Increase of price in miro, migo

Dear All,
I have a issue
migo , miro thay done with qantity10 price 1000 then that price increased and my doubt is how we have to post fi entry.
Pls suggest me.
Thanks & Regards,
satishkumar.m

Hi!
1) Migo
You can only enter  Qty  &  Delivery  Note
Stock  Dr
to  GR/IR A/C Cr
2) Miro : (Vendor Inovice)
Whenever  Price  is  increse  or decress  in  invoice , It's  loaded  on  Material. (Normal entry)
Vendor A/c  Cr
Price Diff  on Material A/c Cr
to  Gr/Ir  A/c  Dr
Price Diff  on Material A/c Dr
regards,
Rup

Similar Messages

  • CDPOS for the moving avenge price when using MIRO, MIGO & VL31N etc.

    Hi
    Is there a way of tracking all changes with CDPOS for the moving avenge price when using MIRO, MIGO & VL31N etc.
    We can show changes for MR21 in CDPOS but we need to reflect all changes made to the moving avenge price for MIRO, MIGO & VL31N etc. We need to run a report that will show all these changes.
    We run a report to look at all the change records for Moving Avenge Price, We use tables CDPOS & CDHDR, then Change the document Object for both tables to material, so when the report is run you can identify the material by the object value field
    u201CIf you look at CDPOS the fields where reading the data from in the u201CNew Value fieldu201D is CDFLDVALN when I do an F1u201D
    u201CIf you now check MBEW on the u201CMoving Avenge Price fieldu201D, the data reads from VERPR which is the field we need to reflect the changes. If we can change this then the report will worku201D
    Can you help please?
    Edited by: Derrick smith on Nov 28, 2008 1:51 PM

    Hello Jürgen,
    Thank you for your quick reply. I read the note -- it describes the symptom perfectly, and gives example cases which match our situation. However, no solution or recommendation is given. Does it mean that this way of valuating cancellations is not seen as a malfunction, and cannot be changed?
    Thanks in advance.
    Regards,
    Sergei

  • Determination of Basic price in MIRO

    Hi
    How to redetermine the Purhase order condition after doing MIGO..?
    Currently we are trying to achieve to capture the basic price of the material in MIRO. but system is calculating the basic price as well as the excise duty in MIRO.
    But we would like the system to determine only the basic price in MIRO without excise duty.
    Regards
    Suresh

    If you are in TAXINN then you need to make condition record for your all excise tax conditions as zero.
    If you are using Taxinj then you need to choose zero tax code in MIRO.

  • How system populates price in MIRO?

    hi experts,
                   how system populates price in MIRO?  assume in my po(scheduling agreement(Me32lL)) for a  material, old price 5 INR, current price in 6 INR, so i changed the price in PO also , in MIRO system will take current price or old price?
    regards
    rk

    Hi,
    IN Miro Price will flow from PO history that is value after doing MIGO,
    but for the PO price basis from Info record or last PO document.
    Regards

  • Increase the line items in MIGO

    hi,
    how to increase the line items in migo
    as i have to post more than 150 line items in a single GRN
    is there is any notes on this
    plz give sutable solution
    K.Raghuram

    Hi
    Entering MIGO will not be a problem. U press the downward button to view all.
    Regards,
    Raman

  • Miro & migo

    Hi All,
    This is Thirupathi Rao. plse tell me if anybady what is the MIRO & MIGO and what is purpose of use.
    Regards,
    Thiru

    Dear,
    Both transaction is for Material management.
    Basic process in material management is,
    First create purchase order with ME21N.
    Then with reference of purchase order party send material to company with channel and bill.
    Then store person is create MIGO - Good receipt with reference of purchase order.
    Then purchase person is create MIRO - Invoice invoice verification against good receipt.
    MIGO : - This is enjoy transaction with help of this transaction you create below mention documents.
    Good Receipt,
    Good Issue,
    Transfer Posting,
    Cancelation of Material document,
    Display material document etc.
    MIRO: - With reference of this t-code you can create Bill passing for party, Debit note for party and also credit note for party.
    Regards,
    Mahesh Wagh

  • Price Difference in migo and miro

    Dear Expert,
                        i have created the PO of 10 Quantity with 75 RS Each Price.and At the Migo i have received  10 Quantity reference of PO.when i am doing Miro then i am changing price 73 Rs.what will be process because i want to right financial entry.give me the solution with Financial entry.
    my fin entry
    at migo : Stock ac Dr 750Rs
                     To Gr/Ir Ac cr 750
    at migo time when i m changing price 73 and i similate the docx
    Gr/Ir  Dr 730
    Vendor Cr 730
    rm stock cr 20  
    this is wrong please give me right entry .
    Thanks in advance
    Sarvottam

    Hi,
    The example entry given by you is correct, in case of your purchase order was created without account assignment category(F/K/P)....i.e...STOCK PO
    In case of account assignment cateogry PO, then the price diff during MIRO would be posted to Mat Mag Small Diff account, which you have configrued for acount key PRD in OBYC.
    REgards,
    Srinu

  • Custom invoice MIRO & MIGO

    Hello
    As per Custom invoice rules, I have post the 1st Custom miro in LC, then I have post the MIGO in FC ref of Custom MIRO.
    In EKBZ table filed DMBTR (LC) &  WRBTR(FC), the both values are not match as per exc rate i.e
    exc. rate (type M) 64.66 INR(1 EUR) & DMBTR value 11,756.16 but WRBTR value 266.16 EUR for condition JCDB (same as JCV1, JEDB, JECV), where as GR/IR value is showing correct in MIGO document.
    My query is how to calculate the WRBTR value.
    Regards
    Avijit
    Edited by: Avijit  Barman on Oct 10, 2011 1:49 PM

    Hello Avijit,
    Itis not the error but intended system design. If GR is posted before IR
    then the net purchase order price is used for valuation. If the IR
    price differs from the net PO price (this is your case as you changed
    PO price meantime) then the value posted at GR must be corrected when
    IR is posted. That is why the system always propose IR amount based
    on current PO price when you enter IR with the reference to PO even
    though you made GR at different PO price. In general: during IR for
    PO for which GR was already made the quantity is taken from not invoiced
    GR and amount is calculated on the base of this quantity and current
    PO price.
    Please see also standard R/3 Library -> Logistics -> Material Management
    -> Material Valuation -> Value Changes in Invoice Verification ->
    Invoices for Purchase Orders
    I hope this clarifies the system behaviour,
    regards
    Ray

  • Last purchase order price during miro.

    Here is one issue ...
    We created one plant and maintain all possible required configs for it.
    Al possible transactions are working fine except one.
    When i create a Purchse order of say RS10 as its price. I also perform MIGO for it.
    Now before bill passing i.e MIRO, i update the price as 20 .
    I would like the system to take Rs 20 for Bill passing, but it still take Rs 10 for bill passing
    please share some details.

    1.  If Invoice is done after P.O System pickes the price of P.O. and it is Modifiable.
    2. If GR is done after P.O, system will take the price of GR, while doing Invoice.In your case GR has been doen with Rs 10, so IR  will only take 10, however you can modify IR. But actual solution will be reverse the GR and do GR again if it is GR based I.V. SO latter u will not find hassel for GR/IR clearing account.
    3. If Partial GR/ IR done system adjust to GR /IR account.

  • Price control for MIGO

    Dear experts,
    I need to know what is the settings required for "When doing GR, price in MIGO should be from the PIR and not from standard price of the material". 
    Please advice

    Hi,
    Material - Price control = S and standard price = USD 30
    PIR  -  Has a condition record valid for Feb-2011 and price  =  USD 25
    PO created and price in PO = same as that of PIR = USD 25 (this is fine)
    PIR price control = 5 (GR date)
    MIGO - completed
    In ME23N or MIGO, when I display GR document, it shows the price was picked up from Material master and not from PIR
    MIRO-  Price = PIR price (no issues  here)
    All I need is to know whether we can have MIGO alos pick up same price from  PIR condition record which is valid for the GR date?
    Best Regards,
    Shashidhar

  • MIRO MIGO ENHANCEMENT FOR INDIAN SCENARIO - IMPORTS PURCHASE ORDERS

    ENHANCEMENT IN THE MIRO ACTIVITY. IN INDIA YOU HAVE TO POST 7 CUSTOMS CONDITIONS FOR EACH ITEM. MIRO ACTIVITY IS COMPLETELY MANUAL. ALL THE 7 VALUES, QUANTITIES FOR 7 CONDITIONS ARE TO BE ENTERED. CAN THIS BE IMPROVED TO HANDLE IN A BETTER WAY.
    MIGO ACTIVITY FOR MANUFACTURING SCENARIO THE EXCISE VALUES ARE SET OFF WHICH ARE RETRIEVED BUT FOR TRADING SCENARIO WHERE THE EXCISE CONDITIONS ARE CUSTOMISED [ZCV1, ZEC1, ZEC2, ZAD1] TO LOAD ON INVENTORY THE EXCISE VALUES ARE TO BE ENTERED. CAN THIS ACTIVITY BE ENHANCED SO THAT THESE VALUES COME DIRECTLY FROM THE MIRO FOR DUTY POSTINGS WHERE ALL THE VALUES ARE ENTERED
    BEST REGARDS
    PANKAJ

    Hi,
    In a normal import process, before the goods receipt, you are making invoice verification for Customs using MIRO and using Planned delivery costs as an option.
    As the goods receipts doesn't exist, system is not proposing Customs conditions
    As the goods receipts quantity is unknown and there always a possibility of partial invoice verification for the customs, system will not directly populate the values in MIRO.
    Doing enhancements to populate this values may not be needed. Pls convince the user on the import process.
    Any other option available for that, really dont know
    Thanks

  • Import po, miro, migo, j1id

    1.how i can create custom vendor my xk01 or other code,is ther any tab for  for assign vendor number in PO condition type.
    2.first i have done miro for custom duty ie basic custom duty(CVD),2% cvd, 1% cvd, 4 percent additional import duty, how i will capture this duty by purchase order or other document.and in which g/l accont my all this duty will hits, and i am not getting the total amount in miro when i am doing for custom duty.
    3.or i have to made seprate invoice for custom duty payment.
    4.or i have miro for custom duty/vendor first with po, then how it possible with the same po i can do miro for foreign vendor.
    5.in po i have to put all the custom duty manually , or i have to create create pricing schema and info record for both vendor and material
    6.for import  po, how i can enter the foreigh vendor detail in J1ID,
    7.when i capturing excise invoice i am getting assvalue amount, is is rite, or it will come all the cvd duty.
    8.i have also done migo with excise tab , i only can see the percentage but were i can see the amount which i have got credit.
    9.But i am not able to to update all RG excise register, i all the excise register is only sale or purchase also
    t showing blank what will be the problem.
    10.i want to know what ever credit i am gettinh were is getting posted.
    11.how to capture excise invoice reference to miro
    I12.in import purchasing all duties( like CVD, E cess on CVD) are getting updated in registers and are following, were i can see all this register or g/l account
    1. When Customs Duty Clearing Invoice
    Custom Clearing Dr.
    Custom Payable Cr
    2. When Excise Invoice Credit
    Cenvat Account Dr.
    Custom Clearing Cr.
    3. When Invoice Verification
    GR/IR Clearing Dr.
    Vendor Payable Cr.
    regard
    nabil

    Hi.
    1.  Custom vendor XK01  create assign recon. account. while creating PO in condition tab . select the condition type display the condition for duties there have option to enter the vendor code. you can automate through access seq. assign to all duties condition type and maintain condition record.
    2. MIRO select planned deivery cost.
    Custom Clearing Dr.
    Custom Payable Cr
    3. Yes, you can verify seperately.
    4.Yes, through selection of option in MIRO ---<> planned delivery cose    or   goods serivices
    5. point 1 refer.
    6. J1ID in vendor details.
    7.
    8. Item details you see the amount.
    9. Check you setting on tax on ggods movement . have you enter all the condition type & G/L a/c
    10. Tax pricing procedure --> condition type --> you maintain the accurals & acount key. the acct key have G/l a.c.
    11. Point 1
    12. J1IEX  display mode.
    SAM

  • Price error in MIgo Document

    Hi all,
    While Posting MIGO the following error occurs....
    Transaction cannot be posted due to errors in price determination
    Regards,
    Ram

    Over flow is when u try to post a document and the values go beyoun the field values
    this can happen due to price change for material and system is calculating abnormal MAP
    so u can try 2 things
    try following OSS nots
    See OSS note 579241 and 139176 for solution.
    or
    maintain the correct price for this material
    using the TCode: MR21.Before check for the changes
    using MM04 and try to find what are the changes made to that material.
    Hope it helps you in solving your problem.
    Also try appling above notes given in my previos message
    Edited by: Umakant Bhangale on Dec 29, 2009 3:34 PM

  • Price Variance - MIRO

    Experts,
    We created a PO for one single item for a particular quanity and a particular amt. However, when we received the IR, the amount on the invoice is different than the amount on PO - What are the ways to handle these exceptions. Basically, I am looking for a configuration saying anything under the price variance of 300 USD is ok, but for anything above, an approval is needed.
    All answers/inputs/thoughts would be duly appreciated and rewarded with points.
    Thanks,
    Nandita

    hi,
    Check the below link to understand why price variance is appearing
    Re: MIR7 / MIRO
    thanks and regards
    Praveen.J

  • MIRO MIGO Relation

    Hi,
    I want to find out Expense Account/Stock account debited through MIGO. I have only MIRO document No. with me.

    Hi Sandeep
    If you have the material document number from the MIRO transaction, please go to MB03, input your document number and the year - and enter, then you will see PO number and the line items with Quantities too.
    Go to ME23n, display your PO and under the item PO history tab - you will see all the transactions which happened on that PO and the Goods receipt document wil also be there
    Double Click on the line you need and then go to the last tab which will have yet another tab saying 'FI Documents'
    This should display all the accounting entries
    Hope this answers your Qs. I guess there are easier ways to get about to it, but this is what I usually do
    Rukshana

Maybe you are looking for

  • I reset my itouch and now it no longer works

    I reset my iTouch and now all that shows up on the screen is a cord pointing to iTunes.  Help!

  • Creating a 'macro' to adjust system settings...

    I recently bought a Wacom Bamboo tablet, and have been messing around with the settings for optimal preferences. I prefer to have the screen restricted to the same size of the tablet whenever I'm doing my artwork, however I would like to go back to f

  • Getting Photoshop CS3 on my new computer

    Is it possible to download a copy of CS3 to my new computer?

  • Legacy Serial Number MIA - SOL?

    I've been a PageMaker user since 1.0a (uh, that'd be 1987). Subsequent versions of PM came with a "lite" version of PhotoShop. PMx had PS2.0 LE. PM6 had PS 3.04 LE. PM6.5 had PS 5.0 LE. They were all I needed since I also had Corel Paint and Draw thr

  • Custom Brush

    Why wont photoshop let me upload my brush?