EXIT/BADI REQUIRED FOR DELIVERY SCHEDULE INSERT FOR PURCHASE ORDER

We are creating delivery schedule for Purchse Requisition created through MRP in Z-Table , Now we requires this delivery schedule dates to be copied directly in PO while creating a PO.
We have Tried Exits for the same MM06E004 and MM06E005 but after setting a break points system is not stopping at the required screen (delivery schedule date screen).
Please provide BADI or exits available for the same.
Thankx

Dear Mr.Shan ,
Thanks for your prompt and valuable reply , I had tried the exits mentioned by you previously and was not upto the expectations ,
Problem solved using stac technique.
Thanks
Ankush

Similar Messages

  • NEED VL02N VL09 USER-EXIT FOR DELIVERY COMPLETE INDICATOR IN PURCHASE ORDER

    I NEED VL02N VL09 USER-EXITS FOR DELIVERY COMPLETE INDICATOR IN PURCHASE ORDER POSITIONS.
    F.X: IF POST QUANTITY 10, BUT PURCHASE ORDER POSITION QUANTITY 30, I NEED AT ANY CASE TO SET DELIVERY COMPLETE INDICATOR FOR RELEVANT OUTBOUND DELIVERY AN P. ORDER POSITIONS.
    THANKS/

    Hi Malka,
    It's possible set the system to mark automatically the delivery completed indicator.
    First you need to set the under delivery and over delivery tolerances.You do this in customizing:
    Materials Management under Purchasing -> Material Master -> Define Purchasing Value Keys.
    Once you set this, you can insert this value keys on Material Master Record for the materials.
    When you create the PO with a material with this value keys set the system will check the under delivery and over delivery set on customizing.
    In customizing you also have the option to let the system mark automatically the delivery indicator based on delivery tolerances set.
    In Customizing for Inventory Management and Physical Inventory under Goods Receipt -> Set Delivery Completed Indicator, you can determine for each plant whether the system automatically sets the delivery completed indicator for delivery quantities within the underdelivery and overdelivery tolerances.
    You can test setting the under delivery for 0 (with a warning message) and see if the system will only mark delivery complete only for over delivery.
    You can also work with the following Badi: MB_GOODSMOVEMENT_DCI. This Badi also allows custom logic for setting the delivery completed indicator in a PO item.
    Message: M7 433 (The "delivery completed" indicator is set for the purchase order item)
    Regards,
    Rodrigo

  • Link Delivery Schedule Line and Purchase Order History

    Hello,
    Please, i need to know if there is some link between delivery schedule item and PO history like PO history.
    I need to know the quantity of goods issues per schedule line...
    thanxs a lot
    Jean Baena

    Hai.
    Check CO06 for undelivered item list.
    Regards,
    Mani

  • System problem in the delivery schedules of a purchase order ?

    hello to all,
    I am creating a purchase order and displaying it (in smart form). what i am noticing is the system does not keep that entry of the delivery schedule(with itself) that has the same audit quantity and delivered quantity. why is this so and how to display that entry ?
    suppose following r thr delivery schedules entries(against a material), while creating a purchase order..
    PO Quantity of Material is  4
    Delivery Schedules are:
    Deliv Date  SL Qty    Stat Del Date  GR Qty   Open Qty
    01.03.2006    1        01.03.2006      1          
    03.03.2006    2        03.03.2006      1           1
    04.03.2006    1        04.03.2006                  1
    where,i believe, 'SL Qty' = Audit Quantity and 'GR Qty' is the Delievered Qty.
    Now when i display these delivery schedules(thru a smart form) the first entry in the deliveryschedules does not get displayed.
    Deliv Date  SL Qty   GR Qty  
    03.03.2006    2        1  
    04.03.2006    1        0  
    why does system deletes the entry whose audit qty is equal to the deliv qty ??
    hope u all got it... Thanks for yur time..

    Hello,
    Refreshin this thread ... can sumone anwser to my query ?

  • Scenario : How to include scales for delivery schedule

    Hello,
    1.How to include scales for delivery schedule
    Example u2013 I have a total SA for 10000 EA for Rs 10 EA
                  i.     When SA line And GR  is for 0-100 system should take  Rs 10 EA
                 ii.     When SA line and GR is for 101-1000 System should Rs 9.50 EA
                 iii.     When SA line and GR is for 1001-5000 system should take Rs 9.00 EA.
    How to do ?
    Regards
    sapman man

    Hi,
    This you have to maintain in Scheduling agrement document itself.
    In scheduleing agreement (ME31L)--> Pricing Condition Icon.  if you select this there you can find the scales assignemnt in headel leavel icon. (F2).
    If assgin this will fllow in delivery schedule line.
    SAM

  • How to include scales for delivery schedule.

    Hello,
    How to include scales for delivery schedule.
    a.       Example u2013 I have a total SA for 10000 EA for Rs 10 EA
                                                                   i.      When SA line And GR  is for 0-100 system should take  Rs 10 EA
                                                                 ii.      When SA line and GR is for 101-1000 System should Rs 9.50 EA
                                                                iii.      When SA line and GR is for 1001-5000 system should take Rs 9.00 EA.
    Normaly SA will calculate Scales based on target qty, not delivery schedule qty?
    Regards
    sapman man

    Hello SAPman man ,
    Please read SAP Note 401941. This could be helpful depending on what Release you are running.
    SAP Note 401941 -  Incorrect price at time of GR
    I hope this information has been helpful for you.
    Best Regards,
    Frank

  • Material po text repeating in a table loop for delivery schedules

    Hello,
    i am displaying a purchase order in a smart form. In the main area of the table(where i am displayin the material and the delivery schedules) after displayin the material i have created a loop node in which i am displayin the delivery schedules(against each material). Inside the loop i have a text node in which i am displaying a 'material po text'. What is happening is, the 'material PO text' is repeating for every delivery schedule (cuz its inside the loop, so every time the loop iterates the text is repeated).
    I want to have a condition or an event by which i can display the 'material PO text' once for every material.
    NOTE: the 'material PO text' to be displayed is inside the loop(for delivery schedules)
    i know its a mess , but i hope u have understood ...
    thanks..

    Hii,
    please reward points if the post helps you..
    Ok just forget whatever is written above:
    Just follow the steps below:
    1. declare a global variable called Last_material.
    2. Inside the loop in the text node where you are printing the material PO text -> goto the conditions tab -> give a condition -> itab-matnr ne last_material.
    3. create a code node(program lines) just after the loop node. Assign the material number you are printing(itab-matnr) to Last_Material.
    This should solve your problem..
    Lokesh

  • BDC/BAPI for set delivery cmlition indicator in purchase order @ item level

    Hi Expert,
    could you please suggest me bapi to set/reset delivery completion  indicator in purchase order at item level for  t-code "ME22n"?
    Thanks and regard,
    Santosh Gupta

    Use BAPI_PO_CHANGE to set the delivery completed indicator.
    Refer to table section in the BAPI Interface
    POITEM     LIKE     BAPIMEPOITEM
    POITEMX     LIKE     BAPIMEPOITEMX
    Set Field POITEM-NO_MORE_GR = 'X' & Set field POITEMX-NO_MORE_GR = 'X'

  • Exit or BADI when Tax Calculation in MIRO from Purchase order

    Hi Gurus,
    I Need a Exit or BADI when Tax Calculation in MIRO from Purchase order.
    The problem is the tax is automatically calculated from tax code in PO but I want it to be calculated
    from PO condition. Is there any exit available by which I can modify the value of tax when ticking the check box of tax calculation in MIRO.

    BADI has method COPY_DRSEG_SELKZ but since there only importing paramters and no exporting or changing parametrs you cannot change the values of rseg here.
    Try using proper Implicit enahncement by debugging .
    For implicit enhancement check
    Re: How do we search enhancement point/section
    Edited by: Gautam Totekar on May 29, 2009 5:56 PM

  • Delivery schedules with outline purchase agreement

    Can somebody tell me how to automatically result delivery schedules with outline purchase agreement through MRP running?

    Priyanka.P thanks for your reply.
    The following is how I process:
    1.I use auto po indicator at VMR
    2. I tick Auto PO indicator and source list indicator at MMR
    3.I have made schedule agreement(type LP) and assign it in source list as fix vendor(1000) and with the MRP indicator 2(Record relevant to MRP Sched. lines generated automatically)with the proper validity periods in IDES.
    4. In MD03, I use the create schedule as 3
    5.There is Dependent reqmt.
      When I finish my MRP running I find a Purch.Req with Exception 30( Plan process according to schedule (08.11.07/08.11.06)) generated. however I hope a  vendor Delivery schedule.

  • How can I purchase FormsCentral premium for my organzation with a purchase order?

    How can I purchase FormsCentral premium for my organzation with a purchase order?

    Hi;
    A FormsCentral subscription purchase requires a credit card in one of the supported countries for purchase.  It cannot be purchased using a purchase order, only a credit card.
    Thanks,
    Josh

  • Cant able to do UD for Goods Receipt Inspection against Purchase Order

    Hi Experts,
    I am facing problem while doing UD for Goods Receipt Inspection against Purchase Order.
    The Problem is,
    "Selected set code does not exist, or data entered is incomplete
    Message no. QV121
    Diagnosis
    Code  in code group * (selected set 1000 in plant ) does not exist.
    Procedure
    Enter a valid combination or complete combination, or make sure that the combination is available in the selected set."
    And the Result Recording for Inspection lot is completed.
    kindly suggest..
    Thanks in Advance,
    Naveen

    Hi Naveen,
    1.     Go to QCC0 > Quality inspection  >  Inspection lot creation  > Maintain Inspection Types > Select 01 (or the type which you are using) and double click on it.
    2.     Check what code is maintained in UD Selected Set
    3.     Create the same code in QS51 for your plant.
    Regards,
    Anand Rao

  • Customisation settings for VC Configuration copy from Purchase order to GRN(Goods Receipt note)

    Hi Experts
    I was looking for Customisation settings for VC Configuration copy from Purchase order to GRN(Goods Receipt note),
    Please share.
    Regards
    Sandeep

    Hi Ritesh
    Thanks for your reply,
    I checked  both of these transaction  we need to select 3 option Characetrstics frm configuration(prio) and classification. I will check that, I had one more question
    In PO VC configuration is called for class type-300  and  in GRN VC configuration  is called for class type -023. How it will fetch the variant class configuration to Batch class configuration?
    Once we had faced some issues the copy from PO to GRN was happening for some batches & some batches it was not happening.
    yes we have activated Mill Functions in our ERP box.
    Regards
    Sandeep

  • In MIGO, i need to see delivery dates from the purchase order

    Is there a way to see in transaction MIGO, the delivery dates from the purchase order?  I hope there is some exit or BADI or BAPI or .... to perform this copy function? 
    We have multi-line POs for the same material with staggered delivery dates and the Warehouse needs to know which PO line to receive against.

    when you enter the PO number in MIGO and hit enter, then you only get the items that can be received.
    If you make sure that the PO items are created by ascending delivery date, then you can always take the first.
    if you have the personal setting to display all items (even the already received ones), then you can take the first with a quantity proposal. already received items do not propose quantities.
    I would ask purchasing to tell the vendor that he has to state the PO number along with the item number in all papers (delivery note, invoice).

  • Print delivery address in a Purchase Order

    Hello,
    Could you please tell me, what I should to do for print delivery address in a purchase order?
    I need to configure or activate these fields: Name y Street/House number in the PO printed
    Thanks!!
    Best Regards,
    Mariela

    the delivery adress is storage location address, if storage location has an address and is entered in the PO.
    the delivery adress is plant address, if no storage location is entered in the PO or the storage location does not have an address.
    or the delivery address is taken directly from POs delivery adress at item detail  if maintained manually there.
    If it does not print, then you may use a customized form which is not prepared to print the address.
    If that is the case, then contact the developer of the form.

Maybe you are looking for

  • How do I create an input box with a cancel button that will end a loop in my script?

    I have been working on a script for my client and I am having trouble getting it to work properly. I stole most of the code from the PowerShell Tip of the Week "Creating a Custom Input Box". I also took someone's code for the Show-MessageBox function

  • Need to create maintenance view for a custom infotype

    A custom infotype 90XX is created. The data cannot be modified or created through PA30 in this infotype. Through PA 40 actions only we can create/change the record/data. We have created some 1000 records in it. Now can we create a maintenance view fo

  • Dvd-r

    I inserted a dvd-r, my machine wouldn't read it and now it's spinning in the drive and it will not eject.

  • How do I get google + 1 to stop popping up when I click on a web site on my i pad

    How do I get google +1 to quit popping up when I am surfing the web with firefox on my I PAD? I cannot see what I clicked on it just keeps showing a white screen. I tab back and it keeps going back to the +1 screen.

  • Open new windows in float mode

    I want to be able to open a new window and have it float, not be a tab. However, I can't find a preference for that. So each time, I have to track down my main window, find the correct tab, and drag it off to float it. I'd like to be able to 'float a