Info regarding upgrade project

Hi Experts,
am going to join to do upgrade project (ECC6.0) till now i ve worked on up to 4.7 only, so what is required knowledge for upgrade project.
and what is unicode is it required for this?
Thanks in advance.
sudha.

Hi,
ECC 6.0 does not support MDMP installations. For those systems, a Unicode
conversion needs to be done before the upgrade to ECC 6.0. A combined Unicode
conversion / release upgrade is another possibility. In such a project, the system is
upgraded to ECC 6.0 and migrated to Unicode in one step.
All this does not apply to your environment. Non-Unicode, single code pages systems
are still supported in ECC 6.0. You have to option to an upgrade to ECC 6.0 and migrate
to Unicode at a later stage. If you want, you can also do a combined Unicode
conversion / release upgrade project which does both in one step.
I cannot predict the expected downtime as it depends on many different factors such as
the database size, size of the biggest table, number of CPUs and amount of memory in your system.
OR Check these links....
http://searchsap.techtarget.com/expert/KnowledgebaseAnswer/0,289625,sid21_gci1242699,00.html
http://www.saptechies.com/upgrade-from-sap-47-x110-to-ecc6/
for upgradation project guide.....
http://www.sappressbooks.com/product.cfm?account=&product=H2903
Reward points if useful....
Regards
AK

Similar Messages

  • Regarding Upgrade project

    Hi I want to know about upgrade project from 4.7 to ECC 6.0.
    The points to be known is........
    1. What are the steps to be followed during upgradation?
    2. Any phases are there in an upgradation?
    3. In an ABAP program run what are the statements giving the problem (Few examples)?
    Help would be appreciated.
    Thanks in advance
    Ramesh

    Hi Ramesh,
    When we go for upgradation, first we read upgrade guide thoroughly and implement accordingly then we will do very fast and with out problem. Please ready carefully and implement.
    Regards,
    Anil

  • Need info regarding upgrading Solaris 10 update 4 to update 8

    hi all,
    i need to upgrade my Solaris sparch OS from update 4 to update 8. i have the update 8 patch bundle with me sol10.U8.patchbundle.zip .
    how i need to proceed with the same?
    Current relaease is
    bash-3.00$ cat /etc/release
    Solaris 10 8/07 s10s_u4wos_12b SPARC
    Copyright 2007 Sun Microsystems, Inc. All Rights Reserved.
    Use is subject to license terms.
    Assembled 16 August 2007
    bash-3.00$ uname -a
    SunOS pbn 5.10 Generic_127111-09 sun4u sparc SUNW,Sun-Fire-V445

    hi ...
    sorry for not to be specific...
    see my current update is 4 and i need to 8 and the patch bundle am having is 8.
    so i shall directly use the update 8 bundle? means does this bundle will contain all updates between 4 and 8 or do i need to use other bundles before using update 8.

  • Upgradation project details in technical

    Hi,
    I need the brief details regarding upgradation project i.e. from one version to another version. Please provide the Technical (ABAP) details...
    Thanks in advance.
    Regards,
    Kittu.

    hi Kishore,
    Upgrading SAP is something that all companies have to face on a periodic basis.
    In a technical upgrade, you merely upgrade the SAP system and adjust any existing userexits and configuration only as necessary (e.g.  the introduction of Lean WM - warehouse management - gave Business Sponsors the choice to implement Lean WM with it's relatively minor changes or use the old configuration without any negative impact).
    The objects that are needed to be upgraded are:
    Includes
    Function Groups / Function Modules
    Programs / Reports
    OSS Notes
    SAP Repository Objects
    SAP Data Dictionary Objects
    Domains, Data Elements
    Tables, Structures and Views
    Module Pools, Sub Routine pools
    BDC Programs
    Print Programs
    SAP Scripts, Screens
    User Exits
    You can refer to the below links for more information on technical upgrade:
    https://www.sdn.sap.com/irj/sdn/wiki?path=/display/profile/2007/05/07/upgradeFROMR3TOmySAPERP-PARTII&
    https://wiki.sdn.sap.com/wiki/display/profile/UPGRADEFROMR3TOmySAPERP-PARTIII
    http://help.sap.com/saphelp_nw2004s/helpdata/en/60/d6ba7bceda11d1953a0000e82de14a/content.htm
    http://help.sap.com/saphelp_nw04/helpdata/en/2e/6d66647d9011d396b60000e82de14a/content.htm
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/5ac31178-0701-0010-469a-b4d7fa2721ca
    Hope this is helpful, Do reward.

  • Regarding Go Live ( Upgrade Project )

    HI All
    Good Day
    We are having Cutover on 18th and will go until 21st. On 22nd of this Month we are going to decide whether to Go Live or Not.
    What i would like to know is
    What are the important guidelines for Going Live
    what are the important considerations for Going Live or No Go after Cut Over.
    What factors incluence the decision.
    If the Go Live is delayed what the steps need to be taken
    Thanks & Regards
    Janardhan Kumar

    Hi Janardhan,
    Check these threads. These might help u...
    Pre-go live activity..?
    Pr-go live activities..?
    /message/1280426#1280426 [original link is broken]
    Re: PS Cut over document
    cut over process
    /message/1280426#1280426 [original link is broken]
    Re: Go live strategy
    Re: Steps for improvement once after GO LIVE - please help
    Re: Go/No go criteria for an Upgrade Project.
    Regards,
    KK.

  • Regarding information on Upgrade Project

    Hi Experts,
    I would like to know more details about Upgrade Project. What are the technical and functional tasks will be there in the process of Upgrade.
    Please help me this because i'll be starting my work in Upgrade Project in another 2 days.
    Thanks in advance
    Tanveer

    Hi,
    first of all upgrade is nothing but
    Upgrade is nothing but installing a new version of software which have more functionality earlier version.
    in Upgrade mainly three types
    1.Technical Upgrade
    2.Functional Upgrade
    3.Strategic upgrade
    Technical upgrade : is a fast upgrade without additional functionality but with minor user interface changes, to ensure business continuity. This upgrade type includes a cleanup of the system without implementing additional functionality, as well as technology upgrade with the opportunity to eliminate not used modifications and custom developments.
    Functional upgrade : Is built on the technical upgrade, the functional upgrade provides in addition the opportunity to implement new functionalities in area like FI,HR,Logistics ..,this upgrade type also represents an opportunity to maximize the use of SAP standard functionalities by replacing custom modifications and consolidate instance or systems.
    Strategic upgrade: Is driven by enterprise SOA to provide more flexibility to business process innovation. This type of upgrade approach represents a significant technology improvements step by leveraging SAP Net weaver functionality to standardize, adapt, and enable new business processes and optimized scenarios.
    The major stages of a technical upgrade can be:
    System preparation and stack level patch upgrade u2013 Basis Team
    SPDD Phase u2013 ABAP and Functionals
    Up gradation of the system u2013 Basis Team
    SPAU Phase u2013 ABAP and Functionals
    DBACOCKPIT for indexing u2013 ABAP TEAM
    Unicode check
    Issues during upgrade
    For Further clarification in this regard, Do let me know.
    Hope I have answered your query.
    Regards,
    Abdur Rafique

  • BW Upgradation Project from BW 3.5 t o BI 7.0

    Dear SDNS,
                             We got an requirement to do an upgradation project for BW 3.5 to BI 7.0... This is the first time am involving for Upgradation..Am An BW Technical Consultant.. Can anyone one sugggest at scratch level wat are the roles should play by BW Technical consultant.. And Wat are the activities whould done by BW technical consultant.. An can anyone tell me.. How many SAP Consultants should involve in this Project.. i.e like how many Basis Consultants and how many ABAP Consultants should involve.. Who plays the Vital Role for Upgradation...
    Can anyone send me the Documents Related for BIW Upgradation for BW 3.5 to BI 7.0.. If anyone send me screen shots related to BW Tehcnical Consultant work it would be helpful.....
    My E-Mail - [email protected]
    Answering Getz Appreciated,
    Thanks & Regards,
    Aluri

    Hi
    I have some checklist ,do not exactly remember from where i got it but its really usefull
    There is no standard SAP checklist as it used to exist in 3.x for nw2004s upgrade and trust the master data guide available on market place is not upto the mark and expectations
    So Heads up..
    /message/2979584#2979584 [original link is broken]
    /message/2765713#2765713 [original link is broken]
    /message/2979576#2979576 [original link is broken]
    /message/3214476#3214476 [original link is broken]
    /message/3024448#3024448 [original link is broken]
    You may wish to have a look at draft portrayed below,rest you learn when you drive
    Lessons Learnt - Upgrade
    1)Convert Data Classes of InfoCubes. Set up a new data class as described in SAP OSS Note 46272.
    2)Pay attention to the naming convention. Execute the RSDG_DATCLS_ASSIGN report.
    3)Run the report RSUPGRCHECK to activate objects.
    4)Upgrading ABAP and JAVA in parallel may cause issues. If there is no custom development on J2EE instance, it is recommended to drop the J2EE instance and re-install the latest J2EE instance after the upgrade.
    5)Apply SAP OSS Note 917999 if you include the Support Patch 6 with the upgrade or you will get the error at PARCONV_UPG phase. When you upgrade to a product containing Basis 700, the phase PARCONV_UPG terminates. You included Basis Support Packages up to package level 6 (SAPKB70006) in the upgrade. The job RDDGENBB_n terminates with the error RAISE_EXCEPTION. In addition to this, the syslog contains the short dump TSV_TNEW_PAGE_ALLOC_FAILED. The program SDB2FORA terminates in the statement "LOOP AT stmt_tab". An endless loop occurs when the system creates the database table QCM8TATOPGA.
    6)Apply the OSS note 917999 if you get the following error during PARCONV_UPG phase: PARCONV_UPG terminates with TSV_TNEW_PAGE_ALLOG_FAILED
    Critical OSS Notes:
    819655 – Add. Info: Upgrade to SAP NW 2004s ABAP Oracle
    820062 - Oracle Database 10g: Patchsets/Patches for 10.1.0
    839574 – Oracle database 10g: Stopping the CSS services ocssd.bin
    830576 – Parameter recommendations for Oracle 10g
    868681 – Oracle Database 10g: Database Release Check
    836517 – Oracle Database 10g: Environment for SAP Upgrade
    853507 – Usage Type BI for SAP Netwaevers 2004s
    847019 - BI_CONT 7.02: Installation and Upgrade Information
    818322 – Add. Info: Upgrade to SAP NW 2004s ABAP
    813658 - Repairs for upgrades to products based on SAP NW 2004s AS
    855382 – Upgrade to SAP SEM 6.0
    852008 – Release restrictions for SAP Netweaver 2004s
    884678 - System info shows older release than the deployed one
    558197 – Upgrade hangs in PARCONV_UPG
    632429 – The upgrade strategy for the add-on BI_CONT
    632429 - The upgrade strategy for the add-on FINBASIS
    570810 - The upgrade strategy for the add-on PI_BASIS
    632429 - The upgrade strategy for the add-on SEM-BW
    069455 - The upgrade strategy for the add-on ST-A/PI
    606041 - The upgrade strategy for the add-on ST-PI
    632429 - The upgrade strategy for the add-on WP-PI
    Post upgrade Steps :-
    1. Read the Post Installation Steps documented in BW Component Upgrade Guide
    2. Apply the following SAP OSS Notes
    47019 - BI_CONT 7.02: Installation and Upgrade
    558197 - upgrade hangs in PARCONV_UPG, XPRAS_UPG, SHADOW_IMPORT_UPG2
    836517 – Oracle Database 10g: Environment for SAP Upgrade
    3. Install the J2EE instance as Add-in to ABAP for BI 7.0 and apply the Support Patch that equivalent to ABAP Support Patch.
    4. Run SGEN to recompile programs.
    5. Install the Kernel Patch.
    6. Missing Variants - (also part of test script)
    look at the RSRVARIANT table in SE16. If it is empty, then you will definitely need to run RSR_VARIANT_XPRA
    program - RSR_VARINT_XPRA
    OSS -953346 and 960206 1003481
    7. Trouble Shootauthorizations
    820183 - New authorization concept in BI
    I think the above material is sufficient but in case you face any issues feel free to revert back
    Reward suiatble points

  • Role of a functional consultant in an upgrade project

    Hello friends,
    My client is planning for an upgrade of 4.7 to ECC 6.0.
    Could you pls give me some info regarding the Role of a functional consultant in an upgrade project.
    Naveen

    The role of a functional consultant in an Upgrade depends on the scope of the project.
    whether it is a Technical Upgrade or a Functional Upgrade.
    Following would be some of responsibilities -
    Coordinate with Client  Business/Functional Team to identify critical business processes, understand the functionality of the custom developments
    Overall Test Planning, Preparation of Test Plans, test scripts and executing Unit and Integration testing
    Providing clarifications for functional related issues during UAT
    It is is functional upgrade analyze which custom functionalities can be retired and which can be brought back to standard.
    Prepare a POC on the recommended new functionalities on how these would be useful for the Client.
    Training the Client super users
    Preparing training documents
    Analyzing the obsolete transacations and modifying the documents with the new transactions
    Hope this helps you.

  • Need information on upgrade project

    Hi all,
    Could anyone kindly let me know what are the information that i should know regarding an R/3 upgrade project?
    If anyone has got any document please forward it to
    [email protected]
    Awaiting replies.
    Thanks in advance.
    Best Regards,
    Ram.

    Hi,
    It contains links like service.sap.com/upgradenw2004s and
    https://service.sap.com/~form/sapnet?_SHORTKEY=01100035870000671159&, which is general info.
    Eddy
    PS.
    Put yourself on the SDN world map (http://sdn.idizaai.be/sdn_world/sdn_world.html) and earn 25 points.
    Spread the wor(l)d!

  • Going live check for SAP upgrade projects

    Hello,
    I am interested in "going live check" service and procedures for my upgrade projects. May I find any documentation? Do I have to pay for it?..
    Thanking you in advance and a happy new years!
    Kind regards
    Nilüfer Çalışkan

    Hi Nilufer,
    The following Input as follows :
    Source : http://www.thespot4sap.com/upgrade_guide_v2.pdf
    This service is included as part of your annual maintenance fee.
    The underlying concept of the SAP GoingLive Functional Upgrade Check is
    to ensure smooth operation of your mySAP.com solution by taking action
    proactively, before severe technical problems occur.
    The GoingLive Functional Upgrade Check is made up of three sessions
    (Planning, Analysis and Verification)—two sessions (Planning and Analysis)
    before the upgrade and the other (Verification) after the upgrade.
    Planning Session: This session should be performed as much in advance as
    possible when the upgrade is first being considered.
    Analyses compatibility for the target release with regards to connected
    systems in the Solution Landscape, OS version, DB version, installed Add-
    Ons, Plug-ins, Country Versions, and so on.
    Analysis Session: It is generally performed two months before the
    production upgrade (consider lead time for hardware procurement).
      The focus is on resource planning and system configuration.
      There is a high-level hardware plausibility check (this is not a hardware
    sizing exercise).
      Potential resource bottlenecks are identified.
      Necessary changes will be recommended to prepare the system for the
    productive use of the new release.
    38 SAP Upgrade Guide | Simplifying Your Upgrade
    Verification Session: Generally performed four to six weeks after the
    production upgrade, and the recommendation from the analysis session
    implemented.
      Comparison of performance with results prior to upgrade
      Recommendations on configuration and optimization
    More information and ordering . For more information, see the GoingLive
    Functional Upgrade Check web page at:
    <b>http://service.sap.com/goinglive-fu</b>
    To order a GoingLive Functional Upgrade Check, contact SAP Customer Care
    Center at least eight weeks prior to the planned upgrade of your production
    system.
    For customers of value-added resellers (VARs) such as CBS customers in the
    US, special conditions apply. Contact your VAR.
    Remote Upgrade Service
    Remote Upgrade Service is a technical upgrade that is performed by SAP
    remote consultants. Pricing is based on the complexity of the customer’s
    environment.
    SAP performs the technical upgrade of your system, allowing you to focus on
    the functional and training side of the upgrade. You are still responsible for
    resolving object conflicts.
    See SAP Notes 106447 and 84044.
    The Remote Upgrade Service is an attractive option for CBS sized customers
    with small or non-existent mySAP Technology group.
    For more information see the Remote Upgrade Service web page at:
    http://service.sap.com/remoteupgrade
    Resources
    The following list shows some of the resources you can use as you prepare for
    your upgrade of SAP. These resources include:
      Your installation partner
      Customers and others you have networked with at customer functions and
    conferences such as:
    • ASUG
    Hope this Info helps you.
    <i>Advanced New Year wishes.</i>
    Br,
    Sri
    Award points for helpful answers

  • New Development project  in the middle of  ECC EHP7 upgrade project

    Hi All,
    We are performing ECC EHP7 upgrade project in our project system landscape and i have already started Dev system upgrade.Suddenly our development team wants to perform new project  which required to install add-on product from third party application. Installing new add-on will require us to regenerate stack.xml file right? if that is the case  do we need to perform re upgrade to Dev right?. As per my knowledge this is not recommended to perform parallel project with upgrade project.
    Is there any  best practice or recommended method to perform multiple projects with upgrade project at the same time.
    Thanks,
    Raghu

    Hi Raghu,
    First here i would like to suggest you & your development team i.e during an upgrade project dual maintenance is required as per SUM guide,as per SUM guide you need to maintain parallel systems to perform regular activities, for same you could refer SUM guides and follow the standard procedures.
    Installing new add-on will require us to regenerate stack.xml file right?
    Yes you need to regenerate the stack.xml file .
    if that is the case  do we need to perform re upgrade to Dev right?
    If you are under upgrade phase no need to perform re upgrade,required add on can be installed after completion of an upgrade as per availability for EHP7.
    Try to avoid perform multiple projects with upgrade project .
    Regards,
    Gaurav

  • 4.6 C to ECC 6.0 Upgrade Project Timeline Sheet in MPP format

    Dear all,
    We are now proposing our customer for the 4.6c to ECC 6.0 Upgrade.
    Our customer is currently in 4.6c/oracle 9i/HPUX 11 i. He wants to move to ECC 6.0.
    If you have the project timeline for the above Technical Upgrade, can you pl send it to me.
    If you don't have in MPP format atleast send me the Work Breakdown structure with timelines.
    I shall modity the same to our customer and submit
    Thanks & Regards
    Senthil
    [email protected]

    Preparation Phase* 6 days
    Kick Off Meeting 1 day
    Upgrade Project Procedures Preparation 1 day
    Prepare Upgrade Project Plan 1 day
    Technical Requirements Assessment 3 days
    Assess Training needs of Key-users & End-users 1 day
    Prepare Detailed Basis Activity List for DEV, QA & PRD 1 day
    Business Blueprint Phase 6 days
    Develop System Landscape Upgrade Plan 1 day
    Functional Requirement Checklist 1 day
    ABAP Development check list 1 day
    Develop detailed Training Procedures & Documentation for Key Users & End Users 1 day
    Identify Testing Scope & Scenarios 1 day
    Identify Authorizations Conversion to Roles for SAP ECC 6.0 2 days
    Develop Documents as per Basis Activity List 1 day
    Develop Authorization Matrix for Activity Groups to Roles Conversion 2 days
    Prepare Upgrade Deliverables Checklist 1 day
    Realization Phase 28 days
    Installation of Solution Manager 3.2 System 1 day
    Creation of New Development System for Upgrade Project (Homogenous System Copy - PRD) 2 days
    Upgrade to AIX & Oracle 10g, SAP ECC 6.0 on New Development Server 3 days
    Upgrade Frontend Software 4 days
    Perform SPAU & SPDD Corrections 5 days
    Perform ABAP Development & Corrections 10 days Perform Authorizations Conversions and corrections after upgrade 8 days
    Perform Upgrade Testing for each Application Module 7 days
    Perform Unit & Integration Testing 6 days
    Perform Training to Key Users & End Users (Generic & Specific) 3 days
    Upgrade to AIX, Oracle 10g, SAP ECC 6.0 on Quality System 1 day
    Homogenous System Copy of PRD to New Quality & Upgrade to AIX, Oracle 10g & SAP ECC 6.0 2 days Perform Testing in Quality System 3 days
    Testing by end users on Quality System 1 day
    Production Realization & Go-Live Phase 6 days
    Upgrade to Production System Operating System to AIX (after close of business hours - 23:00) 1 day
    Oracle Upgrade to 10g (after close of business hours - 23:00) 1 day
    SAP Release Upgrade to ECC 6.0(Downtime Minimized - Downtime occurs in non-business hours) 2 days
    User Acceptance Testing 1 day
    Production System Go-Live 1 day
    Post Go-Live Support 14 days
    Post Go-Live Support 14 days Note: This is high level plan subject to change during Business Blue Print Phase 0 days
    This is taken from a post in Ittoolbox, May be this is generic. Hope you can tailor this to meet your requirements.

  • Text Determination Error in Upgrade Project

    Hi All,
    I am working on Upgrade Project from 4.6C to ECC 6
    I encountered the error like the Text Determination is missing in all the Documents like Sales Order, Delviery and Billing Documents in ECC6.
    But the same is appearing in 4.6 C.
    I am getting the error " Error in Text Formating ".
    Message No.VX201.
    Could you please give your valuable inputs on this.

    Hi,
    Check the settings again in 6.0. Follow the path IMG-sales and distBasic Func--Text Control. It may that while migrating the data certain tax type is found missing in the new system.
    Regards,
    Saurabh

  • Cutover Activities for Upgrade Project

    Experts
    What are the cutover support activities for the administration of the ECC 6.0 (SAP) upgrade project. Also please do let me know how to prepare cutover strategy , and how do we develp cutover plans.
    Regards,
    Mahesh

    Hi,
    Check this thread.
    CutOver activities in BI7.0 while doing  production upgrade BI7.0 FromBW3.x
    Regards.

  • Info on upgrading RAM and Hard Disk on late-2011 Macbook Pro

    Hello everyone,
    I would like some info from anyone regarding upgrading RAM on my macbook pro (13inch, late 2011 model) from 4GB to 8GB. Will the notebok support 8GB and if so, is it something that you can do yourself or should it be taken to an Apple store ?
    Also, my notebook currently has a 320GB hard-disk drive, that I would like to swap for a 320GB/480GB SSD. Again, which models are compatible with my notebook, and whether I can swap it out myself, or should I let an Apple technician at the store do it for me?
    Thanks and regards to all ..

    Yes. You can upgrade that machine to 8 GB. I have the same machine. I think you can do 16 GB but the RAM is quite a bit more money. You can do it yourself with a small enough screwdriver. I doubt the Apple Store would install 3rd party RAM and you don't want to pay Apple prices for it.
    A hard drive is about the same. Once you open the case, you can replace both. I suggest OWC. They have the tools, instructions, the RAM, the hard drives, etc. They even sell external enclosure kits so you can upgrade your internal drive and use the old drive an an external for archiving data.

Maybe you are looking for

  • How do I monitor and record a MIDI instrument on Garageband?

    I may be missing something simple in Garageband setup. I want to monitor and record a drumkit via its MIDI output. It is a Yamaha DTXplorer so I have Subtlesoft Midipipe installed and a Focusrite Saffire 6 USB converter. Microphones and guitars are b

  • Float/Untab Document Windows

    Is there any way to make it possible to float document windows properly, like you can for every other piece of the software? By that I mean not locked within the parent window of the app. This was the default for dreamweaver for the longest time, the

  • Unable to determine the number of SMSs generated by the message

    In JES5, I tested the SMS logging with two options; standard and xml. In both cases, I was unable to determine the number of SMSs generated by the message. However, such information can be found in the debug log; If i enable the debug logging, the de

  • Please help??  complete computerphobic!!  with java error message!

    Please help? I have installed the newest version of Java this morning and then did a restart. anyway, when i tried to log onto the online game "Runescape" I found it hard to do. I got the error: Java.lang.ArrayIndexOutOfBoundsException: 8 I have abso

  • Tecnical help: how to open an iTar

    Hi, I have several questions to ask about BiBeans,how can I open an iTar? I have access to metalink,but i can't find the related section... Thanxs Antonio