards,
    Siddarth

    Dear Rajesh,
    It means no need to maintain in table level, every time when ever user creates new material.
    with this the opening and closing balance is not showing J1i5.
    Regards,
    siddarth

  • Acconting doc.  for move ment type-501 & trading material

    Dear cons
        If we receive the material through 501 Which accounting document will hit. Also pl. give process for trading material ( hawa). which accounting will hit for HAWA material type.
    nrk

    Hi
    It entirely depends on whether the material type is maintained as value update in OMS2
    If the material type has a value update then follwoing accounting entries are passed during 501
    Stock acc Dr
    Clearing account Cr
    The material will be valuated at Price maintained in Material master
    If the material type doesnot have a value update then  accounting documnets will not be generated.
    Regards
    Sandeep

  • Cost of goods sold for trading goods

    In my company Cost based copa is configured.
    We do manufacture and sale the goods, also we do trading to goods. for manufacturing goods the standard cost estimation is released but for trading we are not doing std cost estimation. In SD pricing procedure VPRS condition is incorporated to get cost of good manufactured. Now i want  the cost of goods sold for Trading material to flow to co-pa.
    How do i do it?
    Do i need to create and release the std cost estimate for trading material? or there is any way i can manage the cogs to flow to co-pa actual cost.
    Regards
    Sanjay Petkar

    One way is certainly to create standard cost estimates for the purchased products. Depending on your costing view qty structure and MRP view procurement settings you can use either CK40N or costing without qty stucture.
    If you want moving average, then you need to exclude the purrchased material type from looking for a cost estimate in COPA, and then you need to link VPRS to your cost of sales key figure in PA.

  • Issue regarding 0MATERIAL_ATTR  - Attribute not Updated for Some Materials

    Hi All,
    As per requirement, I had enhanced 0MATERIAL_ATTR DS with one customer field MRP Controller.
    After enhancing 0MATERIAL_ATTR, I had made necessary changes in related objects like 0MATERIAL Info Object & related transformation for this new attribute.
    After making changes, when I had done Repair full request for 0MATERIAL_ATTR, newly added attribute had not updated for all material, other attributes were updated correctly but MRP controller had not updated for some records.
    I am confused with why attribute(MRP controller) updated in some Materials & for some materials its not updated.
    I had checked in PSA, data for this added attribute is come in PSA but not updated in data target (0material).
    I had also activated master data by running Attribute change run but still problem persist.
    Please help.
    Regards,
    Divyesh Khambhati

    Hi Venkatesh,
    I had write code in CMOD for MRP controller.
    As data is coming fine till PSA but its not updated in Data Target (0MATERIAL) .
    if I take one example..
    For exp Material XYZ has two entries in PSA table, one is updated during delta load & recent one which come though Repair Full request.
    Now newly adder attribute MRP controller available in recent request of Repair Full but that is blank in case of prior delta update.
    I am confused because MRP controller attribute is updated for some Material but for some material its remain blank.
    please help.
    regards,
    Divyesh Khambhati

  • Trading material Price  Control

    Hi expert
    I would like to know for price Control must be kept for Trading material, the same time we are procuring and selling the same.....i doesn't  want MAP keep change most of time.
    Regard
    Nabil

    Hi,
    SAP Note 81682 - Pr.contr.V for semi-finished and finished
    products;- Read this sap note
    SAP strongly recommends that you do not select price control V for+
    +semi-finished products and finished products, because doing so will very+
    +easily cause the calculation of unrealistic valuation prices. SAP+
    +recommends: Price control V for raw materials and trading goods; price+
    +control S for semi-finished products and products.+
    +If you nevertheless select price control V, take care in the following+
    +situations:
    Regards
    Kailas Ugale

  • Standard Price for a Traded material?

    Hi,
    What are the pitfalls/disadvantages of defining the traded material at a Standard Price and not a moving average price. Details will be appreciated.
    any relevant information will be usefull.
    Thanks

    Hi
    If you are maintainnig a Standard price for the Trading material , then the Pricediffernce between the Material & the Purchase ptrice will be put into a different account.
    When you sell the same material the profit will be calculated based on the Price of the material.
    So if you are procuring the material at a higher price than the material price, in such case the material price is not updated & the Profit & loss calculations of the material will not be appropriate.
    So it is better to alway use Moving average.
    Thanks & regards
    Kishore

  • Import purchase of excisable trading material for depot

    Dear gurus,
    In one of my clients scenario, I have to purchase imported execiasable material from foreign vendor with all the seven excise duties viz CVD,AED,ECS,SCESS, BCD and ECEss and HSECess on BCD.But interesting thing is that he want to inventorised all the excise duties for traded materials .For general import purchase we use ZIMPORT prising and in that only customs duties get inventorised and other CVD,AED,ECS,SCESS duties gets refunded,hence non inventorised.
    My client wants all CVD,AED,ECS,SCESS duties to be posted in respctive excise register for depot and at the same time all the 7 import duties to be inventorised as they are not getting any setoff for that. IF we use same import prising procedure for depot as like that of manufacturing plant, as i said only BCD and ECEss and HSECess on BCD will get inventorised.
    Shall i need to design new prising for depot or new conditions for same import prising?
    Kindly help.

    hi nilesh..
          in depot import purchase, it is not possible to pass entries to RG23D as well as to inventory...
           if u want all the duties to get inventorized u should use no credit/non cenvatable condition type in ur pricing procedure and manually enter that for the respective vendor...
          in this case u cant pass the credit to ur customer...

  • How to update Unit Of Measure for a material in BAPI_SALESORDER_CHANGE

    Hi All
    How to update Unit Of Measure for a material in BAPI_SALESORDER_CHANGE

    hi,
    in BAPISDITM structure, which is their in orderitemin
    update updateflag of BAPISDITMX, which is their in orderiteminx for the same field with update flag = 'U'
         kindly try with <b>T_UNIT_ISO</b>
                                or
                               <b>TARGET_QU</b>
    comeback with u r comment
    regards,
    pavan
    Message was edited by:
            pavan kumar pisipati

Maybe you are looking for

  • Why no sound from DVD drive H/Phone sockets ?

    Hello again folks, Just a little niggle here. I have just noticed that I am getting no sound from my 2 DVD Drive front headphone sockets. One is an MSI the other a LiteOn, both have Headphone sockets and volume controls but not a sound issues forth,

  • Not sure how to get font anti-aliasing

    I'm trying to make my desktop a little prettier. My WM is XMonad, and my terminal is urxvt-256-unicode-color. I just don't really know where to start - is something like this handled on a system level? Is it something I configure X to do? Or is it so

  • Video preview is not updating my changes

    Hi everyone, First I would like to let you know that I am really excited to be in this comunity (please excuse my english, I haven't practice it in a while) and I thank you all in advance for reading my question. Well, the problem I have is regarding

  • Activate RE module in ECC 6.0

    Hi, I need to activate this module in ECC 6.0 but i don´t know what i need to activate. I have some things in spro that i can see. Does anyone have some notes for RE implementation? Kind regards, Nuno Silva

  • Display website in xcelcius dashboard

    I want users to select a website name from a -say list box, which consists of website urls- say google, yahoo, etc. The selected website should then load in another component or container in the same canvas. I am using xcelcius 2008. Regards Chris