Hyper-V for hospital information system, calculation and requirements?

Hi All,
This is my first post here, i am a technical support and developer for one of hospital information system, because its application for healthcare so this application demands performance, reliability and high availability, after a long discussion with my
team, we decided to deploy our application and database on Hyper-V VM's. But the problem is we never deploy this apps in VM's before, we usually deploy on physical server, here are our scenario:
for VM1 : Application server (Windows Server 2012 R2), our application would be optimal serve 100 users running on 1 processor with 6 cores  (if deploy on physical server) and 16GB memory.
for VM2 : Database server (SQL Server 2012 R2), usually we use 4 to 6 cores (if deploy on physical server) with 16GB memory.
the questions:
1. Can someone help me with the Hyper-V VM's calculation or configuration regarding computing power for host and guest? like how much vCPU? Dinamyc Memory? (we intended using Hyper-V Server 2012 R2 as hypervisor)
2. What if i want to use fail-over cluster ? does our fail-over must be on VM's too?
3. For SQL Server on VM, which one more impact on performance, assign a lot of vCPU or memory?
4. Can someone suggest me the hardware requirements for those scenarios?
Thank you for the help.
Regards,
Mahdi.

Without knowing the exact performance characteristics of the applications, it is really difficult to provide any information about the effects of oversubscribing the CPUs or memory.  So, just look at it as though it were a physical deployment.
"1. Can someone help me with the Hyper-V VM's calculation or configuration regarding computing power for host and guest? like how much vCPU? Dinamyc Memory? (we intended using Hyper-V Server 2012 R2 as hypervisor)"
Many servers you purchase today will come with two processors and 8 cores (forget about simultaneous multithreading at this point) giving you a total of 16 logical CPUs.  Create your VM with 6 virtual CPUs and 16 GB of memory for Application 1. 
Configure your SQL VM similarly.  I don't know what issues might arise with Application 1 with dynamic memory, but SQL performs best without it.  Most servers today will have at least 64 GB of memory.  With the above configuration, you have
plenty of headroom on a pretty average server.
"2. What if i want to use fail-over cluster ? does our fail-over must be on VM's too?" 
With Failover Clusters, you cluster the Hyper-V role.  This means that the VMs will fail back and forth.  Remember, though, this is at the VM level and not at the application level, meaning that if Hyper-V host 1 fails, the VMs restart on Hyper-V
host 2.  Now, it is possible to also create failover clusters between VMs.  This is quite common with SQL.  When clustering VMs, you would need to install VMs on each node of the Hyper-V cluster.  Then if Hyper-V host 1 fails, there is
an instance of SQL running on host 2 ready to take over.  The recovery time is much shorter.  You will have to ask the vendor of Application 1 if it is a cluster-aware application.
"3. For SQL Server on VM, which one more impact on performance, assign a lot of vCPU or memory?"
Without more information, that is pretty hard to answer.  Generally memory helps first, but depending on the types of query/update activity, multiple CPUs is also helpful.  Start at 4 and monitor to see if more would help.
.:|:.:|:. tim

Similar Messages

  • My Windows 7 Professional desktop system hard disk got corrupted and I took the opportunity to install an SSD for a new system disk and reinstall Windows.  The system is up and running on the SSD, with my old system disk now used for storage as it is stil

    My Windows 7 Professional desktop system hard disk got corrupted and I took the opportunity to install an SSD for a new system disk and reinstall Windows.  The system is up and running on the SSD, with my old system disk now used for storage as it is still readable.  The only Adobe product I have reinstalled so far is Reader XI but I would like to reinstall Elements 8 and Acrobat 9 without taking up more licences as both are also installed on my laptop.  Can you point me to the best way to do this?  - Thanks

    If you have the two allotted activations already and one was lost on the hard drive that failed then you need to contact Adobe Support thru chat and ask them to reset your activations.
    For the link below click the Still Need Help? option in the blue area at the bottom and choose the chat option...
    Serial number and activation chat support (non-CC)
    http://helpx.adobe.com/x-productkb/global/service1.html ( http://adobe.ly/1aYjbSC )

  • System calculator and calendar in java!!!

    Hello to everyone! I'm new to Java ! Is it possible to include the system calculator and the system calendar in a Java application??I mean if i push the calendar button, Java opens the system calendar or the same thing with calculator??can anybodu help me??
    THX

    Thanks Praveen_Forum !It's working!But I dont need the string you mentioned, I only put
    Runtime.getRuntime().exec(calc);And it is working like this!Thanks again:-)

  • COMAC - COHV: manage object profile for order information system

    Hi,
    when you carry out an collective availability check from transaction COHV or COMAC, it is possible to select a layout or a profile. The layout can be defined within the transaction.
    What about the profile ? I can't find how to create a new profile in the  customizing for order information system.
    In standard the profiles are:
    000001 standard profile
    000002 pick list
    000003 collective availability check
    000004 documented goods movements
    Do you have any idea where the profiles can be maintained ?
    Many thanks
    Regards

    Hi,
    Go to SPRO > Production >Shop Floor Control > Information System>Define Profile for Order Information System.
    Hope this helps
    Regards
    Ali

  • Same SID for QA & Prd systems - pros and cons?

    We have the foll systems:
    1. Enterprise Portal 7.0
    2. NWDI 7.0
    3. NW 7.0 (with XECO - Ecommerce)
    4. TREX 7.1
    5. Content Server 6.40
    6. ECC 6.0
    Currently the QA and Prd systems have the same SID and system/instance no, although they are on different hosts.
    We would like to know what are the long term pros and cons for keeping the QA and Prd SIDs the same for all systems.
    We are already making a list, so thought we might as well get more inputs from the community too.
    We already have this arrangement for the past 3 months and have not faced any major issues.
    A couple of cons though:
    1. Cannot use solman as it cannot distinguish between the diff servers with same SID
    2. ABAP transports from QA to Prd have to be manually done (cannot use STMS)
    Thanks
    Prasad

    Hi Manoj,
    Changing the SID of java systems is a very tedious procedure. Hom sys copy is just a part of the SID change...there are a whole lot of configs to be done after that...the task is eq to a new setup of systems
    For once, the efforts put in are huge..you can see there are 5 systems..besides, it will involve coordination from all teams - basis, development, functional, project management.
    Here are a few advantages that we know of:
    1. No efforts reqd to change back to original SID
    2. During disaster recovery, we just have to restore the production database on QA and change the hostname, whereas its not so in case of having diff SIDs
    3. For end-users this will be transparent because they will be using the hostname in the URL which is anyways different
    We have the same SIDs for the past 3 months and have not seen major issues, but we also would like to know from the long term perspective if there are any risks that we have not foreseen...hence we seek help from the community.
    Hope its clear now
    Thanks for your response
    Prasad

  • System unstable and requires reboot after 24 hours - HELP

    I did a clean install of Leopard twice and the same issue appears. The system becomes unstable and requires a reboot. Mail doesn't function correctly and Firefox gives an error, "Another copy of Firefox is running. Only one copy can run at a time'.
    The only option at this point is to reboot, however the system hangs on shutdown.

    Sorry for the delay and thanks for the response. what I mean by unstable is that the system will not perform as expected. The problem seems to be growing however. It use to only occur after 24 hours of up time. Now it seems to occur after the system goes to sleep. Twice I have put the system to sleep and each time when it wakes, I can not do anything. If I click an application Firefox, Yahoo, iChat, Mail, etc it will not respond. Forcing a quit on the application does nothing. Each time I have been forced to bring the system down hard. -Any help is appreciated.

  • External tax system calculation and FTXP -% not considered .

    Hi ,
    We are using taxware for us  sales and use tax calculation . we have requirement where we need to accrue less tax during purchase of materilas that are used in manufacturing in CA  . the product code kind of configuration is ruled out as business does not want .
    So created a new input tax code in FTXP where in maintained the XP1I as 50 % and the rest of the condiitons as 100% .
    created PO with the  new Tax code and the rate from the taxware pulled in for 100% for XP1I and not  for 50% as in the configuration .
    Please let me know if i am missing any configuration ?
    Thanks in Advance for any inputs .
    S.E

    Hi,
    You've set up 100% for other conditions, besides XP1I, also. Are they used in system, and calculated correctly?
    Please check MM Pricing procedure used to create PO, and relevant tax condition M/06.
    Thanks,
    Nirav

  • Can anyone pls..  give me the material for sales information system?

    hi,
    good evening to all gurus,
    this is arunteja vasan
    pls.. if anybody have material for SIS, u will send me.
    thanks to all.

    Hi,
    1.create information structure by selecting the key figures and characteristics. After creating the information structure u must activate and generate.
    2.include updating rule for information structure. After including the updating rule the information structure u must activate and generate
    3.select the updating rule is whether for day, week, month, or year by double clicking on the information structure.
    4.Maintaining all seetings ie; customer statistics group, materialstatistics group, sales document, sales item, billing document, and assign all these to sales document type, sales item, billing type,
    5.Assign sales area to updating rule.
    6.check the sales area whether all settings are maintained or not.
    7.maintained customer statistics group in the customer master record, and material statistics group in the material master record.
    8.After all the settings use T.c. MCSI enter the sales area customer material and see the results, now u get the report or sales of a particular customer or organization.
    Note: Before doing the last step create a sales order, delivery, AND billing.
    Award points if useful.
    Regards,
    Amrish Purohit

  • Jsp for student information system(SIS)

    I am a student and studying jsp Recently for my Graduation thesis named SIS.
    who can give me some advice . thank you so much.

    I am a student and studying jsp Recently for my Graduation thesis named SIS.
    who can give me some advice . thank you so much.

  • Why does my system hang and require a power-cycle?

    My macbook air just stops. The trackpad, mouse, keyboard are all inoperable. The cursor does not change to the "I am busy color wheel". We have reset the SMC controller once on a suggestion from Apple support. This happens regularly and we are getting REALLY aggravated at the lost time and data.

    Cineast wrote:
    If you tell me to reload the operating system, then I'll have to go retro with Snow Leopard.
    All subsequent updates were purchased from Apple on the Internet and downloaded.
    Not so. You use the recovery mode to reinstall Lion. Details in Recovery and About OS X Recovery. Also, see Computers using Internet Recovery.

  • Error while reading PO in backend system Inform system adiministrator

    Hi All,
    I am working on extended classic scenario and the problem is that after the PO ís ordered it gives the message " Error while reading PO in backend system Inform system administrator" and this is happening only for a particular local PO.
    When I check the PO number in R/3 it does not exist.
    The number range is correct both in SRM and R/3 (external no. range is ticked).
    Also I could not find any logs in RZ20 nor a dump.
    When I checked in bbp_pd, couldnt find any relevant information except that the PO has the status ordered.
    I am on SRM version BBPCRM 4.0 SAPKU40007
    R/3 version 4.6 C SAPKH46C47
    Thanks in advance,
    Rgrds,
    Raj
    Message was edited by:
            Raj Malhotra

    Hi
    Have you tried out this ?
    <b>There are two BADIs which might help you in achieving the job.</b>
    <u><b>BBP_EXTLOCALPO_BADI</b> [Control Extended Classic Scenario ]
    <b>and</b>
    <b>BBP_GROUP_LOC_PO</b>
    [Exit Grouping of Items for Local Purchase Orders]</u>
    <u>Read the documenatation first, using transaction - SE18
    before implementing them for your requirement.</u>
    Hope this will help.
    Please reward suitable points.
    Regards
    - Atul

  • Want to do PhD in SAP /ERP System / Managment Information System

    I want to Full time PhD in SAP / ERP System / Management Information System in SAP Related Area with scholarships.I have done Master of technology in Information technology from Jadavpur University ( india).I have 2 years I.T experience in I.T and Academics if you can give any helpful information on that I will be grateful to you.
    Thanks
    Sayanta Mallick

    Hello,
    As an active UA member, we are interested in supervising PhD students in SAP related areas (Business Intelligence in my own case). Please be aware that, as a student, your PhD would need to have a focus on the challenges and issues in the area (many are noted in both the threads on the Community Network) and not on SAP technology per se - though you may well use SAP technology or additions to it to develop/demonstrate solutions to issues and challenges.
    We offer full and part-time study options and details can be found at the following URL:
    http://www.brunel.ac.uk/about/acad/siscm/disc/pg/phd
    I do not mean to use this as an advert for my institution in particular - as noted in other posts there are many choices open to you.
    Mark Lycett
    Professor of Information Systems Development
    School of Information Systems, Computing and Mathematics
    Brunel University, UK.

  • Use of Information systems

    Hi,
    What is the use of Missing part information system list and Missing part list?
    If there are missing parts during availability check for an order, will the system stop processing that order? In such cases, what should we do to overcome this issue?
    Sridharan

    hello Shridharan,
    In the missing parts list you can:
    1.display the missing parts of all orders which have been checked (for collective orders)
    2.check the availability of individual components
    3.filter / sort components
    4.print the missing parts
    5.vary the field selection
    6.The missing parts list is not saved if you exit order processing.
    where as missing part information system is used to display the missing parts list for a selection of materials, or for all materials. You can also restrict your selection of missing parts according to a specific plant, MRP controller or requirements date.
    And if there are any missing parts during availability check of an order system will not stop processing the order.
    hope it's helpful stuff for you.
    Regards,
    Sarfaraz.

  • Capturing system time and date and the time difference and date difference.

    Hello Experts,
    i have a requirement the i need to capture select query start time and date as i runthe program on midnight (ie) 11:55 p.m.
    I tried system fields sy-datum and sy-uzeit for capturing the system date and time when my program runs but it gets reset when the date changes.
    i tried get time field option but it is resetting the sy-datum to zero so i am able to capture the date of the next day and resulting in wrong calculation of time .
    please help with your valuable answers.
    Thank you,
    Srinivas.

    Hi,
    As per my understanding you want to fetch those data which are created between the program last run date time and current date time.
    If I am right please follow the below procedure.
    1. Create one custom table to store program name and program execution last date time
    2. at event INITIALIZATION populate to fields date and Time using the statement sy-datum
    initialization.
      v_curr_time = sy-uzeit.           " Current time
      v_curr_date = sy-datum.           " Current date
    3. Get the last run date and time from the above custom table.
    4. Do your logic.
    5. at last Update the custom table with current date and time based on the step two (Here do not take sy-datum like that, take the value in the global variable populated in step 2)
    Thanks
    Subhankar

  • F.30-Accounts Receivable Information System -Dynamic selection

    Hi,
    I tried to execute the report RFDRRSEL-create evaluation for customer information system with dynamic selections-document type and reason code. These selections are not considered, how can i make it work with dynamic selection?
    Thanks

    Hi,
    Seems that the table, FII_AR_ADJUSTMENTS_F has been locked since it is being used by some other user.
    Make sure that the other users/programs are not performing some operation on this table.
    Regards,
    Sujoy

Maybe you are looking for

  • 'Picking request file' and 'Picking confirmation file'...

    Hi, Suppose the business scenario like this: After delivery created in SAP system, then the system generate an 'Picking request file' to 3rd party shipper service provider. And then 3rd party shipper service provide will generate an 'Picking confirma

  • TWO VERY TOUGH SUPPORT PROBLEMS FACED AND SOLVED IN REAL TIME

    pls any body post two very tough support problems faced and solved in real time. my id is: [email protected]

  • Message identity of the developer can't be confirmed

    I am trying to edit my Creative Cloud 2014 (enterprise) and I get the message that the CCP launcher can't be opened because the identity of the developer can't be confirmed. Also, I was able to use the launcher on another computer and got the softwar

  • RFC Destination using ABAP / 4 driver

    hi all       i want to create RFC Destination using ABAP / 4 driver (Transaction-SM59) so do anyone have detailed steps/any blog/code regarding that. Plz forward it. Regards Martin

  • Error 4SNS/1/0000000: Tm0P-64.000

    I'm having trouble with my Macbook Pro ever since my daughter tried to update her Iphone 5 software through it. Ran the Apple Hardware Extended Test and it came up with this error number: 4SNS/1/40000000:TmOP-64.000 Took 30 minutes to run this test,