Fill/upload data for the customizn order in Tcode SE09

Hello!
I have created a customizing order in SE09 and have to fill it with data from SAP Note (it is a .txt file).
After this this should be transported into the producitve Client
Which action are necessary for that?
Should I perhaps better implement the SAP Note?
Thank you very much indeed!
regards

Hello!
Thank you for your response!
<b>Is it aslo possible to create an customizing order in SE09 and to fill the data that is included into the SAP note (.zip-file --> unzipped it is a .txt-file)?</b>
Because this procedure is recommended in the SAP Note 898614
Thank you very much!
regards

Similar Messages

  • Date when the cube was filled with data for the last time

    Hi!
    We are using a SAP BW System and on top of it BOBJ for reporting. Within BEx Web Application Designer, it's very simple to access the data, when the cube was filled with data for the last time. Is it possible to access this information within BOBJ, too?
    Thanks for your help!
    Greetings
    Stefan

    Hallo Ingo,
    thanks for your answer. That was exactly what we were looking for.
    We will have to think about a workaround now.
    Greetings
    Stefan

  • Want last date of the month as default basic finish date for the Proc order

    For forward scheduling type in process order, irrespective of the start date i want last date of the month as my  basic finish date.
    Ex start date can be 01/10/2009 or 15/10/2009, but the basic finish date should be 31/10/2009.

    Hi Sam,
    sorry to say , its not possible in standard SAP.
    1) If, on order creation, a planned order exists for the production order/ process order, the basic dates are copied from the planned order.
    2)If no planned order exists on order creation, you must specify at least one basic date.
    The scheduling type determines the basic dates that you must specify. and it useses timings from routings for scheduling.
    so may be you need some work around.
    explain your requirement why do you want to fix it for the last day of month and other constraints, may be we can find some way.
    Regards
    Ritesh

  • Problem in uploading data for the Tcode CA02

    Hi,
    I am trying to upload the data for the Tcode ca02  and i am facing a problem i.e. the uploading for the for the 18th  inspection characterstic is not able to being uploaded. I had checked the code of it  and the logic is there.
    It was previously uploading the data for it,but iit is not doing now. I had cheked the program of the screen also the fields are also present..

    would u plz send code.so i can check

  • Who to get Actual Shipment Date for the Sales Order

    Dear All,
         How to Get Actual Shipment Date for the given sales order.
    REgards
    sudheer

    Hai,
    If you want the actual shipment date of an order call the function module RV_ORDER_FLOW_INFORMATION and pass the order number as vbeln in the structure COMWA.select the values from the return table which corresponds to 'J' type which are delivery and get thedate.
    THis will give the actual delivery date (if created).
    Oher way is to look for vbeln in table LIPS using VGBEL = order number as the selection criteria.
    Cheers,
    Sandeep

  • Uploading data for Tcode IW21

    Hi,
    I want to upload data for the Tcode IW21,I tried to make BDC but i was giving only 1 problem that it is not able to capture the screen for Long Text as it is used as script handling.i am able to find a BAPI but i dont know how to use it,i tried to do work through LSMW but there is no information. Pleas provide me guidelines how to solve this problem.. I am providing the link to the code which i had developed(BDC) for the tcode IW21 .
    Here's the code:-
    http://docs.google.com/View?id=dfxswwff_3gtn9qsdp
    Edited by: ricx .s on Jun 24, 2009 6:24 AM

    hi,
    Thanks for your help. Can i use BAPI to upload data for IW21 and how to trace the fields of a BAPI to upload the data .
    Here's the code which i searched on net bu there is no information regarding the fields tobe traced and should i include it in my code which i had provided above ?
    data: i_bapi2080_nothdri type standard table of bapi2080_nothdri with header line.
    data: i_bapiret2 type standard table of bapiret2 with header line.
    data: i_bapi2080_nothdre type standard table of bapi2080_nothdre with header line.
    data: i_bapi2080_notfulltxti type standard table of bapi2080_notfulltxti with header line.
    * create header data
    i_bapi2080_nothdri-refobjectkey = 'PJAREF'.
    i_bapi2080_nothdri-equipment    = '10000030'.
    i_bapi2080_nothdri-reportedby   = 'PJAREP'.
    i_bapi2080_nothdri-short_text   = 'PJA Short Test from BAPI'.
    i_bapi2080_nothdri-priority     = '1'.
    * create header long text
    i_bapi2080_notfulltxti-objtype    = 'QMEL'.
    i_bapi2080_notfulltxti-FORMAT_COL = 'U1'.
    i_bapi2080_notfulltxti-text_line  = 'Long text 1'.
    append i_bapi2080_notfulltxti.
    i_bapi2080_notfulltxti-objtype    = 'QMEL'.
    i_bapi2080_notfulltxti-FORMAT_COL = 'U1'.
    i_bapi2080_notfulltxti-text_line  = 'Long text 2'.
    append i_bapi2080_notfulltxti.
    call function 'BAPI_ALM_NOTIF_CREATE'
      exporting
    *   EXTERNAL_NUMBER          =
        notif_type               = 'M1'
        notifheader              = i_bapi2080_nothdri
    *   TASK_DETERMINATION       = ' '
    *   SENDER                   =
    *   ORDERID                  =
    importing
        notifheader_export       = i_bapi2080_nothdre
    tables
    *   NOTITEM                  =
    *   NOTIFCAUS                =
    *   NOTIFACTV                =
    *   NOTIFTASK                =
    *   NOTIFPARTNR              =
        longtexts                = i_bapi2080_notfulltxti
    *   KEY_RELATIONSHIPS        =
        return                   = i_bapiret2.
    call function 'BAPI_ALM_NOTIF_SAVE'
      exporting
        number            = i_bapi2080_nothdre-notif_no
    * IMPORTING
    *   NOTIFHEADER       =
    * TABLES
    *   RETURN            =
    call function 'BAPI_TRANSACTION_COMMIT'
    * EXPORTING
    *   WAIT          =
    * IMPORTING
    *   RETURN        =
    Please provide me guidelines for it.Is there any way to upload  the data for this Tcode IW21 through LSMW?
    Edited by: ricx .s on Jun 24, 2009 10:20 AM

  • Billing date for a purchase order in the corresponding billing document

    Hello,
    for a purchase order I need to select the billing date in the bill which corresponds to the purchase order. There is a posting date in the order history but I am not sure that this date is identical with the billing date in the purchase order. Any suggestions? Thanks.
    Regards, Lars.

    I guess you are talking about due date for a billing document.
    There's an FM Determine_Due_date for that. before that you'll have to use FM FI_DOCUMENT_READ with I_AWTYP as VBRK and I_AWREF as Billing Document Number. You will get T_BSEG entry.
      CALL FUNCTION 'FI_DOCUMENT_READ'
       EXPORTING
         i_awtyp           = 'VBRK'
         i_awref           = po_vbeln
       TABLES
         t_bseg            = i_bseg
      SORT i_bseg BY vbeln.
    READ TABLE i_bseg WITH KEY vbeln = 'Billing Document Number'.
      IF sy-subrc IS INITIAL.
        MOVE-CORRESPONDING i_bseg TO wa_faede.
        CALL FUNCTION 'DETERMINE_DUE_DATE'
             EXPORTING
                  i_faede                    = wa_faede
             IMPORTING
                  e_faede                    = wa_faede
             EXCEPTIONS
                  account_type_not_supported = 1
                  OTHERS                     = 2.
    This wa_faede will have due date in one of its fields.
    Hey do reward points if this post is helpful.

  • Scehdule Line Date getting change to future date once the Sales Order is saved

    Hello Experts,
    Good Morning to you all,
    This is with respect to the Issue we are facing for the Orders having Product Allocation on multiple materials. Please find enclosed the detials below.
    Issue : Scehdule Line Date getting change to future date once the Sales Order is saved. These Order's are having Product Allocation on multiple materials.
    Description:
    We have implemented Product Allocation few months back.
    We have Product Allocation on multiple materials which are in demand and has been reserved for the Customers of different PA behaviors.
    When we are trying to create the Sales Orders for the normal customer who is not on Product Allocation. The Order Schedule Line is getting changed to future date once the Sales Order is saved after initial creation.
    These Order's are having materials of Product Allocation.
    I have enclosed the sample screen shot of the error we are getting which saving the Sales Order and also the Order Schedule Line screen shot showing future date.
    Error Message : There may be Product Over Allocation in Delivery Group 001.
    Message No : VV023
    This is a random behavior we are coming across and out of 10 Order 2 or 3 Orders is getting this Issue.
    Please share your inputs how to rack this Issue.
    Your suggestions will be highly appreciated.
    I am unable to upload the attacments dont know what the reason.
    Thanks,
    Farhan.

    Check whether you need to carry out the coding corrections as recommended in the following note:-
    Note 52067 - Message VV023/VV024, but no prod.alloc.processing    
    But I wonder this is for older versions and not sure whether this would help you to overcome from the issue.
    G. Lakshmipathi

  • DB Connect Load - "Unknow error while uploading data from the DB Table"

    Hi Experts,
    We have our BI7 system connected to Oracle DB based third party tool. The loads are performing quite well in DEV environment.
    I would like to know, how we transport DB Connect datasources to Quality systems? Any different process to be followed for DB Connect datasources?
    At present the connections between BI Quality and the third party quality systems are established. We transported the DataSource from BI DEV system to BI quality system, but on trigerring an infopackage we are not able to perform loads. It prompts - "Unknow error while uploading data from the DB Table".
    Also on comparing the DataSources in DEV system and Quality system there are no fields in "Proposal" tab of datasource in Quality system. Also I cannot change or activate Datasource in Quality system as we dont have change access in quality.
    Please advice.
    Thanks,
    Abhijit

    Hi,
    Sorry for bumping an old thread ....
    Did this issue get ever get resolved?
    I am facing the same one. The loads work successfully in Dev. The transport for DBConnect DS also moved in successfully.
    One strange this is that DB User for dev did not automatically change to db user from quality when I transported the DBConnect datasource. DBCon DS still shows me the DB User from Dev in Quality system
    I get "Unknown Error" whenever I trigger the data package.
    Advait

  • How to set up automatic payment for the purchase order

    Hi, All,
    I have one question how to set up automatically payment for the Rent Office purchase Order?
    There is the requirement from the client. They want to create one kind of purchase order for the Office Rent, then pay the fees in the certain time of every month to the vendor for the rent fees without any invoice. Whatu2019s the normal solution for this kind of purchase order? Is it ERS? Or something else?
    Please give me the details and business flow. Also please tell me how to setup in the SAP and T-code.
    Thanks in advance

    Either you can set up ERS or you can pay directly from the FI side.
    Prerequisites
    Evaluated receipt settlement must be flagged in the purchase order item.
    The vendor must be flagged as being subject to ERS in the vendor master record.
    The goods receipt must refer to a purchase order.
    Goods-receipt-based Invoice Verification must be defined for the purchase order item.
    A tax code must have been maintained in the purchase order item.
    The order price of the materials may not be an estimated price.
    If you flag a vendor as being subject to ERS, the system sets the ERS indicator as a default in each item when you create a purchase order for the vendor. You can prevent this happening for certain vendors by flagging the info record for the material and the vendor as not being subject to ERS.
    In Purchasing, you can delete the default ERS indicator in a purchase order item.
    Choose Logistics Invoice Verification ® Automatic Settlement ® Evaluated Receipt Settlement (ERS).
    The selection screen appears.
    You can use the following criteria to narrow down selection of the transactions to be settled:
    Company code
    Plant
    Goods receipt posting date
    Goods receipt document
    Fiscal year of the goods receipt
    Vendor
    Purchase order and order item
    You can define the selection criteria for the invoice documents by:
    Delivery
    Purchase order
    Purchase order item
    Goods receipt document
    Credit memo
    Invoice
    Currency
    Choose  Execute.
    The system issues a log for Evaluated Receipt Settlement, which displays the following:
    Settled
    In line with your selection criteria, the system displays all the order items that were settled (or if you are working in test mode, which would have been settled).
    Could not be settled
    In line with your selection criteria, the system displays all order items for which ERS is defined but could not be settled. It also lists the reasons.
    If the system reports being unable to invoice a transaction, you should exclude the transaction from ERS to avoid it being included in the log the next time ERS is run.
    Select the item and choose Exclude from ERS.
    The system also generates and possibly sends a message to inform the vendor(s) about the transaction settled, depending on the settings in Customizing.
    You can display the following environment information for the order items selected. To do this, choose Goto ®:
    Display purchase order
    Display invoice
    Display material document
    Display long text

  • Unable to change requested delivery date in the sales order at item level.

    The issue is when I create order with one material (linked to network and project is created automatically in the background), I am able to change (in change mode) req delivery date for an item, but when I create order with 2 materials (linked to network and project is created automatically in the background), I can not change (in change mode) the req delivery date of any item. Req delivery date is then copied from the header req delivery date.
    Is this a standard SAP functionality or a defect?

    Req del date is the date requested by customer and  can be changed at item level. Probably the confirmed date in the schedule line is derived from the network scheduling after ATP check. (ATP check is not activated in this case)
    I am able to change the req del date at item level if there is only one item (Linked to network) and not when there are two line items (Both are linked to 2 diff networks belonging to same project)
    I tried to change the date in the network, scheduled and saved but that didnt change the date in the sales order. On the contrary, if I run ATP check, netowrk dates get back to original dates derived from sales order.

  • In MIGO, i need to see delivery dates from the purchase order

    Is there a way to see in transaction MIGO, the delivery dates from the purchase order?  I hope there is some exit or BADI or BAPI or .... to perform this copy function? 
    We have multi-line POs for the same material with staggered delivery dates and the Warehouse needs to know which PO line to receive against.

    when you enter the PO number in MIGO and hit enter, then you only get the items that can be received.
    If you make sure that the PO items are created by ascending delivery date, then you can always take the first.
    if you have the personal setting to display all items (even the already received ones), then you can take the first with a quantity proposal. already received items do not propose quantities.
    I would ask purchasing to tell the vendor that he has to state the PO number along with the item number in all papers (delivery note, invoice).

  • Report of expiry dates for framework purchase orders

    Hi,
    In Standard SAP is there any report of expiry dates for framework purchase orders?
    Thanks & Br,
    Sandeep

    Hi
    There is no standard report available to display the expiry dates for frame work orders.You can get the details from table EKKO and field is KDATE or U have to go for development.
    regards
    Ramakrishna

  • How to creat deadlock for the purchase order in SAP Workflow

    How to creat deadlock for the purchase order in SAP Workflow

    Hi Ben,
    Are you using FM "CONVERT_DATE_TO_EXTERNAL" before passing delivery date?  If not, use FM like this, before passing the date to BAPI_PO_CREATE1 and it might work
      DATA: vf_doc_date(10),
                 internal_date TYPE d.
         vf_doc_date = sy-datum.              "Document date.
         internal_date = vf_doc_date.
      CALL FUNCTION 'CONVERT_DATE_TO_EXTERNAL'
        EXPORTING
          date_internal            = internal_date
        IMPORTING
          date_external            = vf_doc_date
        EXCEPTIONS
          date_internal_is_invalid = 1
          OTHERS                   = 2.
    Regards,
    Vivek

  • Problem in retreiving data for the given user parameter year!!!

    hi all,
    I am working in oracle report 6i. I want to display the data for the date given in the parameter field(MM/YYYY).
    For ex. Input is 07/2007 means i want to display the data from 04/2006 to 07/2007.Please guide me
    to get this desire output......
    Here is my query.....
    select gl_code,financial_month,financial_year,division_code
    from gtemp
    where financial_year between to_number(to_char(:P_Date,'YYYY')) - 1 and to_number(to_char(:P_Date,'YYYY'))
    and financial_month >= '04'
    and financial_month < = to_char(:P_Date,'MM')
    and division_code = 11
    order by financial_month, financial_year
    regards,
    jame
    Message was edited by:
    Jame

    Works fine if u gave values instead of variables.... But if we gave 02 in place of 11 like below.Query will get
    confused to take which years 02 because in both 2005 and 2006 we have 02(Feb)thats y.......
    how to overcome this prob.......I think, my entire query is wrong to get this desire output....Please guide me how
    to solve......
    select gl_code,financial_month,financial_year,division_code
    from gtemp
    where financial_year between 2005 and 2006
    and financial_month >= '04'
    and financial_month < = '02'
    and division_code = 11
    order by financial_month, financial_year

Maybe you are looking for

  • Is there a way to create a flipping book with the flipping 5k adobe software?

    Am I the only one pissed with the f adobe products? Is there a way to create a flipping book with the flipping 5k adobe software? Is it Flash, etc? Thanks

  • Time Machine Hard Drive Missing

    Specs: 1-year-old iMac (2.8 GHz i7 etc) running OS X 10.6.7. Until a last week (and possibly this issue is related to my recent 10.6.7 update), my Firewire-800-connected external Lacie backup drive (2 Tb RAID) showed on the desktop faithfully. This i

  • Having an issue with vpn load balancing certificate on the vip

                       Hi all, I am setting up vpn load balancing in a lab. I have two asa's running 8.6. I created a ucc cert from our internal CA  that has the vip as the CN in the cert and the two ASA's themselves as subject alternative names. I used

  • QT 7.1.3 plugin doesn't initialise properly in IE7

    Since installing IE7, I have had problems with the Quicktime 7.1.3 plug-in for Internet Explorer. The issue seems to be related to the IE7 security "enhancements" but I have not been able to find a solution. An example - if I click on a movie trailer

  • Connecting FAX to PSTN line using FXS and FXO ports

    I have 2 cisco 1760 routers with FXS and FXO card installed in each. I have to transport 2 PSTN lines from Head Office to remote loaction using FXS and FXO cards and these lines will be used for  voice calls and FAX( one line each for FAX and voice).