Process Order Creation without Standard Cost

Hello All,
I need a functionality.. If standard cost is not released for a period , system should not allow me to create a process order in the certain period.
Is any standard configurations allow me to achieve this????
Thanks & regards
Mahesh
Message was edited by:
        Maheshbabu M G

Mahesh,
Standard SAP allows creation of order without Std cost estimate. Only in REM you could make it give error.
However I suggest you could implement the exit PPCO0006.
In this the function module EXIT_SAPLCOZF_003 contains the import parameter CAUFVD_IMP which has material number (MATNR) and plant (WERKS). Pass these to table MBEW and get the value of STPRS (std cost). If this value is 0 then give the error.
Hope this is useful....if so reward points and close this thread.
Regards
Ram

Similar Messages

  • Order settelement without standard cost estimate

    Hello,
    My Scenario MTS,
    Client doest not want to take Cost roll up (Standard cost estimate run) the price control code 'S' for all the Finish goods, Semifinish
    and raw materials.
    In this how to handle order settelment , variance calculation without standard cost estimate.
    Please provide configuration steps also.

    Hi,
    Can you let us know why your client does not want to update the std. cost price for a material?
    One of the key reasons for implementing SAP or any ERP system is to monitor the cost & value flows within the organization. Unless there is some compelling business need for it, you should strongly advise your client to go for costing of parts / assemblies.
    However if no costing is done & the std. price is '0' then if the activities have prices maintained, then when a confirmation is posted only the activity cost will be posted on the order. The variance calculated will then show only the difference if any b/n plan / target / actual activity costs, while part cost will remain zero.
    Regards,
    Vivek

  • Process order creation without master recipe creation

    Hi, i have created a finished product and i dont want to create the bom and master recipe for this finished product. when i create the process order for this material, i want system to copy the master recipe of the similar products either manually or automatically. please advise how to achieve the same.

    Dear Raju,
    Check these threads,
    Re: Create Process order without Production Version
    Production Order for a material without BOM and Routing
    Regards
    Mangalraj.S

  • Order  Creation Without cost estimate

    Dear All,
    Please guide me how can i restrict process order creation of a material if its cost estimate was not run.
    Now i m facing a problem that system creates process order while i did not run cost estimate of that material.

    Dear Shoaib,
    Use the BADI - " WORKORDER_UPDATE" using the method at save or at release .You can write the FS for building the logic
    either using the method at save or at release to make a system check for the field LPLPR from the table MBEW,by passing the
    material and valuation area.
    Check this link to explore more, [Error message if no std.cost exists during Prod .Order creation|Re: error msg if  no standard cost present  for  Production order target cost]
    Check and revert
    Regards
    S Mangalraj

  • Re:No release of production order without standard cost estimate

    Hello Experts
    I do not want to release any production order without standard cost estimate
    I have come acroos the same problem raised by some other users and can you please suggest how to achieve this?
    Is there any way to achieve this without user exit?
    Thanks and Regards
    Subbu

    Hello Subbu,
    In this case, you need to put the status as "B4" Blocked in costing 1 view of material master, when you create the costing view and change it to "03" status when you released the cost estimate.
    Please note that this field can be overwritten in MRP view also. Hence please get the good control of material master and good coordination with PP team to achive this.
    Please let me know if you require any clarifications.
    Thank you,
    Regards,
    Santosh
    Please reward points if helpful.

  • Goods movement - without Standard cost

    Hello All
    In our existing client system, price control for new material X is maintained as 'S'. We have not maintained the standard price in it yet.
    Ideally if price control is 'S' and you dont maintain a Standard cost of the material. SAP does not allows any goods movement on this material.
    But without standard cost if I am able to raise a Purchase order (which is fine) and also able to do GR (using MIGO).
    The result being GR is done and FI document is posted with PO price + MAP is updated with PO price.
    Is it std SAP functionality or is there is a setting which I have missed.  Please let me know.
    Note: Price control indicator for material type is 'S'.

    Dear Rajeshwari,
    1.You can use the plant specific material status to block the material for production,purchase and inventory management,by
    creating a new key in OMS4 and set the value as B in all these parameters and assign this value in the material master in MRP1
    view of the particular material and set the valied from date.
    2.In case if you want to remove this valu or say you have carried out a standard cost estimate,you can remove the assignment in
    MM02.
    3.For blocking the production order creation for the materials that does not contain a standard cost use this BADI -
    WORKORDER_UPDATE(method during Release).
    Check this link,
    Re: error msg if  no standard cost present  for  Production order target cost
    4.Also go through the points suggested by Ajay,
    Regards
    S Mangalraj

  • Proceeding without standard costing for May08 and June08

    Hi,
    We have implemented Material Ledger here.
    The backlogs are on.
    We are still on May08 backlogs.
    We had to proceed without standard costing for May and now also for June which we would be able to finish by July 20th.
    After that we will be doing the standard costing run for July 2008 by 22nd July.
    I dont think we neeed to calculate and settle variances for May and June 2008.
    Please guide.
    Could you please guide me on what precautions that need to be taken.
    Also, when I do the actual costing (ML) run for July in August 2008, I think only the variances for July will be calculated and settled.
    Any material Ledger experts, please advise and guide.
    regards,
    Nidhi

    Hi Elaine,
    Thanks a lot for your reply.
    You are absolutely right.
    The system will not allow me to close July in ML, unless I have closed May and June.
    Also, the second option is completely ruled out. Every material has to be included in the ML run.
    For carrying out ML closing activities for previous posting periods, the note no. 361236 would help. Please advise.
    Also, Elaine, I am noticing that despite the fact that we did not do the standard costing run for May 2008, the system is using the standard cost estimate of April 2008 to calculate all variances.
    I checked the costs analysis of all process orders and the system is correctly calculating the variances for all process orders.
    So please suggest if the steps I am mentioning below are correct:
    May 2008:
    I will first calculate production variance using T code KKS1
    Then settle the production variance using: CO88
    Then I will carry out ML run for May using: CKMLCP
    May closes in Material Ledger
    June 2008:
    I will first calculate production variance using T code KKS1
    Then settle the production varinace using: CO88
    Then I will carry out ML run for June using: CKMLCP
    June closes in Material Ledger
    Then I will do the standard costing run for July 2008.
    (Also please note that we closed May and opened June in MM using MMPV, because one region is still in May backlogs while the other has started June backlogs. So the current period in MM is June and previous period is May 2008. This I guess should not have any impact on the ML run for May 2008)
    Please guide me with possible reconstruction of steps.
    Thanks a lot & regards,
    Nidhi

  • Problem in process order creation.

    Dear Sir/ Madam
                             i am facing a problem while process order creation.
    the problem is:
    Error when calculating cost for order ATFEDEC11  "see log Log is deleted when saving
    Do you still want to save?"

    Hi,
    The log for production order preliminiary costing is not saved. Therefore, once the order is saved, there is no log available anymore (this is by the way a question of PP; none of the logs is saved).
    Hope that helps...
    Regards,
    Declan

  • REGARDING PROCESS ORDER CREATION

    Hi All,
    While creating the process order for material, system showing the message that "Manual process order cannot be created for this product". But if we try with another user id, i could able to create the order for the same material.
    Plz suggest the solution to get rid of this error.
    Thanks
    Arvind S

    Hi,
    The message "Manual process order cannot be created for this product" clearly indicates that the user is not authorized for Manual process order creation by COR1 transaction for this material and may be this material is planned through MRP or SOP etc. and in critical or certain situations manual process order creation is allowed to another user/user id for the same material ( type of materials/material code).
    Some time organizations put such restrictions through enhancements. You can search the exact reason or logic of restriction by the help of ABAP consultant.
    Regads,
    Narresh

  • External Number gneration for process order creation

    Hi,
       I need to generate external number range for process order creation and at the time of goods receipt.
       How can I do this in the include ZXVBZU02.
    Regards
    SAi

    You might want to try search first:
    http://www.google.com/search?hl=en&source=hp&q=externalnumberrangeforprocessordersite%3Asap.com

  • TCODE for Process order creation against Sales order

    Hi gurus,
    Pls tell me what is the TCODE for Process order creation against Sales order
    Eg. CO07 is for production order from sales orde

    Typically, in MTO scenario after the sales order is created you run MRP which will create planned order and then you convert that into production order using MD04.
    Or if you have SD settings correctly directly from the release of Sales Order it will create planned order or production order.
    please check and revert back.

  • No release of production order without standard cost estimate

    Hi All,
    I have an requirement, that is production order for a material should not be released or saved if standard cost estimate for that period is not released. Basically it should not allow to release or save the production for that material, is SCE is not run for that period. I tried various options, i also overheard its possible through user exit and many people have succeed in that.
    Has anybody overcome this problem, please do let me know. And which user exit??
    Thanks in advance
    With Best Regards
    GJ.

    Hi...
    I have faced the same problem in my previous project. What i have instructed to my client is to take control of Master data and put the status as "03" Blocked for movement till the statndard cost is released for this material.
    You can relase the status to "E2" in Cross Plant Status Field in Costing one view once the cost estimate is released for the material.
    I hope this works for you.
    Please let me know if you require any fruther information.
    Thank you,
    Regards,
    Santosh
    Rewards points if helpful.

  • Target Cost in the settled process order become zero after cost deletion

    Dear all,
    User has standard cost estimates created in Jan 2010 that valid until the end of 2010 for every material in the system.  user created a process order in April 2010. Target cost of the order was created based on the standard cost estimate and recipes as well as order qty.    The order was also confirmed and settled in April 2010 without problem. 
    However, after I deleted all old costing estimates before I did a costing run for all materials in May 2010, the old order was resettled and all Target cost is removed from the order.  I guess system try to look at April costing estimate but it is not there since it was deleted before I created the new costing estimate in May.  Therefore, all varainces are throwed into remaining variances since the target cost become zero.
    Other than mark the settled order for deletion or keep all old costing estimates,  I am just wondering is anyway in the configuration to prevent the system to recaculate the target cost again for the settlement so I can avoid the problem happens?
    Thanks.

    Hi,
    Target costs are only calculated after goods movements have occured on the order, the Target Costs are then calculated during the Variance calculation.
    Target costs will only be calculated after the first goods receipt has been posted to the order. Also you have to ensure that the information to calculate target costs exists on the system in particular in OKV6.
    This estimation is based on the customizing for the Target cost version in transaction OKV6 as in turn will the "real" calculation of the Target costs via the variance calculation.
    So in OKV6 the Target cost will be based on preliminary costing on the order, an alternative cost estimate or the current standard cost estimate. Importantly if the choosen option is not fulfilled e.g. no current standard cost estimate, the target costs will not be predicted or calculated.
    regards
    Waman

  • OPM Process Execution and OPM Standard Costing for Poultry Business

    I have a business requirement from the client at their Poultry Processing plant where the client feels that the OPM Execution steps are too cumbersome until closing the batches. The client wants to maintain minimum number of batches in Production: one for Primary, one for Secondary and one for Further Processing, rather than having multiple batches based on different formulas. There are 3 main types of processing which can be briefly described as follows:
    A.) Primary Processing:
    Live Birds (Ingredient) become Whole Dressed Chicken with Neck, without Neck, Liver, Heart, etc... (40 Finished Products)
    e.g. Live Birds (Broiler) -> Whole Dressed Chicken with/without neck, Whole Dressed Chicken with/without neck, etc.
    B.) Secondary Processing:
    Only one type of Whole Dressed Chicken (from Primary Processing) become Chicken Cuts (80 Finished Products).
    e.g.[Scenario B1] Whole Dressed Chicken (Broiler) -> Drumsticks, Thighs, Wings, Breasts, Backbone, etc.
    [Scenario B2] Breasts -> Filets and Deboned Breasts (2 FGs)
    [Scenario B3] Thighs -> Thighs in Plain Bag
    Please note that the Whole Dressed Chicken is also sold as a Finished Good as well as an Ingredient for the Secondary Processing.
    C.) Further Processing:
    Chicken Cuts become 40 Finished Products
    e.g Filets -> Chicken Nuggets, Chicken Fries, etc...
    The client is using Standard Costing method for its OPM Financials and all the finished products (160 Products in all) are having different production cost. Please note that 1 kg of Chicken Wings is not equal to 1 Kg of Chicken Thighs. Different body parts have different costs. In order to alleviate the maintenance of multiple batches per day on the production floor, the client wishes to have minimum batches. We therefore would wish if you can confirm the below approach to be correct?
    a.) OPM Process Execution:
    ==========================
    EITHER should I (Option 1):
    a.) Create ONLY 3 Formulas for Primary, Secondary and Further Processing . The 3 Formulas will have all the processing line Finished Products grouped together (as per the scenarios explained above). Formula for Primary and Secondary Processing can also combined together, reducing it to only 2 batches to maintain per day.
    b.) Can set any Quantity Values for the Ingredient, Product and By-Product in the Formula details with ANY Cost Allocation (amounting to a total of '1') in the Products section
    c.) Set the Validity Rules as 'PRODUCTION' for the 3 Recipes
    d.) Complete the steps defined in the 'OPM Cost Management' (as described below)
    e.) Create the 2 or 3 batches and record the appropriate quantities at the end of the day before closing the batches
    OR should I (Option 2):
    a.) Create MULTIPLE Formulas (above 100 formulas) for Primary, Secondary and Further Processing based on the different products processed.
    b.) Can set any Quantity Values for the Ingredient, Product and By-Product in the Formula details with ANY Cost Allocation (amounting to a total of '1') in the Products section
    c.) Set the Validity Rules as 'PRODUCTION' for the 3 Recipes
    d.) Complete the steps defined in the 'OPM Cost Management' (as described below)
    e.) Create the MULTIPLE batches and record the appropriate quantities at the end of the day before closing the batches.
    b.) OPM Cost Management:
    ========================
    Whether (Option 1 or Option 2) selected, the below needs to be set for OPM Costing:
    a.) Define multiple formulas (above 100), as in Option 2.
    b.) Set the Quantity value to be '1' for the Ingredient, Product and By-Product in the Formula details with the appropriate Cost Allocation in the Products section
    c.) Set the Validity Rules as 'COSTING' and 'PRODUCTION' for each Recipe
    d.) Run Cost Rollup at least once so that the products can have an item cost per unit
    As per me, for the purpose of Costing, it would be imperative to have multiple batches (created one time only) with appropriate Cost Allocation in the Formulas and the ‘Recipe Use’ in the Validity Rules should be set as ‘COSTING’. Then, setting Profile Option 'GMF: Use Only Costing Validity Rules for Cost Rollup' to 'Yes'. In this way, we are sure that the different products in the formula with correct Cost Allocation will have their Item Cost calculated after performing the Cost Rollup. AND, for the purpose of operations, we can only one combined formula of Live Birds (as Ingredients) to yield -> All FGs for Primary and Secondary Processing with Cuts. But, this time, the ‘Recipe Use’ in the Validity Rules of the Recipe should be set as ‘PRODUCTION’.
    I want to confirm which approach (Option 1 or Option 2) is more appropriate in terms of Operations and confirm that the above proposed steps are correct with no circular reference (as certain finished products are also used as ingredients for another product in the Secondary Processing)?
    Thanks and regards
    Raveesh Nobeen
    [email protected]
    Edited by: user12189219 on Jan 20, 2010 3:48 PM

    Hi Raveesh
    I am implementing OPM R12 in Poultry Processing business, I think option 1 (Create 3 formulas/recipes/batches) is more appropriate. In my case we are using actual costing (Moving Average) as a costing method.
    I have set the profile option GMF: Cost Allocation Factor Calculation to be "Dynamic" to calculate the batch cost allocations as a ratio of actual quantity of each product produced to the total production batch output quantity and I have used OPM Financial Cost Allocation process to allocate GL expenses on different products based on Fixed percentage % according to product "value" where Filets has a return more than wings.
    Can you please share your knowledge in this business area and confirm to what extend my approach is correct ??
    Thank you and best regards
    Mamdouh Ragab

  • Automatic Reservation at the time of process order creation

    Hi Experts,
    As you are aware, when we create a process order and save, system automatically generates the reservation and the reservation will be for movement type 261. My requirement is like this. When system creates reservation, system should consider for which order type the process order is created and create a reservation for other movement type also.
    For eg. Iam having order type ZRRW. When system creates reservation at the time of order creation, system should check the order type and reservation should be created for a movement type Z11 instead of 261 in the normal case.
    Is there any user exit for the same. Please let me know.
    Else how can I post the goods issue with a movement type other than 261. MIGO is not accepting other movement types.
    Anticipating your reply
    Regards
    Prathib

    Hi Ayethebing,
    Thanks for the reply. we created the new movement types inorder to use the SAP standard reports and get the different types of goods movements based on the different processes.
    We can do the goods issue using the custom movement type through MB1A. But I was trying to use in MIGO and this is where system wont allow this.
    In MIGO, system will do the goods issue based on reservation only. The reservation is created at the time of order creation and it uses movement type 261 irrespective of the order type.
    I was trying to find out whether any option is there to use custom movement type to create reservation so that system would propose this movement type in MIGO for goods issue against process order.
    This is an interesting case but unfortunately dont have any option of user exit or Badi. Only one user exit related to reservation is to change the str loc and back flush indicator.
    @Sabine: Thanks for your reply. But the BADI that you provided wont serve the purpose.
    Thanks
    Prathib

Maybe you are looking for

  • How to change owner of queries and transport.

    Hi Experts, Earlier the queries are designed by some other user.According to business requirements I have customised the data targets and infosets also accordingly.All queries are designed on infosets only. If I  am coming to query designer to change

  • How do I get a list of filenames in a library

    Last night I started importing roughly 31,000 photos and videos into an otherwise empty iTunes library from a remotely mounted Windows share. This is iTunes 9.5.1 on a new MacBook with Mavericks. This morning the import seemed to have completed, but

  • Endpoint for FTP based proxy in Linux-urgent

    Hi, I have configured FTP based proxy. Both FTP server and ALSB are running on same machine. I have configured endpoint as ftp://<ip>:21/. FTP directory is /home/alsb I have also mentioned error,archive and download dirs in /home/Dir/download ,/home/

  • Since using FF 5, my File Send link.. has quit working

    Since using FF5, the File > Send Link... has quit working. Also, FF 5 takes a log time to start and a really long time to Exit.

  • HT4059 How to recover Sample books in iBooks?

    Though iBooks allows you to recover lost purchased books redownloading from, an option like this doesn't exist for downloaded samples. Case in point, I download samples of books in iBooks as a way to capture books that I intend to buy -- instead of k