FM for List of Work Center.

Dear Friends,
I am looking for the functional module which give me list of work center ;
Like Customer will provide the product requirement and depend upon product specification i should get the specific work center where the product will manufacture.
Regards

Check with Below FM's :
CR_WORKSTATION_READ
CR_WORKSTATION_CHECK
Search in SE37 like CRWORK and thereis no BAPI
Table name is CRHD
Thanks
Seshu

Similar Messages

  • Is it possible to find the Equipment for given PP work center?

    Hello PM Masters,
    Is it possible to find the Equipment for given PP work center?
    Please tell me which table will lend me the EQUNR when I have the PP work center (ARBPL).
    Thank you.

    Yes,
    Provided you maintain this value in Equipment master Location tab like this.
    And then query by this field in IH08
    Jogeswara Rao K

  • Fields for Super BOM, Work Center & Super Routing for Variant Config

    hi! gurus,
    Please can you give me mandatory fields & values for Super BOM, Work Center & Super Routing for Variant Config
    thank you

    Hi,
    In the Super BOM you need to maintain the object dependencies.
    Workcenter fields are as usual for other production processes.
    Also you can use search option in the forum to view the threads posted in the past. There are many posts related to variant configuration.
    Regards,
    Senthilkumar

  • Capacity list from work center

    Hi all,
    there's some BAPI or MF to retrieve a capacity's list from work center ?
    tks,
    bye

    Dear,
    CRHD-wc header table  and CRCA- assignment of capacity to WC.
    From CRHD - pass WC name to CRHD and get the object ID
    Pass this Object ID to CRCA to get the capcity in WC.

  • SAP Code to Return Production Order List for a Given Work Center

    We are looking for native SAP code (BAPI, BADI, FM, ...) that would take a work center value as a parameter and then return all the production orders that have been assigned to that work center.
    We are running 4.7 and do not have access to BAPI's BAPI_PRODORD_GET_LIST or BAPI_PRODORD_GET_DETAIL.
    I believe we could write our own BAPI for this but was hoping that SAP had something natively embedded that we just can't find at this point.
    Thanks in advance for any information you might share!!!
    Chad

    Thanks, Srini
    This was very helpful.
    We're looking for an SAP object that we can interface into xMII.  So the logic in this report is useful but a BAPI, BADI, or RFC would be ideal.
    Thanks again,
    Chad

  • User exit/Badi for changing operation work center based on service product

    Hi,
    I have an requirement to change the operation work center based on the service product in IW31/IW32 transaction. I am using the BAdi 'IM_SM_BADI_READT399A' for changing the main work center. It changes all the operation work centers except the first one. But I need to change it all the operations.
    Thanks in Advance.

    I am using the enhancement spot 'IWO1_TL_INTEGRATION2' for changing the first operation work center

  • Employee Responsible for a work center

    Good Morning,
    We use Project Systems in order to do project management within SAP.  We use the work center to define the team structure.  I know that there is a place to maintain the person responsible for a work center in the config, but the entry here is a text field.  We are trying to link the owner of a workcenter back to the reporting structure that can be pulled from HRP1001, and a text field makes it more difficult to track this back to the HR side.  We currently enter the name of a manager in this field, and if there is no other place to define the person responsible using a pernr, we'll have to start using this field to enter personnel number.  This will allow ABAP to pull the pernr and trace it to a position number on HRP1001.  I'd like to keep the manager name in this field if at all possible though.  Any help will be much appreciated.  Thanks in advance.

    HI,
    Create a Cost center using T code - KS01.
    Create an activity type using T code - KL01.
    Assign the Rates for an activity type & cost center combination using T code KP26.
    In the input screen of T code KP26 ,enter version as 0, from period 1 and to period as 12 and the Fiscal
    Year as 2009,enter the cost center, activity type click on overview screen (F5) & enter the per hour Rate
    After performing this in work center assign activity type & cost center
    should be assigned. Then while creating routing/task list this work center can assigned for performing
    as per the operation time, whichu2019s used by the work center, the cost is getting calculated.
    Overhead cost is the indirect cost which's spent during production.
    So when the cost rollup is taken using T code CK40N (or else using CK11N estimating & CK24 for
    Hope You will get some idea
    Thanks and regards
    E.Rambabu

  • BAPI for getting Equipment and Resources for a WORK CENTER

    Hi All,
    I have a requirement where i need to get all the equipment list for a given work center. So its Interface should be like
    Input -- Work center
    Output -- Table filled with Equipment list
                   Table filled with Resource(Person) list
    Please let me know if i need to provide other additional information also.
    Thanks ,
    Abhishek

    Hello,
    I think What you providing input is right.Just would like know how will you get Person Responsible out put list??
    Please Use The table ITOB to fetch the Equipment List according to Work Center as Input.
    OBJID=Put work center ID in CRHD Table you will get the OBJID then you have use the OBJID in table ITOB for  getting the equipment data.
    Regards,
    Rakesh
    Edited by: RAKESH ASHOK MANE on Oct 1, 2010 9:13 AM
    Edited by: RAKESH ASHOK MANE on Oct 1, 2010 1:20 PM

  • Activity Types for a Work Center

    Dear Experts,
    I have done KL01 and KP26 transactions. That is I ahve defined the activity and assignes a cost conter to it.
    Still, when I am trying to enter the activity type in costing tab while creating the work center, the system throws an error as "No activity types are assigned to the cost center XXXXX, controlling area XXXXX....."
    The Msg No. is CR 091.
    Please guide me to find out where I am missing something?
    Thanks & Regards,
    Rohit.

    HI,
    Create a Cost center using T code - KS01.
    Create an activity type using T code - KL01.
    Assign the Rates for an activity type & cost center combination using T code KP26.
    In the input screen of T code KP26 ,enter version as 0, from period 1 and to period as 12 and the Fiscal
    Year as 2009,enter the cost center, activity type click on overview screen (F5) & enter the per hour Rate
    After performing this in work center assign activity type & cost center
    should be assigned. Then while creating routing/task list this work center can assigned for performing
    as per the operation time, whichu2019s used by the work center, the cost is getting calculated.
    Overhead cost is the indirect cost which's spent during production.
    So when the cost rollup is taken using T code CK40N (or else using CK11N estimating & CK24 for
    Hope You will get some idea
    Thanks and regards
    E.Rambabu

  • BAPI for reading capacity of a workplace/work center?

    Hi,
    I'm looking for a BAPI/RFC using SAP MII to read the capacity of a workplace/work center in a given time period (eg. one or more days/weeks/...). I would like to use the import parameters plant ( WERKS ), date from, date to, workplace/work center (eg. CRHD-ARBPL ) and capacity category (eg. KAKO-KAPAR ). As output I would like to get a list of (planed/used) capacities as the working time for the given time period at the specified workplace/work center.
    In theory the BAPI CBP_EXC_WC_CAPACITY_REQUEST nearly does what I want. The only drawback is, that it outputs the "wrong" time.
    Let me give an example: The work center uses at a given day a capacity from 6 to 22 clock, including one hour break. This gives us a working time of 15 hours for this workplace and day. And "15h" is the time I need. But as there are working 5 worker at this work center the BAPI CBP_EXC_WC_CAPACITY_REQUEST returns 75 hours (which is 5 * 15). But the result "75" is useless for me as long as I don't additonal get the number of workers.
    I've searched in our SAP system and in this forum, but wasn't able to find another BAPI that gives me the correct time. As an alternative I would need another BAPI to get me the number of workers for a workplace/work center at a given time. But I also was out of luck finding one.
    Looking out for help,
    Simon

    Thanks for your fast reply!
    I have looked to both functions before. Beside that they are both not remote enabled (which is not such a big problem as I could copy them or build a custom BAPI around them) I'm not quite sure how they could solve my problem.
    If I got it right, I would first use CR_CAPACITIES_OF_WORKCENTER to get the KAPID and using it as input for CLOI_WC_CAPACITY_READ. But I have problems to understand the output of CLOI_WC_CAPACITY_READ. The data type of the capacity is a float ( FLTP ) and the number seems to be to big, eg. 9.800000000000000E+01= 98h for one day.
    Could you try to explain your solution once again?
    Thanks,
    Simon

  • Actual hours done against a work order for a Work Center by non-maintenance

    Hi All,
    I have below question with respect to work center.
    -If there is this actual work hours done on a work order by non- maintenance personnel for a certain work center and same is not reflecting under operation tab of work order, then where & how this hours (done by non- maintenance personnel) for a work order is maintained for that work center?.
    -In which database table these hours done by non- maintenance personnel for a work order is stored by work center wise.?
    Thanks

    Have a look at the document flow button in the order header.
    The confirmation data resides in table AFRU
    PeteA

  • Automatic release of production order for perticular work center

    hello,
    any body please help me how to set automatic release of production order when creation for a particular work center. please suggest me.
    Thanks & Regards
    Bhakta

    Dear,
    Use T Code COHVOMRELEASE here select work center as ZPACK then in header menu Program--Schedule in background here define as perodic job and set ferquency as Hr.
    Or Use Transaction SE38 to create  the variants for program PPIO_ENTRY and schedule it through SM36 or use standard variant as SAP&RELEASE.
    Please try and come back.
    Regards,
    R.Brahmankar

  • Capacity planning for Work Center

    I programmed time for a Work Center on internal activity, for 40 hr using 100% of one resource, the work center it has  a capacity of 8 hr each day, the activity gets a duration of 5 days and I indicated that it has to begin the first day of the next month.
    When I executed transaction CM01, I notice that the 40 hours are planned for the actual day and don´t respect the dates of the internal activity, I think it is a problem with the work center but do not find the error.
    Any suggestion where to look for?
    The data used for creating the Work Center on Capacities:
    - Capacity Category : 002 Person
    - Other formula: SAP008
    The data used for capacity:
    - Base unit of meas.:H
    - Start: 08:00:00
    - Finish: 17:00:00
    - Capacity utilization: 100
    - No. of indiv. cap.:1
    - Unit: H
    - Relevant to finite scheduling: active
    - Can be used by several operations: active
    - Long-term planning: active
    The data used for creating the Work Center on  Scheduling:
    - Capacity Category: 002 Person
    - Other formula: SAP004
    - Work dimension: Time
    - Work unit: H
    Best Regards...

    Hi,
    Please activate the capacity requirement in Capacity tab in CNR2.
    Thanks..

  • Function Module to get a work center's capacity requirements (load) within a given period

    Hi all experts,
    Currently I’m doing a capacity summary report similar to CM01, but with a summarized capacity availability and loading for a period.
    Selection Parameters: Work center range from and to, Period from and to
    List Format: Work Center, Avail Capacity, Loaded Capacity, Free Capacity, Load %
    I have found a standard function module (FM) to get work center's available capacity for a period, but still facing the challenge to find a FM to get a work center’s capacity requirements (load) in a period.
    I have read through all the related threads from the web, and tested the recommended FMs, but still cannot get a right result.
    Please help to provide some leads for a FM or the logic.
    Best Regards
    Philip

    Hello Philip
    The following function modules should be useful:
       - CY_PRIMARY_SELECTION            - Function module for selection of orders for the work center
       - CY_SECONDARY_SELECTION          - Check for additional criteria
       - CR_CAPACITY_AVAILABLE_PERIODS   - Reads the available capacity from work center
       - HR_PERSON_READ_TIME_INFO        - Reads the available capacity from person (modification)
       - CY_GET_PART_CAPACITY            - used only for the first period to read backlog
       - CY_LOAD_DISTRIBUTION            - Distribution key
    Please observe that these are simple function modules, not BAPIs, That means, they were developed to be used on the SAP internal programs and they are not supported by SAP when used in custom programs.
    BR
    Caetano

  • Work Center Routing

    Hi Gurus,
    Please can you explain in detail how Work center routing functions with T- Codes?
    And how it works?
    Regards,
    PMAddi

    Hi,
    For details of Work Center in routing u need to float ur query in PP forum. PM its work center and maintenance task list.

Maybe you are looking for

  • Error when Connecting to Remote Host

    Hi, I am not sure if this post belongs here or in the network section, if I need to repost this in the networks section please let me know! The problem is when I use an applet to connect to a remote host I get an error.I am am pasting the error below

  • How to deal with different Pixel Ratios?

    Hi, I have a project in which I use two different pixel ratios (0.9) and (1.2).  Now of course, they both look squished, and not only that but the exporting of the file is completely messed up, with black bars and still some squishiness.  Does anyone

  • Getting access to new customer deals

    My 2 year contract is about to end. If I cancel my service and move back to Comcast, how long do I have to wait before I can get access to the deals offered to new Verizon customers ?

  • Displays blank page when tried to access ORACLE Application Server Control

    Hi, I have successfully installed the Oracle SOA Suite using advance installation. But when tried to open ORACLE APPLICATION SERVER CONTROL by following the below path. start-> programs-> oracle-soa->ORACLE APPLICATION SERVER CONTROL, It displays a b