How to block CIFed Transportation lane from ECC to APO
Dear all,
I want to know if there is any way to stop automatic creation of Transportation lane in APO when material master records, with procurement type F: External Procurement and special procurement U, are registered or modified in ECC.
Although only APO-DP is implemented in our project, which does not require the transportation lanes at all, we have to delete not only a product location master record but also collesponding product specific transportation lane when the product is no longer available for demand planning.
The integration model includes only material master records, not other TL-related data such as Pur. info.
I've tried to find any configurations or EXITs stuff which satisfy the requirement above, but couldn't find it...
I would appreciate any information on this.
Thanks in advance.
So Kitagawa
Edited by: So Kitagawa on May 14, 2008 6:12 PM
I think this is created part of the Product Integration Model and is controlled via the Product Inbound User Exit - APOCF005.
There is no User Exit for Transportation Lanes.
In this User Exit ... there is a Structure /sapapo/matloc which I think contains the Procurement Type (BESKZ) and instead of the Spl. Procurement Key it contains the Supplying Plant (SUPPLPLANT), Procurement Category (SUPPLTYPE).
It's got to be the fields in the MATLOC Structure.
Could be the MATLOCX Structure too ... I could not see any, so I think the above 2 fields should do it.
Try Coding in this UserExit to make the SUPPLPLANT and SUPPLTYPE field as Blank via ABAP Code. Do not touch the BESKZ field as that is needed in APO. This should do it ...when you activate the Model the Inbound Processing.
Hope this helps. Reward Points if you do.
Regards,
Ambrish Mathur
Similar Messages
-
How to delete Master Data transferred from ECC to APO via CIF
Hi, all
I'm connecting SCM 5.1 with ECC 6.0 via CIF.
When activating Integration Model in ECC, the following error occurred;
"Location 0001 of type 1001 (BSG 592BUSGP) already exists in APO"
This is because Location 0001 was already transferred from different ECC client via CIF, and not cleared.
I'm now trying to initialise master data transferred from ECC to APO via CIF, but in vain.
I suppose I have to first delete all master data CIFed from ECC in APO, or have to execute initialisation of APO master data with ECC data in ECC.
Please tell me how to do this.
For details, please read the followings;
I connected APO client with ECC client 590.
I transferred Plant and Material Master from ECC to APO via CIF.
After that, I wanted to change ECC client from 590 to the other.
I created the other client (592) by client-copying from 590 with SAP_ALL copy profile.
I deactivated Integration Model in ECC 590, and activated the same in ECC 592.
Here, I faced the problem.
The initial data transfer failed due to the duplicate of data.
Now I'm wondering how I can initialise master data in APO and transfer initial data from ECC.
Due to testing purposes, I have to change ECC clients from one to the other this time, but I cannot initialise master data in APO and cannot tansfer initial data from different ECC client.
thanks in advance,
HozyHi all,
Thank you very much indeed for lots of your replies.
Thanks to all of your advices, I'm getting to understand what to do.
Well, I'll say I have to create one more client for testing with other ECC clients or I have to rebuild the client by client-copying from 001 and implementing all transportation requests, for marking del flags to each master data and running del programme sound like tough work, and sound like odd ..
Then, I've got next issue here.
In SCM-APO, I use BI objects, and , if I have to create several clients for testing, I have to set up clients where you can use both BI objects and CIFed master data.
I suppose I have to change 'BWMANDT' in RSADMINA and make RSA1 accessable in other SCM clients and implement tests.
Also, I have to register BI System for newly created SCM clients in RSA1-SourceSystem.
Well, if you have any experiences on this kind of use, and if you have any advice on it, please give me any tips.
Particulary, I'd appreciate very much if you give me advice on which way you have chosen; creating several clients or rebuilding the one client in SCM-APO when you use both BI objects, CIFed master data and Demand Planning.
Thanks in advance.
Hozy -
How to transfer Sales BOM from ECC to APO DP
Hi,
Demand planning require Sales BOM from ECC. Sales BOM in ECC will not have Routing & Work center, then how a PPM with Sales BOM can be transferred. If i have to create a dummy routing & WC for those sales BOM it will be tidious job to create all the master data. Is there any way to transfer the BOM alone from ECC to APO.
Please throw some light on it.
Thanks & Regards
ShanHi Somnath / Ritesh,
Are you sure about ciffing Sales BOM(usage 5)to APO as PDS ? Did you test it or your comments are based on SAP documentation?
I tried to CIF Sales BOM as SNP PDS, it is creating PDS with only parent item.Child items are missing.I have not used any production version here.
If i use production BOM(usage 1), it is creating PDS with both parent and child items.I have not used any production version here also.
SAP says BOMs can be ciffed to APO as PDS. No productions versions are required. but it has not mentioned about BOM's usage. May be , Is it by default production BOM?
One more question, Is it possible to create production version with BOM usage 5? It has no meaning right..
I think system does not allow you to create production version with BOM usage 5.
I also tried with BOM usage 2. In this case also it behaves like sales BOM.
looks like only production BOM can be ciffed with proper BOM structure in APO.
if required i can send you the link to share screen shots.
Pls comment..
regards,
Umamahesh -
How to map service contract data from ecc to crm
Hi Experts,
Please help me,how to map service contract data from ecc to crm system.
is there any perticular process.please let me know.
thanks in advance..Hi Srinivasulu,
Create the service contract type of ECC and also item categories under it in ECC in CRM. Map the number ranges.
Check the Partners mapping from R/3 to CRM and that will be all.
I tried but in CRM in the transaction type internal number range is mandatory. So, if you create service contract in ECC with one number it will replicate to CRM but with different number. But you can see ECC number under the transaction history in CRM.
Good Luck.
Sharath. -
How to pass PO customer fields from ECC to SUS ?
Hi Gurus,
We defined a customer PO field at ECC side and want to pass it to SUS and diaplay it in SUS PO, my question is, how to pass PO customer fields from ECC to SUS?
Please advise.
Thanks and best regards
jackHi jackytam ,
/people/yeusheng.teo/blog/2008/01/05/ordering-unit-vs-order-pricing-unit-in-srm-sus
you make get some pointers
regards,
Neelima -
How to block a partner customer from transaction posting
Dear Experts,
Please suggest/advice how to block a partner customer from transaction posting,As we have two customer categories defined 1.Parent customer 2.Child customer.One parent customer has several child customers and they are assigned in partner function part of the child master record.We have defined the parent customers for reporting purpose only,not for any transactions to be done.
So please suggest how can we block those parent codes from being transacted directly.We wan them only for reporting purpose.
Can we do the restriction on account group level or we have to make a validation for this.
Please advice.
Regards
ParthaDear Partha,
You need to Block customer against posting -> Transaction FD05 (you can choose foe selected company or for all)
You can block also directly the invoice/payment in the document
Or define some tolerance limits and system block automatically
Let me know if it is not clear
Thanks
Tarek -
How to CIF enterprise Change Management ECM, from ECC to APO
Dear All.
I am facing problems during CIF process for ECM (Enterprise Change Management) from ECC to APO.
Every change into Material Master, BOM, etc, we must to create one Change Number (CC01) and link with the master data that we are changing.
But when we are changing the BOM status to 02 - Inactive for a specific period, and then transport this information from ECC to APO using Core Interface, into APO the BOM, in this case PPDS, will be changed for the Whole Period. It means that the PPDS will be set as Inactive into APO being set to become inactive in the future on ECC.
Thank you all.Somebody knows where I can found information regarding Core Interface for ECM (Enterprise Change Management).
Thank you all. -
Issue in transfer of data from ECC to APO
Hi All,
I have a requirement of transferring data from ECC to APO. I am using EXIT_SAPLCMAT_001 fro this purpose. The problem is, I need to transfer the data of a field that is not present in cif_matloc but present in /sapapo/matloc.
How should I proceed...Please help....this is an urgent requirement
Thanks & Regards,
SriLalithaHi,
you may want to go to the transaction /SAPAPO/SNP_SFT_PROF
Determine Forecast of Replenishment Lead Time
Use
In this field, you specify how the extended safety stock planning determines
the forecast of the replenishment
lead time (RLT). The following values are available:
Supply Chain
The system determines the RLT forecast using the supply chain structure by
adding the corresponding production, transportation, goods receipt, and goods
issue times. If there are alternative procurement options, the system always
takes the
longest
option into account.
Master Data
The system determines the RLT forecast from the location product master
data.
Master Data/ Supply Chain
First, the system determines the RLT forecast from the location product
master data. If no RLT forecast can be determined, the system determines the
forecast using the supply chain structure (as described under
Supply
Chain
Dependencies
You can retrieve the replenishment lead time forecast yourself by using the
GET_LEADTIME
method of the Business Add-In (BAdI) /SAPAPO/SNP_ADV_SFT.
Replenishment Lead Time in Calendar Days
Number of calendar days needed to obtain the product, including its
components, through in-house
production or external
procurement.
Use
The replenishment lead time (RLT) is used in the enhanced methods of safety
stock planning in Supply Network Planning (SNP). The goal of safety
stock planning is to comply with the specified service level, in order
to be prepared for unforeseen demand that may arise during the replenishment
lead time. The longer the RLT, the higher the planned safety stock level.
Dependencies
The field is taken into account by the system only if you have specified
master data or master data/supply chain in the RLT: Determine
Forecast field of the safety stock planning profile used.
Hope this helps.
The RLT from ECC is in MARC-WZEIT which is transferred to APO in structure /SAPAPO/MATIO field CHKHOR.
May be if you maintain the setting in the profile, you may get the value in RELDT.
Thanks. -
Transfer of PIR from ECC to APO - Time stamp
Hi Friends,
We are transferring Planned Independent requirements from ECC to APO through CIF.
In APO Product view Forecast requirements Date is sync fine with ECC date however the time is setting default to 03:00:00 am.
we want the time to be set to 06:00:00 am by default.
How we can we archive this?
Regards,
KrishDear Tiago,
I changed Product view Time zone settings, and issue resolved.
Thanks for your valuable reply. Awarded you the points.
Regards,
Krish -
Transfer of global settings from ECC to APO
I know there is the 'transfer of global settings' option from within transaction RSA1 in APO to transfer units of measure, fiscal year variants etc from ECC to APO, to ensure synchronisation.
How does this actually work? For example, suppose we have 14 units of measure in ECC, but already have 16 units in APO. If we run the synchronisation transaction, what will end up in APO? Is the complete table of units replaced in APO, so we would have just 14 units?
Thanks, Bob Austinthere is some explanation to what you have mentioned in Re: Factory Calendar
this talks about calendars and is relevant till SCM 4.x
I would imagine the situation would be the same for UOM
In SCM 5 you have the option to update the tables, Rebuild the tables and also a simulation option -
Need to Populate Material Type from ECC to APO Product Master
Hi All,
I need to update the material type field from ECC to APO.
I am using the userexit CIFMAT01 and component EXIT_SAPLCMAT_001.
I need to extract field MTART from MARA table and need to Populate it in APO Product master.
In APO i am using the ATT01 field of table /SAPAPO/MATKEY.
But this does not work the data of material type is not getting populated in APO.
We have tried to use a break point in the user exit and while executing the transaction CFM2 it does not stop at the break point.
Can anyonwe guide me as to how to go about in implemeting this user exit.
Regards
NitinHi Nitin,
Make sure that u r pass the material type as a below :
CT_CIF_MATKEY-ATT01 = Pass the Material Type.
CIF_MATKYX -ATT01 = 'X'.
Check the below thread to debug the CIF queue:
debugging CIF user exit
Regards,
Siva. -
Regarding Integration Model to CIF from ECC to APO
Hi ,
Please assist me in the following issues:
What will the impact if any material is ciffed twice or multiple times from ECC to APO through IM ...will it generate inconsistency ? if so, how we can avoid this ?
While I'm ciffing the material from ECC to APO through IM, the ' Find Master Data Object ' is showing certain number say 'X' but when I'm running CTM for it the explosion of BOM of Master Data is showing less number of material than 'X'...in that case what might be the possible issue ?
While generating IM , can I club Sale Order, Sale Order Stock, Planned Order, Prodn order under same variant ? or ill it generate inconsistency ?
TIA
-MichaelHi Michael,
1. It is not a problem. Is is quite common to CIF materials twice a days or even more. It shoul not generate inconsistencies.
2. You could have more materials than materials bith BOM. In other words, maybe not all your materials have a BOM.
3. Its recommended to have a separate integration model for your object.
Read this document with the Best Practices:
https://websmp102.sap-ag.de/~sapidb/011000358700000715082008E
Also, note that I was mentioned by Dog Boy, it is convinient asking single questions in your threads. This way you will find more responses.
Kind Regards,
Mariano -
Amend Forecast after CIF import from ECC to APo
Hi all,
I need to amend the forecast in APo after a particular Sales Order type has been imported.
The import Occurs using an RFC connection to trigger the Function Module /SAPAPO/CIF_SL_DOC_INBOUND
Is there a user exit that gets fired after this completes? I've found one at the beginning but not at the end.
If anyone has any other ideas how this could be achieved then please let me know.
Thanks.
Regards
DaveI can use the CIF for independent demands or PIR's from ECC to APO. But the CIF functionality that sends independant requirements ignores MRP elements with type SB for dependant requirements you can not pick them up. At least I have not found a method for the standard CIF to send MRP elements SB as of yet.
-Mike -
Master/Transaction data from ECC to APO-BW
Hi All,
Normally we come across scenarios where Master/Transaction data is pulled from ECC to BW and then pulled into APO-BW. What are the pros and cons of CIF (direct connection between ECC and APo-BW) rather than pulling data from ECC to stand-alone BW and then into APO-BW?
Regards,
JoyHi Santhana,
If you want to add data of ECC to APO BW & Then in to DP, then follow the following Steps.
1. Create Generic Data Source in ECC for thet Sales Order table.
2. Replicate that data Source in to APO BW with Source System.
3. Create whole data flow process by using created Data Source.
Data Flow Process: 1. Info Package
2. Info Source
3. Info Cube
4. Transformation between DS & IS, Then IS & IC
5. Data Transfer Process.
4. Load data from ECC to APO BW
5. Use transaction /n/sapapo/tscube, for copy Info Cube data to Planning Area.
Hope this will help you.
Regards
Sujay -
Hi,
I have fetch to data from ECC custom table to APO and create data, can anyone let me know the procedure.
Thanks in advanceHi Santhana,
If you want to add data of ECC to APO BW & Then in to DP, then follow the following Steps.
1. Create Generic Data Source in ECC for thet Sales Order table.
2. Replicate that data Source in to APO BW with Source System.
3. Create whole data flow process by using created Data Source.
Data Flow Process: 1. Info Package
2. Info Source
3. Info Cube
4. Transformation between DS & IS, Then IS & IC
5. Data Transfer Process.
4. Load data from ECC to APO BW
5. Use transaction /n/sapapo/tscube, for copy Info Cube data to Planning Area.
Hope this will help you.
Regards
Sujay
Maybe you are looking for
-
Report - Alert Message when Link with value 0 is clicked
Hi, I have a report with many fields eg. Year , Count of High Priority Project , Count of Medium Priority Project , Count of Low Priority Project. I have used Column Attributes to link the report data to page 22. Now , some of the cells in the report
-
0FI_AR_4 extractor loaded data doesn't match ECC
Hi all. I load data through 0FI_AR_4 into 0FIAR_O03 DSO and 0FIAR_C03 by several FULL loads (closed fiscal periods) and Initial Delta. When I check amounts in BI and ECC using fbl5n I get these figures: 2 542 230 491,77 in BI 2 542 229 491,77 in ECC
-
WebDynpro Table Contents to Adobe:
Hi , I have WebDynpro Table element containing lots of data and on click of button it has to open in Adobe and display all the contents in Adobe Table. The problem is that i receive only one record which is lead selected in WebDynpro table. In Ado
-
Invoice verification done doubble times agaisnt one PO
Hello, SAP has Verified , two invoices two times. Please suggest me. I m sure the vendor master has no tick in the check doubble invoice Indicator., what could be the other Reason? Best Regards, Sridhar.k Siemens
-
Unable to update PSE 10, getting adobe server error message
Unable to update PSE 10. Getting error message re: server possibly down. However, get this message constantly.