FIRST DELIVERY DATE AND DELIVERY BLOCK REMOVER IN SALES ORDER.

Hi All,
sales order created in SAP-CRM . after sales order replicated in ECC system at that time first delivery date comes blank in each line item after that first delivery date update in each line item when ever first delivery date updated in ECC at that time i want  to disable delivery block for that line item. for this which user exit i need to use and where i need to write  the code. im thinkin user exit is mv45afzz. if it is correct where i need to write the code.
thanks& regard
sakthidharan

Hello,
Use enhancement userexit_field_modification in include MV45AFZZ for delivery block LIFSK in VBAK Table.
below is the sample code for it.
if (write specific condition)
vbak-lifsk = '1' to '9'.
else.
vbak-lifsk = ' ' .
endif.

Similar Messages

  • BAPI for changing delivery date and delivery time fields in LIKP table

    Hi All,
         Is there any BAPI or function module to change the delivery date and delivery time in LIKP table ?
    Please tell me experts if exists.
    Thank you,
    Raghu.

    try these:
    BAPI/FM to update LIKP and VTTK tables
    http://sap.ittoolbox.com/groups/technical-functional/sap-dev/bapi-for-changing-sales-headertable-likp-662800

  • Req. delivery date and Delivery date should be same in a sales order

    Hi experts,
    We need a customization for getting Requested delivery date, Material Availability date and Delivery date should be same.
    Example if I keep request delivery date as 12/12/2012, system should consider same dates for MAD and Delivery and confirm the requested quantity.
    How to achieve this customization..
    Thanks,
    Bala.

    system should consider same dates for MAD and Delivery and confirm the requested quantity
    What you are going to achieve by this?  Hope you know the concept of MAD and confirmed quantity fields.  Let us assume, if stock is not there for a material for which sale order is created, can you let me know, you want the system still to confirm the quantity? You can post the goods issue only if system confirms the quantity in schedule line which is possible, only if stock is made available.  If client asks something which is not possible in SAP, think in a logical way how SAP works and convince them accordingly. 
    G. Lakshmipathi

  • Required delivery date not to be cpoied into sales order from quotation

    My requirement is that required delivery date should not be copied when i create a sales order with reference to quotaion,
    In the sales document types i have unchecked propose delivery date .it works fine while creating quotaion but then when i create sales order with ref to quotation the required delivery date is copied into the sales order which i dint want.
    Kindly guide me on this

    Hi,
    I think if u dont want to copy only required delivery date from QT to OR  you need to write the routine and has to assign in VTAA -Coping requirements.
    if u assign 502 it ill not copy quantiy in schedule lines i think.
    Just ask your ABAPer about 502 , if it work then assign the same to ur document types in VTAA.
    Hope this will helps u
    Regards,
    Ramesh
    Edited by: Ramesh on Mar 30, 2009 11:25 AM

  • How to pass delivery date through BAPI while creating a sale order

    Dear frndz,
         I am using 'BAPI_SALESORDER_CREATEFROMDAT1'
    to create a sale order .
        I don't have any problem..
        But I have to pass schedule line delivery date through this bapi .
       I used REQ_DATE in structure BAPISCHDL.
       But I can' t get it.
       Through which parameter can i meet this..
       The sale order should be created line item wise along with my delivery date..
      Any suggestions...
    regards.
    siva

    Dear frnd,
        Danq for your response..I can't use DLV_DATE for this requirement..
        But I used REQ_DATE in the structure BAPISCHEDULE .
       I came to know that the problem i faced previously  was only
    internal data conversion.
        Now am able to pass my delivery date..
        so I am closing the thread..
    Regards.
    siva

  • Automatic determination of Delivery type and Billing type in a sales order

    Hi,
    I want to know that in a sales order cycle, how does automatic assignment of delivery type and billing type takes place after we create a sales order?
    For example,when I create an outbound delivery for a sales order of type normal (OR) then in that case how does the system knows that it has to create an outbound delivery of type LF.How does the system propses it automatically and same is the case of billing document.

    Hi
    In customising the sales document type (Tcode VOV8) -
    specify the default Delivery type in the field DELIVERY TYPE in the 'Shipping' area of the sales document type customisation.
    Similarly you can specify the billing type in the BILLING area for both Delivery related billing and Order related billing.
    Thanks,
    Ravi

  • Delivery Qty and OPEN Qty Field in SALES Order Delivery Reports.

    Dear All Experts.
    Please Help me for which field put for Delivery QTY. and it is necessary to calculate OPEN QTY. or we can put directly from field.
    i used this field for Order Qty : WMENG.
    Please Guide me.
    Thnks With Regards :
    Bhavesh Panchal.

    Delivery qty - LIPS-LFIMG.
    You cannot get open quantity directly.
    use this way.
    Delivery qty   - LIPS-LFIMG.
    order qty       - VBAP-KWMENG.
    open qty = delivery qty - order qty.

  • How to List Sales Orders based on Creation Date and Delivery Priority

    Dear all,
    How can we list Sales Orders based on creation date and delivery priority.
    I tried using vl10a transaction code, but there we can see sales order based on delivery date.
    we need to list all sales order based on delivery priority and sales order creation date.
    can any one of you tell me which standard report gives such kind of report. Your suggestions will be highly appreciated.
    Thank you
    Raghu Ram

    Hi Raghu,
    There is no st report available as per your req.
    Using SQVI, you develope one report that is list of sales orders based on your req.
    SQVI is used to convert a Quick View into a query.
    Quick Viewer:
    The Quick Viewer allows you to define reports without having to program yourself. The Quick
    Viewer is especially useful for new users and occasional use.
    Quick Viewer is a tool for generating reports. SAP Query offers the user a whole range of options for defining reports. SAP Query also supports different kinds of reports such as basic lists, statistics, and ranked lists. Quick Viewer, on the other hand, is a tool that allows even relatively inexperienced users to create basic lists.
    Quick View definitions are user-dependent. You can transfer a Quick View into SAP Query in order to make reports, for example, accessible to additional users, or to use the other functions available in SAP Query.
    The following is a comparison of Quick Views and queries:
    Quick Views possess the same functional attributes as queries. However, only basic lists may be defined with Quick Views.
    In contrast to queries, no user group assignment is necessary with Quick Views. Each user has his/her own personal list of Quick Views. Quick Views cannot be exchanged between users. Quick Views may, however, be converted to queries and then be made available to other users in a specific user group.
    Info Sets are not required for Quick View definition. Whenever you define a Quick View, you can specify its data source explicitly. Tables, database views, table joins, logical databases, and even Info Sets, can all serve as data sources for a Quick View. You can only use additional tables and additional fields if you use an Info Set as a data source.
    The Quick Viewer uses various controls. Certain hardware and software requirements must also be fulfilled before you can use the Quick Viewer.
    To define a Quick View, you select certain fields according to your data source that determine the structure of your report. The report can be executed in basis mode with standard layout or may be edited using drag and drop and the other toolbox functions available in WYSIWYG mode.
    Reports created using the Quick Viewer may also be passed to external programs (Excel, for example).
    Call the Quick Viewer using System -> Services -> Quick Viewer (or transaction SQVI).
    Enter the name of the Quick View. Quick View names can contain a maximum of 14 characters.
    Choose Create.
    Enter a title for the Quick View and remarks, if you think they are relevant.
    If you do not want to base your list on a table, use the possible entries pushbutton in the Data source field to select another data source. You can choose logical databases or Info Sets. In addition, you may also create table joins. For further information, see Selecting a Data Source.
    Choose Basis mode if you want to create the list directly with no list design. Choose Layout mode if you want to define the layout of your list yourself.
    SQVI Table Quick viewer – Used to created quick client dependent reports
    Probably the easiest and most flexible way to do this is thru one of the ABAP query transactions.
    Transaction SQVI can do this and it has a very good help function that explains how it works... the drawback is that it is only for one user.
    You can play around with it and see if it meets your needs...
    The query results will come back in an ALV Grid or Excel... you can select what fields are returned, and have a selection screen to enter the search criteria.
    You can get the report by joining the tables VBAK and VBAP.
    If you have any queries, i will forward screen shots to your id.
    Reward points pls.
    Regards,
    Govind.

  • Delivery date and sales order creation date

    Dear all
    Can you please explain the relation between delivery date and sales order date. In my case i can create delivery with delivery date as before the sales order date... how it is possible that i can create delivery before the sales order date.??
    Please explain.........
    Warm Regards
    Inder Pal

    Hi,
    Sales order date: Date on which the customer officially places an order to your company.
    All the commitment and product allocation counting starts with reference to this date.
    e.g. customer says that the goods are required from 20 days of placing order, then from this date the calculation starts.
    Delivery date: Date on which after the system goes through material availability date, replenishment time, calculates the date on which physically the goods can be delivered to the customer.
    e.g. customer orders 100 qty of material X in 15 days, you will hve to check this delivery date through availability check which can be done in sales order and also delivery.
    payment date is based on this delivery date.
    regards,
    Siddharth.

  • Delivery not before date and Delivery not after date

    Hi Everyone,
    Can anyone help me in this issue, we need to map "delivery not before date" and "delivery not after date" from an EDI 850 into a sales order.
    Are there any fields to which we can map the data? if not would anyone suggest how to go about it?
    Thanks,
    Michelle.

    Michelle,
    We have a similar requirement, albeit we call it a Delivery Window. We have implemented this by mapping two E1EDK03 qualifiers (we use 033 & 034) to two Z fields extended to VBAK, which we then include in our Sales Order Delivery Date logic.
    Not very elegant, but then my understanding is that SAP has no concept of the Delivery Window.
    Cheers, Paul.

  • What is the difference between delivery date and actual goods issue date?

    Hi ,
    Can you please tell me the difference between Delivery date and Actual goods issue date ?
    Delivery data can be be greater than goods issue date?
    Thanks,
    Ajay

    Hi Ajay,
                  Delivery date means its the original date on which the delivery should be done.Actual goods Issue date is the date on which goods to be delivered according to the purchase order.There can be delay in the delivery so we maintain 2 objects.
    Yes delivery date can be greater than Goods Issue date.
    Hope this clears
    Regards
    Karthik

  • SRM7 grouping items in RFx despite of multiple delivery date and locations

    Hi Gurus,
    I need to know for a proposal of SRM 7 implementation, WITHOUT  the newest E-sourcing component,  how to solve the following scenario:
    We are gonna use the SRM7 classic scenario where PO is created in ERP and Shopping cart  is created in SRM.
    In Plan-Driven Scenario for Third Party Sales Order, TPO will be created in ERP, Shopping carts, RFx and contract in SRM, PO will be triggered in SRM and created in ERP.
    1.       We have 8 main customers (Sold-To Party), 50 Items, 40 Ship-To (locations) 4 delivery dates for each item to each location.
    2.       Under Each Sold-To Party, there are several Ship-To party (Locations)
    3.       For each location, there could be multiple delivery dates. 
    4.       In the Third Party Sales order (TPO), each material could be repeated several times because of the multiple delivery dates and multiple locations;
    5.       After saving TPO, the system automatically generates Purchase Requisition (PR) in background.
    6.       For each delivery date in TPO, the system creates a separate line in PR. These lines will be converted into line items in shopping carts in SRM.
    7.        Total # of lines in PR would be:
    a.       8 (main customer) X 50 (items) X 40 (locations) X 4 (delivery dates) =  64000 lines in PRs è same number of lines will be created in SRM in Shopping carts (SC)
    8.       In sourcing, we have the option to convert these SCu2019s into RFx. This means we will send 64000 lines for the vendors to give their quotes while we actually have only 50 items.
    My questions:
    1.       In standard SRM, is there a way to create RFx for the total quantities for item? i.e. can the system read all SCu2019s and sum all the qty for each item, regardless, of the locations, customers, delivery dates and create one line item in the RFx. i.e RFx should be send for 50 items only?   If so, which functionality or work-around should I proposed to meet the req.?
    Regards
    Thanks
    Livio

    Hi Ramki,
    According what you say I assume that this specific requirements in SRM7, without  E- sourcing , CANNOT  be executed in a standard way, it makes sense to me.  Can you firmly confirm it?
    My real worry is that, eventually, in this last version of SRM7 could be already covered, somehowu2026 that why my post. 
    Can you give me some more details when defining the u201CAggregator txnu201D please (u mean txn or txt? And why)? 
    I mean, If I understand good, must be a development which finally summarize the quantities for each material and create the SC/PR and related RFx.
    The PO, created from the RFx, will collect all the delivery date and location from a custom table.  The custom table is a pointer between TPO, delivery date, location and RFx. Am I correct?
    Thanks
    Livio

  • Fieldes planned delivery date and actual good recipt date for SAP QUERY

    Hi Gurus
    I am changing sap query. I need to find two fieldes  : planned delivery date and actual goods recipt date
    I dont know MM tables, do you know wrhere are?
    in table EKPO i don't find the fieldes.
    Thanks in advance

    Thank a lot!
    Regards

  • Planned Delivery Date and Actual Delivery date.

    Hi,
    Is there a report in SAP which shows the delivery date of a PO line item and actual GR posting date from PO history in one report?
    I need to display the planned delivery date and actual delivery date in one report, preferably in columns next to each other.
    Thanks in advance.

    Hi
    To my knowledge there is no such report. You will have to develop this report through ABAP help. You need to pick the planned delivery date from the PO and GR posting date from material document. Both this fields (EEIND & BUDAT) can be viewed in the PO history.
    However, challenge will be when you have multiple delivery dates and receipt posting dates are for part quantities.
    Regards,
    Jagadeesh

  • Delivery date and shipping date

    Hi,
    Delivery: individual delivery
    Shipment: collection of deliveries which has to be delivered if route is same.
    Then, my question is whether the shipping date and delivery date is same for a particular order? Then what is the filed and table for shipping date?
    Regards,
    Sooraj.M

    Hi Sooraj,
    The delivery document’s delivery date (LIKP-LFDAT) is independent of the various dates found on the shipment document to which the delivery belongs.  Shipment processing will not automatically change LIKP-LFDAT. 
    There are several planning and execution dates on the shipment document that can be considered the “shipment date”:
    Check-in
    Loading start
    Loading end
    Shipment completion
    Shipment start
    Shipment end
    All of these are found on the shipment header table VTTK.
    Regards,
    Ken

Maybe you are looking for