How to calculate cost(COGS) in Sales from project

Dear all,
I have a situation like this:
My customer do not emplement PS(project system) and when managing sales from project, i don't know how to calculate cost of good sold for the service line.
Each project (contruction site; building, ....), I use 1 material master as service item to manage. while project excecution, we issue material; collect labor cost; cost of external service, so on.... total up to COGS. but i don't know how to get this one in Sales order. Could you give me some suggestions?
thanks!

Dear,
You need to create all these activities ( LABOUR CCOST/ COST OSFG EXTERNAL SERVICES)as Service Material and then put it into S.O. as Service Item and Bill the same.
Regards
AJIT K SINGH
HAPPY TO HELP U

Similar Messages

  • How to consume the Calendar Exception details from Project Server 2013 to an SSRS report using PSI ?

    Hello,
    Can anyone guide me how to access the calendar exception details from Project Server using PSI?
    I need to extract calendar details of enterprise resources , like exception name, exception type, exception start date and exception end date into my SSRS report hosted in SharePoint 2013 and 2010.
    I would be helpful if I can get a sample of this. I have read through many PSI documents in fact still going through ,what  PSI does and doesn't ,  PSI methods etc. from Project Server SDK and MSDN . Moreover, I
    am a beginner in .NET programming. I am confused and have lots of questions in my mind, like which PSI service should be used in my report(is it  just Calendar.svc), can we pull the details as XML type data source my SSRS report ,are
    there any other configuration settings apart from " setting up an event handler by installing an event handler assembly on each Project Server computer in the SharePoint farm, and then configuring the event handler
    for the Project Web App instance by using the Project Server Settings page in the General Application Settings of SharePoint Central Administration" (as per prerequisites for PSI in SDK) , how can I implement authentication settings
    -(when user with proper SharePoint permission
    can accesses the SSRS report  )
    Kindly bear with me if my questions are not appropriate .
    Please do guide me, and .
    Thanks in Advance!!
    Mridhula
    Mridhula.S

    Hi Brendan,
    Project server reporting database doesn't contain the calendar info. The only supported way to use the PSI to read the calendar info from Published database.
    See this
    reply from Amit.
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, P-Seller |

  • How to split cost allocations for sales order lines?

    Has anyone here solved a requirement to split the cost of goods sold from a service request debrief.
    The scenario is -
    1.  A debrief of a service request is completed.
    2.  Material is issued and technical labor used and expenses incurred.
    3.  I am hearing that in Oracle Service, the material is only costed but not the technical labor and expenses.
    4.  No splitting can occur in any of the cases through standard Oracle?
    5.  We have gone down the path of creating sales order line types for each department (unique code combination) and then splitting the COGS in SLA.
    6.  This way, we have to create items for labor and expenses.
    Is this the only semi-standard way.
    Thanks for your thoughts in advance.

    Hi
    I have reverse the sales order settlement, PP order settlement to sales order and I have also done KB11N for transfering the cost to the new production order.
    The only problem is I was unable to transfer labour hour confirmation as cost element used for this are not for transfering cost. If I will reverse the confirmation in PP order system will reverse material movement also which I don't want any more. Can you please tell me how to I reverse the Labour hours with out affecting goods movement?
    Many thanks

  • How to calculate the number of vowels from a txt file. Pls give me a hand!!

    Guys! How do i calculate the number of vowels from a txt file? I have to create a program to count the number of words, sentence, and vowels. So far I had managed to count the number of words. Now I need help on counting sentence and vowels! Pls give me a hand guys!

    I first have to read from the file not the string.I
    know how to read from a file. Now the problem ishow
    to compare a character from a txt file!You fail to understand, that you have read the data
    from the file into a string. Now loop over all
    characters in the string. Forget about the file.
    KajOr forget the scanners just as others have told you. Just read the file character by character using a FileReader.
    Kaj

  • How the Material costs and Overheads flow from Logistics to COPA

    Hi,
    I know that Revenue will flow to COPA from SD Condition types which we assigned to value fields in KE4I.
    But i am not clear how the Material cost will flow to COPA?
    How the Overheads will flow to COPA?
    Kindly help me in understanding the flow...
    Thanks
    KB
    Moderator: Please, read available SAP material for basic questions

    Hi,
    check this link:
    http://help.sap.com/saphelp_erp60/helpdata/en/7a/4c48c64a0111d1894c0000e829fbbd/frameset.htm
    Go to: "Flows of actual values" to get the big picture of CO-PA value flow.
    best regards, Christian

  • How to reference a folder/file outside from project folder

    Hi All,
    I have two extensions which wants to share some code(files) placed in a folder outside from source directory.
    for a simple case see the below example.
    created a sample extension HelloWorld whose project structure are as follows
    HelloWorld
         ExtensionContents
              lib/CSInterface-4.0.0.js
              jsx/InDesign.jsx
              HelloWorld.jsx
              index.html.
    I have another folder say "sharedAssets" it contains two images "Orange.gif and pear.gif" which is at same location where HelloWorld and now folder structure becomes
    HelloWorld > ExtensionContents
    sharedAssets > Orange.gif
                             pear.gif
    I have added linked resource folder see the attached screenshot
    I have written following line of codes in index.html
    <body onLoad="onLoaded()">
    <div id="content">
      <ul>
      <li><img src="Orange.gif" width="42" height="42"/></li>
      <li><img src="shared/pear.gif"/></li>
      </ul>
    </div></body>
    but when I opened the extension then it failed to load Orange.gif and pear.gif,
    Please let me know how I could reference an image placed in a folder outside from project folder.
    Regards,
    Alam

    Hi Alam,
    I don't use Eclipse / EB myself so I can be of no help in the way you set an alternate location folder there.
    I've looked in the MXI reference but it seems there's no token equivalent to the "parent folder of all extensions" i.e.
    /Users/Davide/Library/Application\ Support/Adobe/CEPServiceManager4/extensions
    or whatever it will be in the future. This is where Extension Manager puts stuff when the MXI is something like:
    <file   source="HTML/com.example.helloworld.zxp"
            destination=""
            file-type="CSXS"
            products="Photoshop,Photoshop32,Photoshop64"
            minVersion="14.0" />
    that is, destination is blank, file-type is "CSXS".
    I've never tried to put there stuff other than ZXP - you can give it a try.
    An alternative escamotage could be to use an external folder, which path token exists both in MXI land *and* in (CSInterface or ExtendScript).
    That is, a place Extension Manager installs your shared content; which path can be reached from the panel or the JSX.
    As an example $userdatafolder/alam/shared in MXI, and Folder.userData/alam/shared in JSX, or SystemPath.USER_DATA/alam/shared in JS.
    There are other product specific tokens (Photoshop Script folder for instance) where you can put things into.
    Regards
    Davide Barranca
    www.davidebarranca.com
    www.cs-extensions.com

  • How? Minimize image length when dragging from Project Pane to Timeline

    Greetings Gurus.
    How do you keep an image, dragged from the project panel to the timeline, from spanning the entire composition length?
    Images pulled to the timeline always span the entire composition. When you have a hundred clips, and only need two seconds or so, resizing each clip in a four minute composition is ... well, time consuming. Even dragging to the time and layer order just pushes it off the composition end, and still requires resizing.
    Has to be an easy answer. Ready for my Homer Simpson "Doh!".
    Thanks in advance
    Gr33nE99s

    To reset the out point of 100 layers press Ctrl/Cmnd + a while in the Timeline, move the CTI (current time indicator) to the desired out point, then press Ctrl/Cmnd + ]
    Using the [ key sets the in poing.
    or, as has been mentioned you can reset the default duration for still images in Preferences.

  • How to calculate first date of month from a given date in IDT BusinessObjects

    Hello Experts,
    I have a date field in IDT Universe which shows date in this format: Dec 13,2014 12.00.00 PM. Now I want to extract first day and last day of month from this date value. For example: here I want to see Dec 01,2014 12:00:00 PM and Dec 31, 2014 12:00:00 PM in First day of month and Last day of month columns. Also, if database date value is Nov 17, 2014 12:00:00 PM then in first day of month column, it should show Nov 01, 2014 12:00:00 PM and in last day of month it should show Nov 30, 2014 12:00:00 PM.
    I got some google help but 'Date' function is not supported by IDT tool in BusinessObjects.
    Please help.
    Thanks in advance.

    Hi
    Try to use the DB Functions to find out the First and last day. Please find out the below screenshot.
    If DB is BW, you can calculate the First and last day @ BW level use same object in BO directly.
    SQL DB:
    http://docs.oracle.com/html/A95915_01/sqfunc.htm#i1006893
    Oracle DB:
    http://msdn.microsoft.com/en-US/library/ms189794(v=sql.90).aspx

  • How to calculate the temperatur​e accuracy from RTI accuracy voltage ?

    Hi..
    I calculated the system accuracy = +/- 0,9 mV which the system accuracy RTI=0,018%
    I connect PT100 to SCXI1121+DAQ6052E.
    That I need is the accuracy in °K
    If I use (system accuracy RTI)0,018% * 300 (Full scale of Temperature) and I get +/- 0,05°K, is that correct ?
    I already read from
    "Finding the Accuracy of Measurements in the Units of a Sensor" http://digital.ni.com/public.nsf/websearch/99173BA​39CEC612986256CFF000A933E?opendocument&Submitted&&​node=133020_US
    But I don't really understand how to convert from mV back to Temperature again. Is that depend on some special factor?
    The next point, is I used interpolation method. The output temperature is also depend on the ca
    libration curve. ---> How can I convert back in this point.
    Thank you very much for any kind help.

    Thanks for the link, here is the result:
    Quote
    Recommended PSU: 324W (206W on +3.3v & +5v rails) for:
    -1 x Motherboard without onboard devices
    -3 x Fans (including PSU fans)
    -3 x Memory (128MB DDR)
    -1 x Graphic Card
    -1 x with powerful 3D Accelerator
    -1 x PCI Sound
    -1 x PCI Network Card
    -1 x HDD
    -1 x CD-RW
    -1 x DVD
    -1 x Floppy
    -4 x USB devices
    -1 x Keyboard
    -1 x Mouse
    -CPU: AMD K7 2167C MHz BT (1.65 V)
    So 300W probably is a bit on the light side for me, then?
    3.3V - 20A
    12V - 15A

  • How to raise customer invoice in case of third party sale from PS

    Dear All,
               In case of third party sale from project systems module, PR is raised which is further converted to PO and once the material reaches at client place GRN is done.Based upon the GRN the actual cost is booked to the project.How should I raise the customer invoice against the materials received by the customer?
    I went through the Forum and based upon the threads there, I came to know that one option is to  create sales order for the same items and do order based billings.But for this I have to enter the same materials items again in the Sales order which is nothing but duplicacy of data.
    Is there any alternative to this? Or some other way by which the PO line items be copied to sales order so that I can save time while creating sales order.
    Regards,
    B P Singh

    Hi Virendra,
                       Business scenario is like this.
    I have created project and activities.Have assigned materials as 3rd party sale in NWA. I have released the project.PR are getting followed by PO.On doing the GR the actual costs are getting booked on NWA.
    My concern is how to bill the Items(the same material components) which are assigned to activity.
    As per your input I need to do Resource Related billing.Thanks for the input.It is no longer required to assign materials in DIP to Carry out RRB. 
    To carry out RRB do I need to create Sales Order first ? If  No then how to do RRB? If Yes  I need to create a Sales Order with all the material components which I have assigned at activity level. So I was looking for some alternative so that SO creation becomes less tedious.
    Regards,
    B P Singh

  • Cost center to sales office assignment

    Hi,
    Please let me know how to assign Cost center to sales office.

    Hi Sanjeev,
    There is no option to assign cost centre to sales office in standard SAP. Please correct me if i am wrong.
    Can you explain your scenario ?
    Rgds
    San

  • Cost Calculation for Sales Order Collectively

    Hi,
    We need to recalculate sales Order cost. We can recalculate Sales order cost in SAP T Code VA02 for individual sales order. I am having approx 1000 sales order of which cost needs to be recalculated. Can any one help me How to recalculate Cost of these sales order Collectively.
    Thanks in Advance,
    Pawan Kumar

    Hi,
    I guess you should select B (carry new pricing). Although the system would try to reprice, in fact I guess that no pricing value would be change. If this doesn't fit your requirements then SD expert should answer your question (there are some ways you can control the pricing calculation, the ultimate way is some coding under REQUIREMENTS, but I would use it as last option).
    Benni

  • Moving buttons from project to project

    I have a button where the selected state and highlighted states took me a long time to create a long time ago.
    I copy to the clipboard the button, paste into a new project and none of the attibutes, selected state or highlighted states work. whats more, the "selected Shape' shows "not set'
    How do you correctly move a button from project to project????
    Thanks
    dvdsp 3

    Right click on the button, and elect "create button style" not specific to the project.
    Name it and save it self contained.

  • How to transfer cost from old sales order (cancelled) to new sales order

    Hi Gurus
    I want to know, how to move cost from one sales order to another sales order.
    SD created sales order before 1 month and there was production order behind this. Production was completed and all the cost was moved to sales order and also SD has raised invoice on customer. This transaction was completed.
    The above order was rejected by customer due to some changes in the order. SD raised another sales order and production order was created to to additional work. Production transfered above stock (produce before on old production order) to new production order.
    My problem is stock is now transfered to new production order but cost is still sitting on old sales order. How do I transfer cost from old sales order to new sales order. SD cancelled old invoice and raised new one with full value (old + new work) on new sales order. Now cost is on old sales order and revenue is on new sales order.
    Please help.
    Thanks

    Hi
    I have reverse the sales order settlement, PP order settlement to sales order and I have also done KB11N for transfering the cost to the new production order.
    The only problem is I was unable to transfer labour hour confirmation as cost element used for this are not for transfering cost. If I will reverse the confirmation in PP order system will reverse material movement also which I don't want any more. Can you please tell me how to I reverse the Labour hours with out affecting goods movement?
    Many thanks

  • How to Copy Cost Estimate from Quotation to Sales Order in MTO Scenario

    Hi,
    We are working on a MTO scenario- Sales order Costing with Valuated Stock.
    And our case we are creating the Cost Estimate at the time of Quotation using PP qty structure. Now we wan to transfer the cost estimate to Sales Order as we don't want to recost the sales order.
    Currenty it's transferring only the EK01 condition as total planned costs in Sales order but we want to see the itemization also.
    Please suggest is there any way to transfer this cost estimate with itemization from Quotation to Sales Order.
    Regards
    venkat

    Hi
    As far as I know the CO esimate does not get copied from Quotation to Sales Order
    You need to recost the SO again.. If your Qty Structure has not changed between Quotation to SO and your valuation variant is also the same - it would give the same result
    br, Ajay M

Maybe you are looking for

  • Erro de SYSFAIL e Queda do Ambiente JAVA (PI)

    Bom Dia Estou num projeto de NFe e atualmente esta acontecendo o seguinte cenário de Erros:     Na SMQ2 , quando apresenta um aumento nas filas de Mensagens , aparece SYSFAIL em determinadas Filas , todas as outras travam , aumenta o numero de Filas.

  • Reader does not use or display the embedded fonts

    I have an odd problem with both Reader X and XI. Neither one will use the embedded fonts when opened from an email. I can forward from that PC to any other PC and the fonts will display correctly. The HP is Windows 7 64 bit. I can view the document t

  • Effects not playing in Captivate 6

    Hello, I am trying to have an image zoom in using the Effects options. I have a static image on the page and want it to act like a portion of the image is getting bigger. I have it set to zoom in and it does it on the "Live Preview" but won't do it w

  • Brush is making dots instead of a line

    Last night in CS5 I was playing with the opacity and spacing of the brush, and now I can't get back to a normal brush. I want just a normal stroke, but the brush is making lots of transparent dots instead. I've switched to Photoshop Elements 7 for no

  • Working with ZULU timestamps.

    I have this simple code: String timestamp = "20050723165000Z-0500";           SimpleDateFormat fmtTimestamp = new SimpleDateFormat("yyyyMMddHHmmss'Z'");           int start = timestamp.lastIndexOf("Z") + 1;           int end = timestamp.length();