Sales order cost estimate with GIT account

Hi,
Business introduced Goods - in - Transit (Balance sheet account), so PGI will always post to GIT and Invoice it will get reversed.
For one of the Configuratble material (MTO) scenario we need the Sales order cost estimate to get the Planned cost.
When i try to execute the sales order cost estimate it says cost element doesnot exist for GIT GL (WHich is right).
But with maintaining the GIT how to achieve the sales order cost estimate.
I tried to create CE category 90 for GIT, in Cost estimate am getting error CE 90 not supported for Cost estimate.
Kindly help this is kind of urgent req for us
Thanks,
Sudha

Hello Ashley
Yes, if you have done your settings correctly, especially Requirements class set up  (see the documentation link),  then the cost estimate will flow to a condition type in Pricing, usually EK01/EK02 conditions. These conditions are used to calculate sales prices (PR00) in cost-plus (mark-up) scenarios.
Link: http://help.sap.com/erp2005_ehp_04/helpdata/EN/90/ba6da4446711d189420000e829fbbd/frameset.htm
However Profit margin  as calculated in a sales order comes from VPRS condition  (which is based in Material Master) and is the difference of net value and VPRS condition value in normal circumstance.
Hope other more knowledgeable experts will weigh in.

Similar Messages

  • Sales Order cost estimate with variant config

    Hi
    I'm hoping for some advice on costing on a variant material.
    I have created a sales order for a variant material and ran a cost estimate to get costs for the sales order.  Should this populate a cost condition within the sales order pricing?  How can the margin be seen in the sales order?
    Thanks for your help.
    Ashley Shannon

    Hello Ashley
    Yes, if you have done your settings correctly, especially Requirements class set up  (see the documentation link),  then the cost estimate will flow to a condition type in Pricing, usually EK01/EK02 conditions. These conditions are used to calculate sales prices (PR00) in cost-plus (mark-up) scenarios.
    Link: http://help.sap.com/erp2005_ehp_04/helpdata/EN/90/ba6da4446711d189420000e829fbbd/frameset.htm
    However Profit margin  as calculated in a sales order comes from VPRS condition  (which is based in Material Master) and is the difference of net value and VPRS condition value in normal circumstance.
    Hope other more knowledgeable experts will weigh in.

  • Sales order cost estimate not happening because of GIT B/S account

    Hi,
    Requirement is to have Goods in Transit account in PGI and reverse it in Invoice no issues iwth it.
    For the same sales order user wants to get cost using sales order cost estimate.
    When i run that am getting following error
    Item 00001 : Cost element 14001212 does not exist in CO area 0010 for 10/07/2011
    Message no. KK689
    Even though i maintain the CE for Balance sheet account with Cost element category 90 its not accpeting.
    Can you please help me on how to proceed for sales order cost estimate.
    Thanks,
    sudha

    hi,
    if you give a balance sheet account in obyc , you will not be able to create a cost elementin category 01 , accordignly system will give error in sales order costing , as its not able to get correct cost element in cost planning.
    if your requirement is just to post  cogs to a balance sheet account which is goods in transit and when invoice is done cogs to be posted.
    you should actually use  revenue based RA functionality on sales order instead of assinging a balance sheet account in obyc.
    in this approach;
    - first assign a p/l account in obyc and create cost element in cateogry 01.
    - create revenue based RA and assign RA key in requirement class.
    - in OKG8 for RA category  WIPR and your ra key assign , goods in transit account and give a offsetting account which is not cost element (credit entry in offsetting account nullify debit in account given in OBYC when GIT is posted , when billing is done system will automatically post a oppsite entry in both account).
    -in OKG8 for RA category COSR give the COGS account and a offsetting account without cost element (credit entry in offsetting account nullify debit in account given in OBYC when COGS is posted).
    regards
    rajesh

  • Sales order cost estimate

    hi,
    While saving the sales order cost estimate its getting the GL account from GBB-ZG0.
    as we assigned Balance sheet account its asking the cost element.
    can you please explain what is link to get the gl from GBB-ZGO, can we change this to pick from GBB-VBR.
    Thanks,
    Sudha

    Hi,
    Are you are working with unvaluated special stock ?  In this case, the system is looking for a consumption account via the account assignment category. For example if you are using requirement class ZPJ which uses account assignment category Q. In account assignment Q, you entered account modification VBR. Therefore, the system is looking for an account via the keys GBB / VBR.
    regards
    Waman

  • User Exit or BADI on saving of Sales order cost estimate (CK51N)

    Hi,
    Can any one share with me what are the User Exit or BADI that gets triggered on saving of Sales order cost estimate (CK51N).
    Regards,
    Bijay

    Hi
    Check the link
    Need Enhancement Spot or BADI for transaction ck51n
    Regards
    Sanil

  • Sales Order Cost Estimates -- Versions?

    In our MTS plant we are creating cost estimates each month with different version numbers so they can easily be compared to review cost changes.
    This concept in our MTO plant is (of course) a problem.
    We would like to create a dummy sales order and on each line list a KMAT and build an "average" configuration.  We use variant config, so the sales order bom is built automatically.  It also costs automatically.  We would like to save this cost estimate and compare it with a cost estimate of the same configuration next month.   I do not have an option for version CK51n, nor do I see a Costing Date in KEKO table.  Either of these items for MTS would create a second cost estimat and allow comparison.
    Is there a way to compare Sale Order Cost Estimates across periods?
    Any other suggestions as to how to obtain the required data??
    Thank you for all suggestions!!

    Any one think of a solution?
    thanks

  • Sale Order Cost Estimate

    Hi,
    We have maintained Material BOM (usage 1) as well as Sale Order BOM (usage 5).
    When we run the Sales Order Cost estimate, which BOM would be picked for costing the sales order.

    Hi,
    The issue is not with respect to selection of the Sale order BOM or routing. System is correctly selecting the specific BOM and routing for costing.
    However, when we display the sale order cost estimate, when we navigate to the Qty Struc tab and double click on the sale order BOM or Routing Group, it does not take me to the specific Sale Order BOM.
    Please suggest.

  • Sales order cost estimate to be updated in Info Record (ME11)

    Hi,
    We have two plants: (a) Sales plant and (b) Manufacturing Plant.
    At sales plant, sales order (external) is created and for same external sales order we create another sales order (internal) at the manufacturing plant.
    At the manufacturing plant we have the option of doing sales order cost estimate (VA02/ CK51N).
    We want to update info record (ME11) at sales plant with sales order cost estiamte value at the manufacturing plant. How this is possible? please suggest.
    Regards,
    Bijay

    Hi
    Ask your SD guy which routine is used during the pricing.. You need to write ABAP code in the routine in order to fetch the values from the Sales Order cost estimate
    usually, the sales order cost estimate is stored in EK02 condition type... You can read the value from EK02 cond type in Mfg plant and update it in Sales plant
    br, Ajay M

  • Different versions in Sales order cost estimate

    Hi,
    Is it possible to calculate different versions of "sales orders cost estimate"?
    Greetings.

    Create another costing variant with a different valuation variant, while within valuation variant you can choose different things, among those is CO planning version for activity prices.

  • AFS grid value/valuation type not picked in sales order cost estimate

    Hi Experts,
    We have different valuation types in the material master. This is part of the AFS, where each grid value is a valuation type. While making a sales order cost estimate and in one sales order item, we have 3 grid values (valuation types), system is costing only for one grid value and that too for the entire quantity. This way the costing is wrong as different grid values have different BOMs and routings.
    Is there any specific setting to have the grid value to be picked up in the sales order cost estimate? Or am i missing some setting? in general product costing settings or AFS product costing settings?
    Best Regards
    Vimal

    Hi,
    Do you mean "sales order costing", please  if so then please ref. the link:
    http://help.sap.com/saphelp_46c/helpdata/en/90/ba6da4446711d189420000e829fbbd/content.htm
    Regards
    DSR
    Edited by: D.Srinivasa Rao on Nov 25, 2011 8:19 AM

  • WBS planned cost in Sales order cost estimate

    HI Experts,
    Can you please help me in below:
    Will it be possible to include WBS planned cost in Sales order cost estimate.
    ETO Scenario
    Creating Project and booking planned cost
    Creating Sales order and assigned the WBS at line item level
    WHen i do the sales order cost estimate it calculating cost from Sales order BOM includeing Chars value for KMAT.
    I want to know if there is any way to include the WBS planned cost also in the sale order cost estimate.
    Can anyonce please provide inputs.
    Thanks,
    Sudha

    Hi Sudha
    Are you saying the WBS Planned cost is in addition to the Sales Order cost estimate? Well, as far as I know, there is no such possibility
    you can use Unit Costing feature in Req Class instead of Quantity Structure Based Costing... Then you can enter whatever items you want
    br, Ajay M

  • CATS vs. Sales order cost estimate

    Hi Gurus,
    If I sent some hours to the sales order item thru CATS, can I have them in the sales order cost estimate?
    Thanks
    g

    Thanks.
    So the one way to have CATS hours in sales order cost estimate is somehow squeeze these hours into the sales order BOM, init?
    What is the best way to do? Plan it in the routing and put the actual hours thru CATS into the production order? Or some other way?
    Regards
    g

  • Sales order and linked with BSX account key?

    Respected Members,
      I am creationg a purchase order with account assignment category M.
    Suppose i have given material ABC and in material master of ABC i have maintain the valuation class 3000.
    Now in details of account assignment category i have given the account modification VKA and consumption V and special stock E.
    This VKA i have embedded in the GBB in the tcode OBYC and with the valuation class 3000 i have given the GL account
    400210 ie consumption account.
    Now this account is visible in purchase order as soon as i give the account assignment category and material.
    Now secondly when i am giving sales order no in then it is replacing the consumption gl account with inventory gl account.
    This inventory gl account is mentioned in the account key
    BSX with the same valuation class 3000.
    Now the doubt is that how from the sales order it is reaching to account key BSX .kindly explain me this background flow and settings.
    I have also brief knowledge about the Requirement type and the requirement class.
    Thanks a lot please give me the solution as soon as possible.
    Thanks a lot.

    Hi,
    Here is the explanation.
    Account determination of valuated sales order stock and project stock                                                               
    Note that for valuated sales order stock and project stock (special 
    stock E and Q) and for the transaction/event keys BSX and GBB, you  
    must maintain an account determination to avoid receiving warning   
    messages when entering data (purchase order or transfer posting) for
    valuated stock.                                                     
    During data entry, the system attempts to execute a provisional     
    account determination for GBB for valuated stock. The system will   
    only replace the provisional account determination for GBB with the 
    correct account determination for the stock account (BSX), in the   
    background, if you enter the data for valuated stock at a later     
    point in time.             
    Hence if there is an entry in BSX then system replaces the GBB with BSX.
    Thanks
    Krishna.

  • Automate Sales Order cost estimate

    Hi Experts,
    Can anyone please let me know about the automate sales order costing. We are suggesting to client pl follow the following method:
    1.Create Req class
    2.Create Req type
    3.Assign req type to class
    4.Define Cositng variant, costing ID etc., in req class through controlling.
    Otherthan this is there any alternative method to calculate automate sales order costing for MTO?
    Please suggest us and looking forward your valuable comments
    thanks
    vk

    hi,
    check this link
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/90/ba6794446711d189420000e829fbbd/frameset.htm
    Thanks,
    Rau

  • Sales order costing release not possible due to Goods in transti account

    Hi,
    Business introduced Goods - in - Transit (Balance sheet account), so PGI will always post to GIT and Invoice it will get reversed.
    For one of the Configuratble material (MTO) scenario we need the Sales order cost estimate to get the Planned cost.
    When i try to execute the sales order cost estimate it says cost element doesnot exist for GIT GL (WHich is right).
    But with maintaining the GIT how to achieve the sales order cost estimate.
    Can you please help me in this regards.
    Thanks,
    Sudha

    Hi Ajay,
    I have created GIT (B/S) account with CE category 90.
    but in sales order cost estimate getting message " inconsistancy in CE category" CE category 90 is not accetable it should be either 01/02
    can you please help to move forward on sales order cost estimate with GIT account
    Thanks,
    sudha

Maybe you are looking for

  • HT5622 Two Apple devices, how can I use FaceTime with one ID?

    I recently purchased a new IPad as I will be traveling. The reason for the new iPad was to be able to connect with my family through FaceTime. I have an Apple ID, can I use the same id on the new iPad and still connect through FaceTime? To me it soun

  • HD DVD Compatible?

    Hey, This might be an odd question. I was looking around the DVD Player prefs, and came up an HD option. Does this mean my Macbook can play HD DVD's? Thanks, Tom

  • SQL Server 2008 reporting services reports just went blank even though I can still download excel pdf etc....

    I'm quite stumped.  All of my reports are suddenly blank. I see the icons for the reports, and I can even download the PDF by exporting to Excel of PDF. Can someone help explain what may have happened to my instance and how to correct this?

  • ERASER AND PENCIL PREVIEWS STOPPED WORKING

    Hello.  I have been running Adobe CS6 Photoshop extended for about 18 months, and tonight, a problem occurred that I am not able to fix.  The eraser and pencil functions normally preview showing their diameter with an outline.  I was working away, an

  • WL service crashing

    We are using Peoplesoft 8.15 with Web Logic 5.1.0 Service pack 8 with Windows 2000 Service pack 1. We have just applied Service pack 2 and the web logic server closes down every few hours. This is what the weblogic logs says at the time it crashes. W