How to control Inspeciton generation from Process/ Production Order

Hi SAP Gurus,
In our business place earlier we used to have Process order.The specific Process order type wouldn't generate any Lot.But once we switch to production order , we are getting inspection lot for New Production Order type.
The need is that for specific production order (which is not for main production), the system shouldn't generate 03, 04 type of inspection lot with many real process / production inspection tests.
For this purpose we  tried to limit the inspection type for Production order using Order type dependent parameter.
In that we assign new inspection type (other than 03 or 04 inspection types ). The new inspection type is attached with new Usage.And New usage has got its own Group counter with limited test.
So Group counter created with new usage. New usage used in new inspection type. And new inspection type tied with production order. With this we were able to limit for not having inspection lot of 03 inspection type for this production order.
But system generate the 04 type of inspection lot , though production order has got new inspection type attached with it.
Also the new setup 04 type of inspection lots in created mode.
How to make sure that system only generate the new inspection type inspection lots.
Advance Thanks for all the detail help steps.

Hi
If you want to restrict quality inspection based on production order type, Its possible. Use exit QAAT0001. Take help from ABAPer, dont forget to set E_NO_INSPECTION based on the order type field there. VERY IMPORTANT: Put  E_TQ32 = I_TQ32 in the program, otherwise you will get error "Post stock in QM only"
SDG

Similar Messages

  • Control recipe generation from process order

    Hi,
    Iam using XSteps to generate control recipes for external destination ie destination type 02. But I find no control on the number of control recipes that can be generated.Whenever I click on the generate control recipe botton,  a new control recipe is getting generated,
    I need to have a control on this similiar to the case of destination type 04. ie system will not generate a control recipe if already a control recipe is there for a destination.
    Can anybody know how to bring this control?
    Thnaks in advance
    Regards
    Prathib

    Hi
    If you want to restrict quality inspection based on production order type, Its possible. Use exit QAAT0001. Take help from ABAPer, dont forget to set E_NO_INSPECTION based on the order type field there. VERY IMPORTANT: Put  E_TQ32 = I_TQ32 in the program, otherwise you will get error "Post stock in QM only"
    SDG

  • I have sent my iPod back for servicing because it is cracked, with some dispute with Apple I have managed to get a brand new iPod Touch. Just wondering if anyone has had this problem how long did it take from "Replacement Product Pending" to get bck to UK

    I have sent my iPod back for servicing because it is cracked, with some dispute with Apple I have managed to get a brand new iPod Touch. Just wondering if anyone has had this problem how long did it take from "Replacement Product Pending" to get back to the UK

    Not really. Is say "pending"
    pend·ing 
    /ˈpendiNG/
    Adjective 
    Awaiting decision or settlement.
    Preposition
    Until (something) happens or takes place: "they were released on bail pending an appeal".
    Synonyms
    adjective. 
    pendent - undecided - unsettled - outstanding - pendant
    preposition. 
    during - until - till - to

  • How to stop PR creation from PM work order for a particular vendor?

    Hello Experts,
    We have following scenario for breakdown maintenance activities.
    When a machine breaks down, a breakdown order is created in SAP. The external manintenance services are planned in the order. When the order is released, a single PR (with multiple item numbers corresponding to number of services) is created by SAP. The PR has a release strategy. When PR is released, PO is created followed by the SES.
    The practice followed AS -IS for breakdown outside business hours:- If the breakdown happens outside business working hours, the person releasing the PRs is not available & hence PR can not be released resulting in no PO & no subsequent SES.
    In this case, the maintenance is completed by the external agency & the work order is TECO. The next day, TECO is reveresed, new PR is created, released, converted into PO, & then SES.
    TO-BE process:- Client expects that, for certain vendors identified, PR should not get created at all from the breakdown order. (The list of  vendors will be maintained seperately). For these vendors, a framework order will be created at the start of fiscal year & SES will be created as & when required agaainst the framework order.
    My concern is :- How to stop PR creation from PM work order for a particular vendor? OR delete the created PR?
    Highly appreciate your quick response.
    Thank you.
    Amit
    Note:- My ABAP consultant has checked following BADI's, but could not find it useful.
    IWO1_ORDER_BADI
    ORDER_COSTING_CK
    DATA_EXTENSION_CK
    VALUATION_CK
    ME_REQ_OI_EXT
    IWO1_PREQ_BADI
    ME_CHECK_SOURCES
    ME_REQ_POSTED
    IWO1_ORDER_BADI

    Dear Amit
    I am giving a different dimension to your question check if it fulfills your requirement -
    As we know Vendor selection comes at a later stage only after your PR creation, approval & RFQ etc. & PR generation from maintaine. order is controllled through control key PM03.  While triggering PR from order you have to specify Material group, Purchase group and vendor. Try to control it through authorisation as all these are authorisation objects. The persons executing breakdown order shall no t be given this authoriations
    shakti

  • What is target qty in process /production orders?

    Hi Experts,
    I am doing a report that needs to display the quantity and costs (target / planned / actual) of each component in the process /production orders. Through tcode COR3 --> given a process order# --> Goto -- > Costs, I can see total target qty / total planned qty / total actual qty for each component. But I can only find planned qty and actual qty from tables COSS, COSP, RESB.  Where to get target qty ?
    Can anybody explain to me what is exactly the target qty? Any tables to get target qty? Or any FM to get target qty?
    Thanks a lot.
    Yu

    Dear,
    Definition: target costs                                                                               
    Product Cost Controlling (CO-PC)                                                                               
    The costs expected to be incurred when a specific quantity is produced.                                                                               
    In Cost Object Controlling, the target costs are calculated on the basis 
        of the planned values of a service unit (such as the planned cost of a   
        production order) and the control quantities (such as the yield          
        delivered to stock).                                                                               
    Target costs can be used for purposes such as:                                                                               
    o   To determine variances                                                                               
    o   To valuate work in process                                                                               
    Total Target Costs                                                                               
    Total value of the target costs.                                                                               
    Calculated with the following formula:                                                                               
    Total target costs = Target cost debit + Target cost credit.                                                                               
    Use                                                                               
    Target costs are the planned costs adjusted to the actual operating    
        rate.                                                                               
    The target debit on a manufacturing order is the sum of the            
        activity-independent planned debit of the order and the                
        activity-dependent planned debit of the order multiplied by the actual 
        quantity of the order.                                                                               
    The target credit of a manufacturing order results from the goods      
        receipt postings to stock. The delivered actual quantity is valuated   
        with the planned price according to the price control.                                                                               
    The total value of the target costs is the sum of the target debit and  
        the target credit.                                                                               
    The target costs are calculated during variance calculation and updated 
        to the database.                                                                               
    The target costs cannot be shown until you have performed variance      
        calculation for this target cost version. The target credit for the     
        calculation of the total variances and production variances cannot be   
        calculated until an actual quantity for an order exists after a goods   
        receipt posting.                                                                               
    For the calculation of variances, the target costs are compared with the
        control costs.                                                                               
    Dependencies                                                                               
    The calculation of target costs depends on the selected target cost     
        version.

  • How to change the status of a production order

    Dear All,
    May i know how to change the status of a production order.I want to de-active the status like OPGN (Operation generated).This status is updated as there was no routing assigned to that particular production order during its creation
    Thanks and Regards,
    Varun Siddharth

    Dear,
    When you create a production order, an operation created by the system is generated automatically if no routing is used for the creation. As a result the order header receives the status HOGAN; the operation created automatically also has this status.
    If you delete the operation created automatically and then do not have the status HOGAN.
    To avoid this maintain the Routing for the material or delete the setting of default operation from OPJG.
    Regards,
    R.Brahmankar

  • How to select the correct routing for production order?

    In table PLPO i have 4 different group numbers for a particular routing. I'm wondering how a production order, created in CO01, selects which one to use. Our base quantity is dz/hr. When I create an order for a particular material, it shows up as 290 as the base quantity. The group 1 is 400dz/hr, not 200. Why does the order choose this group number and not the group number 1.
       Here is a screen from PLPO table.
       Here is a screen showing the material master.
       This is an image of the order details within the created order.

    PLPO contains operations
    The planselection would be based on PLKO entries.
    Please check online help to first get a better understanding on how routings are selected.
    Routing Selection - Production Orders (PP-SFC) - SAP Library   
    Automatically Selecting a Routing - Production Orders (PP-SFC) - SAP Library
    Definition of Base Quantity for Operation:
    "Quantity of the material to be produced to which the standard values of the
    operation refer"

  • Update Itemcost from the Production order.

    Hi Experts,
    I have created a UDF(Amount) in the Production order rows, if iam entering the amount for the input item the Amount should get updated in the Itemcost of the Itemmaster data.. How to write the update statement? Is it possible to update the Average price of the item from the Production order using a UDF?
    Regards,
    Magesh.

    Magesh,
    The Item cost of an Item is managed and calculated by SAP based on the different transactions.  You should not be updating this Cost using SQL UPDATE statements.
    The times you generally change Item cost manually is when you are using Standard Cost and you want to set the Cost for the Item.  This is also possible only when there is no Quantities on Hand.
    Suda

  • Capacity Requirement From Released Production Order

    Hi PP Gurus,
    Can i limit capacity requirement only from released production order ? I don't want to count requirement from production order that just created but not yet release.
    Regards,
    Arman Lie

    Dear Arman,
    As a standard practice the system creates the capacityrequirements once the production order is created.
    Check this,
    When a production order is created the following actions are carried out:
    ·        A routing is selected, its operations and sequences are transferred to the order
    ·        The bill of materials is exploded and the items in the bill of material are transferred to the order
    ·        Reservations are generated for bill of material items held in stock
    ·        The planned costs for the order are generated
    ·        The capacity requirements are generated for the work centers
    ·        Purchase requisitions are generated for non-stock items and externally-processed operations
    Regards
    Mangalraj.S

  • How to find suborders for the given production orders?

    can any one give solution for finding the sub-orders for my given finished product,
    prodution order?
    my finished product may have the hierarchy as.....
    Finished Goods-> Semi-finished  goods ->  Semifinished-> up to n numbers
    > at last raw material.
    how to find the relation ship between production orders and corres ponding
    cost for this requirement?
    Thanks .
    <u><b>Solution Rewarded.</b></u>

    Hello Meeta
    If you are considering Reporting Manager as appraiser.
    First get pernr, find out position ID from the infotype 0001, check the relationship A002 maintained for the appraisee's position (HRP1001), and finally to find out Appraiser ID check the relationship A008 (HRP1001) of the appraiser's position.
    BR
    Reddy

  • Change in Sales order deleted all process production order

    Dear All,
    We have Make to order scenario for our export sales. When we have receive order we make production with reference of sales order with help of t-code MD50 then convert plan order into production order.
    IF sales department do changes in sales order it'll delete all processing production orders So, we have to do revoke all production orders manually.
    2 query is that, Is there any way to run MRP (Make-to-order) on all line items of sales order ?
    Please provide solution.
    Thanks,
    Farrukh khan

    Dear Farrukh,
    There is not tcode to run sales order for all line items, but if you run MD02 it will plan all sales order & line items also. You can run MD02.
    Regards
    Abhijit Gautam

  • How to replenish warehouse pick bins for production orders

    Hi All,
    Currently in WM we use LP22 to replenish the pick bins, here LP22 considers all the outbound deliveries for creating the replenishment TRu2019s
    In the similar fashion how can I use LP22 to consider Production orders (raw materials and their quantities) for replenishing the pick bins? My aim is to replenish the pick bins not just for the outbound deliveries but also for the production orders
    Please suggest if this can be accomplished using LP22 by running in different ways or there is different transaction.
    FYI: the materials that are ordered in the outbound and production order are same
    Please suggest
    Thank you

    Hi,
    Instead of opening multiple threads in different forums, it would be better if you reply back to the suggestion provided as to whether it helped or if you need any further help.
    This is the link to your same query posted in PP forum
    LP22/LP21 for production order
    I hope you have gone through the forum rules & would do your bit to ensure the forum is used properly.
    Regards,
    Vivek

  • How to analyse actual cost for each operation in Process/Production Order?

    Hi all,
    IN SAP, I know that we can analyze plan cost for Operation in Process Order/ Production Order.
    However, I can not analyze Actual cost for Operation .
    I know the object when I good issue material is ORDER, not OPERATION.
    But, as requirement of users, they want to analyze actual cost for each Operation.
    CAn SAP do this analyze?
    If Yes, What should I do in SAP to have this reports?
    THanks in advance,
    Emily Nguyen

    Hi Emily,
    as I see from one other message that you're using material ledger. Then your expectation is apparently to also see the actual costs of materials in your production order by operation.
    This is not supported. Actual material costs are handed up in material ledger multi-level settlement from one material to the next, bypassing the production orders.
    That means the production order will always contain the material costs valuated at plan price, not at actual price.
    For activity prices that might be better, when you revalue the orders at actual activity prices with CON2. But even there I am not sure that it will always be assigned correctly to the operations.
    There is currently an enhancement in development, the operation level costing. But that will affect more the planned cost side not the actuals. Might be interesting to learn more about your requirements and the use case behind.
    best regards,
                      Udo

  • How to control po item from pr can't been changed manually?

    when i create po via pr. the item can been modified.it is not permitted. how to control the behave in system.

    hi
    while creating a PO wrt PR if the user changes the item then we will get the warning Purchase requisition &, item &, has a different material number but we will not consider it.
    if we do not want to continue
    goto SPRO - MATERIAL MANAGEMENT - PURCHASING -ENVIRONMENT DATA -DEFINE ATTRIBUTES OF SYSTEM MESSAGES -SYSTEM MESSAGES -VERSION 00 APPLICATION AREA 06 NUMBER 56 MESSAGE TEXT Purchase requisition &, item &, has a different material number , u change the categeory from warning to ERROR
    then automatically when ever ur doing po wrt pr when we change the item automatically the system issues an error message

  • How can we improve performance while selection production orders from resb

    Dear all,
    there is a performance issue in a report which compares sales order and production order.
    Below is the code, in this while reading production order data from resb with the below select statement.
    can any body tell me how can we improve the performance? should we use indexing, if yes how to use indexing.
    *read sales order data
      SELECT vbeln posnr arktx zz_cl zz_qty
      INTO (itab-vbeln, itab-sposnr, itab-arktx, itab-zz_cl, itab-zz_qty)
      FROM vbap
      WHERE vbeln  = p_vbeln
      AND   uepos  = p_posnr.
        itab-so_qty = itab-zz_cl * itab-zz_qty / 1000.
        CONCATENATE itab-vbeln itab-sposnr
           INTO itab-document SEPARATED BY '/'.
        CLEAR total_pro.
    **read production order data*
        SELECT aufnr posnr roms1 roanz
        INTO (itab-aufnr, itab-pposnr, itab-roms1, itab-roanz)
        FROM resb
        WHERE kdauf  = p_vbeln
        AND   ablad  = itab-sposnr+2.

    Himanshu,
    Put a break point before these two select statements and execute in the production.This way you will come to know which select statement is taking much time to get executed.
    In both the select statements the where clause is not having the primary keys.
    Coming to the point of selecting the data from vbap do check the SAP note no:-185530 accordigly modify the select statement.
    As far as the table RESB is concerened here also the where clause doesn't have the primary keys.Do check the SAP Note No:-187906.
    I guess not using primary keys is maring the performance.
    K.Kiran.

Maybe you are looking for

  • Unable to update Photoshop CC with Creative Cloud

    I have tried multiple times to download and update the Photoshop CC update that just came out. Everytime I try it gets to the end and then I get an error message that pops up. I click on more details and this is what I get when I open up the file. 09

  • Logic for Deletion of a row is not reflecting in DEV instance

    Hi , I have a method in AM attached to a Search screen which has logic to delete rows from 3 different VOs. 1. VO for selecting the rows from Details table. 2. VO for selecting the rows from Master table. 3. VO for holding the rows of results tables.

  • "The Pure Networks Platform Service Is Not Running" every time I print

    I will be glad to follow-up with all the gory details about my system, but I thought I'd throw out a general question first.  I just installed a network printer to my NM Network.  It's a Lexmark 543dn connected via ethernet.  Everything prints just f

  • Errors compiling avTouch

    hi, errors showing up when compiling avTouch in these lines in avTouchController.mm: - (void)updateCurrentTime; - (void)updateViewForPlayerState; : error: expected `{' before '-' token - (void)updateViewForPlayerInfo; : error: expected `{' before '-'

  • Error 50 when installing/updating help

    Whenever I try and install or update Creative Cloud, I get an error 50 with a failed to install message. I use windows 8.1 PC Help?