How to calculate the COGM for ETO

Hi Gurus,
In my client follows Discrete Manufacturing ETO (Engineering to Order),
Some Orders showed std price for COGM
In some Orders  it showed  planned Price for COGM
In some Orders it showed Other Value for COGM.
Still i am confusing regarding for this issue, so could you clarification how the process going on ETO Order.....
Thanks,
Chandrababu.B
Edited by: Chandrababu Naidu on May 17, 2011 3:15 PM
Edited by: Chandrababu Naidu on May 17, 2011 3:19 PM

I agree with you. But, the optimizer's produced best_plan may not be perfect for some queries. Search in asktom site regarding cost of CBO. There is a big debate on this in one of the oracle list group by an oracle experts. Remember this could note be the same for all qureies. I am just warning you that, a low cost not gurantee that run father than a higher cost value.
SJH
OCP DBA

Similar Messages

  • [svn:fx-trunk] 10545: Make DataGrid smarter about when and how to calculate the modulefactory for its renderers when using embedded fonts

    Revision: 10545
    Author:   [email protected]
    Date:     2009-09-23 13:33:21 -0700 (Wed, 23 Sep 2009)
    Log Message:
    Make DataGrid smarter about when and how to calculate the modulefactory for its renderers when using embedded fonts
    QE Notes: 2 Mustella tests fail:
    components/DataGrid/DataGrid_HaloSkin/Properties/datagrid_properties_columns_halo datagrid_properties_columns_increase0to1_halo
    components/DataGrid/DataGrid_SparkSkin/Properties/datagrid_properties_columns datagrid_properties_columns_increase0to1
    These fixes get us to measure the embedded fonts correctly when going from 0 columns to a set of columns so rowHeight will be different (and better) in those scenarios
    Doc Notes: None
    Bugs: SDK-15241
    Reviewer: Darrell
    API Change: No
    Is noteworthy for integration: No
    tests: checkintests mustella/browser/DataGrid
    Ticket Links:
        http://bugs.adobe.com/jira/browse/SDK-15241
    Modified Paths:
        flex/sdk/trunk/frameworks/projects/framework/src/mx/controls/DataGrid.as
        flex/sdk/trunk/frameworks/projects/framework/src/mx/controls/dataGridClasses/DataGridBase .as
        flex/sdk/trunk/frameworks/projects/framework/src/mx/controls/dataGridClasses/DataGridColu mn.as

    Hi Matthias,
    Sorry, if this reply seems like a products plug (which it is), but this is really how we solve this software engineering challenge at JKI...
    At JKI, we create VI Packages (which are basically installers for LabVIEW instrument drivers and toolkits) of our reusable code (using the package building capabilities of VIPM Professional).  We keep a VI Package Configuration file (that includes a copy of the actual packages) in each of our project folders (and check it into source code control just as we do for all our project files).  We also use VIPM Enterprise to distribute new VI Packages over the network.
    Also, as others have mentioned, we use the JKI TortoiseSVN Tool to make it easy to use TortoiseSVN directly from LabVIEW.
    Please feel free to contact JKI if you have any specific questions about these products.
    Thanks,
    -Jim 

  • How to calculate the unit for RATE?

    Hey All,
    I am not sure if there is something standard for this or not.
    I am calculating the 'Rate' by using 'Value/Amount' and 'Quantity' as follows -
    Rate == Value /  Quantity
    I need to calculate the unit for the rate as below -
    Rate unit == Value unit (Currency) /  Quantity unit (Base_uom) 
    (for example -
    if value is 1000 USD and quantity is 10 TO then Rate should come out as 100 USD / TO)
    Could anyone please suggest how to calculate the unit in this case?
    Many Thanks!
    Tanu

    Hi,
    Go through the below link it may give some idea
    http://help.sap.com/saphelp_nw04/Helpdata/EN/19/1d7abc80ca4817a72009998cdeebe0/content.htm
    Regards,
    Marasa.

  • How to calculate the compliance for an software update deployment

    Hi All,
    I am trying to find as how do we calculate the compliance for an software update deployment.
    Scenario, We have about 4000 machine in the domain. but we have some stale records in the domain which is about 1200. The AD cleanup for the stale records is planned for sometime in March.
    So total number of machines in a collection (including the stale machines) are 5200.
    The current compliance of that deployment shows the following status:
    Complaint : 1156
    In Progress : 1724
    Error : 38
    Unknown : 2462
    And in the unknown, we have :
    Client check failed/Active: 2
    Client check failed/Inactive: 6
    Client check passed/Active: 732
    Client check passed/Inactive: 1722
    Can you please suggest in understanding the formula that should be followed to get the compliance.

    Your Compliancy, should be based solely off of the number of computers within CM12.
     There are no “if”, “and” or “but” able it.  This is the only way to truly and reliably provide numbers to management.
    Again it should be very simple calculation:
     (Total outstanding  Security SU, Total outstanding
     Critical SU, Total outstand Service packs, Total outstand Update Rollups, Total outstand Updates, Total outstand Definition Updates, Total outstand tools, Total outstand Feature packs) Vs Total applied SU (all Classifications)
    Or
    Total # of 100% patched PCs vs Total # of PCs as seen by CM12.
    If you use any other calculation then you MUST include a disclaimer that you are filtering out computers because they might be invalid. Or you MUST define exactly how you are calculating the number. Therefore any compliancy rate that your calculate maybe
    invalid too or at least it will change once you clean up AD.
    I will never hide low compliancy numbers to management, I will always show it to them.
     In many case I will ask to give a presentation to Management to explain why the numbers are so low.
     Provide them with a list of action items that need to be done in order to bring up the number to more reasonable level. I also set their expectation on what a reasonable level is.
    100% is unachievable; there is no exception to this!
    95-99% Very excellent but expect to spend lots of $$$s to obtain these percentages.
    90-95% is really, really, good; expect to spend $$s in this range.
    85-89% is good; expect to set strict procedures
    81-84 is ok but you could do better
    Below 80% is bad
    In your case, I would start by saying AD is dirty and need to be clean up, this has been schedule for March 2015. I would follow up this to say, in order to keep AD clean the follow procedures need to be define / updated / followed. You should also define
    exactly what you are doing to ensure that all computers are management by CM12.
    IMO these is no simple answer of this.
    Garth Jones | My blogs: Enhansoft and
    Old Blog site | Twitter:
    @GarthMJ

  • How to calculate the measure for the next month using the AGO Function

    Hi,
    I need to calculate the measure for the current month and the next month.
    Can anyone please let me know the syntax to use AGO function for the above requirement.
    Regards,
    Ambika Nanda.

    Hi.
    You can also use Oracle analytic functions LAG and LEAD inside the EVALUATE obiee function. The second one will give you the next measure.
    For example the report is:
    TIMES.CALENDAR_MONTH_DESC
    SALES.AMOUNT_SOLD
    LAG column: EVALUATE('LAG(%1, 1) OVER (ORDER BY %2)' AS DOUBLE, SALES.AMOUNT_SOLD, TIMES.CALENDAR_MONTH_DESC)
    LEAD column: EVALUATE('LEAD(%1, 1) OVER (ORDER BY %2)' AS DOUBLE, SALES.AMOUNT_SOLD, TIMES.CALENDAR_MONTH_DESC)
    And the result is:
    CALENDAR_MONTH_DESC--------AMOUNT_SOLD--------LAG--------------LEAD
    2000-01----------------------------------8025513.84---------------------------8474475.88
    2000-02----------------------------------8474475.88----- 8025513.84-----7439568.24
    2000-03----------------------------------7439568.24------8474475.88-----7062040.48
    2000-04----------------------------------7062040.48------7439568.24-----7497971.40
    Regards
    Goran
    http://108obiee.blogspot.com

  • How to calculate the depreciation for an asset under repair for a month

    Hi,
    I have placed an asset (Laptop) into service 01.01.2013 and I have calculated the depreciation for the 1st period and in the second period 01.02.2013 the laptop is broken and which was sent to the service center and for that entire month no depreciation is calculated. I wanted to start the depreciation for the same asset on 01.03.2013.
    how to process for the depreciation for 3rd period and for the 2nd month what should be the activity of the asset?
    Please explain in detail.
    Thanks,
    Santhosh.

    Hi,
    If you do not want to post depreciation for an asset, then assign depreciation key 0000 for the asset.
    OR
    Use the asset shutdown option in field status group in time dependent tab.
    Regards
    Srinivas

  • How to calculate the retropay for a company who has grade rates & not notch

    Hey everyone
    I am trying to calculate the arrears of bunch of employees, the company has the grade rates i.e. salaries are defined as minimum , maximum Mid Value.
    Navigation: Grade>Grade Rate
    Now when i run the retropay by element process i am failing to get the element of Arrears or Retropay attahced automaticaly to the pay period i am trying to run.
    I have worked on 11i retropay by element for Grade Steps and Points, but i am a bit new to the Grade rate thing and the Salary Basis.
    I feel like i am missing some steps some where.
    kindly help me out of this issue as i am stuck.
    Appreciate all ur help!

    Ho. Guess this falls in the "never try to do humour on forums" pitfall :-)
    You have a pointer here.
    And another one on Wikipedia.
    Yoann

  • How to calculate the amount for cleared documents.

    Hi Experts,
    I am working on a program and here i need to display the amount for the cleared document.
    I have a scenario where there are two financial document related to a single cleared document.
    I can get the amount for financial document from BSAK by passing the BELNR value of the financial document and confirm if it is a clearing document by comparing AUGBL value of BSAK with document number of cleared document.
    Actually i am not very clear about the process flow of clearing document.
    If anyone can explain me the same.

    Hello,
    Go through this links it will help full
    http://help.sap.com/saphelp_sbo2004c/helpdata/en/fd/25f4c6d8888e40a521972d0be5d68b/content.htm
    http://help.sap.com/saphelp_45b/helpdata/en/e5/0783e84acd11d182b90000e829fbfe/frameset.htm

  • How to calculate the payment  for the following ......questions

    hi,
    if an emp absent for the first 10 days he will get the 100% sal,
    and the next 10 days, he will get only 75% of the sal for the absents
    and the next 10 days he will get only 50%,
    please help me out to know it

    hi,
    you have to use the valuation bases for WT valuation in table T512W_B.
    and you also have to use counting classes in Time management.
    also have to maintian table T554C.
    regards,
    salman

  • How to calculate the mt_bf  (optimum blocking factor) in mtio.h?

    Hi geniuses,
    One of our customers asks our tape driver to support the mt_bf defined as optimum blocking factor in mtget structure in mtio.h. The mt_bf is supported in MTIOCGET ioctl in Solaris native tape driver -- st. I can not find any Solaris document how to calculate the value for Developers. Please help me to figure out if you know the answer.
    Thanks in advance!

    I would have liked this as a homework assignment when I was in college - beats the heck out of "find the range of a given artillery shell..."
    good luck with it, looks fun
    Lee

  • How to calculate the size each PSA request or all PSA for the Datasources?

    Hi All,
    Can anybody tell me how to calculate the size of each PSA Request or all PSA's requests for all datasources?
    Regards,
    Rajesh

    Hi ,
    PSA technical name can be found as,
    1)Right click on your Data Target,go to Display dataflow,click on the PSA ,here you can find the technical name.
    2)Goto RSRV tcode>PSA Table>Consistency between PSA Partitions and SAP Administration-->Give your Infosoure name,it gives u PSA technical name also,
    Thanks&Regards,
    Praveena.

  • How to calculate Opening balance for a customer?

    Hi Experts,
    How to calculate Opening balance for a customer? I am trying to develop a report where in i have to get opening AR balance,current sales,adjustments etc of a customer. Please let me know how can i do this. I have some tables with me KNC1, BSAD, BSID.
    Thanks in Advance.
    Sharat Chandra.

    Say for example ..
    Get the opening bal for Customer 'K' in CCode 'C1' in 2008 ..
    First get all items from BSEG ..
    Select * from BSEG where KUNNR eq 'K'
                                     and BUKRS eq 'C1'
                                     and GJAHR eq '2008' .
    Sum all the DMBTR values (This is the total value).
    Second get the cleared items form BSAD for the above entries;
    Select * from BSAD for all entries in BSEG where KUNNR and BUKRS and XBLNR eq BSEG-XBLNR.
    Sum all DMBTR values ( this is cleared value).
    Third substract the cleared value from total to get Open value.
    This is a overview .. you should go to the tables and look for fields and etc.. and then define the logic meeeting your requirements .... this is a genric undersatnding ....
    Thanks,
    Aditya. V

  • How to calculate Average balance for an account

    Hi,
    How to calculate average balance for an account for a particular period say for JAN-12 period and after the end of that period for another two days 01-feb-12 and 01-feb-12 ?
    I'm using the following query :
    SELECT cc.segment1||'-'||cc.segment2||'-'||cc.segment3||'-'||cc.segment4||'-'||cc.segment5||'-'||cc.segment6 "Account_XX",
    nvl(sum(l.accounted_dr - l.accounted_cr),0) "Balance"
    FROM gl_code_combinations cc,
    gl_je_lines l
    WHERE cc.code_combination_id = l.code_combination_id
    AND l.set_of_books_id ='XX'
    and code_combination_id = replace it with code combination_id for account_xx
    AND l.effective_date <= '31-Jan-12' (january period end ??)
    GROUP BY cc.segment1||'-'||cc.segment2||'-'||cc.segment3||'-'||cc.segment4||'-'||cc.segment5||'-'||cc.segment6
    There are some discrepancies in "average balance" after end of month (Jan-12)?
    How to calculate average balances for a particular account (Account_XX above)from end of month of Jan to first two days of february?
    Thanks,
    Kiran

    Kiran,
    Please let me know first, is Average Balancing feature enabled in your GL Ledger?
    Regards
    Muhammad Ayaz

  • How to calculate the Daily Call Volume

    Hello,
    Can anyone please advise how to calculate the daily call volume in a contact center - the counts of the calls terminated in ICM ?
    Is there any webview report or a SQL query which provides the count ?
    Many thanks in advance for the help!
    Thanks & Regards,
    Naresh

    The ICM software generates a Termination_Call_Detail record for each call that arrives at the peripheral. From This report you can get the number of calls to ICM as well as the call details.
    To get the report run this sql query
    select * from dbo.t_Termination_Call_Detail where convert (varchar(10), DateTime, 101) = '12/03/2010'

  • How to calculate the quota base quantity in quota arrangement?

    Hi all,
    As we all know, when a new supplier is added in the quota arrangment, we take the help of quota base qunatity so that the new supplier does not get any unfair advantage over the existing suppliers. Would you please help me on how to calculate the quota base quantity or on what basis the quota base quantity is calculated?*
    Regards,
    Ranjan

    Dear,
    Quota arrangement divides the total requirements generated over a period of time among the sources of supplied by assigning a quota.
    Quota u2013 quota is equal to a number and its represents the proportionate of requirements. Total quota of all the vendors is equal to 100% of requirements.
    This quota arrangement is also specific to material and plant level.
    Quota rating = quota allocate quantity + quota base quantity / quota.
    Quota based quantity used only when a new vendor introduced.
    In the as on date situation, the minimum quota ratings will considered as preferred vendor.
    The 2 vendors has 2 same quota rating, the vendor who is having the highest quota will considered first.
    In the running quota, a new source of supply is included. (In situation of short supply) including a new source not means to reduce the quota for existing.
    Regards,
    Syed Hussain.

Maybe you are looking for