Integration between Training and Events and Attendances

Good morning,
It seems to be simple to automatically create a It2002 for an employee who has just finished a training course, only by doing the follow up of the course.
well, it does not work form me. I do the follow up, I fix the course, everything seems to work fine, but the IT2002 does not get created.
My config:
PLOGI-TIME = '1' -> I have also tried with 'X' but no difference
SEMIN-APART = 0420
Created an event type, event and booked an employee. I firmly booked the event and did the followup.
The IT2002 was not created. Is there anything else I need to do to automatically create this infotype?
Otherwise, how can I manually create all the pending ITs for all the courses that have been confirmed from a specific date?
PS: I am a very generous rewarder
Many thanks

hai
try with the following ..i have collected this from previous thread..
PLOGI-TIME = '1'
SEMIN-APART = 0420
Created Attendance Type, Quota, Deduction rules etc.
Configured a Business Event Type, Business Event and Booked a person against the same. I firmly booked the event and did the followup.
PLOGI PLOGI entry for the integration of Training and Event Management Entry variant
SEMIN-TIMEP entry to specify the minimum percentage attendance for the business event to create an attendance.
1001 relationships and the A025 relation between the E and the P has a percentage (PROZT) of 0%. Could it be the reason? If yes, how can I change this value to 100%
created entires in T779X and it worked

Similar Messages

  • How to make a Integration between jdev10.1.2 and vss

    How to make a Integration between jdev10.1.2 and vss to enable a version control.the help document tell to make a extension file, but how to do? thank you!

    http://www.oracle.com/technology/products/jdev/101/htdocs/partners/addins/905resources.html
    There is a link there to:
    Creating a Version Control System Extension
    A project with sample code to get you started

  • PI Integration between SAP NW MDM and APO

    Hi SDners,
    This is a Parts Master Data Solution for one of the Largest Auto Manufacturer where SAP MDM will be the central hub of all the Global and Local attributes of Parts . The subscribing system is SAP SCM APO  . Please advice if there is any possibility of direct integration between APO -MDM through PI. Does PI has the standard IDOC types to communicate with APO.
    Thanks,
    Prabuddha

    Hi Roy,
    Please search for standard content in SAP Market place. If you have standard content then you can download and install in PI. With standard you can directly use the master data mappings coming from MDM. If either in MDM or APO has any changes from standard then you can do the map accordingly.
    PI doesnot hold any idocs, whatever system here in your case APO what ever the master idocs, you can import the metadata and then do the mapping accordingly.
    Just for an example you can see on how to do this:
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/70c83ba5-5c86-2b10-2fbf-9135c4fc248f?quicklink=index&overridelayout=true
    Regards,
    ---Satish
    Edited by: Satish Reddy on Jul 19, 2011 4:35 PM

  • PI Integration between SAP ERP system and Cloud for Customer

    Hi,
    We have set up integration between Cloud for Customer tenant and our SAP ERP system via PI.
    For performing initial load, when we try to activate change pointers for Message types in the SALE transaction, we don't find the MATMAS_CFS and DEBMAS_CFS in the ERP system(IDES ECC 6.0 EhP6).
    CODERINT 600(SP1 &2) are installed and BC set COD_BYD_ERP_INT is activated in the system.
    Could anyone let us know what are we missing here, so that we can get the message types.
    Also we tried using Message type MATMAS for sending a message from ERP to Cloud for Customer. In PI message monitoring, the status shows as 'Processed successfully', however we do not find the message in Business Communication Monitoring in the Cloud system. neither do we see the Business Object created for that Material master.
    Please let me know how to debug such a scenario.
    Regards,
    Sangeeta

    Hi Vatsav,
    Yes the outbound works now with the following urls with channel id as param. With the 'BusinessSystem used as the sender(COD) business system ID. Thanks for your help and the document
    Customer Replication
    /XISOAPAdapter/MessageServlet?channel=:<business system>:COD_SOAP_BusinessPartnerReplication_Send
    Customer Address Replication
    /XISOAPAdapter/MessageServlet?channel=:<business system>:COD_SOAP_BusinessPartnerAddress_Send
    Customer Contact Replication
    /XISOAPAdapter/MessageServlet?channel=:<business system>:COD_SOAP_BusinessParterContact_Send
    Regards,
    Sangeeta

  • Integration between IBM Rational DOORS and Business Process Architect/ARIS

    I'm working with AMWAY in Ada, MI that is a big ORACLE shop....They have also invested in a Requirement Management tool, DOORS. They would like to have a bidirectional integration between DOORS and BPA to provide traceablity. Is there any integraton that exisits via Oracle, Oracle Partner, or ARIS/Software AG? They would like to not just have requirements trace to an entire model, instead to a piece(s) of the model. If nothing exists, who can I contact to see if that could be done for AMWAY via $.

    Yes, ARIS models can be passed to Solution Manager, and then from Solution Manager to BPM.
    Here is how we coonect ARIS to SolMan:
    We assume a project in SAP Solution Manager is created, which contains all SAP components to be used, maintained within the SolMan system landscape. Furthermore all settings in ARIS, are accurately done.
    The synchronization requires a new folder within the database. This synchronization folder should preferably be created in a seperate area of the database and should be named distinctly.
    The connection between the ARIS source database and the project in SAP will be established by importing the project into ARIS.
    The context menu of the newly created synchronization folder in ARIS contains a SAP entry (right mouse click). Select u2018Transfer project u2026u2019.
    Choose the SAP SolMan project, which was newly created within SAP Solution Manager.
    The Solution Manager instance which was preset in the ARIS options is pre-selected.
    Enter SAP Client, RFC-User, Password and Language to allow the system to log on the Solution Manager.
    The system offers the selection of project, which is available within Solution Manager.
    Select the SolMan project you want to use for your implementation.
    After confirmation with the button u2018oku2019, the download of the project starts and finishes after a short time.

  • Integration between primavera 8.1 and Ebiz-Oracle Project

    Hi all ,
    I need to integrate Primavera p6 v 8.1 with oracle E-busniess suite 12.1.2 is that possible ?
    Regards,,
    Mohamed

    Please see if these docs help.
    How to Integrate Primavera with Oracle Projects E-Business Suite? [ID 1091836.1]
    Oracle Project Portfolio Management Integration Pack for Primavera P6 and Oracle E-Business Suite 2.5 - Release Notes [ID 959567.1]
    Oracle Project Portfolio Management Integration Pack for Primavera P6 and Oracle E-Business Suite 2.5 - Implementation Guide [ID 956562.1]
    Thanks,
    Hussein

  • Integration between WLC WEb auth and NGS

    Im trying to integrate WLC and NGS and getting this error message:
    Preauthentication ACL needs to be configured/selected for external webauth to work.
    Where do I need to configure ACL?
    Thanks

    Hi Surendra,
    Thanks for the links.
    Even though im using the 5500 WLC I still need to add the ACL!
    Looking at the attachment , if I permit ANY source and dest, then I can connect to the internet, but it didint go through the login page and ask for the username and password, I could access the Internet without any authentication. If I set the rules as shown in the attachment, it get me to the logon page (which is good) but I could not logon, here's the radius log:
    rad_recv: Status-Server packet from host 127.0.0.1 port 43507, id=90, length=38
            Message-Authenticator = 0xf7233fc3f00a133f273b87e9c2359199
    Sending Access-Accept of id 90 to 127.0.0.1 port 43507
    Finished request 111.
    Cleaning up request 111 ID 90 with timestamp +5120
    Going to the next request
    Ready to process requests.
    rad_recv: Access-Request packet from host x.x.x.164 port 32770, id=65, length=169
            User-Name = ""
            CHAP-Challenge =
            CHAP-Password =
            Service-Type = Login-User
            NAS-IP-Address = x.x.x.164
            NAS-Port = 1
            NAS-Identifier = ""
            NAS-Port-Type = Wireless-802.11
            Airespace-Wlan-Id = 10
            Calling-Station-Id = "x.x.x.x"
            Called-Station-Id = "x.x.x.164"
            Message-Authenticator =
    +- entering group authorize {...}
    [radius-user-auth]      expand: %{User-Name} ->
    [radius-user-auth]      expand: %{User-Password} ->
    [radius-user-auth]      expand: %{NAS-IP-Address} -> x.x.x.164
    [radius-user-auth]      expand: %{Calling-Station-Id} ->
    Exec-Program output:
    Exec-Program: returned: 1
    ++[radius-user-auth] returns reject
    Delaying reject of request 112 for 1 seconds
    Going to the next request
    Waking up in 0.7 seconds.
    Sending delayed reject for request 112
    Sending Access-Reject of id 65 to x.x.x.164 port 32770
    Waking up in 4.9 seconds.
    Cleaning up request 112 ID 65 with timestamp +5144
    Ready to process requests.
    What is this message mean "++[radius-user-auth] returns reject"?
    Thanks for your time.

  • Imovie, i can't see my project files and events, and won't make new ones!?

    When opening imovie (11) i cant see eny off my events or project files and i cant make new ones or import files. But i still se my events and project if i go to User-Film-Imovie Projects/Events...!?
    Message was edited by: Seb K S

    I've been having problems along the lines of most of these people as I have been trying to move iMovie files from one computer to another. I then put them on a USB drive, only to find out that it wouldn't work, according to the documentation. We then bought another Firewire drive, and formatted it as forum notes indicated, HDF. It didn't work correctly for file transfer in FAT32. Then when the files were put on the new drive via command line file copying program called rsync.
    I still couldn't get it to sync up on the new drive, but they were there. The answer turned out to be a few things found in much older posts, so I thought I'd post them here in case it is helpful to others.
    I'm now using iMovie11, but some of these were written for 08.
    *1. The files have to be in the two directories, Events and Projects. These have to be at the *top level of the hard drive*. If they are at a lower level, iMovie won't find them*. I had put them in another folder called Movies, but it can't find them there.
    2. Throw out the preference file, if necessary, as noted in several of the online posts. I'm not sure if that mattered or not, but did it, as well as restarted iMovie and the newly added projects and events finally showed up.
    3. Copy files to the events or project folder while holding down the command key.
    It now looks like there is a little bit of an issue with the syncing of the project data and the movie, but so far, it seems to be o.k., other than that.

  • Moving project and events and continue to edit

    I'm working on a MBP, I have the project and events on that computers drive. I'm fast running out of space and therefore I would like to move project and events to external HDD and continue to work on project from the same computer MBP. What is the best method to achieve this?
    I know I can move the project and referenced events but will I be able to continue to work on the project unhindered.
    Thanks
    Jeff

    One more question, if I move another project that uses the same events folder, how would I go about that? Do I choose just move project? Or do I again choose move with referenced events? Would that duplicate the events folder?
    Thabks

  • General Info on integration between Project Systems (PS) and cProjects

    Hi,
    I would like some general info on the integration scenarios between PS and cProjects. Links to any documentation/blogs on this would also be very helpful.
    Thanks,
    Lashan

    Hi Srini,
    Thanks very much for the links. However, I've already gone through the standard documentation in SAP and they are a bit too high level/vague for me. I have considerable experience in xRPM, cProjects Suite and have good grasp of project management concepts, tool and techniques. My knowledge of PS is somewhat limited though.
    What I am specifically looking for is what type integration options and scenarios are available. For example, cProjects can have phases and tasks defined. How would these integrate with for example WBS elements and networks in PS? What are the things you would do in cProjects and not PS and vice versa? Hope my question is clearer now.
    Appreciate any further information you may have on the above.
    Thanks,
    Lashan

  • Integration between CRM 5.0 and ERP 5.0

    Hi all,
    i need to retreive data from a HR module of an ERP 5.0 and import them into a CRM 5.0
    How can i connect the 2 systems?
    And how can i make the import?
    Do you know the steps that i have to follow? there is a guide concerning this topic?
    thank you
    Dan

    Usually in this case you use IDOCs to get the integration done between ERP and CRM. However, you need identify what are the business process, and which IDOC's need to be used for the same.
    Here are couple of documents which will tell you what configuration needs to be done.
    http://www.sappro.com/downloads/OneClientDistribution.pdf
    http://www.sapgenie.com/sapgenie/docs/ale_scenario_development_procedure.doc
    Regards,
    Ravi
    Note : Please mark all the helpful answers

  • Integration between third party software and SAP

    Hi all,
    I have requirement in which i have to integrate SAP with third party software. My third party software will be generating material no as we generate in SAP then after the generation of the Material No by the third party software again i have to pull the material no generated and corresponding information into SAP .Please tell me how to do this as i am new to these concepts and if possible please send links from where i can download study materials.
    Thanks and Regards
    Manu.

    Hello Manvendra,
    There are many approches for solving this integration issue:
    But before solving this issue there are few questions which need to be known:
    1. In what form the material no list is generated? i.e. some flat file, in database table, or shared memory
    2. What is the language for 3rd party software? C, Java, .Net etc
    3. What is the frequency of material number generation? i.e. is it on demand, batch processing etc
    Considering 3rd party software is generating flat file or csv files for material number we can have this integration in
    following way:
    1. Save file at particular location.
    2. You can configure logical path in FILE transaction
    3. Write ABAP report to read that file using logical path and file name.
         Refer following link for Link: [logical path creation|http://help.sap.com/saphelp_nw04/helpdata/en/8d/3e4ec2462a11d189000000e8323d3a/content.htm]
    4. Read file into internal table using Link: [GUI_UPLOAD|http://saplab.blogspot.com/2007/10/sample-abap-program-to-upload-table.html].
    5. Create BDC recording for MM01 transaction for material creation using Link: [SHDB|http://abaplovers.blogspot.com/2008/02/recording-bdc-using-transaction-shdb.html] transaction code.
    6. Using data from internal table and BDC recording create all the materials in SAP systems.
        In this step you need to loop at internal table and fill data variables in BDC recording with the internal table data
        and call the transaction MM01 for creating material.
    Above steps are very high level guidelines and it is one way of integration but concept wise more or less integration will be in same way!
    You can definetly fine tune it by exploring SAP help!
    Enjoy SAP!
    Thanks,
    Augustin.

  • Integration between NW 7.02 and text analysis

    I intend to use business object text analysis with webdynpro abap application.
    would bobj integration kit would help me ?
    could you guide me to some documents.
    Thanks
    Anurag17

    No.  There were no major differences.  New features were developed and then backported in one step in order to keep the two codelines in sync.

  • Integration between SAP EP6 SP2 and Documentum WebTop Application

    Hi all,
    We are try to integrate de WebTop Application with the EP6 SP2 using SSO Ticket or using the User/Passward actually logged on EP6, but do not using the User Mapping
    Somebody have this experience?
    Thanks in advance.
    Talis Treichel

    Hi Talis Treichel,
    Have you found any solution to solve this? I am having a similar scenario in my project and I am using App Integrator for integrating Documentum Webtop
    via user id pwd mapping.
    But it is giving me an error saying java.lang.null pointer exception.
    I guess the parameters its not taking.
    Here are some details:
    Main Page: http://<server>:<port>/webtop/component/main?Reload=1137919145246&_dmfFrameId=Login_dialog
    This page contains user id and pwd.
    The view source of this page contains the below information:
    <form name=Login_0 action=/webtop/sdk/system/login/login.jsp method=post>
    <input type=text name=Login_username_0 id=LoginUsername> <input type=password name=Login_password_0 id=LoginPassword>
    Based on the above info I gave the following:
    URL Template: <System.protocol>://<System.server>:<System.port><System.uri>?<Authentication>
    URL template fraction for user mapping: Login_username_0=<MappedUser>&Login_password_0=<MappedPassword>
    Authentication method: POST
    Please help how can we solve the null pointer exception problem
    Regards
    Umamahesh

  • Integration between Lightroom 4.2 and PS Elements 11.0

    I am using Lightroom 4.2 and PS Elements 11.0. Clicking "Edit in" in LR  when I have selected at least two photos, I get as bottom menu item "Open as layers in Photoshop...". When selecting this item PS Elem. nicely starts up but after waiting for a while no layers are created. Same applies to the HDR and Panorama options. The only LR menu item working is the one moving to the PS Elem editor sec. After carrying out editing of the file(s) in PS Elem and saving (as) there is only the option to include the edited file in the PS Elem catalog (while the version set option is "greyed out"). In the normal Photoshop (CS versions) the edited file is nicely included in the LR catalog. I now have to follow a cumbersome route by importing the file from within LR. Another issue is when 16 bit files are loaded into Elements; there is no warning that layers can only be generated/worked on  in 8 bit mode.
    Yet another, small LR issue, is that when in library mode moving from the center thumbnail grid/pane to the left Navigator, etc and right Histogram, etc. panes, the cursor changes into a double headed arrow passing the separation line and but does not turn back into the cursor (mode). Only moving fast through the separation line or "going over the top" passing along the top menu items helps
    Obviously anyone with some suggestion as how to solve/circumvent the issues above?
    Message was edited by: doctorspek

    Photoshop Elements does not support layes with 16-bit files. Additionally, there is no HDR function in Photoshop Elements. You should be getting an error letting you know this is the case when you try from Lightroom.
    These menu options are designed to be used with Photoshop, not Photoshop Elements and would normally be greyed out. Have you had a version of Photoshop install previously? When looking at the Edit In menu, what does it say at the top? Does it say "Open in Adobe Photoshop Elements..."?
    Saving the file should automatically import it into Lightroom, even if you use the option to add it to the Elements Organizer as well.
    As for the cursor not changing back to normal after crossing over the panel dividing line (which allows you to grow or shrink the panels) is rather curious.
    All of these issues could be caused by corrupt settings files. Deleting these while the applications are closed will cause them to be recreated at next launch (with default settings). I would suggest doing this will all Adobe preferences (not just PSE and LR). Where they are stored depends on what OS you are working on.

Maybe you are looking for