How system determines Valuation strategy in PP order confirmation.

Hello Experts,
i have maintained in valuation variant for valuation variant 006 and 007 strategies are 1st  standard price  2nd moving price and 3rd plan price.
We have maintained two prices in material master one according to price indicator That is V in our case for eg 1000 per ton and other price which is standard price For eg 1200 
Now while creation of production order my planned price according to valuation variant 006 is picking 1200 for a ton which is perfect  but while doing confirmation and saving my production order system is not picking the strategy defined in 007 which same as 006 and its should pick same 1200 instead of 1000 but not happeninng
kindly reply as soon as possible
Regads
Naveen Chawla

HI
The System will take either Standard Price or Variable price but it will not take the values at time even though u maintain both the prices in material master . if its is taking the standard Price than your material may be Semifinshed  or Finished good s
For Semifinished & Finished Goods --- Standard price is taken into consideration
For Raw Material - Variable price is taken into consideration ,,,,
Varable price is not consideration of HALB&Fert as in the the priceses are updated by the variable price inthe raq material when we perform Costing Run ...
Hope this may help u
Regards
Ramanujam

Similar Messages

  • How system determine delivery date in sales order

    Hi, sap gurus
    I am new to sdn forum please help me regarding my question
    1) how the system will determine delivery date in sales order
    2) what are factors effects to conform sales order stock
    3) what is different between static check and damanic check in credit mgt
    Thanks and regards
    nishad

    hi,
    Reg question:1 - System determines the Requested Delivery Date based on the Scheduline assigned to the item category of the item in sales order.the schedule line in the order transfers the requirements trhu MRP (can be individual or collective) . If its ruch order , you configure the order type "Deliver Immediately".
    In Detail:
    The TOR depends on the Requirement Type (MMR), Requirement Class(MMR), Checking group(MMR) and the Sc line category (Line Item). For the TOR to happen u need Plant at line item, scheduline category markd for TOR, Requirement Class marked for TOR and Checking group in MMR (Availability check)
    What all stocks need to be checked during Availability check is controlled by using the checking rule.. for example for AV -02 Ind Requirements a checking rule will be assigned and this checking rule- and then what all stocks need to be considered to determine the delivery can be maintained here.
    Rgds
    Sai

  • How system determine target cost ?

    Dear experts,
    we use moving average price control for in-house production parts, when we finish one production order, I can not see any target cost from cost analysis.
    Can you tell me how system determine target cost ? for moving average price control , is that mandatory for variance calculation ?
    BR , Shubin

    Hi
    Target cost is calculated based on released Standard cost estimate
    What you are doing is wrong.. Follow S for In House Made items and release standard cost estimate before GR
    Maintain Target Cost Version 0 in IMG for variance Calculation
    br, Ajay M

  • How to display discount price amt in order confirmation page

    hi,
    I created a discount for site,who places any order will get a discount for that particular order ,How to display discount price amt in order confirmation page.suggest some points guys.

    Try displaying it as following , just put the jsp code for the if() statement i have put below.
    This block loops through order level adjustments and displays the discounts for the one's associated with order promotions.
    <dsp:droplet name="ForEach">
    <dsp:param name="array" bean="ShoppingCart.current.priceInfo.adjustments" />
    <dsp:param name="elementName" value="pricingAdjustment" />     
    <dsp:oparam name="output">
    //displaying if discount was provided, associated with some order level promotion
    if (pricingAdjustment.getPricingModel() != null && pricingAdjustment.getAdjustment() < 0) {
    <dsp:valueof param="pricingAdjustment.totalAdjustment" />
    </dsp:oparam>
    </dsp:droplet>

  • Valuation Strategy for Sales Order Costing

    We are currently using valuated sales order stock in ECC 6.0. The "without valuation strategy field" on the requirements class is not checked. However, the valuation strategy varies for a material and for a sales order. Sometimes it is using valuation strategy 2 - cost from the production order cost estimate - which is desired and other times valuation strategy 3 - cost from the standard price field in the material master - which is not desired. When is the valuation strategy determined for a production order for valuated sales order stock?

    Costing Variant is assigned to Requirement class
    Requirement class is assigned to Requirement type
    Requirement type is assigned to Planning Strategy
    Planning strategy is assigned to strategy groups
    Strategy group is assigned to MRP3 tab in Material Master
    System picks the costing sheet in requirement class
    In this way product will be costed for Make to Order sale order costing.
    Srinivas

  • (DBT_E001 Translation of Purchase Value) How system determines this value?

    Hi gurus,
    I am selling an security after the same i am doing TPM18 afterwards system posts gain or loss on sale of security.
    now to determine the gain or loss system derives a purchase value by using DBT_E001 update type. difference between this and sale price is treated as gain or loss based up on the situation.
    in our case we are having this mutual fund from year 2007 and we are buying and selling this frequently then how system calculates the purchse price which is shown in DBT_E001.
    what is the correct procedure of selling the security?
    Pl. Help!
    Thanks & Regards,
    Sayujya

    Hi,
    Once you have posted the sale flow, then if you reverse the purchase flow, then the earlier profit/loss will be automatically reversed and a new profit/loss will be calculated.
    But in your case, you cannot reverse the purchase because the sale units will become more than the purchased units if you reverse that purchase.  Check the no of units is sale transaction, whether it is correct.
    Hence system will not allow you to reverse the purchase.  So you have to reverse the sale and then reverse the purchase and after that reenter the sale with correct number of units.
    Regards,
    Ravi

  • How to tigger SISCSO01 Idoc for sales order confirmation

    Hello Experts,
    I have a requirement where in I need to send the sales order confirmation as an IDoc. I need to use SISCSO01 IDoc type for that.
    Can any please tell me how to configure SAP to trigger this IDoc when ever a sales order is confirmed.
    In which T-Code is this sales order confirmation is done? and how to trigger the IDoc?
    Thanks,
    Suma

    Hi Suma,
    We need to maintan BD64 and WE20 with the Idoc SISCSO01 type. This is will automatically trigger the Idoc when we create a sales order.
    You need to matain NACE for tiggering the IDoc. For that use BA00 in output types and configure program RSNASTED, from rotine as ALE_PROCESSING. In default values give transmission medium as ALE and parter function as SP.
    Then come back to NACE-Condtion records and maintain meduim as A and date as 4.
    Please reward if helpfull.
    Thanks,
    Srikanth

  • How to determine the Installation after Work Order installs a new meter

    Hi IS-U Experts,
    I have a question about the integration of Work Orders and Installation of Devices as it relates to IS-U data.
    Our understanding of a Meter (Installation) process is as follows:
    1.  A Work (Service) Order is generated by CS (or a Sales) process.  At minimum, the Device Location (ES65) and the Device Category (Material) needs to be provided for.
    2. A techniciation executes the Work Order to install the meter.  After which, this work is confirmed (IW42) and a Goods Issue is done on installed Device.  In our case, the technician decides actual Device Number based on his/her vehicle stock.
    3. Now, we want execute the IS-U Device Installation (EG31).  However, we don't know where to draw the IS-U Installation from.  There is no IS-U specific reference on the Work Order for the Installation. (It would be nice if the Order Type had an IS-U releavant screen category (table TQBT) for such a reference).
    We could create the Installation on the fly, but we need the IS-U Premise (ES60). Our expection, anyway, is to build IS-U data
    prior to the Work Order execution as part of the CS process. We defer IS-U Installation only because the device number is determined at the time of installation.
    How should the IS-U context data passed around in the Work Order?
    Thanks, Ed

    Hi Reddy
    Thanks for your reply, but the note says that only applies for India or Brazil legal purposes.
    In my case I still have confuse, in a normal Sales scenario CRM to R/3 how to works the determination of the delivery plant.
    I know that in R/3 is determined by:
    1. Customer-Material info record (Sales Area data)
    2. Customer Master data (Sales area data)
    3. Material Master data (Sales-area data)
    I can think that in CRM is determinate bye Material Master Data, but I still don't know if I can change
    it??  and where in the crm sales order before it is download to R/3??
    Thanks
    Sussie

  • How to determine Service Tax in sales order

    Dear Guru's
    What all the configuration setting that are required for determine the Service Tax in the sales order for service Item we are using Tax procedure for India u2013 TAXINN.
    Regards,
    Bhanu

    Following SAP Notes to be referred for Service Tax:
    1.     778976 u2013 Service Tax and Ecess on Service Tax
    2.     1032265 - SEcess on Service Tax
    Regards
    AK

  • How to determine the status of  Maintenance Order while working in workflow

    Hello Experts,
       I am working on a workflow to release production related maintenance order.In this workflow I need to determine the status of the Maintenance Order (BOR object BUS2007) whether it has been released or not.I am trying to do this by condition step type.I can't understand which field of BUS2007 object I need to check to know the status of the maintenance order.
    Can somebody help please?
    Regards,
    Manas

    Hi,
    Have you not getting any value in Status Profile attribute.
    For new attribute u need to write coding, getting the value of that released field.
    First, u need to implement by going to Edit->Change Release Status ->To implemented.
    Then check your BO and generate it. If any error occurs in Menu bar Goto->Error List and see what is the error.
    After generation of your BO, test your BO.
    If test works fine, then Delegate with the standard BO.
    To delegate, u need to be in initial screen of SWO1 and goto Settings->Delegate. Give Super type as Std BO and delegate type as your custom BO and use the Std BO in your workflow.

  • How to determine Charge types in forwarding order ?

    Hi Experts,
    I am new to SAP TM, I am configuring the charge management.
    Please provide step by step configurations to determine charge types automatically in forwarding order ASAP.
    Thanks,
    Shakti

    Following SAP Notes to be referred for Service Tax:
    1.     778976 u2013 Service Tax and Ecess on Service Tax
    2.     1032265 - SEcess on Service Tax
    Regards
    AK

  • How to determine whihc user created Sales Order Draft

    Hello,
    I am creating an add-on that performs a certain event on sales order drafts that were created by the manager user.  What field do I filter on to accomplish this?
    Thanks,
    Richard.

    Hi Owen
    Could you tell me what is the UserSign in the OCRD table,  I'm trying to map it to the Business Partner object from the DI API and I do not find any equivalent but I still don't how to set this field by the DI API Business Partner
    Since the UserSign is a field of the OCRD table there must have an equivalent property in the Business partner object ?
    Also, if it's part of a USERS object well why I do not see any USERS object in the Business Partner obect by the DI API ?
    Thank you for any help

  • Smartform how to determine the language of apurchase order.

    Hi,
    Maybe a simple question. But i cannot find it in my form because it isn't used in it so far.
    A purchase order must be printed in the language of the receiver of the purchase (vendor).
    Which variable is used to detemine in which language these form text has to be printed.
    (it is not sy-langu).
    Gr., Frank

    No, just the first one
    SSFCTRLOP-LANGU
    and well it wont be filled, YOU gotta fill it.
    Since you want to print out something, you probably have an output type (Nachricht) which is beeing processed.
    Language of output type (NAST-SPRAS) is normally drawn from communication language of customer.
    So what you need to do is:
    data: ls_controls                type SSFCTRLOP.
    ls_controls-langu = nast-spras.
    CALL FUNCTION lv_formname
        EXPORTING
    *     ARCHIVE_INDEX              =
    *     ARCHIVE_INDEX_TAB          =
    *     ARCHIVE_PARAMETERS         =
    *     CONTROL_PARAMETERS         = ls_controls
    *     MAIL_APPL_OBJ              =
    *     MAIL_RECIPIENT             =
    *     MAIL_SENDER                =
    *     OUTPUT_OPTIONS             =
    *     USER_SETTINGS              = 'X'
          gt_header                  = gt_header
          gt_items                   = gt_items
    *   IMPORTING
    *     DOCUMENT_OUTPUT_INFO       =
    *     JOB_OUTPUT_INFO            =
    *     JOB_OUTPUT_OPTIONS         =
        EXCEPTIONS
          formatting_error           = 1
          internal_error             = 2
          send_error                 = 3
          user_canceled              = 4
          OTHERS                     = 5.

  • Automatic batch determination in order confirmations

    Hi all,
    when I am doing confirmations through CO12, for some of the components the batch is picked up automatically. But for some other components, the batch is coming only when I manually select the component line and click on batch determination button below.  The two materials are of two different material types.
    Why is this difference? How can I get the batch automatically with out selecting the line and clicking manually on the batch determination button?
    Thanks in advance,
    Raghu

    Dear,
    Define the batch determination search strategy for process order in COB1 with sort rule in CU70.
    On the initial screen of your application choose Logistics>centrel function>batch management>Batch determination>For process order -->Batch search strategy --> Create.
    On the initial screen of your application choose Batch search strategy -->Create.
    Choose the strategy type, say choose co02
    Choose the key combination-
    Enter the required dat-->say plant ,production order type, product,valid from and component for which you want to have this
    Choose Selection criteria push button. Choose a sort sequence.
    If no values have been entered, enter the selection class and the characteristic values.
    Go back to the screen on which you create a batch search strategy.
    Choose Sort if required(it should be defined earlier(in CU70- here you are giving the charateristic name on which you want to sort)
    For component you need to use MBC1 with search stratgey as ME01 for your plant movement type and material and assign the sort rule and search procedure here.
    Check also in COR4, for the combination of plant and order type...you have selected search procedure-CO0001
    Batch management> Batch serach procedure allocation and check activation
    T.Code to be looked specifically OMCG , CORC
    Hope it will help you.
    Regards,
    Madhu

  • BAPI For Procduction Order Confirmation

    Hi Expert,
    How to use the BAPI_PRODORDCONF_CREATE_TT for Process Order Confirmation
    I have to use two internal tables for order confirmation 
    GOODSMOVEMENTS
    LINK_CONF_GOODSMOV
    Please help.
    Thanks in advance.

    Hi Arpit,
    This BAPI is having Table parameter 'TIMETICKETS' as mandatory. You can use it as below:
      ls_timeticket-conf_no            = i_rueck. " confirmation number
      ls_timeticket-yield                  = i_erfmg. "Quantity   
      ls_timeticket-conf_quan_unit = i_erfme. " Unit
    ** propose goods movements
       ls_bapi_propose-goodsmovement = 'X'.
      CALL FUNCTION 'BAPI_PRODORDCONF_GET_TT_PROP'
        EXPORTING
          propose                      = ls_bapi_propose
        IMPORTING
          return                         = ls_bapi_return    
        TABLES
          timetickets                 = lt_timeticket
          goodsmovements     = lt_goodsmovements
          link_conf_goodsmov = lt_link_conf_goods_mov
          detail_return               = lt_detail_return.
    CALL FUNCTION 'BAPI_PRODORDCONF_CREATE_TT'
          IMPORTING
            return             = ls_bapi_return
          TABLES
            timetickets        = lt_timeticket
            goodsmovements     = lt_goodsmovements
            link_conf_goodsmov = lt_link_conf_goods_mov
            detail_return      = lt_detail_return.
    If you already have data for internal tables GOODSMOVEMENTS and LINK_CONF_GOODSMOV, you can skip the propose goods movements BAPI  'BAPI_PRODORDCONF_GET_TT_PROP'.