HR Master Transfer from PRD to Quality

Hi All,
I have a issue in PRD for an employee in PRD.
Hence to analyse and test the same, I need to transfer/clone all his HR master data of same employee from PRD to QUality.
Is there anyway I can achieve this?????

HI,
1. There is a Cloning tool available for such thing  called Clone and Test from Accenture. You can clone the data employee data from one system to another.
2. However if there is a small set of updations, you can do that manually in QA.
Hope this helps.
Param

Similar Messages

  • Vendor / Customer Master transfer from Feeder to GTS

    Hi All,
    When I transfer a Vendor / Customer / Bank Key from Feeder system to GTS, the Business partner is created with BP Role "000000 - BP General".
    But what I need is whenever I transfer a Vendor the BP should be created with BP Role "SLLCPS" & For customers "SLLCPC".
    Please let me know whether this BP role mapping depends on some Configuration that i need to perform.
    Thanks in advance.
    Regards,
    Murali Mani

    Hi Murali,
    I would like to suggest that your Basis team should recheck the installation of GTS as well as the installation of the R/3 (ECC) plug-in.  You should be able to successfully transfer customers and vendors directly from the feeder system to GTS without "partner function" configuration because PF config is to help GTS determine the role of a partner in document screening.  Normal business partner master data transfer to GTS and screening does not depend on PF config.
    If validation of the installation is correct and you are still having this problem, search for partner setup in Cross-Application Components section of GTS.  Be careful in this area.
    In the feeder system your ALE distribution model could be incorrect.
    Consult the configuration guides for details on these issues
    Cheers !
    Greg

  • Transfer from unrestricted to quality

    Dear Gurus,
    I have a scenario that sometimse I need to transfer a certain quantity in the unrestricted stock to quality inspection stock and perform inspection to it.
    I tried to transfer the quantity from transaction MIGO, but it didn't allow as quality is active on the material.
    Keep in mind that this is not the case of recurring inspection, it is random.
    How can I handle this issue?
    Regards,
    MaX

    Hi
    I will try to answer your question based on the little information provided by you.
    As you have posted the stock already to the Unrestricted you can reverse the stock to quality using OSS note  175842.
    Again if you do not want to reverse the inspection stock posting and ur business scenario allows you to create new inspection lot then you can use stock transfer inspection. Transfer posting ( Storage location to storage location) but create a Z movement type so that it will not effect your daily storage location transfers. Activate material for 08 Stock transfer inspection or new variant of 08, in QM view.
    Post the material using MIGO
    Regards,
    Nitin

  • Automatically Transfer from unrestricted to quality after oneyear

    Hi expert
    i have requirement that after every one year from the GRN i want the materiel goes to quality check automatically. now i am doing manually by Movement type 322.
    regard
    nabil

    QA07 can do this job. Precondition is either a shelf life date or a recurring inspection method in material master

  • HP Photosmart C5580 All-in-One- Photo Transfer from Scan- Color Quality

    I am a  quilter. I have printed a photo (from a scan) onto fabric. I purchased the fabric made for this specific purpose. However, the color is off. The actual photo and scan have more brown tones whereas the transfered photo has a more purple tone (rather like the tone you get when you are out of ink). I have brand new ink cartidges installed. #75 tri-color and #99 photo. Should I be using something else?

    Hi Thisisridiculou,
    I hate to hear you are having print quality issues.  Please be aware fabric printing is not supported for this unit.  Please view the chart below to identify supported media types.  If you are experiencing print quality issues with supported media types please complete the steps located at the following link.  Click Here  Please carefully review the note below regarding non-supported media types.  You may be able to improve quality by adding a generic driver.  Here is a link that will provide the steps for that. Click Here
    Note: Use of non-supported media types can cause poor print quality as well as damage to the internal hardware components of unit.  HP and I are not responsible for damage caused by unsupported media type usage. 
    Hope this helps!
    Also, remember a click on the Kudos star to the left is a quick "Thanks" for a helpful post.
    Please select the "Accept as Solution" button on the post that best answers your question.
    I appreciate your input !
    Thank You,
    I work for HP.

  • Error while uploading HR master data from inQuality server

    Hi, Expert. While uploading of MAster data from Developement to Quality by BDC. When program starts for Tcode PA40, selecting Hiring Action, it is goining to the Action Screen. Here while taking the position from HR template, it gives error as Position is not in Table T428B. Payroll area on the date (Date of original hiring, of the person) it is taking DM as defalt in place of our created Area and terminating. When i am trying entering the data manually, it is giving same error for Position. I am not able to upload the data. Kindly help me by suggesting me the correct sequence and steps for uploading the data. Correct answer will be provided with STARSSSSSS **. Regds Punit.

    Have all your configurations been transported to Quality?
    Have you created the positions before initiating BDC for Hiring?
    Check Feature ABKRS in Quality. Is this same as in Development?
    Is your BDC running OK in Development?
    Regards,

  • Transfer master data from a project from one client to another client

    Hi all,
    I have a training client and a production client.  The project master data has been created (Tcode CJ01) in training client with multiple levels and WBS.  Is there a way to transfer the master data from the training client to another client so there will be no need to create the same project in another client?
    Thanks.

    Refer note for 37899 batch input option.
    Though this pertains to older versions with few changes to code it might be suitble to the version you are working on.
    Regards
    Sreenivas

  • Transfer of Business Partner Master data from CRM to TIBCO.

    Hi All,
    We intend to integrate CRM4.0 with TIBCO for transfer of Business Partner Master data from CRM to TIBCO.
    Can anyone provide solution for the same. One of the think is through XI.Please correct if it is the right way to do it?.
    Also, would appreciate if someone can provide documentation or links for integration.
    Regards,
    Mehul Shah.

    Hi Rahul,
    Yes you can integrate CRM and TIBCO using XI.
    Check the below links
    transfer the Business Partners from the CRM system to XI and to MDM.
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/406efa7e-388a-2910-f9b8-81913b0ca57f
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/50260ae5-5589-2910-4791-fc091d9bf797
    any XI content delivered by SAP can be found in the SAP service marketplace which you can enter http://www.sap.com/services/bysubject/servsuptech/index.epx.
    a) After you entered the service marketplace go to Software Download under the header SAP Support Portal.
    b) Next navigate to Download -> Support Packages and Patches -> Entry by Application Group
    c) In the main window select SAP Content and then Process Integration Content (XI Content).
    d) Now you should see a list of XI content packages.
    The package containing XI content for CRM is
    XI CONTENT BBPCRM
    In addition you find some packages that offer mappings from CRM interfaces to industry standards like RosettaNet or STAR standard, like
    XI CONTENT ROSETTANET CRM
    XI CONTENT STAR CRM
    Some of these packages may require a license, therefore I am not sure if they are visible to you.
    As per my knowledge, XI has CRM pre-delivered content and usually it communicates thru Proxies,Http, RFCs..
    And in your scenario , you can always go for Proxy communication
    Have a look into these threads
    CRM and SAP XI
    SAP CRM integration with XI
    How to access the pre-delivered XI Integration Content for APO ,SCM or CRM
    Dont forget to Reward points if this helps
    Regards
    Pragathi.

  • Transfer Customer Master records from one company code to another company.

    hi ,
        working on a rollout project ,
    needed to transfer Customer Master records from one company code to another company code.
    is there any sap standard BDC/T-code as in case of Vendor Master FK15,Fk16(T-CODE) .
    thanks in advance.
    rahul
    Edited by: RAHUL SINGH on Jul 22, 2009 9:05 AM

    Hi,
    I think you should ask this question in functional consultant forum.
    Thanks,

  • IDOC - message type WMMBXY(Stock transfer from quality to unrestricted)

    Hi Gurus,
    I have IDOC problem.
    Inbound message type WMMBXY(Stock transfer from quality to unrestricted), The status if I check in WM02 of Doc is "51-Application document not posted"
    Error Message ""Required function
    MB_CREATE_GOODS_MOVEMENT is not being processed".
    Please Help.
    Prashant

    Hi
    The Idoc whcile Posting using Message type WMMBXY calls the Function module L_IDOC_INPUT_WMMBXY & in turn this calls the function module MB_CREATE_GOODS_MOVEMENT.
    This function is not getting executed.
    Please check if the Movemnt type used is not active for WM movemnts.
    If you have used previously this movemnt type & now it is not working. Please take hlep of ABAPer  for debugging & finding the Root cause
    Thanks & Regards
    Kishore

  • Error while performing Master Data transfer from SAPR/3- ECC5.0 to SCM4.1

    Hi all,
    Am getting an error while transfering Master data from SAP R/3 system ECC5.0 to SCM4.1 through Core Interface (CIF).
    After creating an Integration model and while activating the same am getting the following error,
    " System: SCMCLNT800    User:  SMART03 06/17/2006 13:32:14
    Function: /SAPAPO/CIF_LOC_INBOUND
    Text:Error in address data for location DC2000/ECC800 "
    Could anyone provide me how to fix this?.
    Regards
    Bharanidharan

    Hi Veera,
    Am sorry for the delayed response. Well am using XI as integration engine for transfer of transactional data from R/3 to SCM4.1. I resolved this issue which was because of master data problem. Thanks for your input.
    Regards
    Bharanidharan

  • Table Technical settings for transfer data from developemnt to Quality

    Hi All,
    Please let me know which table techinical settings required for to transport table with data from development to quality?
    Thanks & Regards,
    padmaja.

    Hi,
    You do not require technical settings to transport data from dvlpmnt to quality.
    However, you can transport any tables entries with a simple trick:
    (1) Create a workbench request
    (2) Change the request (or its task) and add the following entry: R3TR TABU <name of table> =>
    (3) Enter the key values you want to transport, e.g.:
    - <client>* for all entries of the current client
    - add additional restrictions for the table entry (<client><bukrs>* for all entries of a given company code)
    Best regards,
    Prashant

  • Transfer posting from Unrestricted to Quality using QM

    Hi Team,
    Im not expert in QM, I need your help.
    Here is using the module QM for quality inspection, I have the following situation:
    A GR 101 was done into a PO.
    Quality release the material and stock moved from Quality to Unrestricted
    The detect that the Qty of pieces are not correct and now they want to reverse the GR, they tried but was not possible. Error:; Deficit of SL Stck.in qual.insp 972 PCE : 004933000301 7601 9001
    So What step I need to follow in order to move the inventory from unresticted to Quality.
    I already try with Mov 322 but get this message: Change the inspection stock of material xxx in QM only

    If you have QM then you cannot post stock with MM movement into Q-status.
    But you can reverse the GR in MIGO, but not with cancel in reference to material document. You have to do a Goods receipt to purchase order but using then movement type 102 for cancellation. Then in the detail tab you can change the quality status from the proposed quality status to unrstricted status.

  • Error migrating Master Repository from Dev. to Prd, Environment

    Hi,
    We are trying to migrate our development environment (dev_env) to production (prd_env), so for this we are doing the following:
    - We create a Execution Work Repository (prd_env)
    - We create a Master Repository (prd_env) with different internal ID (dev_env)
    - We export one scene from dev_env and import to prd_env
    - We export Master Repository from dev_env and import to prd_env, but in this point we have problem with the import wich say
    "com.sunopsis.tools.core.exception.SnpsSimpleMessageException: ### KEY com.sunopsis.res.object / DwgDuplicationTools.GeneralImportObjectFailureMsg###     a"...".run(Unknown Source)Caused by: java.sql.SQLException: ORA-02291: integrity constraint (....) violated - parent key not found"
    Please, some one help us with this issue, thanks!!!

    Hi,
    Both your Prod and Dev are in same platforms?
    Normally Dev we do on windows and production in Linux.
    IF, your case is above. then create another schema in same platform(DB and OS ) and import the master and work repositories in Insert update mode from dev.
    After import, re-export this newly created repositories and try importing into your production.
    I have faced the similar issue and after following the above process, I am able to import my master and work properly.
    If you are still not able to resolve this issue after following the above way.
    Then try export you Logical and Physical Schema instead of master repository.
    While importing , please import the Physical topology(Topology) and then the Logical Topology.
    Thanks,
    Nagarjuna

  • QAS Refresh from PRD

    Dear Bhudev/Guest,
    I am Planning to refresh my Quality system from Production's Offline Database Backup. I have seen you a lot posts.
    XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
    Refresh from Offline backup (AQC from APC)
    Let's say AQC is quality and APC is production.
    Pre-processing Activity:
    Verifications:
    1. Verify the last offline backup in the source system /oracle//sapbackup/back.log
    2. Verify that both the source and target systems are at the same Oracle level (which is already the case between APC and AQC)
    3. It is recommended that an off-line backup be taken of the target system before starting this process, in case of fall back.
    4. Confirm there is enough space in the target (AQC) file systems to contain the data from the source system this is required as we may have to copy the files from Production to quality. /oracle/SID/sapdata* folders should be having little more space as compared to the source filesystem.
    5. Check access to SAP* for APC (000 and 400) and also for AQC (000 and 400)
    6. Check other passwords such as adm and ora
    7. Server : User : ora > sqlplus u201C/ as sysdbau201D > alter database backup controlfile to trace > exit In /oracle/SID/saptrace/usertrace, the last trace (check the time) is the script for recreating the control file. You will need to edit it. Please rename the trace file to ld.sql and send the file to the target system /oracle/SID Edit the Script: vi ld.sql Delete or comment out all lines at the beginning of the file before STARTUP NOMOUNT which is kept. Change old controlfile creation statement at the beginnig of the controlfile: Old line: create controlfile reuse database NOresetlogs archivelog; change to New line: create controlfile set database resetlogs archivelog; replace all occurences of string by in each line where appears :g / / s / / /g example: :g/P10/s/P10/T21/g Delete the following lines a the end of the script: ; RECOVER DATABASE; ALTER SYSTEM ARCHIVE LOG ALL; ALTER DATABASE OPEN;
    8. Get from the Prod system (APC) the .aff and backDPR.log and copy them on AQC. (/oracle//sapbackup) Copy the files to /instkits/SID/. And after we can go on target source server and copy them from /instkits/SID to the /oracle/SID/sapbackup/. With the good owner and permission
    9. Lock all the users in client 400 except Basis and post system message. Target system data collection (On AQC -400):
    1. SM59 Expand all the trees, print by choosing: ->System ->List ->Print i) Compare list to R/3 connections on source system. Record details for any that will need to be recreated on target system.
    2. SCC4 Record all client settings. -> Tableview ->Print ->Standard List -> List -> Print Make sure you understand the columnsu2026
    3. SE06 Record system change options
    4. RZ10 Record the instance profile settings for: rdisp/wp-no-btc and rdisp/max_wprun_time
    5. STMS Record current transport routes. ->Overview -> Transport Routes -> manually expand all trees -> system ->list ->print
    6. Request customer to provide u201Ccatch-upu201D list of transports to be applied to system after refresh (QA and Sandbox systems).
    7. RZ04 Record current work process set-up. Highlight each operation mode and click instances/op modes button. i) Print with ->System ->List ->Print
    8. SAP License Ensure the SAP license information is available. If not on-hand, logon target system as adm and enter command: saplicense u2013show. This information is also available on OSS.
    9. TSM Nodename View /usr/tivoli/tsm/client/api/bin64/dsm.sys on source and target system. Record the nodename entries. These will be SAP or server names.
    11. Take printer Export through SPAD and save it locally to desktop->SPAD
    12. Take Export of User Master from the client 400 through SCC8 target system is AQC , so that it may be re-imported through STMS. Note the Transport number here also verify the transport exist in the queue. DB Restore from offline backup from APC:
    1. Stop SAP on AQC -> Login as aqcadm -> stopsap
    2. Change the TSM node on AQC-> cd /usr/tivoli/tsm/client/api/bin64 ls -lrt vi /usr/tivoli/tsm/client/api/bin64/dsm.sys Change it to point to APC, comment the AQC Node. Post Restore Acitivity:
    1. Stop Database Delete Old controlfile rm /oracle/AQC/sapdata1/system_1/cntrl/* rm /oracle/AQC/saparch/cntrl/* rm /oracle/AQC/origlogA/cntrl/*
    2. Re-create the controlfile and then after that start the database User : ora > cd > sqlplus u201C/ as sysdbau201D > @ld.sql > alter database open resetlogs;
    3. Change the sapr3 password Server : User : ora Temporarily, we have to change the sapr3 password to the default password. With SAPBA, change this user password to pass.
    4. Test the connection: Server : User : adm > R3trans u2013d It should have a return code of 0000
    5. Reasign tempfile alter tablespace psaptemp add tempfile '/oracle/AQC/sapdata1/temp_1/temp.data1' size 6020M reuse autoextend on next 20971520 maxsize 10000M; alter database rename global_name to AQC.WORLD; drop user OPS$APCADM cascade; drop user OPS$ORAAPC; create user OPS$ORAAQC identified externally default tablespace psapdnausr temporary tablespace psaptemp; grant connect, unlimited tablespace, SAPDBA to OPS$ORAAQC; grant connect, unlimited tablespace, SAPDBA to OPS$AQCADM;
    7. Change the instance profile to stop all the background processing To be sure that no production batch are executing, set rdisp/wp_no_btc to 0 posprocessing:
    8. Startsap
    9. Run Transaction SICK (as sap*)
    10. Installing license through the tcode: slicense While logged in as 000/sap/using password of APC system Get the License from service.sap.com and download it to local machine Log in 000 client using SAP and run the Tcode slicense import printers, run BDLS for logical system name conversions se06 posprocessing stms usermaster import import profiles for QAS
    thanks
    Bhudev
    XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
    Hi Pranav
    why the SIDs of production and QAS are same, did you do refresh of QAS from PRD ?
    If yes, then you should have done control file creation and change of SIDs, after the datbase restore...
    however, if you want to create the new control file and change the SID then try to consider the following steps:
    1. Login as orasid
    2. connect to sqlplus
    3. run query: alter database PRD backup controlfile to trace;
    4. It will create a control file as a latest trace file (.trc) in the directory /oracle/PRD/saptrace/usertrace
    note: logout of sqlplus
    5. Rename that .trc file into ldQAS.sql
    6. copy this file into /oracle/SID ie. /oracle/QAS directory
    7. edit the .sql file as below
    8. CREATE CONTROLFILE SET DATABASE u201CQASu201D RESETLOGS ARCHIVELOGS;
    add above statement replacing the below:
    CREATE CONTROLFILE REUSE DATABASE u201CQASu201D NORESETLOGS ARCHIVELOGS;
    9. Replace all occurences of string <PRD_SAPsid> by <QAS_SAPsid> in each line where <source_SAPsid> appears
    :g/PRD/s/PRD/QAS/g
    10. login in sqlplus, stop database
    11. as oraqas, delete old control files:
    rm /oracle/SID/sapdata1/system_1/cntrl/*
    rm /oracle/sid/saparch/cntrl/*
    rm /oracle/SID/origlogA/cntrl/*
    12. again login into sqlplus (as sysdba always)
    13. run this .sql : @ldQAS.sql
    note: it should give a message that control file creaated.
    14. Open the database using: alter database open resetlogs;
    15. alter database rename global_name to QAS.WORLD;
    16. drop user OPS$PRDADM cascade;
    17. drop user OPS$ORAPRD;
    18. create user OPS$ORAQAS identified externally default tablespace <tablespacename>
    temporary tablespace psaptemp;
    19. grant connect, unlimited tablespace, SAPDBA to OPS$ORAQAS;
    grant connect, unlimited tablespace, SAPDBA to OPS$QASADM;
    at SAP level:
    1. you can run BDLS to convert logicalsystems from PRD to QAS SID
    Bhudev
    XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
    In both post, There is some difference specially like User droping.
    Whether I have to run BDLS or Drop usr and create or both activity have to be done?????
    Regards
    Dharmendra

    Please explain step by step:-
    7. Server : User : ora > sqlplus u201C/ as sysdbau201D > alter database backup controlfile to trace > exit
    In /oracle/SID/saptrace/usertrace, the last trace (check the time) is the script for recreating the control file.
    You will need to edit it. Please rename the trace file to ld.sql and send the file to the target system /oracle/SID
    Edit the Script: vi ld.sql Delete or comment out all lines at the beginning of the file before STARTUP NOMOUNT which is kept.
    Change old controlfile creation statement at the beginnig of the controlfile: Old line: create controlfile reuse database NOresetlogs archivelog; change to New line: create controlfile set database resetlogs archivelog; replace all occurences of string by in each line where appears :g / / s / / /g example: :g/P10/s/P10/T21/g Delete the following lines a the end of the script: ; RECOVER DATABASE; ALTER SYSTEM ARCHIVE LOG ALL; ALTER DATABASE OPEN;
    8. Get from the Prod system (APC) the .aff and backDPR.log and copy them on AQC. (/oracle//sapbackup) Copy the files to /instkits/SID/. And after we can go on target source server and copy them from /instkits/SID to the /oracle/SID/sapbackup/. With the good owner and permission
    Break into steps and explain. It looks confusing to me because I am new to ECC with Oracle.
    Regards
    Dharmendra

Maybe you are looking for