Integrate Cost Estimates( Code of Accounts) with Planning

HI friends,
Want to have your opinion..
Cost Estimation is done using <b>Code of Accounts</b> (COA). There is a separate development being carried out in SQL database for Cost estimation purpose, as we believe detailed Estimation is not possible in SAP PS. We want to integrate these COA with the WBS elements.
We can brought this estimation figure in PS only in summarized form. Say one cost element for one COA. Then we can do cost planning for the wbse by CJR2.
Is there any other way in which we can brought the estimated figures in the PS.
Is it advisable to have number of cost elements equal to COA.
Can the detailed estimated figures can be brought in SAP instead of in summarized form so that afterwards we can compare the actual values with the estimated figures.
Thanks

hai
U can do cost planning for entire project. U can do planning for the activities and at the WBS level. means when u plan at the activity level - the total cost will get summarized at the WBS level and project definition.
If cost planned at activity and WBS level - both cost will get summarized at WBS and Project definition level.
Assuming there r no activities - u can plan at WBS level. based on the actual posting u can compare Plan Vs Actual.
Enjoy SAP PS.
Regards
PP

Similar Messages

  • Using OM: Generate Cost of Goods Sold Account with RFFU1 (segment6)

    We have a new requirement to change our COGS account which is generated on sales order issues. Currently we use the COGS generator workflow to 1st derive the default COGS account ccid based on line type (OE_FLEX_COGS_PUB.GET_ORDER_TYPE_DERIVED), then we derive the "STORE" segment (from ccid generated from OE_FLEX_COGS_PUB.GET_SALESREP_REV_DERIVED).
    We now additionally have to use "item category", whose value will be stored in segment6 (RFFU1) of the Accounting Flexfield. Since this is a "future use" segment, I understandably don't see any function in OE_FLEX_COGS_PUB that would be able to do this. My question is, I believe I could write some custom functions that could assign the ccid based on the category (RFFU1) segment and add them to the workflow, but would that be considered a best practice? Is this something that businesses do ?
    Thanks for any information!
    Mike

    For 1):
    When a workflow is launched (create and start) from anywhere in the application a form or batch program, the workflow will continue to process all activities until it finds an error or it is explicitly defined to deferred the current activity. In that case the activity will be put in a workflow queue, so that later on the worfklow background process resumes such activity till the workflow is completed or again an error is hit or the activity is explicitly defined to be deferred.
    So basically when a worfklow is launched, it will process as much as it can till it is completed. The background process will progress a workflow when it did not complete in the original kick off; otherwise it is not needed to run the background process to complete a WF.
    Yes, the status monitor is a good tool to tell what stage a workflow process is at.
    For second question you might need to open a forum thread on the involved functional groups.

  • GL account in cost estimate

    Hi,
    For Standard cost estimate the GL account will be pick from Cost component strucutre OKTZ.
    We are fine here
    Can you please tell me how the sales order cost estimate will take GL and where it will store value.
    we are in MTO scenario and posting COGS to B/S while posting we are getting the error "CE doesnot exist".
    Can you pleaes help as this is very urgent.
    Thanks,
    Sudha

    hi..
    Please check if COGS is created as a cost element.
    regards,
    Ramesan

  • St.cost estimate in order

    hi sir,
    please tell my problem,
    i have estimated the material cost and released, closed the production order also.
    now i want cost estimate for same product with the same raw material no change in MOB,no change in price also. i want to make repeated cost estimate with slight difference in costing sheet or overhead rate or activity price.
    please tell how to make repeated cost estimate for production order.
    while doing so like i got error '' product cost estmate  is released ''
    i have taken new costing variant,but same costing type and valuation variant have been taken and i have tried also using transfer variant (pc01,pc01) with no transfer and with transfer also but i didn't get , same error showing
    1.i have taken cost type"01-st.prod.order plan( standard cost, legal view)
    2.006 valuation variant plan( plan price,moving price, st.price).
    TO UNDER STAND EASILY I HAVE GIVEN THIS LEANTHY,
    please tell me how to cost estimate repeated same product afer mark and release the variant.
    thank you
    sekhar

    Dear ,
    I think "CKR1 Reorganize of Cost estimate" will be useful for for you.
    Enter
    Comapny code
    Plant
    Material Number
    choose radio button :
    Current Std. cost estimate.
    GOPAN

  • Can't delete the cost estimate via CKR1

    Hi,
    We have one material. We can't delete the cost estimate via CKR1. It is only warning. It is no error log. The other material cost estimate can delete normally. I check the material master I can't find the issue. The following is the warning message. Could you pls help check it? Whate factor will effect the cost estimate deletion? Thanks.
    ==========================
    Deleting current standard cost estimates can cause inconsistencies
    Message no. CK 669
    Diagnosis
    u2022 If you delete a current standard cost estimate, the fields for
    the cost estimate are set to zero in the material master record. If you
    use the material ledger, the standard prices in the material ledger
    master data are also deleted when you delete the current standard cost
    estimate. The material master record for the material thus does no
    longer contains a current standard price from a standard cost estimate.
    u2022 If you delete an active standard cost estimate, you can no
    longer determine scrap, work in process and variations for previous
    periods.
    u2022 In certain countires, it is a legal requirement to maintain
    records of standard pricing. Therefore, you should check whether you
    are obliged by law to keep records of your standard cost estimates.
    Please also contact the relevant accounting and inventory management
    departments.
    ==========================
    Best Regards
    Park Han

    Hi,
    The deletion of Current standard cost estimate should be followed with some rules of the IFRS.
    If you want to change the standard cost you can do the change,If you want to delete the standard cost of material then it will set the price of material to zero.If the material ledger also activate then it will make the Moving average price & standard cost of the material to zero.
    So follow the Law of the country & Discus with Audit team &then delete the curent standard cost estimate of the material.
    Regards,
    Raj

  • Std. cost estimate

    Dear Experts,
    We have ROH, HALB & ZMAT as materials.  The question is with respect std. cost estimate.
    The cost estimate are run for HALB & ZMAT  items created  on day to day basis. However cost estimate is executed for all the  HALB & ZMAT on alternate months.
    I would lke to know the best practice or industry standard on this issue on the frequency of estimates. I appreciate any other points rellated to this point.
    Thanks in advance.
    T.S.Shankar

    hi read the following basics of CO-PC        
    1)A material cost estimate used to calculate the standard price in the 
    material master record.                                                                               
    2)The cost estimate must be executed with a costing variant that updates
    the material master, and the cost estimate must be released.                                                                               
    3)Forms the basis for profit planning or product costing where the focus 
    is on determining the variances.                                                                               
    4)Typicall, a standard cost estimate is created for each product at the  
    beginning of the fiscal year or new season or BEGINING OF THE PERIOD /  MONTH.                                                                               
    5)Standard cost estimates establish standard prices for semifinished     
    products and finished products. The costs calculated in standard cost  
    estimates are used to valuate materials with standard price control.   
    A costing type that calculates the cost of goods manufactured for a   
    product during the course of a planning period.                                                                               
    It differs from the standard cost estimate in that it uses the quantity
    structure that has changed during the planning period as the basis for
    calculating costs.   (  WHEN EVR YOUR PLANNING WILL BE CHANGED    )
    CURRENT COST ESTIMATE                                                                          
    1)A cost estimate that can be created at any time to valuate the current   
    quantity structure with the current prices.                                                                               
    This cost estimate serves the following purposes:                                                                               
    A)  You can compare its results with the results of the standard cost    
         estimate to support decision-making in production.                                                                               
    B)You can transfer the results of this cost estimate to the material   
         master and use them to valuate the goods receipt when working with   
         materials that use the moving average price.                         
    Regards
    Mala K Reddy

  • How SAP use transfer control or material cost estimate

    Hello!
    I have strategy "3-Previous standard cost estimate" in transfer control material cost estimate.
    I have cost estimate for product AAA with status KA and costing date from 01.01.2014.
    Product AAA produced from component BBB.
    Component BBB has two cost estimates with costing date from 01.01.2014 and 01.02.2014.
    I run cost estimate for product AAA with costing date from 06.03.2014.
    Cost estimate not use existing cost estimate for component and create new cost estimate.
    In help.sap.com contains next information about transfer strategy 3 - The system searches for existing previous cost estimate.
    why my system does not use the existing cost estimate for component?
    Thanks for attention.

    Thanks, Szymon!
    I use russian interface and read russian help. Where stragegy 3 has name "Прошедшая плановая калькуляция" which means "The last planned cost estimate".
    This led me astray.
    In english help i read next:
    Previous standard cost estimates
    The system searches for an existing previous standard cost estimate.
    You are completely right!
    two more questions:
    - We can not use strategy 3 if we not realesed cost estimate as standard price?
    - What strategy we should use for transfer material cost estimate with status KA?
    Thanks

  • Sales Order Cost Estimates -- Versions?

    In our MTS plant we are creating cost estimates each month with different version numbers so they can easily be compared to review cost changes.
    This concept in our MTO plant is (of course) a problem.
    We would like to create a dummy sales order and on each line list a KMAT and build an "average" configuration.  We use variant config, so the sales order bom is built automatically.  It also costs automatically.  We would like to save this cost estimate and compare it with a cost estimate of the same configuration next month.   I do not have an option for version CK51n, nor do I see a Costing Date in KEKO table.  Either of these items for MTS would create a second cost estimat and allow comparison.
    Is there a way to compare Sale Order Cost Estimates across periods?
    Any other suggestions as to how to obtain the required data??
    Thank you for all suggestions!!

    Any one think of a solution?
    thanks

  • Sales order cost estimate with GIT account

    Hi,
    Business introduced Goods - in - Transit (Balance sheet account), so PGI will always post to GIT and Invoice it will get reversed.
    For one of the Configuratble material (MTO) scenario we need the Sales order cost estimate to get the Planned cost.
    When i try to execute the sales order cost estimate it says cost element doesnot exist for GIT GL (WHich is right).
    But with maintaining the GIT how to achieve the sales order cost estimate.
    I tried to create CE category 90 for GIT, in Cost estimate am getting error CE 90 not supported for Cost estimate.
    Kindly help this is kind of urgent req for us
    Thanks,
    Sudha

    Hello Ashley
    Yes, if you have done your settings correctly, especially Requirements class set up  (see the documentation link),  then the cost estimate will flow to a condition type in Pricing, usually EK01/EK02 conditions. These conditions are used to calculate sales prices (PR00) in cost-plus (mark-up) scenarios.
    Link: http://help.sap.com/erp2005_ehp_04/helpdata/EN/90/ba6da4446711d189420000e829fbbd/frameset.htm
    However Profit margin  as calculated in a sales order comes from VPRS condition  (which is based in Material Master) and is the difference of net value and VPRS condition value in normal circumstance.
    Hope other more knowledgeable experts will weigh in.

  • Sales order cost estimate not happening because of GIT B/S account

    Hi,
    Requirement is to have Goods in Transit account in PGI and reverse it in Invoice no issues iwth it.
    For the same sales order user wants to get cost using sales order cost estimate.
    When i run that am getting following error
    Item 00001 : Cost element 14001212 does not exist in CO area 0010 for 10/07/2011
    Message no. KK689
    Even though i maintain the CE for Balance sheet account with Cost element category 90 its not accpeting.
    Can you please help me on how to proceed for sales order cost estimate.
    Thanks,
    sudha

    hi,
    if you give a balance sheet account in obyc , you will not be able to create a cost elementin category 01 , accordignly system will give error in sales order costing , as its not able to get correct cost element in cost planning.
    if your requirement is just to post  cogs to a balance sheet account which is goods in transit and when invoice is done cogs to be posted.
    you should actually use  revenue based RA functionality on sales order instead of assinging a balance sheet account in obyc.
    in this approach;
    - first assign a p/l account in obyc and create cost element in cateogry 01.
    - create revenue based RA and assign RA key in requirement class.
    - in OKG8 for RA category  WIPR and your ra key assign , goods in transit account and give a offsetting account which is not cost element (credit entry in offsetting account nullify debit in account given in OBYC when GIT is posted , when billing is done system will automatically post a oppsite entry in both account).
    -in OKG8 for RA category COSR give the COGS account and a offsetting account without cost element (credit entry in offsetting account nullify debit in account given in OBYC when COGS is posted).
    regards
    rajesh

  • Error in Cost Estimate through SAP t code CK11n

    Dear All,
    we are encountering a problem in the Production server with regards to the costing of the finished goods materials u201CFERTu201D, when cost estimate is ran through CK11N, the system pick up standard price maintianed in material master of Raw material.
    please note that we valuate our raw material on MAP and price control indicator V has been maintained for all raw materials
    our material are coming form our BOM and procurement type F has been maintained in MRP view
    We also want to share that before executing the cost estimate we updated moving average price through t code MR21 ( as at the time of GRN of these raw materails, moving average price was disturbed due to wrong per unit price entered in PO by one end user)
    we have throughly examined configuration for standard cost estimate of material with Qunatity structure.it is ok from all respect, if we execute costing run for same material in Developemnt server, cost estmate is executing accuratley by picking MAP price. the differnce of the step between dev and production server is to update prices through MR21
    Immediate reply is highly appreciated----please advice

    Dear Pradeep,
    in our case , strategy sequence in valuation variant is "Valuation price according to price control in material master " and then is "standard price"
    in accounting view of material master we have maintained price control indicator "v" i.e MAP
    i once again do inform that results of cost estimate is accurate if i execute in my Dev server i,e raw materials are being costed at MAP
    plz advcie

  • Can I find out, with user has deleted all cost estimates with CKR1?

    Hi Community,
    ich have a major problem: all our standard material don't have a cost estimate any more, because a unknown user has deleted all current cost estimates. Can I find out, with user has used the CKR1 transaction? And much more importend: how can I solve the problem? Do I need to re-calculate all the material?
    Thanks for any idea and help
    PoD

    Hi,
    you have to make the costing run, marking, releasing again but thats not the whole work.
    If there are PP-orders that have been created based on the old/deleted plan cost estimates, the variance calculation will not work as the plan cost estimate is missing (even if the new one is released in the same period).
    Thus variance calculation is not possible for those orders... You have to settle the whole balance to receiver object by removing the variance key in PP-order. Try first for one particualr order to see if there are some other problems that need to be solved during month-end-closing.
    How to find out who has executed CKR1 (SAPCKR1): Check authorizations for (hopefully) a small number of user who are allowed to use CKR1.
    Use T-Code ST03N, in the left upper window double-click "total" (maybe click a day if you can imagine which (possible) date it was). In lower left section open "user and settlement statistics" and then click "user profile". Now go to each possible user and look for T-Code CKR1.
    This can be time-consuming but its worth a try...
    For the future: restrict CKR1 to a very small number of user (and they should be well trained...). I once had a company (with poor authorization concept) but CKR1 was blocked in SM01 and a ZCKR1 was created and in this Z-transaction USER-name was checked (if SY-USNAM...) so only the use names named in this Z-program were allowed to use ZCKR1. Not the best way but sufficient for them...
    Good luck, Christian

  • Problem with rounding in standard cost estimate.

    Hi All,
    Happy 4th of July!
    I have a problem with the standard cost estimate where the system try to calculate overhead costs (from costing sheet) with a fix percentage (9.7%) to the value coming from material consumption costs element.
    Let say I have $1.71 material consumption and the overhead rate of 9.7%
    The real calculation should be (1.71*0.097) = $0.16587
    But at CK11N screen, it shows only $0.16 (two decimal rounding)
    Is there a way that I can bump the rounding to at least 3 decimal point to make it more accurate?
    Very appreciate any input you guys can share. Thank you.
    Charitha

    Hi Chari ,
    My experience says that you can use only 2 decimals ..
    Moreover , please have a look into SAP Note : 639410 - CK11N, CK13N: Message CK869 due to rounding
    differences.
    There a some source code corrections also on rounding differences- check if it helps you also...
    Regards
    Sarada

  • Issue with Standard Cost estimates / Material Ledger

    Background:
    We have been using SAP for the last 5 years with Material Ledger active. Due to a number of reasons, we have not revised its standard cost estimates from 2001 till now. This means that at month end, we do not mark and release prices as recommended, nor do we mark prices and use dynamic release.
    What Happened:
    A new material called PFSW3 was made. This is a FERT. Before production
    could start my team released the standard cost estimate for this material. Production was now able to proceed without problem. Then, when the time came to sell the material (VF02), SAP again raised the error 'cost estimate not found'. On checking the standard price in MM03, we discovered that the future cost estimate was missing. So we created and marked a new cost estimate in the middle of February 2007.
    Problem:
    When the first sale took place, SAP released the marked cost estimate and posted a Price Change document to adjust for the new standard cost. I understand this was due to dynamic release. Now, when month end came, the system settled all the production orders of material PFSW3 but did not do multi level costing on it.
    Internal Investigation:
    My team has determined that the material PFSW3 has price determination 2 set by mistake. All our other production materials (HALB and FERT) are
    set to price determination 3 in the material master (accounting view).
    Questions:
    To sum this situation up,
    we need to know why the material PFSW3 was not marked closed in its period status (CKM3) at the time of closing through CKMLCP?
    What are the implications of not closing this material in Feb 2007 (current period status is showing 'Quantities and values entered')?
    How can we close this material this month?
    The future cost estimate is again missing for PFSW3 in March 2007 and I
    fear we are going to face more problems as this material is sold to customers.
    Please respond this is an urgent issue.

    Dear Shumyl,
    Please, have a look at Note 645083 - Material period status set to "Closing Entry Completed" that might help to closing your material in previous period.
    Hope it will be useful.
    Regards,
    Flaviano.

  • Re: create material cost estimate with ck11n without

    hi gurus,
    i need to do create material cost estimate with ck11n without cost result but before i need to check the BOM with material component 11111, and also instruct me how to correct maintain BOM list to get the standard cost
    if anybody do the same scenoria giveme your golden inputs
    thanks in advance,
    kumar.b

    Hi,
    As note 351835 explains, calculation needs an inforecord to calculate prices from purchasing. Prices from outline agreements are generally not taken into account. According to note 499699, the system may consider entries in the source but it will ignore entered agreements (before this correction, any source list entries with agreement were ignored).
    Prices from agreements could only be considered either via a modification or by using the user exit for material valuation (COPCP005).
    This unfortuntely is a restriction resulting as a side-effect from note 499699. As soon as an agreement is entered in the source list, the fixed indicator will not be considered anymore.
    You therefore have two options to overcome this.
    1) You create a second source list entry without an agreement; then the fix indicator will be reflected; report Z_CREATE_EORD from note  409960 could be used to do this automatically
    2) You are using user-exit EXIT_SAPLMEQR_001 in order to 'overrule'   the standard search for source of supply (enhancement LMEQR001)
    regards
    Waman