How to trace that particular Sales Order is changed (amended)

Dear All,
The issue is to know whether the particular Sales Order is Changed (amended).
Is there any concept in Sales Order like amendement.
Requirement is, once the order is created n later the customer specifications are changed n accordingly they have made changes in Sales Order (VA02) too.
However, now client wanted to track the record of this particular Sales Order which is Changed they call it as Amended & they even wanted to know how many times its changed. For eg., If suppose 100 is the Sales Order No. after the changes in VA02 it should have some version of 100.
i/p will be helpful n rewarded too.
With Regards,
Vijayashree

Hi
Go to VA02 -
In menu path ENVIRONMENT -- Changes---
this is available in all versions
And available in sales, delivry, billing documents
also in customer and material master
Reward if helpfull
Muthupandiyan

Similar Messages

  • How to find that a sales order for which there is  delivery but no goods

    Hi
    How to find that a sales order for which there is  delivery but no goods issue has been done i.e we have an open delivery for a sales order.
    How in VBUK table can we find  out with the sales order no .
    Thanks in advance

    make use of table VBFA.
    Regards
    Peram

  • How to know that a sales order is approved?

    Hi all,
    Can any one let me know how to know that a sales order is approved? Is there any flag or status code to pull the information from the backend?
    Thanks for your help,
    Prathima

    Hi Prathima,
    Oracle Order Management does not have any approvals, i.e. there is no status as 'Approved' for Order. You can consider an order to be final once it is booked, which you can know from the booked_flag or the value of flow_Status_code field in oe_order_headers_all.
    Hope this helps

  • How to trace the DO(Sales Order)

    Dear Forum,
    The process is DO(Sales Order)--->Delivery Order(OBD).
    I have deleted the Delivery.
    How to get the Sales Order number aginst this Delivey Order.
    Thanks in advance !!!!!

    Use change pointers
    http://help.sap.com/saphelp_nw04s/helpdata/en/12/83e03c19758e71e10000000a114084/frameset.htm
    Activate
    http://help.sap.com/saphelp_nw04/helpdata/en/0f/9d563cf19bcb43e10000000a11405a/frameset.htm
    Regards,
    Prateek

  • How to hold a particular sales order by applying holds

    Dear Guys,
    I have some sales orders for which i need to hold the shipments of pending lines.
    The purpose is to hold the shipments to projects which are closed.
    As i know there is no seeded link between project and SO, we cannot control the shipment by closing the project from project module.
    Is there any other solutions any one can suggest, like applying any hold or something which blocks user from shipping the orders related to these closed projects.
    Regards
    Mohamed Irshad
    Abu Dhabi

    Thanks Mahendra.
    Actually i am not a super user with setup responsibility.I m just a user.
    I will try to contact our oracle consultant for setup the holds as suggested.
    The reason i posted this thread because we have a customized program for project sales orders, in which we can enter the project number,task,expenditure type in additional information of lines.
    Once the lines are picked and shipconfirmed the shipped lines are interfaced from OM to Inventory and from inventory to projects through some scheduled requests.
    As per the process,if the project invoiced 100% ,immediately i will close the project.But i cannot delete the pending lines from project sales orders immediately because may be they requests some items from pending lines for some snag works or replacement.
    But the problem arises when the order management team picks the items of closed projects and ship, it will goes to rejected transactions in project expenditure transactions interface table.
    Since there is no seeded link between projects and OM,my oracle consultant rejected the possibility of holding the shipment of projects sales orders for which project are closed.
    I believe the requirement is clear to all.
    Kindly seeking the possible suggestions to block the shipments.

  • Simple credit check - value need to be blocked from particular sales order to be post in f.35

    Dear Expert,
    I have a case here to find, the client uses simple credit check , we have different order types ( Example 6 order types), out of which we want to restrict the value of one order type to be posted in f.35 i.e the value should not effect credit limit used or open sales order.
    Is there any standard procedure by which this can be done or do we have to use userexit.
    Also can i know in which screen do we have to keep the userexits so that the value of the order type will not have impact on the f.35 or crdit limit used.
    Regards
    Abhishek Ojha

    Sorry small correction to my initial post.
    Even though you removed the credit group for the respective sales order type still system update the values subject to if the respective item category the "field credit active" active.
    Removing the credit group to sales order type controls whether you want to perform the credit check or not. And your requirement is not to update the particular sales order document values in FD32  so the actual control is credit active field for that particular item category.
    Since you have mentioned that you don't want to update that particular sales order document values( assuming that you are taking about receivable only).
    Please note sales order determines the item category,  so do as below.
    De select( un check) the credit active field in the item category which is determined based on the sales order type for  which you don't want to update credit values.
    Please test and update here.So far I did not check this in my system.
    thanks,
    Srinu.

  • Sale order plant change not possible

    dear sir,
    we have set valuation level is a plant in OX14. we have two production plants 1010 and 1020
    we are using variant configuraion also.
    we are unable to change the plant from one plant (1010) to (1020) other in sale order  VA02 if we have
    1) ProForma-Order
    2) Order BOM
    3) Cost run
    Retaining above things how can we change the plant in sale order
    please give some details to solve this problem
    thanks and regards,
    srinivas

    Hi
    Guess the changes are not saved. Could you see the changes recorded in the sales order - change log (Menu-Environment-Changes).
    Please check again which plant is there in that particular sales order item.
    Thanks,
    Ravi

  • How to know , when serial number in sales order is changed ?

    Hi All,
    I am changing Sales order line item serial number. So the equipment number and Serial number both are changed for that particular line item. But I am unable to know, what was the last Equipment number, and Last serial number for that material of sales order line item.
    Can any one please help me, how to determine the details about the date and time of change of serial number of a particular sales order line item ?

    I have already checked for VA02 -> Line item -> Environment ->changes.  It show changes related to fields available in VA02.
    But it is not showing changes related to Serial number change.
    I have also checked with table CDHDR, CDPOS. But the data related to change in serial number of SO line item is not captured in those tables also.
    Is there any other way to know?

  • How to configure rescheduling for sale order quantities

    kindly explain how to configure rescheduling for sale order quantities that are created last month. kindly explain. i am in urgent.
    regards,
    g.v.shivakkumar

    Hi,
    Short text
    Rescheduling sales and stock transfer documents: by material
    Description
    The 'Rescheduling' program (SDV03V02) processes sales document items that are contained in the item directory for the material. It takes into consideration open items and schedule lines from stock transfer items, stock transfer scheduling agreements and purchase order requests (items only), referred to hereafter as stock transfer documents, for the materials.
    All sales documents for the material that are still open are selected. This means that the material index must be activated for at least all sales document types, whose items may have requirements. All stock transfer documents or items for the material that are still open are also selected. Open in this case means for example, that there is no deletion indicator, that the item from a stock transfer purchase order request cannot be labeled as completed or that the quantity delivered and posted to goods issue for the item in a stock transfer purchase order is the same as the amount ordered. An availability check can only be carried out if a checking rule is assigned to the document type - if this is not the case, the document or document item is not checked.
    Checking rule 'A' is used as a basis for rescheduling sales orders (exceptions to this are rush orders  they use checking rule B, and orders with individual customer stock; they use checking rule AE). Stock transfer documents use the checking rule that is assigned in Customizing for Purchasing. It is important that the scope of checks is consistent for both the stock transfer documents and the sales documents and that they do not exclude each other, as this can lead to incorrect test results. An example of an incorrect setting would be: The scope of check for checking rule 'A' checks delivery schedules for stock transfer purchase orders and stock transfer purchase requests, however the scope of check for the checking rule for the stock transport scheduling agreement does not.
    The items and schedule lines found in the selection are sorted according to 'Priorities' - document category, delivery priority, creation date of the item or schedule line (for stock transfer purchase orders and delivery plans) entered on the selection screen or according to the schedule line date of the earliest schedule line with order quantity, document number and item number and then transferred to the availability check. Priority 1 is highest priority and priority 5 the lowest. Stock transfer purchase order requests are sorted after stock transfer purchase orders and scheduling agreements, as they are less binding. This means that when you have identical sort criteria such as delivery dates, the stock transfer purchase order item is checked first and then the item from the stock transfer purchase order request.
    The preset option 'Unconfirmed documents required' only carries out rescheduling for materials for which there is at least one unconfirmed transaction.
    You can use the parameters 'Sorting criteria delivery date' to define whether sorting is carried out with the order quantity after the creation date of the item or the delivery date of the earliest schedule line.
    If you mark the 'Simulation' field, the checked documents are not saved. Instead a results list is generated and saved. However, the availability check for the corresponding documents continues as if saving has taken place already, that is, that the simulated list corresponds to the actual one.
    Under 'Options' on the selection screen, specify whether sales documents and/or stock transfer documents should be processed. For stock transfer documents you can enter whether stock transfer purchase orders and scheduling agreements should be processed at item or schedule line level:
    Processing at item level:
    All open schedule lines for the item are read and collected, then transferred to the availability check. To sort and prioritize documents, you do not need each individual schedule line. It is sufficient to have the item or data from the first schedule line. All open schedule lines for the item are processed and checked.
    Example of processing at item level:
    Sorting: Date (Delivery date first schedule line) - Document number - Document item
    Doc. cat. Doc. number  Doc. item  Doc. schedule line  Delivery date PO        4500000012      10               0001              26.01. PO        4500000012      10               0002              26.02. PO        4500000025      20               0001              28.01. PO        4500000025      20               0002              02.02.
    You can see that the second schedule line for document 4500000025/20 from 02.02 was processed after the second schedule line for document 4500000012/10 from 26.02. This is because all open schedule lines for an item are read and processed. The first schedule line from 4500000012/10 has the earliest delivery date, therefore it has priority.
    Processing at schedule line level:
    Each open schedule line for an item is entered in document sorting in accordance with the values entered under 'Priorities'. The availability check is carried out for each individual schedule line.
    Example for processing at schedule line level:
    Sorting: Date (delivery date first schedule line) - document number -document item
    Doc. cat.    Doc. number  Doc. item  Doc. sched. line  Del. date PO           4500000012    10             0001           26.01. PO           4500000025    20             0001           28.01. PO           4500000025    20             0002           02.02. PO           4500000012    10             0002           26.02.
    Here you can see that each schedule line was sorted according to its delivery date. Note that this type of processing requires more runtime due to the individual checks and more frequent saving.
    The results of rescheduling are saved, as long as the program was not started in simulation mode. When calling up from the 'Sales' area menu or when directly starting via the development environment, the iniator is informed via a dialog box that he has just started a process that changes data. He can then decide whether or not he wants to continue.
    Checking procedure for stock transfer documents:
    An availability check of stock transfer documents in rescheduling is carried out in accordance with the check carried out when manually creating a document. If, however, the required quantity for a schedule line is not available on a particular date and will not be ready until later, new schedule lines are created for the stock transfer purchase orders and scheduling agreements, containing the relevant data. New items are created in this case for stock transfer purchase order requirements. The total sum of schedule line quantities for a processed schedule line corresponds to the schedule line quantity of the original schedule line.
    First example: Using a stock transfer purchase order item with a schedule line:
    a) Status of item before rescheduling run:
    Del. date  PO quantity   Confirmed quant  Confirmed del. date 23.07.      50 items       0 items              -
    ==> This now affects the stock/requirement situation:
        - Goods issue is posted for the material in the delivering plant on the 23.07.
        - A purchase order of 10 items was created for the material in the delivering plant. Delivery is expected on the 29.07.
    b) Status of stock transfer purchase order item after rescheduling run:
    Del. date PO quantity   Confirmed quant   Confirmed del. date 23.07.     40 items      40 items            23.07. 29.07.     10 items      10 items            29.07.
    ==> The first schedule line was changed in accordance with the results of the rescheduling availability check. Only 40 of the 50 original items could be delivered on the 23.07. Therefore, a new schedule line is created for the rest on the 29.07. for 10 confirmed items.
    Second example: Same output situation as the above example.
    ==> There is now a change in the requirement/stock situation:
    A purchase order for 10 items is created for the material in the delivering plant. Delivery is expected on the 29.07. A further purchase shows another 40 planned items on the 30.07.
       Status of stock transfer purchase order item after rescheduling run:
    Del. date PO quantity  Confirmed quant  Confirmed del. date 29.07.     10 items       10 items          29.07. 30.07.     40 items       40 items          30.07.
    ==> The first schedule line was changed in accordance with the result of the availability check for rescheduling. The original delivery date is set to the date confirmed in the ATP check. A new schedule line is created for the remaining 40 items, that are available on the 30.07.
    Note:
    Any set fixed delivery date and quantity indicators and creation indicators for schedule lines or items are 'inherited' by newly created schedule lines. Assuming that the original schedule line was fixed in the above example (since it is created manually), this indicator is also set for the newly created schedule line.
    If shipping scheduling is activated for a stock transfer document type, this is also implemented for newly created schedule lines, with the exception of route schedule determination. This means that in the current version of the program no route schedule has been determined for a schedule line containing a route schedule for which new schedule lines may need to be created.
    The results of the run are issued in the form of a list, which is also saved, so that the results can be controlled at a later date. This is done using the function 'Evaluate rescheduling', but it is only a good idea to do this after the first rescheduling has taken place. You can restrict selection requirements but these can however affect the runtime. You can use this function to analyze the saved list until the next rescheduling run, which writes over the result. If you start rescheduling in the background, a spool file with the result list referred to will be created in the corresponding setting. You can see this in spool management.
    Output
    A list of changed documents, a list of documents in which an error occurred during processing and as a result were not changed, can be called up via the menu 'Edit - Error log'. If in a subsequent evaluation a restricted selection is carried out, a note appears at the end of the list to say that not all document items are displayed.
    You can set the scope of the list under the menu option 'List' in the list display. You can view improvements, deteriorations and the whole list. Before the documents can be included in one or either of the restricted lists, the date or quantity has to have changed so that the item can be contained in both the list of improved or deteriorated documents.
    You can use the interface for changing transactions and the order list to navigate. Use 'Back' to exit the list and 'New selection' to return to the selection screen.
    Recommendation
    You should only start this program occasionally and use very restricted selectin criteria during working hours as it requires enormous system resources.
    Note
    The columns for 'New date' and 'New confirmed qty' only contain entries if the dates or quantities have changed.
    As the system only runs the change check (dates/quantities) per line in the original list, an item whose backlog has increased in the list of improvements. This occurs, for example, if the whole quantity can be delivered at once but at a later date. In this situation, the system determines an increase for the line when it compares quantities.
    Regards,
    Amrish Purohit

  • SD How to create IDoc once Sales Order Invoice (Billing) has been created ?

    Hi,
    How to create IDoc once Sales Order Invoice (Billing) has been created ?
    I.e Once you click on save button of Invoice , IDoc Should genrate Automatically.
    Thanks

    Hello,
    Go to T.code VV31 and select the billing output type and select the access sequence required and in the details screen of create condition records give all the required entries for eg: may be Billing Type, Sales Organsiation etc.and in the medium choose the option as 6(EDI) and time select as 4 that is immediately after saving the document.Also please ensure that particular partners for whom idoc should be generated they need to have partner profile setup with the billing message types. Hope this helps.

  • How to implement authorization at sales order/projects level?

    If we open a sales order in VA02 and then try to open the same sales order in another session in VA02, there will be a message that the sales order is being processed. 
    I wish to implement similar functionality in my application which consists of editable report. 
    I tried to debug the situation in VA02 case mentioned above, to know something more about it, but could not understand anything!
    I know that lock objects can be helpful in this, but in my case there can a be range of sales orders (and projects within a range of profit centers). 
    How to implement such a functionality?
    Edited by: Ankit Modi on Dec 30, 2009 10:54 AM
    Edited by: Ankit Modi on Dec 30, 2009 10:55 AM

    @ Max -
    Yes Max, but the problem is that I want the lock on many sales orders at a time.  Its like, there is a report in which many rows (for sales orders) are editable.  I want all those to be locked at a time. This will not work by Lock object, I believe...
    @ Soumya -
    Yes Soumya, but, as I explained above, I want a range of sales orders rather than a sales order in particular.  That will not work by lock object.  Right?

  • Trying to create a query that shows Sales Order/Invoice Totals as well as Paid/Outstanding/Available Down Payments

    Currently working on SAP B1 v8.82
    I'm looking to generate a query that will give an overall report for a given customer that shows Sales Order No, Invoice No, Sales Order Total, Invoice Total, Amount Paid on Invoice, Amount Remaining on Invoice, Down Payments Available, Open on Sales Order.
    I'm not sure what the best way to select the columns in bold above.  Invoice Total should be self-explanatory.  Amount Paid should be any down payments or applied payments on the invoice.  The balance due on the invoice (which seems to be T0.DocTotal if I'm not mistaken) should = 'Invoice Total' - 'Amount Paid on Invoice'. In the Down Payments Available column I want the total amount of money on the account or on down payments that aren't tied to a Sales Order.  If a client overpaid in the past for instance and there's a credit on their account, then it should contribute to this sum.  Open on Sales Order should be pretty easy.  I guess it's just the sum of everything that is still open on the Sales Order.  I'm just not sure what the best way to sum all the un-delivered freight, tax, and line items is.  Here's what my query looks like so far.
    SELECT DISTINCT T4.[DocNum] [Sales Order No],
    T0.DocNum [Invoice No],
    T4.DocTotal [Sales Order Total]
    T0.DocTotal [Amount Outstanding],
    FROM OINV T0
    INNER JOIN INV1 T1 ON T0.DocEntry = T1.DocEntry
    INNER JOIN DLN1 T2 ON T1.BaseEntry = T2.DocEntry AND T1.BaseLine = T2.LineNum
    INNER JOIN RDR1 T3 ON T2.BaseEntry = T3.DocEntry AND T2.BaseLine = T3.LineNum
    INNER JOIN ORDR T4 ON T3.DocEntry = T4.DocEntry
    INNER JOIN OSLP T5 ON T4.SlpCode = T5.SlpCode
    WHERE T0.CardName Like '%%[%0]%%'
    GROUP BY T4.DocNum, T0.DocNum, T0.DocTotal, T4.DocTotal
    I tried doing a little searching around for queries similar to what I need, but I could find exactly what I was looking for and I'm very unfamiliar with OJDT, JDT1, and ITR1 tables which I think might be important to finding unapplied payments...

    Thanks.  There's a few problems though.
    1)  It seems that OINV DocTotal != Balance Due.  I'm seeing a number of invoices where there was a balance due, but we applied additional money (either we took another incoming payment and applied it or applied money from the account balance, etc.) and yet it still shows a total.
    2)  It's pulling incoming payments from different customers.  I think this is because the table was joined based on "RCT2 T4 on T4.[DocEntry]  =  T3.[DocNum] and T4.[InvoiceId] = T2.[LineNum]"  In one example I have 2 incoming payments 446 and 614.  Both have the DocEntry 542, but one relates to A/R Invoice 542 (for a different client) while the other relates to Down Payment Invoice 542.  *I was able to fix this by adding WHERE T5.CardCode = [%0]*
    3)  I'm going to work with this a little bit and see if I can alter it to make it work for me.  Basically this query falls a little short on the following:
    -  Doesn't include incoming payments that aren't linked to a down payment invoice.
    -  Does not give the Invoice Total (I'd like to know how much of the SO was invoiced.  DocTotal seems to give me Amount Invoiced - Down Payments.  I'm not sure the best way to get this number.  Maybe I could do the sum of each line * tax + freight)
    -  Does not give the outstanding amount on an invoice.  The ARtotal [DocTotal] column gives me how much was owed when the invoice was created, but it doesn't tell me what is currently owed.
    -  Lastly it may complicate the query too much and could be left off, but it would be nice to see if they have any money from credits or incoming payments that has not been applied.  Perhaps this would be easily accomplished by simply pulling in their account balance.

  • How to count number of sales orders generated in a month in SAP SD

    Hi SD Gurus,
    I have a very strange query from client. I have to count the number of sales order created in a month for a z report. For example 30 in Jan, 25 in Feb etc. Could anyone suggest me How to count number of sales orders generated in a month in SAP SD.
    Regards
    Vinod Kumar

    Hi,
    Goto the T.Code "SE16" or "SE16n" or "SE11".
    Enter the table name as VBAK
    Enter the created on date as the starting date of the period and to date as the end date.
    Enter.
    Click on "Number of Entries".It will tell you the number of entries created in a particular period.
    If you want a report,goto the T.Code "VA05n".
    Regards,
    Krishna.

  • How can we reject a Sales order after first Down payment invoice for Italy?

    Hello,
    As a legal requirement in Italy the Down paymenty have to be transformed into real invoices, another legal requirement is that an invoice cannot be cancelled it has to reversed by a credit memo.
    I would like to know in this context how we can reject a sales order line once a Down payment invoice has been emitted.
    When I do enter a reason for rejection in the sales order line I receive the message : V1036: Subsequent documenst exist for item XXX and then V2432 Cancellation not possible. Down payment request already created.
    I can create a down payment credit memo in order to cancel the down payment invoice but how can I get rid of my SD requirement in MD04 if I cannot reject the sales order line?

    Hello,
    have you tried using a recjection code which is not relevant for billing?
    Regards,
    Uli

  • How to assign version in sales order and transfer to PP module

    Hi all
    Users say that customer will require to produce/deliver old goods (we active revision level. The newest material version is D. But customer want version B). How to assign version in sales order and let PP user know the version customer want (MRP run and production order must use version B's BOM)?
    Regards,
    Rita

    Hi,
    i have a query if you have implimented ECM this will serve the purpose but it also depends on how good the planning is, in ur client site ( out of SAP ) where planner will plan according to the customer requirement as to which version to be kept active for a date range.The ECO analysts(functional) or consultants will make the ECO changes for those dates.
    In general for those type of customers (who needs old version) a different SO created under different document type which will create a production orders with specific order type depending on the assignment of requirement type and requirement class.
    those specific production ordertypes can be inturn assigned to either different plant where your old version BOM's will be active.
    You need to look into the custom settings in SAP to design the larchitecture to allign with other requirements.What i explained u is common methodology used.
    Hope this is clear..
    Prakash
    Message was edited by:
            prakash Uddagatti

Maybe you are looking for

  • Exhange Rate not working in sales order

    Dear all, I am facing a problem with exchange rate, I have maintain exchange rate procedure in customer master with exchange rate INR 70 = 1 EUR, Now I am creating Sales order where as i m changing Exchange rate INR 65 = 1 EUR, in sales document head

  • Using Oracle XE as a Data Source for Powerpivot

    I will be migrating my database from MS Access 2007 (*.accdb) to an Oracle XE. Any good links or papers on this or possibly any past experience with this (powerpivot connection)? Just trying to make sure that the connector is already within the Power

  • MIRO_PO reference

    Hi gurus, I want to change the PO reference in MIRO (line item) to display. And I manage to do this via variant settings. However, I would like to know, why is the original SAP settings for MIRO is open for changes at PO reference and what will be th

  • Problem installing dev studio

    I have installed the dev studio on a windows workstation and it will not start, I get the following error !SESSION - !ENTRY org.eclipse.core.launcher 4 0 Aug 17, 2005 07:25:13.767 !MESSAGE Exception launching the Eclipse Platform: !STACK java.lang.re

  • FM for Document Relationship in Archive