Help required:Spool Creation for posted document in FB03 transaction

Hi Experts,
The requirement is like I have to send the PDF document to the user by mail once the document gets posted in SAP ECC. The posting is taking place by IDOC.
The problem is how do i get the spool request for the document which is posted in ECC. It can be seen by entering document number in FB03 transaction but there is no smart form or SAP script or any Output type. The document is posted by IDOC.The client wants the PDF document excatly as seen from FB03 transaction. Please help as this is typical requirement i have never come across.
Do let me know some of the user exits where in just after the posting i can write my code for spool creation. The idoc is using the BAPI_ACC_DOCUMENT_POST.

HI
In test mode i am able to view the document no. but not the reference document no and when double click on the document no i am not able to view the journal entry.
Thanks.

Similar Messages

  • Cannot change Transaction Type (COBL-RMVCT) for posted documents. (FB02)

    Hi guys,
    I'm encountering some problems with Document Change Rules. I already configured in SPRO the line item change rules for Transaction Type (COBL-RMVCT).  I already set it to "Field can be changed" but the system still does not allow changes. I also set it for all account types and company code, but still no luck. I hope somebody can assist me since we require that the transaction type be editable for posted documents. Thanks!

    Hi
    I am not sure about the reason for why the "changing" is not working.
    However, thought I should give my experience and opinion on this.
    I have not seen a system that allows "Transaction type" to be changed. If allowed, in my opinon it is similar to allowing the cost assignment field such as cost centre, profit centre or an order being allowed to changed. Thus should not be changed once posted. Further is these are allowed to be changed the imact to the prevous reported data will have to be estimated. E.g. if the transaction types are used for consolidation what is the impact of changing previous month data.

  • Natures of classes of accounts for posted document are not balanced

    Hi
    Can anyone help me with this error:
    "Natures of classes of accounts for posted document are not balanced"
    I am getting this error while doing GR(posting goods) using 561 movement type for a material.
    While I am able to post Goods with another material having same valuation class and Profit Center.
    Thanks
    Neha

    better post this question in procurement or (pure) finance forum!

  • Update of business place and section code for posted documents

    Hi,
    We have few posted documents without business code and section place.
    Now we want to update the business code and section place for posted documents.
    guide me
    sateesh

    Hi,
    The issue got resolved. We need to give in MM invoice number not the accounting document invoice number.
    Fi invoice number and MM invoice number are availiable in bkpf and MM invoice number will availible in BKPF-AWKEY field.
    Sateesh

  • Are there any standard Idocs or Bapis for posting the data into transaction

    Hi,
    Are there any standard Idocs or Bapis for posting the data into transactions ME42N and IK11?
    Thank You.

    Thank you.
    Any idea of the other one?

  • Help required !! For MRP at Storage location level

    Hi ,
    we need to have separate MRP fro two storage locations with direct procurement from Storage locations. Right now we have MRP run at Plant level for all the storage locations. we donot want the materials in these two storage locations to be planned at Plant level only with Separate storage locations. Plant level MRP will run for the other storage locations .
    I have created separate MRP areas for the storage locations & activated MRP for MRP Areas client level. material masters for the two storage locations have been asigned the MRP areas & maintained the MRP area data in material master .
    When we run the MD01, the Planned orders are getting created at both MRP areas plus at the Plant level.we donot want the planned orders creation at Plant MRP area level-only at the storage location level for those two storage locations MRP areas.
    Can anybody guide me -how to achieve that ? Did we miss any configuration?
    I tried to maintain scope of planning & getting error for parallel processing .
    Do i need to maintain parallel procesing with servers ?
    Pls need your input on this. Any help will be highly appreciated .
    Thank you in advance.
    Regards,
    Krish.

    Hi Krish,
    Go to following IMG path and check out your settings -
    IMG>>>Production>>>MRP>>>Master Data>>>>MRP Areas>>>
    (1) Activate MRP for MRP Areas    -
      Is that activated?
    (2)Define MRP areas>>>> Do setting s as per Storage Location
    Then run MRP.
    MRP Areas
    In this IMG activity you define whether MRP is to be carried out with MRP areas. In addition, you define the MRP areas for each plant in which you would like to carry out this type of materials requirements planning.
    The MRP area represents an organizational unit which carries out materials requirements planning independently. The results of the planning run are displayed specifically for each MRP area. An MRP area can include one or several storage locations of a plant or stock with a subcontractor.
    You can assign a material to various MRP areas.
    Basically, there are three types of MRP areas:
    Plant MRP Area
    Initially, the plant MRP area includes the plant with all its storage locations and stock with subcontractors. When you have defined MRP areas for storage locations and for subcontractors and you have assigned the materials, the plant MRP area is reduced by exactly this number of subcontractors and storage locations, as they are now to be planned separately.
    MRP Areas for Storage Locations
    You can define an MRP area that consists of a particular storage location by creating an MRP area and assigning the storage location to it. Material requirements for this storage location are then planned separately from the rest of the plant. You can also group several storage locations into one MRP area by creating an MRP area and assigning the storage locations. These storage locations are then planned together.
    MRP Areas for Subcontractors
    You can also define an MRP area for each subcontractor. Using an MRP area, it is possible to plan the components to be provided in subcontracting, by defining an MRP area for each subcontractor and assigning the components to be provided. You can therefore plan the requirements to be provided for these components for one subcontractor separately from the usual requirements.
    Up to now, MRP at plant level had been carried out. The various requirements were combined in the planning run and procurement elements were created for these pegged requirements with unknown sources.
    The introduction of MRP areas enables you to carry out material requirements planning and know the source of the pegged requirements and to be able to distinguish between them. The source of the pegged requirements can be, for example, production on a particular assembly line or a subcontract order.
    Material requirements planning for each MRP area allows you to have specific control over the staging and procurement of important in-house production parts and purchased parts for each shop floor and assembly area.
    Hope this will give you more idea about the same.
    Satish

  • Bapi for posting documents in PCA

    Hello All,
    Does somebody know a FM or a BAPI wich permit's posting in the Profit Center Accounting?
    We have a list of documents for which we have to post documents in the PCA, tables GLPCA, GLPCP. I have found a series of BAPI's for ALE PCA , but nothing usefull.
    I know that usually the posting in PCA is done in automatic from customizing, but for these documents this is not the case. We have to do this posting via a BAPI.
    If anyone has encounterred this situation, please advise.
    Thank you,
    Viorel Nistor.

    Thank you for your answer.
    I have found the BAPI but it doesn't help me very much because it seems that it's purpose is to create a replica of the document to an external system.
    I need to create this document in the same system.
    Has anyone used it in this way?
    Thank you,
    Viorel.

  • ECC 5.0 BAPI for posting documents only in non-leading ledger

    Hello,
    for an FI-interface i want to call an BAPI for posting the documents. The document were posted to the leading ledger and to the non-leading ledger by usage of BAPI_ACC_DOCUMENT_POST.
    Now there are cases to post documents only to the non-leading ledger.
    Is there anywhere a possibility to tell the BAPI (e.g. enter the ledger group) only to post to the non-leading ledger or is another BAPI available to do so.
    Thank you for your help.
    Thomas

    Hi Thomas,
    You can use the same BAPI for any type of ledger postings. You can restrict your postings to Type of ledger.
    Cheers
    Srinivas

  • How to update Business place & Section Code for posted Documents

    Hi,
    I want to update business place and section code in existing documents, How to update business place and section code in the posted Documents. Is there any validation to check business place and section code while posting Document.
    Thanks in advance
    Best Regards
    Raj

    Hi Raynaju,
    Business place is an organizational unit and  it below company code level that is primarily used for reporting taxes on sales/purchases.
    For that no need to go for validation.Go to the field status and give the Business place & Section Code as required fields.
    There is a option in SAP as Document change rules.There give the company code,field name and account type
    Now you can change the fileds in posted document itself.
    May be this information is useful to you
    If you have any doubt feel free to ask
    Regards
    Aneesh
    Edited by: Aneesh kumarA on Jul 22, 2009 12:45 PM

  • AFAB dynamic variant creation for Posting period.

    HI,
    Business Requirement :
    Business want to run AFAB transaction code every month automatically with schedule job.
    system should pick present month period in posting period field.
    i checked in variant creation  against posting period there is no dynamic " D " in selection variable column.
    how can i fix this.

    Hi Jani,
    Check with abaper if TVARV table can Help you in this case, or create a z program from AFAB. And add date field to it, and schedule job based on that,
    I think TVARV table will be a better approach.
    Another point to consider here would be that dep should be run once business is ready to do so, and has its own hick ups in business if corrections are required to be made after executing AFAB by job
    Regards
    Pankaj B.

  • Business Place change mode for posted documents

    Dear friends,
    I have to make changes of business place/section code field for the posted documents. 
    How is it possible.
    and I am not able to find the FBCJ wht documents in challan updation J1INCHLN. 
    Pl provide your valuable suggestions, which will be rewarded.
    BSR

    Dear Sarma,
    Thank you for your valuable suggestion.  I have tried for updation.  Actually my issue is I have to replace the existing business place with anotherone.
    I think J1INPP is only for updation of Business place/section code for empty documents.  My requirement is for replacement.  Can you see how best we can do.
    BSR

  • Is there any BTE event after 1025  for post document ?

    Hi,
    I used to add default account document's text by BTE 1025 ,but
    after upgrade to ECC5.0,it's not work now .
    I found the reason is : after run the interface program written by me ,the system run another program 
    OPEN_FI_PERFORM_00001025_E ,that made the field t_bseg-sgtxt I added been
    cleared.
    How can I solve this problem?
    Thanks  for help.

    Hi,
    Try with
    1420 CHANGE DOCUMENT: Field modification to line item and fm: OPEN_FI_PERFORM_00001420_E
    But i am NOT 100% sure about this.
    aRs

  • Bapi for post document

    I need create a post document (transaction FB01), there is a bapy to do it?
    Thanks.
    Moderator message: probably the most frequently discussed BAPI around here, please search for information.
    Edited by: Thomas Zloch on Dec 17, 2010 12:37 PM

    I need create a post document (transaction FB01), there is a bapy to do it?
    Thanks.
    Moderator message: probably the most frequently discussed BAPI around here, please search for information.
    Edited by: Thomas Zloch on Dec 17, 2010 12:37 PM

  • Help required: Configure output for goods issue

    Dear All,
    My requirement is to trigger an output type for a goods issue only when the goods movement
    scenario involves cross company accounting. What is the TCode for doing the requirement setting
    for goods issue output.
    Thanks.

    Hi,
    Please check it out,is there any standard requirement is there for your scenario,if it is not there as ABAP people to write one requirement in VOFM and assign to this condition type.

  • Bin determination in automatic TO creation for posting changes

    Hello guys,
    could someone provide some information or some links on how the automatic bin determination for posting changes will be processed in SAP WM?
    Actually I'm looking for some further information for automated processing during a posting with movement type 309.
    What data from the posting change will be taken into account for the automated bin determination?
    Or is it 100 % comparable to the standard putaway / stock removal strategies?
    Thanks for some hints on that.

    Hi,
    I would like to add a point here that there is possibility of transmitting a screen widow to hav the value of GR number. You can do the settings  in OMLR in the AddlData for the appropriate Mvt (eg 321)
    This will cause to have the GR number to the PCN, which is compared with the GR no in the quant existing, while creating the TO wrt PCN.
    For eg: Material           Qty              Stk catgry                Bin                      GRno
                     A                  20                    Q                      B001                  5000000102
                     A                  40                    Q                      B003                  5000000140
    Now, when transfering the stock category form Quality to unrestricted, for 20 qty, a PCN will be created bforethat a pop-up screen flows in which u'll b giving the GR no as 5000000140.
    So u have the PCN for Qty 20, with GR no 5000000140.
    When u create a TO wrt PCN, system will pick the stock from the bin B003.
    I don't know how far this may light u.
    Reg
    Prasanna

Maybe you are looking for