Incorrect assignment of cost estimate number to the material key

Hi,
   While doing GR for a particular PO we are getting error msg that "Incorrect assignment of cost estimate number to the material key"
First we thought that this error might be missing of standard prices for materials. Even though creation of standard prices has not solved the problem.Could you please explain me clearly
1) what are the reasons for this error.
2)what is the soltuion for this?
Thanks in adavance
regds
ramachandra

Hi,
I assume that Material Ledger is active, isn't it?
Message C+451 is usually caused if there are some entries in ML without any entry in the MM tables (MBEW, QBEW, EBEW).
These inconsistencies can be identified with the help of program MLHELP_CHECK_MULTIPLE_CKMLHD. Correction can always and only be done by SAP Support. So if this report shows inconsistencies, you should create a message for component CO-PC-ACT.
Regards,
Antje

Similar Messages

  • No standard cost estimate found for the material

    Hi,
    When we are trying to generate the bill systems throws the error as "no statandard cost estimate found" whereas the material is a kmat material.
    Actually as per the requirement we should not Run standard cost estimate for any material,we will update the standard price in MR21
    What are the settings that i need to do  to avoid the above error message while doing billing?
    Following error msg is appearing:-
    No standard cost estimate could be found for material "300000"
    Message no. K/834
    Diagnosis
    In Profitability Analysis, an attempt was made while valuating with material costing to read for material "123456" a standard cost estimate released on posting date "02.10.2008".
    The system has discovered that there are no error-free standard cost estimates released in plant "BP01" on the specific date "02.10.2008" for material "123456".
    The material cost estimate is accessed according to the CO-PA Customizing settings for costing key "YG1" under Define Access to Material Costing.
    Display Cost Estimate for Material
    Display Material Cost Estimate without Quantity Structure
    System Response
    It is not possible to process the document further.
    Procedure
    Check your system settings.
    Thanks
    Kishore

    Remove the Costing keys assignment in the step "assign costing keys to any
    characteristics" in COPA Configuration settings.

  • No cost estimate number could be assigned

    Dear Experts,
    I am getting below error while creating Material using MM01 transaction.
    Please help me in solving this error.
    *No cost estimate number could be assigned*
    Message no. M3836
    Diagnosis
    If you create accounting data or costing data for a material for the first time, a so-called cost estimate number for the material is assigned by the system.
    However, no such number could be assigned for this material.
    Thanks and Regds
    Sridhara K N

    Dear,
    I'm not sure but check the material type in OMS2 "With Qty Structure" active with valuation area and other setting.
    Regards,
    R.Brahmankar

  • Cost estimate number

    Hello CO experts,
    Could anyone help me understand on what basis SAP generates Cost estimate number? I mean, every time I run CK11N and save does SAP creates a new Cost estimate number? Does it also stores in KEKO/KEPH when CK11N is run n saved? How different would it be when CK40N is run? Anyone of you happen to know/research on this?
    Thanks for your time.
    Regards,
    SC

    Hi,
    a new plan cost estimate number is created for every material / plant combination that is costed the first time.
    Every additional plan cost estimation uses the same plan cost estimation number but the costing version (KALKA), costing date (KADKY), the calculation version (TVERS), valuation variant (BWVAR) differs and creates a new record in table KEKO:
    Best regards, Christian

  • CK51N updates SO cost estimate but not the status of SO line item

    Hi All,
    Ours is a MTO scenario with Sales Order costing. When we execute the Order BOM cost estimate in CK51N the cost estmate is updated in tne sales order line item but the status of the Sales Order line item remains "to be costed". Please advise is there any config setting for the status update of Sales Order line item when the ck51N is executed.
    When i do the Sales Order costing in VA02 --> Extras --> Costing.  The staus of the Sales Order Line item gets updated automatically.
    Regards,
    Rajeswari shankar.

    Hi,
    In general for MTO Scenarios, you would do the sales order costing from VA02 only.Once you get the cost,then in the left corner,there is a symbol for markup the price,by clicking on which you would mark and release the price.

  • Apple Keyboard with number pad the V key will not work

    Apple Keyboard with number pad the V key will not work.  Everyother key works but not the V.  I have a MacBook Pro.  Any suggestions?

    Call AppleCare and get it replace if it's under warranty; otherwise, get a new one. They're only $49 USD.

  • Activate the FIELD Cost Center while issuing the Material to Order by 261

    Dear All,
    How to activate the FIELD Cost Center while issuing the material againest Order IN MB1A?
    Thanks and regards,
    Satyajit

    Hi all,
    I'm having problems with activating the cost center field too. I've already checked OMBW and OMJJ. For OMJJ, cost center field was required. For OMBW, Cost Center field was Supressed. However, when I checked the Change Logs, no changes were performed since last year. The user who raised this issue had the cost center field activated until December 1, 2008 but now it's deactiavted. So I don't think it's OMBW responsible for this since there was no change since last year.
    Please share your knowledge on this.
    Thanks!

  • Assignment from source document number in the query to archived document

    Dear all,
    we scan all original documents and store them in an optical archive like IXOS. This archive is connected to our ERP-system. An on ERP with the source document number. When I pick up the financial document I have the possibility to open the scanned original document.
    In BI we use the cost center cube. One of the characteristics in the cube is the source document number. Now we have the request to jump direct from the source document number in the query to the archived original document.
    Is there a possibility to define an assignment from the source document number in the query to the archived original document.
    Best regards
    Juergen

    Thnaks Oscar and Ganesh for your interest.
    FYI,my infoset is created based on bill doc and item number which is available in both the ODS.
    Here,for every document in Billing ODS,there are more number of documnets in Condition ODS,so the bill qty is getting added according to the numvber of records in Condition ODS.
    Eg.Billing ODS: Doc Num:100012, Qty = 8.if 10 records are ther in condition ODS,then in the infoset my QTY becomes,
    Doc Num:100012, Qty = 80.
    So in the query i divided it by number of records to get the qty and is coming correctly for documnet wise report.
    Problem comes when i remove documnet from the report and drilldown to higher level,say material,then it is calculated wrongly.
    Your suggestions plz..
    Regards
    Sudhakar

  • 0CO_PC_PCP_03 Cost Estimate Itemizations at the top level

    We are wanting to use extractor 0CO_PC_PCP_03 to extract the itemisation behind a cost estimate (The data in table CKIS). The issue with the extractor is that it breaks a multilevel BOM  down to the basic levels (ie, itemisation explosion). However we want to have the data at the  top level as it is displayed in a cost estimate itemisation. Is it possible to get this extractor to only extract the top level of the itemisation without further explosion of detail.
    Thanks
    Geoff ARmstrong

    I have the same problem now.
    I plan to create a generic datasource and extractor is a function module which is originated from KKBW_PCP_ITEMS_GET_ITEMIZATION.
    Do you have got a better way now?

  • Cost estimate missing for a material in sales order

    Hi All
    Users have opened sales orders with materials which does not have a  valid costestimates. These missing cost estimate sales orders did not flow to COPA. Is there any report,  I can run to view all those sales orders which did not flow to COPA?.
    Q2. Now after creating a cost estimate for the materails , how can I transfer those sales orders to copa??
    Thanks in advance for looking into this

    ke2d and ke2c and ke2b are the tcodes

  • Cost estimate that disregards Spec Prc Keys

    We would like to do some test costing using Planned Price 1, 2, 3 to hold "what if" values.
    Issue is that if a MRP Special procurement Key or Cost Special Procurement Key exits, the cost estimate follows that rule. (Of Course)
    Is there a way to create Cost estimate config that ignores SPK (except 30 for subcontract) and then follows these rules:
    Any help/suggestions would be appreciated
    thanks
    Althea

    Hi.
    The idea of the SPK in the costing view is don't consider the MRP SPK in the costing run, so PP boys have what they need to their SFC and planning purposes and costing boys have what they need in their standard cost.
    Now, I dont understand something:
    - you have SPK in the costing view ?
    - You want to have this alternative strategy in other version of your cost estimate ?
    + If you want to select the cost like a external procurement process, you can create a SPK like this, and set in the costing view
    When you run CK11N, the system trigger the flow you define for materials. In my example, my material is InHouse production but in CK11N i fill the cost with a user exit 9999.
    About your question>
    Is there a way to create Cost estimate config that ignores SPK (except 30 for subcontract) and then follows these rules:
    Im Afraid not. In case of SPK 30 i guess you mean in the MRP view, you must set the Costing view blank or 30.
    Just one more stuff, keep in mind the efect in the Cost Component Split in your standard cost.
    Arturo.

  • How Serial Number of the material can be used to track the current status

    Hi,
    I want to know how we can use the serial number of the materail to track its current status. i;e i just want to enter serial number and system should display its current status, whether the materail has been returned, delivered etc.
    Is it possible to know.
    Thanks,

    VK,
    We use serial numbers for tracking purpose. We can track at the document level
    Function Module GET_SERNOS_OF_DOCUMENT can be used to retrieve serial numbers corresponding to any of the following documents.
    1.  Delivery
    2.  Sales order
    3.  Material document
    4.  Inspection lot
    5.  production order
    6.  Internal Handling unit
    7.  Physical Inventory document
    TO see the status of Serial no. you can use Tcode IQ02 - Where the status will be To Stock , From Stock, To Customer, From Customer, Delete Assign to HU, Delete Inv Assign.
    Regards
    Sathya

  • Legacy number in the material master

    Dear SAP Guru,
    Good day.
    We are currently in production support today and we want to understand how a legacy number differs from a material number. As we can see in the material master (Classification View) there is an indicated legacy number there with a corresponding value. Could you further elaborate on how and what is the usage of a legacy number?
    Thanks in advance for your help.
    Kind regards,
    JMT

    Jasmin,
    Basically some clients would be interested to track the SAP material number with referance to the Legacy material number, this data would be uploaded during the Cut-over and data conversion to SAP.
    I would suggest you look at the Functional/Tehnical specification document for the conversion program which was used for uploading the material master data into SAP, that would give you the business reason and the field mapping details.
    Regards,
    Prasobh

  • Avoid Std. Cost Estimate every time the Routing is changed.

    Hi All,
    I have a situation where clinet needs to claculate the standard cost every time the routing is chnaged. We wish to chnage the setting in sucha a way that Standard cost needs not be claculated every time in material master once routing chnage is done. Just in cost collector alone the cost rerun needs to done.

    Setting to be done in REM profile. Issue resolved my self.

  • Cost Estimate Deletion Problem

    Hi,
    I have executed the cost estimate for the material.Now i wanted to delete it in CKR1 as it is incorrect.So that i can execute a new cost estimate for this.
    but my doubt is - if we execute cost estimate,then it will update in material master costing view.If i delete and then execute new cost estimate for the same material.will the new rates will be update? or the old incorrect rates are not deleted?
    Kindly advise me
    Thanks
    Supriya

    From the time you run a cost estimate, till the time it reaches the material master, there are three stages.
    First run and save the cost , Second mark the cost estimate, Third release the cost estimate.
    There is no change to the material master for the first two stages with respect to material value. When you mark, it just updates the future price. Only at the third stage, the material price changes with the new cost estimate value.  For any quantity that is in stock, the change in vaule is journalised.
    Hence, if you have just run the cost estimate, you are only in the first stage. You can comfortably delete CKR1. But please exercise caution, any wrong deletion can take away the cost estimate stored in the material master. This does not take away the standard price, only the estimate gets removed. As a result, you may not be able to get the cost component report for production order etc.
    When you are in CKR1, open up the small plus icon, which will give you more selection option to help you pinpoint the cost estimate that you want to delete.
    You can also check details of the current cost estimate in the costing view to find out which cost estimate has got updated in the standard price.

Maybe you are looking for

  • X6 bluetooth headset will no longer hear calls

    I've been using this with full sucess since July but my headset will only listen to music now.  If i try to make a call it ignores the headset and works on handset, reverting to headset for music when the call is over!  I have a spare controller and

  • Spanish keyboard repair in US

    I reacently encountered a problem (water damadge) with my mac 13" keyboard, it was bought in spain, i was wondering if the Western replacement keyboards would fit this MBA since there seems to be not only a diference with the "ñ" key but also with th

  • I lost the bar for bookmarks,history,esc. on the top left of the screen how do I get it back

    I clicked something and the bar on the very top left of the screen was gone. the had tools, history,and bookmarks. I don't know how to get it back, please help. Thank you...

  • Oracle RAC on Solarais Configuration Issue

    Hi, We are trying to install Oracle RAC 10g R2 on Solaris 10. Following are the products 1=> Soalris 10 OS 2=> Sun Cluster 3.1 3=> Veritas Volume Manager 4=> Veritas Cluster File System Can i deploy Oracle RAC using the above listed Software. Here we

  • Used DC

    Hi guys, I have 2 DCs, say DC-A and DC-B. DC-A contains component A1 and DC-B contains component B2. A1 needs to use a method in B1. THus, to do so, 1. In DC-A, add A1 as public part of DC-A. 2. In DC-B, Add A1 (from inactive tab) as Used DC. THe nex