How to desable ok check for subcontracting child parts in MIGO

Dear SAP Experts,
my client is having one issue regarding disable OK check for subcontracting child parts in MIGO transaction  ,In MIGO subcomponenets are attached to main component , my client is asking for disable that OK check box user shouldnot remove that check box tick mark when system showing message deficiate of subcomponents at subcontractor  because some times users removing that check box tick mark  and proceeding further, with that they are not able to reconcile the sub challans.
Plz let me know how disable OK check for child parts in MIGO

chandu
while making the po we are explode the BOM and we defined the parant and child mateirlas in bom.
system will show the same in migo . i think there is no standard configration to block the option.
Regards
laxman

Similar Messages

  • How often does mozilla check for mail?

    I simply want to know how often Mozilla Thunderbird checks for new mail. Can I change this time period to more or less often?

    As often as you tell it to check. Note, some email providers limit the frequency with which one is allowed to check for new mail. An interval of less than 10 min doesn't really make sense.
    Tools (Alt-T) - Account Settings - Server Settings
    Check for new messages every x minutes.

  • Does Anyone Knows How To Disable The "Check For Updates" Option in Adobe Edge Code and Reflow?

    Does Anyone Knows How To Disable The "Check For Updates" Option in Adobe Edge Code and Reflow?
    Thanks in Advance

    I don't think there is a way for Edge Code. I'm not sure about Reflow.
    Why don't you just upgrade? That will stop the notifications.
    Randy

  • How to make Authority Check for ALVGrid?!

    Hey mates,
    i got the problem which is mentioned in the headline. How can i make an authority check for my ALVGrid? I mean i want to restrict special functions to the matching users ( Display, Edit, Delete mode ).
    Would be cool if someone can help
    Regards Basti

    Hello Bastian
    A simple approach would be to define three different transactions (e.g. Z_MYALV01, Z_MYALV02, Z_MYALV03) for editing/deleting, editing only and displaying only. Add the following coding to the report displaying your ALV grid:
      CASE syst-tcode.
        WHEN gc_tcode_create.    " 01
          " Allow all grid functions
        WHEN gc_tcode_change.  " 02
          " Suppress grid functions for deleting rows
        WHEN gc_tcode_display.  " 03
          " Suppress grid functions for editing/deleting
        WHEN others.
          RETURN.
       ENDCASE.
    Regards
      Uwe

  • How to maintain a check for 3 way match(PO, GR, Invoice) in SRM

    How to maintain/configure a check for 3 way match(PO, GR, Invoice) in SRM

    Hi Sam,
    Please use a Limit cart and select the radiobutton "Confirmation and Invoice" which will need a GR/Confirmation before Invoice on a PO.
    Please reward points if the hint is helpful.
    Thanks & Regards,
    Venkat

  • How to configure ATP check for "create standard order in SD (OR type)"

    first, I had check my stock, I only have ten PC
    , but when I enter 100 PC in a OR order, and issue ATP check, it is carries out, why? I had set availavility check into 02 in MRP3 view

    Availability check
    1. Availability check is an integral part of the business process that determines if the required delivery quantity can be met on a required delivery date. For this purpose the system takes into account pre-delivery activities such as scheduling for picking or packing times and the time taken to produce or obtain the material. It also performs several background functions such as Backorder processing, rescheduling and ATP quantities.
    2. Backorder processing: processing of a sales order that has not been fully confirmed or not confirmed at a certain delivery date.
    3. Rescheduling: is a proposal of how u2013 confirmed quantities already assigned to a sales order can be reassigned to other sales orders that have a higher priority.
    4. Available to promise (ATP): is a process of checking the available quantities of a material. The ATP quantity consists of warehouse stock + planned receipts (incoming stock) u2013 planned issues (outgoing stock). to examine stock on hand (CO09) proceed to logistics u2013 sales & distribution u2013 sales u2013 environment u2013 availability overview.
    5. Replenishment lead time (RLT): is the time taken for the material to become available either internally (in house production) or externally (from a vendor). The most important things to consider during an external procurement are purchasing and MRP2 (procurement) views of MMR where the processing time for purchasing, planned delivery time and goods receipt processing time are taken into account. On the other hand internal procurement is based on in house production time (MRP 2 view) goods receipt processing time or alternatively RLT time, which is found on MRP 3 view.
    6. RLT (Replenishment Lead Time) is the time taken for the material to become available. RLT is only used when doing an ATP check (Available To Promise). The value of RLT for a material is specified on material master record.
    7. There are three types of availability checks u2013
    Check on basis of ATP quantities.
    Check against product allocation.
    Check against planning.
    Configuring Availability check through Checking Groups
    1. The checking group + checking rule determine how the availability check is to be performed.
    2. The checking group determines whether and how the system checks the stock availability and generates requirements for material planning. The checking group defines what type of requirements will be passed on i.e. summarized requirements (daily/weekly) or individual requirements for each sales order.
    3. The checking rule applies to how the availability check is to be carried out at the transaction level. Note that you must define checking rules for each individual application such as for production orders for example. In Sales and Distribution, the checking rule is specified internally within the system and cannot be changed.
    4. The checking rule, in conjunction with the checking group, determines the scope of the availability check for every business operation; that is, which stocks, receipts and issues are to be included in the availability check and whether the check is to be carried out with or without the replenishment lead time.
    5. Briefly explaining the above u2013 checking group determines which type of requirement to be passed on to MRP whether it be individual or summarized and checking rule which is at the transaction level and can be configured independently for each application module, determines which stocks, receipts and issues to be taken into account. For performing an availability check checking group has to work in conjunction with checking rule.
    6. Advantages of individual processing over summarized processing u2013
    Backorder processing is possible.
    You can access (MD04) order, line and schedule line individually which gives a greater control on available stock and requirements placed on stock.
    The system automatically uses individual requirements in case of special stock items.
    7. Required data for the Availability check to be carried out u2013
    The Availability check must be switched on at the requirement class level.
    The Availability check must be set at the schedule line level.
    A requirements type must exist by which the requirements class can be found.
    A plant must be defined in the sales order for each schedule line item (in other words plant must be defined for every material in MMR).
    A checking group must be defined in the material master record in the MRP3 screen in the availability check field.
    8. Configuring Availability check and defining Checking Groups u2013
    Checking groups are introduced into the sales order based on the setting in the material master record.
    SAP standard checking groups are 01 u2013 summarized requirements and 02 u2013 individual requirements or you can create your own by copying the standard ones.
    Total sales and total deliveries columns are there to configure a checking rule to sum up requirements to post to MRP either individually or by day or week.
    Block quantity required can be set if you want several users to be able to process the material simultaneously in different transactions without blocking each other.
    The no check indicator is CHECKED when you DO NOT want the system to carry out ATP check.
    9. Defining material block for other users u2013 the block check box is an indicator that enables you to block material master records of a particular material during the availability check and restrict other users from accessing same master record and reserve the material. If the block is not set, two users can confirm the same material at the same time for two different orders, not knowing if the stock is available or not. If you select this field, the material is blocked during the availability check and other users cannot: a) Make changes in the material master record. b) Create purchase orders for the material. C) Create orders for the material.
    10. Defining default values for checking groups - Checking groups are introduced into the sales order based on the setting in the material master record.
    However if there is no entry present in the material master record for the checking group, a default value can be set here, depending on material type and plant.
    This default value will be used by the system depending on the material type mentioned in MMR and plant in sales order.
    If an entry exists, this default value is over written by MMR.
    11. Controlling Availability Check u2013 in this section, you tell the system what stock on hand and what inward and outward movements of stock it must take into account when performing the availability check in addition to whether or not to consider the replenishment lead time.
    12. These settings are based on the checking group that is assigned to the material master record and the checking rule that is predefined and assigned to the sales and distribution transaction.
    13. These settings carry out control both for sales order and delivery as well. This is due to the fact that you may want to include specific stock or incoming stock for the sales order, yet at the time of the delivery only include physical stock on hand waiting to be shipped.
    14. It is possible to indicate to the system that you would like the availability check NOT TO CHECK the stock at the storage location level. This indicator is used to set the scope of the availability check.
    15. It is used to switch off the check at storage location level. You create a reservation for a particular storage location. However, the scope of the availability check is set in such a way as to exclude the storage location. In this case, the system carries out the check at plant level only and does not take the storage location into account that is specified in the reservation.
    16. Should you not want the system to automatically check RLT, you may indicate so here. RLT is the time taken for a material to become available. It is only used when doing an ATP check and is taken from MMR.
    17. defining the elements in the availability check entirely depends on the business needs, but a few tips are given under u2013
    When controlling the Availability check at the time of the sales order, a purchase requisition does not necessarily indicate by it is going to come into the plant.
    A shipping notification on the other hand - a confirmed purchase order u2013 is a good indicator of receiving stock on a specified date.
    It is always recommended not to select the shipping notifications for the delivery requirements type as you may not actually receive the stock into plant or warehouse for which you are creating a delivery.

  • How do I disable  check for updates automatically for a silent install

    Does any know what the msi parameters are to disable the check for updates automatically. I have tried the following
    autoupdatecheck 0
    ju 0
    update 0
    These do not seem to work as the update tab and check and uncheck is still available
    Also
    Does anyone know how to remove all old versions silently.
    Edited by: DrArms on May 8, 2008 5:24 AM
    Edited by: DrArms on May 8, 2008 5:24 AM
    Edited by: DrArms on May 8, 2008 5:27 AM

    hi,
    in ur PBO one loop will be there...
    make one module disable there.
    PROCESS BEFORE OUTPUT.
    *&SPWIZARD: PBO FLOW LOGIC FOR TABLECONTROL 'MYTAB1'
      MODULE get_data.
      MODULE mytab1_change_tc_attr.
      LOOP AT   mytab
           INTO mytab
           WITH CONTROL mytab1
           CURSOR mytab1-current_line.
        MODULE disable.
        MODULE mytab1_get_lines.
      ENDLOOP.
    MODULE disable OUTPUT.
      LOOP AT SCREEN.
        IF screen-name = 'MYTAB-MATNR'.
          screen-input = 0.
        ENDIF.
        MODIFY SCREEN.
      ENDLOOP.
    ENDMODULE.                 " disable  OUTPUT
    here mytab is my internal table and mytab1 is my table control name...
    reward if usefull....

  • How to avoid extended checks for the events used in ALV.

    Hii,
    I hav delvpd an alv report in which i hav used events for which i haven't declared PERFORM for the same. but when i had checkd in the Extended program checks it says that form interface is not called directly.. check for dynamic PERFORMS...
    how to avoid this error in the extended check program.

    Another option can be calling the routine from the program itself with a check that never satisfies.
    like:
    if 1 = 2.
    perform top_of_page.
    endif.
    form top_of_page.
    endform.
    Regards,
    Joy.

  • Mail? How to set auto check for new mail?

    Ok, I want to be able to turn on my mac, and whenever a new mail arrives it play a sound or pop up etc..
    Now I made the setting in mail Preferences>General>Check for new mail every 5 min, and I tested by sending myself a email, but it didn't make any notify sounds or anything..
    So my question is do I have to open Mail at startup for this to be able to work? "Open at login" or any other ?
    Thanks
    Message was edited by: nubbic

    To start Mail automatically, go to System Prefs>Accounts. Highlight your account then click on the login items tab. Add Mail to the list.
    As for sounds, that is under the Mail prefs. Make sure your sound is turned up.

  • How to deactivate consistency check for ODS?

    Does anyone know if it is possible to deactivate the consistency check for an ODS?

    Here is why you would want to do that -
    In the ODS I am getting the following error: "InfoObject 0FISCYEAR was deleted for DataStore object ZOFIGL_6. This is not allowed as DataStore object ZOFIGL_6 contains data"
    You can resolve this issue in a couple of ways - 
      The first being delete the data from ODS and reactivate the ODS (I would not like to take this approach as I do not want to delete the production data)
      The second approach would be to send in a transport to correct this error but the transport will fail owing to the consistency check it does on the ODS when the transport is moved across. I could deactivate the consistency check, move the transport across and then everything should be okay.
    NOTE: As a side not this is the production box and it is set to be non-modifiable which means that I cannot make any changes in the system.

  • HOw to check for the Child Elements USing only SAX Parsr?

    HI Guyz,
    How to check whether there are any Child Elements in an XML file using ONLY SAX parser ??? I have a requirement of checking first whether there is any Child Elements exists for a Element or not and based on that I have to take certain actions. Can anyone suggest me How to do that ???
    Thanx
    KK

    Since SAX is event controlled, you wont know if there's a child element unless you actually bump into it with the Parser. You'll simply get another startElement event after your current one.
    /Tom

  • *Availability check for Subcontracting*

    Dear All,
    I am using subcontracting Scenario for semifinished product. For this i am making purchase order for this material But How to check availability of Bom component which is used in P.O. for subcontractor. Because it very hectic to check every material for bom in MMBE. If any solution pls revert back with Proper Solution. Thanks in advance.
    Regards
    Atul

    Dear ZOD,
    You can check the availability of BOM Material through the Pur.Order.
    Just do the following steps-:.
    Open pur.order - Item details (at bottom) -click on material data Tab page,select Component,next screen select the row & click F2,at bottom of that screen there is one button for Availability check click on that,at next click on ATP Availability & then overview stock.
    You will find out the result what you want.
    Hope it will clear you.
    Regards,
    Mukesh

  • How to create new check for SELECT* , Naming conventions etc..

    Hi all,
       I would like have a solution for the below checks are possible or not in ABAP - CODE INSPECTOR. If possible can you please give me the solution..
    a). Performance checks i.e, SELECT* , LOOP without field strings, FOR ALL ENTRIES IN SELECT STATEMENT.
    b). Custom naming conventions.
    c). to check if further modularization can be done in the program,
    d). also the coding standards.
    PLEASE help me , i am struck with it for long time in getting the solution...

    > a). Performance checks i.e, SELECT* , LOOP without field strings, FOR ALL ENTRIES IN SELECT STATEMENT.
    > b). Custom naming conventions.
    > c). to check if further modularization can be done in the program,
    > d). also the coding standards.
    the code inspector allows the creation of new checks, you should consult the documentation how to do it.
    The main problem of the code inspector are hits, which are actually no problem. And I think this is a problem with your checks:
    + SELECT*  this is no performance problem, only in cases when the table is really wide then a field list makes sense, i.e your check
       will find a lot of false hits
    + LOOP without field strings  ... you mean fs =field symbols, same as with SELECT *
    + FOR ALL ENTRIES IN SELECT STATEMENT   ???? FOR ALL ENTRIES is fine
    + Custom naming conventions  ... hmmm be more precise, I think it can be hard
    + to check if further modularization can be done in the program,
        before you want to program can you please explain how you check manually .... I would be interested
    +  also the coding standards.   .... what is that?

  • How to write dynamic actions for delimiting child subtype of IT0021

    Hi ,
    I need the dynamic actions for the below scenario:
    In IT0021 , there is a child subtype '02'. This needs to be delimited to a new subtype 'XX' when the child reaches a certain age.
    The above process needs to be automated..as in when the new subtype 'XX' is created, it should check the fields like date of birth , last name and on saving it , the corresponding child subtype screen should be called where the user can modify the end date and delimit the child subtype.
    Please help me with the required dynamic actions..
    Thanks.

    Hi,
    Just try this.
    INFTY     SUBTY      FIELDN      FC NO.      STEP VARIABLE FUNCTION
    0021      02      Field Name      P       TabName-FldName>=age
    0021     XX               I         INS, 0021,XX/I
    Regards,
    Srini.

  • Component Availability Check for Subcontracting PO

    Hi,
    Is their any Setting to check the component availability and reservation of component material in stock after creating Subcontracting Purchase Order, As that is available in case of production order.
    Regards
    Siddharth

    Dear Mr. R Brahmankar
    This what we are doing in the current mapping, but the problem we are facing is that this activity is done by 2 different departments. Subcon PO is created by one department and Component material is sent to vendor by another department.
    So while I am creating PO I will check that all the components are avaibale by seeing it in MMBE or in MB52, If stock is available(or will be available in 1-2 days, as In-house produciton of components is there)  I create the  PO. But the transfer of stock to vendor might take a gap of 3-5 days after creating the PO. So after 5 days stock is might not available or available in shortage(as it is consume by Inhouse Producion or by some other PO).
    Can any soluiton is there to this problem ?
    Regards
    Siddhath

Maybe you are looking for

  • Nokia Phones - Windows 8.1, Firmware and Future

    Lots of posts about Windows phones and the Windows Phone 8.1 update and firmware update(s) that are not happening for Verizon customers.    The talk on the net is Verizon has discontinued the Lumia Icon, so I called Verizon to find out.   The rep. I

  • Debit & credit note for vendors

    Hi, Please tell me how to post debit and credit note for vendors( T-code) and how to take a voucher print of debit note, Because we are not able to find  the particular  correspondence for debit note in OB78.Please assist. Regards, D

  • Cost center report,Profit center report

    Dear Experts,                      Pls tell me what are the reports availble in  ecc6 for cost center & profit center. Pls give T.Code for report. In general for controlling reports are standard or we have to customise the report. Thanks in advance r

  • Multiple PGI against a sinlge Delivery document

    Hi Gurus, Can we have multiple PGI's against a single delivery documents? If yes please provide me the step to do the config. Thanks. Laxmi.

  • Two BW systems Can use one source sytem?

    Hi Experts, We are planning to share one source sytem and its all master and LO data sources to share for Two BW systems, is it possible to share like this, we want only the full loads even for LO data sources can we load to BW sytems, sharing like t