GR cancel posted in SUS created 101 in backend

We are in SRM6.0 SP03.
We have implemented SRM-SUS (extended classic scenario). When we cancel GR in SUS it creates reversal in SRM but it created 101 in backend. The IDOC is having 101. Please help.
Thanks, Sachin

Virender,
thank you for your reply, what sounds strange to me that in my POWL for GRN I have the button CANCEL/DELETE and the system ask me if i really want to delete the selected GR just before giving back that strange message.... It looks like if the functionality exists but doesn't work.
Are you sure you can't cancel a GR in SRM, what should be the procedure in this case?
Thank you in advance,
Fuffo

Similar Messages

  • Posting Document not created (export data missing)

    We are working on ECC 6.0 and during creation of Cancellation Billing document type IVS for the Intercompany billing, the document did not create Accounting document giving the Posting status as G - Posting document not created (export data missing). However checked the Foreign trade data and the system states that Foreign trade is complete.
    Can any one suggest the solution for this?
    Thanks.

    Hello Mohammad,
    About this issue, the incompletion of this cancellation document
    arises might because the reference delivery has been archived/deleted.
    This is likely due to your current copy control settings (VTFL).
    If you have set ' ', in the export determination field this means that
    there is a common 'exnum' key between the delivery and billing documents
    LIKP-EXNUM & VBRK-EXNUM are the same.
    The result of deleting the delivery is that you also delete the FT data
    for the delivery, Because the billing document and delivery share the
    same foreign trade table entries, you have in effect deleted the FT data
    of the billing document too. This would most likely go unnoticed but if
    you then cancel the invoice the system has no FT to copy into the new
    cancellation billing document, which leads to this issue.
    Firstly you should set the export determination flag in the copy control
    of the delivery & billing documents. This will avoid this issue in the
    future. Set it to to 'A' or 'B' depending on your requirements.
    For the incomplete cancellation billing document, you could use userexit to
    set it as complete:
    You can use transaction CMOD.
    Create a project for example FT project button create short text: ....
    drop button Enhancement assignment & save use for example local object.
    Use the F4-help for Enhancement and look for V50EPROP.
    Drop button Components:
    here you will find EXIT_SAPLV50E_005 and EXIT_SAPLV50E_006
    In the userexits doubleclick on the includes ZXV50U05 and ZXV50U06
    The coding in the userexits should be: C_COMPLETE = 'X'.
    Afterwards activate generate ... and save.
    The development class is VEI.
    Please also check note 118573 which explains the FT user exits.
    Regards,
    Alex

  • SRM-SUS: "Create Invoice" button not available in "Confirmation"

    A confirmation is created from SUS(702) and posted to ECC (607). Service Entry sheet is released in ECC.
    Supplier unable to see the "Create Invoice" button in the confirmation. Please advise what could be missing here?
    Is there any status update to Confirmation about the acceptance of service entry. I can see a Service-acknowledgement is posted into SUS but is not visible in the SUS portal.

    Hi,
    Did you check whether 'GR based IV' is clicked for respective vendor?
    Regards,

  • Cancel post goods issue..............

    How do I cancel post goods issue?Process of how it happens?pls tell me.

    by useing the tcode VL09
    You caGoods issue reversal means that you cancel the goods issue posting for a delivery. This function enables you to remove the posting without having to create a returns delivery and then having to post a goods receipt for it (see also Processing Returns After Goods Issue Posting). This function can be especially useful if you have accidentally posted goods issue, for example, and you would like to reverse it. Goods issue reversal usually occurs shortly after goods issue posting.
    Integration
    The cancellation document is integrated in the document flow of the delivery.
    Prerequisites
    Goods issue reversal is only possible for movement types for which a reversal movement type is defined in Customizing. Therefore, if you have defined your own movement types for goods issue, you must also define the respective reversal movement types and assign them to the movement types for goods issue.
    Range of Functions
    When you reverse goods issue for a delivery, the system creates a cancellation document that adopts the quantities and the valuation from the original goods issue document, and also executes the respective value and quantity posting to stock.Procedure
    From shipping, choose Post Goods Issue ® Cancellation/reversal.
    The Reverse goods movement screen appears.
    Enter your selection criteria, for example, route, goods issue date, shipping point, and so on, and choose Execute.
    A list of all deliveries that correspond to your selection criteria appears.
    From the list of deliveries to be reversed, you can branch directly to a list entry in the delivery by double clicking on the entry.
    Select the deliveries for which you wish to reverse goods issue and choose Cancel/reverse.
    A dialog box appears.
    In the dialog box, confirm that you want to reverse goods issue.
    Result
    The system reverses goods issue for all selected deliveries. It also generates a log of all the reversals executed and any errors that may have occurred.

  • Using MM-SUS create invoice can't change price

    Dear All,
       We used MM-SUS create invoice,we want to change the item price,how to do it?

    Hi Bill - Can you post the information of how to do it? This will be really helpful.
    Thanks,
    Sree

  • Array_key_exists('cancel', $POST)

    Good evening all,
    I'm trying to work thru the David Powers book "The essential guide to Dreamweaver CS4"  In chapter 14 he's explaining how to create a form to delete records using the delete record server behavior.  I've created the form several times, always with the same error.
    Warning: array_key_exists() [function.array-key-exists]: The second  argument should be either an array or an object
    and then a line number to the beginning of this code.  I've read a little that seems to imply that this might be a bug in php.  I'm using
    PHP Version 5.2.9
    if (array_key_exists('cancel', $POST)) {  
        header('Location: http://www.someplace.php');
    exit;
    any help is appreciated
    A.

    Thank you,
    That solved the problem.  Great book by the way.  I'm learning a ton.
    Thanks
    Art

  • Cancellation of proforma invoice created.

    Sir,
    Kindly explain in detail as how to cancel the proforma invoice created through Stock transport order through SD

    Hi,
    You cannot Cancel the PROFORMA INVOICE, you can only COMPLETE it
    Goto VF02 for the Proforma invocie and in the BILLING DOCUMENT--->COMPLETE you can complete it.
    The reason behind this is,
    PROFORMA invoices cannot be cancelled as they wont post to Accounting , so not neccessary to cancel
    you can create many proforma invocies referring to Preceeding document as it does not impact on any subsequent document.
    regards,
    santosh

  • Blog post : "Bug in Create/Edit View Criteria Wizard (JDeveloper 11g)"

    hi
    Using steps 1 to 13 from the blog post "Bug in Create/Edit View Criteria Wizard (JDeveloper 11g)" by Andrejus Baranovskis, I have been able to reproduce the issue he describes.
    see http://andrejusb.blogspot.com/2008/12/bug-in-createedit-view-criteria-wizard.html
    I the blog post comments he writes "... there was no time for me to fill bug in Metalink ...".
    Maybe someone from Oracle can pick it up from this forum post and file it as a bug if it is one (and if possible post the bug number here).
    many thanks
    Jan Vervecken

    The mechanism is to create a reproduceable test case, create a Service Request in metalink.oracle.com, post the test case, and convince the analyst to file it as a bug.
    It may be not efficient at some time, but this the way it is handled.
    --olaf                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       

  • Posting document not created (Pricing Error)

    Hello Everybody,
    I have a problem with a invoice. If i go to VF03, I can see a positing status as F Posting document not created (pricing error). The error message is showing as pricing error in item 000010 Message No. VF 073. Kindly help me how to unblock this invoice.
    Your help much appreciated.
    Regards,
    Ravi

    Hi,
    I think problem is in VKOA settings. Please go to VF03. Press Shift + F11. System will lead to Revenue Account Determination analysis. Please check the settings.
    Regards,
    Jigar

  • Posting Document Not Created in Quality Server

    Dear All,
                        My HR-FI Posting document is not created in quality server.
    Whem am running the PC_M99_CIPE  transaction and  run simulation run after that it giving me the message no document is created .
    And also am not able to see the log in quality server.
    All the things is working in the development server but not in quality server.
    I checked the obye,and obyg all things is been fine .
    Kindly help to sort the problem.
    Thanks
    Sandeep

    Dear Sandeep,
    First make the control record status Exit payroll PA03.
    Goto "Posting to Acc : Create posting run" screen.
    Fill period, payroll area, personnel number fields as requested.
    type of doc created write P - live posting run.
    Select output log & Run.
    Click "Doc overview" button.Select the document and click "Release document" button - F9.
    Say "Yes".
    Go back.
    Press "Posting tun overview" button.
    Select the last posting.
    Click post documents button.
    Say "Immediately".
    This procedure should work.
    If not, you may lack some authorization objects.
    Go and check whether the doc is posted via transaction FB03.
    All the best,
    Dilek
    Edited by: Dilek Ersoz on Nov 9, 2009 1:34 PM

  • Mass cancellation of material documents created

    We have generated 400 material documents during initial inventory upload using lsmw. Now we want to cancel/delete the documents created. Is there any method to delete it.
    Thanks

    My suggestions:
    - LSMW + MBST
    - BAPI_GOODSMVT_CANCEL >> with the help of an ABAP programmer...
    Regards,
    Csaba

  • I want to cancel the proforma invoice created in STO PROCESS

    hi experts
    i want to cancel the proforma invoice created in STO PROCESS   (accounting document is not generate)
    i tried but system do not allow
    thanks in advance

    Hi
    Hanumant
                                   U can cancel the commercial Inovice,  for proforma invoice we have to complete the same by using Tcode VA02---- billing doc. -
    Complete.  If u have created excise invoice please cancel the excise invoice first and then complete the proforma invoice. Once u complete the proforma inovice check the document flow and see the status it will be cancelled.
    Hope this will help you.
    Thx.

  • Cancel Posted Excise invoice

    Hi friends,
    How to cancel posted excise invoice(GR is completed) ?
    Regards,
    Chetan

    Hi friends,
    I have already tried it in quality system.
    1.After cancellation of GR.I tried to post excise invoice but system showing the messege that No Part I exists for availing credit in excise invoice TEST 1 2007
    2.J1IH reverse the entry but system is not showing these entries in excise invoice.
    so due to this while entering Vendor invoice in miro system showing tax amount from excise invoice.if reduce tax amount then system showing balance in transaction currency.please suggest me whst to do ?
    Regards,
    Chetan.

  • Cancel post goods issued....

    dear sap guruz....!!!
    i have a problem in production environment. during cancelling post goods issue.. When i reverse the post goods issue PGI the system gives an error
    "asking for account determination key PRD 0001 PRA 7920 is not maintained in MM customizing (valuation)....". This issue can be resolved if i give account determination for PRA 7920 BUT  what i am unable to understand is that why it is asking for account determination when there is no price difference in the post goods issue reversal which is issued on standard price for finished goods..  why we need PRA 7920 account determination..????
    please help me in this regard.... ..
    thanks
    sohail .

    Hi
    Check -
    What is the date of PGI document? and when you are doing PGI reversal. 
    whether costing has been done between these both dates in SAP.
    If the standard price durign PGI document and PGI reversal is different it will look for PRD
    And also check whether you are using two different currencies
    ~Thanks!
    Rajesh

  • How to Cancel Delivery which is created in VL04

    The user has created the Delivery in VL04.
    Plz guide me on How to Cancel Delivery which is created in VL04 ?
    I followed VL09 & VL02 process,
    but at VL09 it states that PU Withdrawn Qty. exceeded.
    At VL02 it only shows the Display Mode.

    HI,
    I also think you can delete the delivery even if its created from VL04.
    Try using VL09N for reversal and then delete the delivery by VL02N.
    Let us know.
    Regards,
    SB

Maybe you are looking for

  • BRF+ Deleting functions within object nodes

    Hi Experts, We are a large FMCG company and are implementing SAP Master Data Governance module for managing our material master data. Hence, we have chosen BRF+ as the business rule engine to drive SAP MDG. SAP MDG version is EHP5 To create a ruleset

  • Html tags within a report link

    I have data in a table that looks like this: This item has a footnote <sup>1</sup> I would like to use this item as the link in a report. When I show it, though, htmldb strips out the <sup> and </sup> tags. Why? Thanks, a-

  • How do I open up a specific port in the Application Level Firewall?

    Currently, my system blocks port 2336 and I want to open this up. To be precise: port 2336 is listening on the local system, both on 127.0.0.1 and its 192.168.x.x address, but no client on the LAN can connect to port 2336. IPFW and PF are not running

  • Contacts Applescript dictionary broken in Mavericks?

    So this script works fine in Mountain Lion, but is broken in Mavericks.  Apperntly, Applescript no longer knows the class "person" anymore, even though it's still listed in the Contacts dictionary. tell application "Contacts"                     repe

  • CIN RECTIFICATION  URGENT

    Hi, Due to budget 2007 we have to do the Cin Rectification for the Higher Edu cess of 1 % For that we have created 3 routines 952- Excise Duty                                                     956- Vat Deduction