Getting a error while creating a product
hi
I am getting a error "please check the user set up" while creating and updating a product in iStore Administrator. System Admin user is able to create a product and also to update.Even assigned the all the roles and enrollments as such as for system admin user. Still i am getting the error.
please help me out to get red of this error.
regards
Nafisa
Hi Neel,
As ponited by you, the material type "PROD" is realted with creation of product group.I am able to resolve the error, "actually the work schedulling & MRP views were not activated for "PROD" resulting in the above error.
Thks for yr help.
Regards,
Nilesh
Similar Messages
-
Error while creating the product group by MC84
Hello Friends,
I am creating the product group by MC84, and in product group field i have given the product group name i.e P2345, and its description i.e product group for waluj, plant i.e cw01 and Base unit i.e KG.Now when i press enter system is throwing the error"The field is defined as the required field;it doesnot contain an entry."Message no.MG144.And with this error system is placing the cursor on product group field.As i have already given product group name than also system is throwing the error.
Though i know the alternative method to create product group by MMO1 and selecting the material type PROD, then also i want to know why system is throwing the error while creating the product group by MC84.
Please guide.Dear,
This message says that you have not entered a mandatory field.Enter proper values for all mandatory fields and then you will not get this error.
Try to create the product group as material of material type"PROD"
Then you go on adding the memebers in SOP Transaction.
In some of the versions of SAP it is the problem.
I have also faced this problem in some versions.
Regards,
R.Brahmankar -
Serial number error while creating the production order
Hello frds,
I am getting the following error while creating the production order.
"Item 000000 requires exactly 100 serial numbers for the asset".
If i give 100 serial numbers in the order, the error is solved. But i do not want to assign 100 serial numbers, i want to assign only 2 numbers.
I have tried using the new serial number profile also, but it is giving same error.
Kindly guide.
Regards,
Narendra BoraDear Narendra
Select the serial number profile and go to serialization procedure and set the ser. usage status 02 - Optional as below.
Procd Procedure description Ser.Usage
PPRL PP order release 02
since the serail number creation is optional for order relase this will allow you to relase with out error and with serail number assigned in partial.
Regards
Soundar -
Getting Connection error while creating Substituion Rule in UWL
Hi Everybody,
Getting below error while creating Substitution Rules in UWL.
"error for the u201Cconnectionu201D to SAP_R3_Finance ".
Can be able to see all Work Items belongs to me. getting the errror while creating Substitution Rule only..
Could anybody tell me what might be the Reason what steps i need to take to resolve this issue.
Thanks,
Naveen KumarHi Uds,
are you running SOA Suite on a Linux server and not on your PC and just running JDeveloper on your PC?
If so try creating the repository file specifying a directory on the Linux server.
For example to:
/tmp/sample_repository
So Choose 'File' from drop down menu
Enter /tmp/sample_repository
Click on create button
This should create the file called sample_repository in /tmp on the Linux server.
Can you tell us what your environment is?
Regards Cel -
Getting an error while creating a ERP Quotation from CRM Sales Web-UI.
Hi Experts,
I am getting an error while creating a ERP quotation from CRM Sales Web-UI. Here I am enclosing the screen shot. Please give me the solution for this.Thank you in advance.
Regards
Kishor Kumar.Hi Kishore,
Please refer to the link below -
Entry of ERP Sales Documents in SAP CRM - Sales Quotation and Order Management - SAP Library
Also, refer to the SAP note -
1446253 - FAQ note: ERP documents in the CRM Web UI (lead-to-cash scenario)
This note will give you the related topic and the configuration required through SAP help links.
Hope this will be useful.
Thanks and Regards
DJ -
Error While creating a Product Group
Dear All;
When running MRP, we would like to run it for specific materials only.
To do so, we need to group the materials in product groups.
While creating a product Group using T.code MC84, i get an error message
"The field is defined as a required field; it does not contain an entry
Message no. MG144"
Kindly advise me on how to resolve this.
Regards;
Richard.Hi,
Refer below OSS note:
Note 621753 - MC84: Error message when creating product group & it's related ones.
Regards,
Ram -
Error while creating a product group--Batch input error 9
Hi,
While creating a product group in T-code MC84, getting the error message" Product group can not be created (Batch input error 9)". Would appreciate providing yr help to resolve above issue.
Thks,
NileshHi Neel,
As ponited by you, the material type "PROD" is realted with creation of product group.I am able to resolve the error, "actually the work schedulling & MRP views were not activated for "PROD" resulting in the above error.
Thks for yr help.
Regards,
Nilesh -
Getting "SAPSQL_ARRAY_INSERT_DUPREC" error while creating a new layout
Hi,
I deleted a layout from a level. When I tried to create a new layout with the same technical name, I was getting a run time error.
Name of the error : SAPSQL_ARRAY_INSERT_DUPREC
Exception : CX_SY_OPEN_SQL_DB
I went to ST22 and analyzed the dump. I found that the entries for the layout that I deleted were still present in the following 2 tables:
1) UPP_PARAMT
2) UPP_ELEMT
My questions are:
1) Is there any possibilities that I can retrive the layout that I deleted with the help of the entries present in the above tables?
2) Can I remove the entries from these two tables so that I can create a new layout with the same technical name?
Thanks,
Seetharaman VHi Matt
Thanks for your comments. I was getting this error while trying to save the new layout i created and not during the creatiion.
Thanks,
Seetha -
Getting 401 error while creating a Report Data Source with MOSS 2010 Foundation
I have setup SQL Server 2008 R2 Reporting Services with SharePoint 2010 Foundation in SharePoint integrated mode. SharePoint Foundation is in machine 1 whereas SQL Server 2008 R2 and SSRS Report Server are in machine 2. While configuring Reporting
Services - Sharepoint integration, I have used Authentication Mode as "Windows Authentication" (I need to use Kerberos).
My objective is to setup a Data Connection Library, a Report Model Library, and a Reports Library so that I can upload a Report Data Source, some SMDLs, and a few Reports onto their respective libraries.
While creating the top level site, "Business Intelligence Center" was not available for template selection since SharePoint Foundation is being used. I therefore selected "Blank Site" as the template.
While creating a SharePoint Site under the top level site, for template selection I again had to select "Blank Site".
I then proceeded to create a library for the data connection. Towards this, I created a new document library and selected "Basic page" as the document template. I then went to Library Settings for this newly created library and clicked on
Advanced Settings. In the Advanced Settings page, for "Allow management of content types?" I selected "Yes". Then I clicked on "Add from existing content types" and selected "Report Data Source". I deleted the existing
"Document" content type for this library.
Now I wanted to created a Data Connection in the above Data Connection library. For this when I clicked on "New Document" under "Documents" of "Library Tools" and selected "Report Data Source", I got the error "The
request failed with HTTP status
401: Unauthorized.".
Can anybody tell me why I am getting this error?
Note: I have created the site and the library using SharePoint Admin account.Hi,
Thank you for your detailed description. According to the description, I noticed that the report server was not part of the
SharePoint farm. Add the report server to the
SharePoint farm and see how it works.
To join a report server to a SharePoint farm, the report server must be installed on a computer that has an instance of a SharePoint product or technology. You can install the report server before or after installing the SharePoint product
or technology instance.
More information, see
http://msdn.microsoft.com/en-us/library/bb283190.aspx
Thanks.
Tracy Cai
TechNet Community Support -
Co- Product Error while creating a production order
Hi,
While performing the Co-Products Approtionment at the time of creation of Production order..
we are facing a problem regarding cost apportionment I have crated a Source Structure and the cost element is assigned to that Source Structure but still iam facing this issue
kindly help me out.
the error msg is
Debit with cost element 9460404 cannot be settled.
Message no. KD549
Diagnosis
Costs/revenues exist for cost/revenue element 9460404. This cost/revenue element was given source assignment 40 in the source structure (-> settlement rule for sender -> parameters). However, there is no distribution rule with settlement type FUL for this source assignment or the total of the percentages for the rules is less than 100.
Note:
Full settlement settles all the costs and revenues which have occurred up to the settlement period and have not already been settled. In the case of periodic settlement, you can configure the settlement profile so that all the costs occurring in the settlement period are settled, or if an amount less than 100% can be settled.
Procedure
Maintain the distribution rules for source assignment 40 and settlement type FUL or use periodic settlement to settle less than 100%. Change the settlement profile for the sender as necessary.
Change settlement profile
Note:
Cost and revenue elements receive source assignment " " if you have not entered a source structure in the settlement rule parameters.Hi Krishna Murthy I went through the note but i couldnt recive a big help from that note.
I will explain the step by step process that i have done.
I am attaching the Screen shots of the issue.
1. For co-products I have created a source structure and Sec. Cost Elements were assigned in the source structure.
2. The source structure was assigned in the Material Master for co-products equally distrubuting the amount between 2 materials.
3. When we are trying to create a production order the error was displayed but the costs was getting calculated properly.
4. When I was settling the production order the same error was getting displayed.
I have tried various methods to resolve it.
1. I have created a periodic settlement rule and tried to settle but it didnt work
2. I have assigned the source structure in the settlement profile this also didnt work. -
Getting following error while creating a datasource connection with oracle database.
I have 32 bit oracle server installed in remote server.
and 64 bit sql server 2008 r2 report server installed, and 64 bit oracle client installed on my report server while create a new datasource
in the report server i am getting this error
Error
Attempt to load Oracle client libraries threw BadImageFormatException. This problem will occur when running in 64 bit mode with the 32 bit Oracle
client components installed
How can i fix this and let me know the reasonThis link will help you out.
http://social.msdn.microsoft.com/Forums/en-US/sqlreportingservices/thread/0a38fa00-31de-49de-b68f-4c5a4565e5b1?prof=required
Milan Das -
Error while creating a production order
Dear PP gurus
I am trying to create a production order of a material through CO01 , I am getting a error 05.05.2016 date comes after end of valid factory calendar. (Please correct
Although for all other material , no error is coming.
My factory calender is till 2015, but i am not able to understand why and how it is capturing the above date.
please help me how to correct it?
Thanks in advance
RegardsDear Aadi,
When your in operations screen
Extras > Scheduling > Schedule > operation overview = operation segments > Click on Gang chat icon
it should show you the days for ur base qty
then click on scheduling results then click on update material master & save
then Go to CA96
input plant
then mark a tick for ur material & click on update material master icon
then check in material master work scheduling view
Regards
Madhu -
Error while creating Partner Product Ranges
HI All,
I am working on Mobile Sales For handhelds module. I have created PPR types and now creating three PPRs:
ZHH_USERS PPR for Users
ZHH_Accounts PPR for accounts
ZHH_Products PPr for products
While creating the PPR (crmm_ppr transaction) , what is the Item tab? what values need to be fillled in the fields: Item Selection and ID/ Description? Right now I do not have any values in the drop down menu. Where and what do I need to configure? What is the purpose of this configuration?
I am gettign an error : field 'PROCESS_QTY_UNIT' is not defined for PPR type 'PRP_BUPA_I' / 'ZHHU'/RefType1'!
Please explain the meaning of this error.
Thank You
Rucha AtreHave you checked your config settings.
Search for "Permissible Partner Roles per Account Group" in SPRO
Make sure the vendor account that you are creating is using an account group that has your new partner in it. -
I am getting this error while creating Database manually.
SQL> @anupam.sql
create database anupam
ERROR at line 1:
ORA-01092: ORACLE instance terminated. Disconnection forced
ORA-01501: CREATE DATABASE failed
ORA-01519: error while processing file '?/rdbms/admin/dtxnspc.bsq' near line 20
ORA-00604: error occurred at recursive SQL level 1
ORA-19502: write error on file "/home/oracle/anupam/users02.dbf", block number
24704 (block size=8192)
ORA-27072: File I/O error
Linux Error: 25: Inappropriate ioctl for device
Additional information: 4
Additional information: 24704
Additional information: 53248
Process ID: 21047
Session ID: 1 Serial number: 3is your directory /home/oracle/anupam/ 100% full can you paste df -kh output
-
Error while creating a production order from a sales order
Hi
Even though the product has BOM when i try to create order with a sales order reference it is showing a warning message " NO BOM FOUND" . How to correct this error .
regards,
PradeepM.Dear ,
Goto -CS02-Enter FG -Goto Header -Staus Long Text -Check wether BOM status is set to 1 -Active .
Check the usage of the BOM -Should be 1-Production .
Check wether BOM is locked and Deltion Flag set -Header Status Long txt tab
Check the valididty of the BOM and Sales Order Schedule delivery date
Try and come back
Regards
JH
Edited by: Jiaul Haque on Jul 6, 2010 9:03 AM
Edited by: Jiaul Haque on Jul 6, 2010 9:04 AM
Edited by: Jiaul Haque on Jul 6, 2010 9:04 AM
Maybe you are looking for
-
Incompatible types - found java.lang.String but expected int
This is an extremely small simple program but i keep getting an "incompatible types - found java.lang.String but expected int" error and dont understand why. Im still pretty new to Java so it might just be something stupid im over looking... import j
-
Problem w Flash Builder 4 help
Hi all, I opened my help today for the first time and noticed that Flash Builder is not included, nor are there any filters. Am I going to have to reinstall Flash Builder or is there another way of getting it into my local help? Screenshot attached
-
SQL Query Problem - Please Help
Post Author: nmellick CA Forum: Data Connectivity and SQL Hello, I am trying to use a query in CR9 to pull the latest date of a DREXAM for each patient. The patient can have one item or several items. When I run this query, it only pulls back one r
-
Adding Movies to InDesign Documents
I successfully added a .swf file movie to an InDesign document and published to PDF - the first take went fine. Then I added audio to my (Captivate) file, republished as .swf, and placed it in another InDesign document. This time I get the message: "
-
What happens to content after my subscription expires?
Hi, this is my first time using an adobe product for a small business, and I'm trying to work out what happens after the subscription ends. I need to create three or four projects this year which I want to host on our employee learning system for the