Goods movement - without Standard cost

Hello All
In our existing client system, price control for new material X is maintained as 'S'. We have not maintained the standard price in it yet.
Ideally if price control is 'S' and you dont maintain a Standard cost of the material. SAP does not allows any goods movement on this material.
But without standard cost if I am able to raise a Purchase order (which is fine) and also able to do GR (using MIGO).
The result being GR is done and FI document is posted with PO price + MAP is updated with PO price.
Is it std SAP functionality or is there is a setting which I have missed.  Please let me know.
Note: Price control indicator for material type is 'S'.

Dear Rajeshwari,
1.You can use the plant specific material status to block the material for production,purchase and inventory management,by
creating a new key in OMS4 and set the value as B in all these parameters and assign this value in the material master in MRP1
view of the particular material and set the valied from date.
2.In case if you want to remove this valu or say you have carried out a standard cost estimate,you can remove the assignment in
MM02.
3.For blocking the production order creation for the materials that does not contain a standard cost use this BADI -
WORKORDER_UPDATE(method during Release).
Check this link,
Re: error msg if  no standard cost present  for  Production order target cost
4.Also go through the points suggested by Ajay,
Regards
S Mangalraj

Similar Messages

  • Re:No release of production order without standard cost estimate

    Hello Experts
    I do not want to release any production order without standard cost estimate
    I have come acroos the same problem raised by some other users and can you please suggest how to achieve this?
    Is there any way to achieve this without user exit?
    Thanks and Regards
    Subbu

    Hello Subbu,
    In this case, you need to put the status as "B4" Blocked in costing 1 view of material master, when you create the costing view and change it to "03" status when you released the cost estimate.
    Please note that this field can be overwritten in MRP view also. Hence please get the good control of material master and good coordination with PP team to achive this.
    Please let me know if you require any clarifications.
    Thank you,
    Regards,
    Santosh
    Please reward points if helpful.

  • Order settelement without standard cost estimate

    Hello,
    My Scenario MTS,
    Client doest not want to take Cost roll up (Standard cost estimate run) the price control code 'S' for all the Finish goods, Semifinish
    and raw materials.
    In this how to handle order settelment , variance calculation without standard cost estimate.
    Please provide configuration steps also.

    Hi,
    Can you let us know why your client does not want to update the std. cost price for a material?
    One of the key reasons for implementing SAP or any ERP system is to monitor the cost & value flows within the organization. Unless there is some compelling business need for it, you should strongly advise your client to go for costing of parts / assemblies.
    However if no costing is done & the std. price is '0' then if the activities have prices maintained, then when a confirmation is posted only the activity cost will be posted on the order. The variance calculated will then show only the difference if any b/n plan / target / actual activity costs, while part cost will remain zero.
    Regards,
    Vivek

  • Proceeding without standard costing for May08 and June08

    Hi,
    We have implemented Material Ledger here.
    The backlogs are on.
    We are still on May08 backlogs.
    We had to proceed without standard costing for May and now also for June which we would be able to finish by July 20th.
    After that we will be doing the standard costing run for July 2008 by 22nd July.
    I dont think we neeed to calculate and settle variances for May and June 2008.
    Please guide.
    Could you please guide me on what precautions that need to be taken.
    Also, when I do the actual costing (ML) run for July in August 2008, I think only the variances for July will be calculated and settled.
    Any material Ledger experts, please advise and guide.
    regards,
    Nidhi

    Hi Elaine,
    Thanks a lot for your reply.
    You are absolutely right.
    The system will not allow me to close July in ML, unless I have closed May and June.
    Also, the second option is completely ruled out. Every material has to be included in the ML run.
    For carrying out ML closing activities for previous posting periods, the note no. 361236 would help. Please advise.
    Also, Elaine, I am noticing that despite the fact that we did not do the standard costing run for May 2008, the system is using the standard cost estimate of April 2008 to calculate all variances.
    I checked the costs analysis of all process orders and the system is correctly calculating the variances for all process orders.
    So please suggest if the steps I am mentioning below are correct:
    May 2008:
    I will first calculate production variance using T code KKS1
    Then settle the production variance using: CO88
    Then I will carry out ML run for May using: CKMLCP
    May closes in Material Ledger
    June 2008:
    I will first calculate production variance using T code KKS1
    Then settle the production varinace using: CO88
    Then I will carry out ML run for June using: CKMLCP
    June closes in Material Ledger
    Then I will do the standard costing run for July 2008.
    (Also please note that we closed May and opened June in MM using MMPV, because one region is still in May backlogs while the other has started June backlogs. So the current period in MM is June and previous period is May 2008. This I guess should not have any impact on the ML run for May 2008)
    Please guide me with possible reconstruction of steps.
    Thanks a lot & regards,
    Nidhi

  • Does MB5L capture the data if goods movement without accounting document

    Dear Guru,
    Can you please advice me if the transaction MB5L capture the data for those goods movement without accounting document?
    Thanks and Regards,
    CW

    Since MB5L captures based on the material and valuation area, still you can see the postings that has been made non-valuated.

  • No release of production order without standard cost estimate

    Hi All,
    I have an requirement, that is production order for a material should not be released or saved if standard cost estimate for that period is not released. Basically it should not allow to release or save the production for that material, is SCE is not run for that period. I tried various options, i also overheard its possible through user exit and many people have succeed in that.
    Has anybody overcome this problem, please do let me know. And which user exit??
    Thanks in advance
    With Best Regards
    GJ.

    Hi...
    I have faced the same problem in my previous project. What i have instructed to my client is to take control of Master data and put the status as "03" Blocked for movement till the statndard cost is released for this material.
    You can relase the status to "E2" in Cross Plant Status Field in Costing one view once the cost estimate is released for the material.
    I hope this works for you.
    Please let me know if you require any fruther information.
    Thank you,
    Regards,
    Santosh
    Rewards points if helpful.

  • Process Order Creation without Standard Cost

    Hello All,
    I need a functionality.. If standard cost is not released for a period , system should not allow me to create a process order in the certain period.
    Is any standard configurations allow me to achieve this????
    Thanks & regards
    Mahesh
    Message was edited by:
            Maheshbabu M G

    Mahesh,
    Standard SAP allows creation of order without Std cost estimate. Only in REM you could make it give error.
    However I suggest you could implement the exit PPCO0006.
    In this the function module EXIT_SAPLCOZF_003 contains the import parameter CAUFVD_IMP which has material number (MATNR) and plant (WERKS). Pass these to table MBEW and get the value of STPRS (std cost). If this value is 0 then give the error.
    Hope this is useful....if so reward points and close this thread.
    Regards
    Ram

  • Mouvement 101 on material without standard cost

    Hello,
    I have a problem: The user can do mouvment 101 (Migo etc)  on material that don't have a standard cost.
    Normally, the system does not allow it
    Any idea why it happened ?
    Thanks in advance

    Hi
    (1) Check the Costing Variant you have maintained in the Project. Go to OPL1. Check the Valuation Variant and check MATERIAL VALUATION Tab for the Strategy Sequence maintained.
    (2) Check with your MM consultant if something need to be done in OMJJ.
    Hope it helps.
    Regards
    Babu

  • Goods Mvnt without PO number?

    Hi,
    Please provide me Link or Doc's for "Goods Movement without Purchase order number/ with reference ?"
    Thanx

    Hi  ,
    Search data Related to Movement Type 122  . You will get  help  from SDN search   .
    regards
    Deepak.

  • Goods movement in CO11

    Hi,
    In CO11 T.code ,the system allow to save the goods movement without saying any error message and waring messge  and the GOGI T.code is not displaying the problematic materials wihch have not issued during the confirmation.(9This problem is coming in PRD but QA server it is working fine.)
    Regards,
    Renuga.A

    Hi,
    The problem is coming due to SAP1-Process control key - OPKC T.code  -the value of backflush has has assigned to  background job because of this the user confirmed the PP order  without  any goodsmovement error .Now how to find that the materials which are not consumed during the confirmation because COGI report is not displaying the goodsmovement error.kindly give the solution for this.
    Regards,
    Renuga.A

  • Standard cost estimation after goods movement when material ledger is activ

    Hi!
    our client is activated material ledger, for some materials standard cost estimation is done till marking but not released.
    goods movements have been posted for those materials.
    Now system is not allowing to release the standar price for those material in the current period, as material ledger expects same price for entrie period.
    what is the alternative way to update the standard price for those materials ( with out reversing the goods movements).
    regs,
    ramesh

    Hi Ramesh,
    When you are using Material Ledger, after goods movemnets for materials, no need to change the standard cost estimate as Actual costing run will take care to derive the PUP price.
    If there is no standard cost estimation release for sold materials (e.g.FG), you will get an error message duirng the billing document release to accounting. To aviod this error, if you are using split valuation (valuation types) and mixing ratios (CK91N & CK94), try with the below steps:
    Create a new valuation type for the same material
    Crate CK11N & CK94,
    Run CK11N
    Run CK24.
    Then release the billing document.
    Let me know if you need more details.
    Thanks & Regards,
    ADI

  • Restrict all goods movements for materials untill the latest costing run ex

    Hi dudes,
    1 here i have a requirement that i need to restrict all goods movements in the month for all materials(SFG,FG) untill the latest costing run(standard cost estimate) on 1st of each month.
    2. Can we restrict the status of process order in such a way that Conformation can be done only after the goods issues against production order. The goods receipt can be done only after the conformation of the process order.
    Thanks in advance.
    Robert.

    Robert,
    Procedurally you can block, by not opening the current period, before the costing run is completed, just when you wanted to release the cost estimate, at that time you can lock all users and then open the next period and then release your cost estimate and then unlock all the users. You need to work with your Basis/MM/FICO guys to have this procedure implemented.
    On the GI Check before confirmation and Confirmation check before GR, you can use Confirmation and GR releated User exits to check. There are many posts on this topic, a simple search on this forum would take you to the thread.
    Regards,
    Prasobh

  • Creation of Excise Invoice J1iin without goods movement (against PV Bills)

    Dear Expert,
    Could you please explain how to create an Excise Invoice j1iin,  in one scenario where goods movement does not take place.
    I am creating a sales order with a service material called price variation and billing it through VF01. Now on the basis of this invoice, i need to create an excise invoice either manually or automatically. Please advise urgently.
    thanks.

    HI
    As per std SAP you can not create the Excise invoice without any goods movement as said above.
    However, if the excise authourities ask for the excise invoice for sevice items with the declared number ranges(say 70000001- 700009999)  then, you can assign this number range to the service billing type in VN01 for this service billing type.
    Hence, when u create the service invoice (commercial invoice) it will generate the invoice number with the number  70000001 as declard to the excise authourities. Also you can take the print out of this with the reqd number..
    P.S: Nevertheles, You are not going to take any credit against this service invoice as it does not ahve any goods movements.
    Hope this helps.
    Reg,
    JJ

  • Goods Receipt without Costs

    Dear Expers,
    A colleague of mine has done Good Receipt without cost  when I go in Inventory posting the G/L Acct is missing because of this. How Can I rectify this... I have tried doing stock revaluation but its giving  BK-PLEASE ENTER A PROFIT CENTER....even tho I put in the profit center I get the same error msg.
    Thanks,
    Titi

    Hi,
    Please check the Note 1099094 suggested by Johnson.
    [https://websmp130.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/spn/sapnotes/index2.htm?numm=1099094]
    Yes of course if you valuing by Moving average. its highly crucial to maintain and you do MR - material revaluation the issue is more the cost is increased. The cost will have increased.
    ( (Item price* qty) + (available item price * qty) ) / total quantity. Please do calulation it will all be correct to the value inthe system.
    Please be careful with these type of transaction.
    Regards,
    Rakesh N

  • I spilled some pop on the back of my iPad. I cleaned it off and everything seems to be going good but when I play music it will either play with no sound or play then continue with no sound. What can I do to fix this (without being costly, it's a iPad 2)

    I spilled some pop on the back of my iPad. I cleaned it off and everything seems to be going good but when I play music it will either play with no sound or play then continue with no sound. What can I do to fix this (without being costly, it's a iPad 2) this happens with other music apps too. Please I need help!

    You can try resetting your iPad by simultaneously pressing and holding the Home and Sleep/Wake buttons until you see the Apple Logo. This can take up to 15 seconds so be patient and don't release the buttons until the logo appears.
    Try again to see if the problem persists. If it doesn't work, there isn;t much anyone here can do for you. It may be a physical problem with your speakers.

Maybe you are looking for

  • "Formatted for mobile viewing by Google"

    When you use Google's mobile search engine with the built-in Nokia browser and choose one of the resulting links, does the site ever appear "formatted" by Google?  This has happened now for several weeks and is driving me crazy!  Why?  Because their

  • Generating IDoc DDF structures for EDI mapping

    Hello all, I am looking for a way to generate IDoc DDF structures to use them in the EDI mapping in Gentran. I was able to find one on ERPGenie.com (developed by Kevin Wilson) but it is only available for ECC 4.x. We are on ECC 6 and the program give

  • Datagrid style

    In addition to the borderThickness of the datagrid, the header of a datagrid has a thin (1 pixel) border between the header and the body. Is there a way to remove the border?

  • Unable to connect to internet - On-Board Ethernet Grayed Out

    Hi, This is my first post.... I have had my iMac for 2+ years and have had no issues. I recently updated to the beta version of Safari and had issues with hotmail not working. So I uninstalled and went back to the "old" Safari. When I did this iTunes

  • Can I turn off autofill on my email?

    can I turn it off or delete the information?