Integration Directory (ID)  transport to Prod system

I am trying to move XI ID and IR to prod system thru file system transport. When I transport ID requests and activate it keeps complaining "Unable to move object. Change lists were not part of the same import"
I checked the ID there are no open requests in my id or others all have been closed.
I would also like to know if there is a way to completely transport the Integration Directory (ID) objects either scenario or service objects along with their change lists
Thanks
Subbu

hi,
<i>Change lists were not part of the same import"</i>
Make sure you have activated change lists open under ur id and check if any for other userid
<i> would also like to know if there is a way to completely transport the Integration Directory (ID) objects either scenario or service objects along with their change lists</i>
Once you have activated the changelists you can either transport the whole scenario(right click on scenario and export) or transport individual objects using the tools-> export option on the tool bar of ID.
Cheers,
naveen

Similar Messages

  • Problem in Integration Directory after transport

    Guys,
    we did a SLD transport (only LD objects), with DEV and PRD groups. It had some error messages because the SWCV's from the Dev XI were not created into PRD XI, but apparently, despite the errors, the products and SWCV's were created.
    After that, we've done IR and ID objects transports, through File System.
    Apparently, the IR part was OK.
    In the ID, it correctly changed the Business Systems from Dev Configuration to their respective transport targets. However, if we try to open any Adapter, it gives an error message:
    Attempt to access the 1 requested objects on 1 failed. Detailed information:  com.sap.aii.ib.core.roa.RoaObjectAccessException: Unable to read object Adapter Metadata SOAP | http://sap.com/xi/XI/System (b38bcd00-e471-11d7-afac-de420a1145a5) of type AdapterMetaData from application REPOSITORY on system REPOSITORY. Detailed information: Software component version with GUID b38bcd00-e471-11d7-afac-de420a1145a5 does not exist
    And if we try to create a new Adapter, when we go to select adapter type (SOAP, File, RFC etc) it says
    Search Result for All Component Versions
    No objects found!
    So, we can't select any adapter type.
    Has anyone had this error before?
    What did we do wrong in the transport?
    Was it the error from the SLD transport that caused this?
    Thanks in advance,
    Henrique.

    Hi Henrique,
    Go and import the SAP BASIS 6.4 or 7.0 Software COmponent Version into Integration Repository.
    For this tpz file you can get from -
    Copy XI3_0_SAP_BASIS_6.40_09_00.tpz from <Components DVD>/XI /XI_CONTENT to directory /usr/sap/<SAPSID>/SYS/global/xi/repository_server/import/
    cheers,
    Prashanth
    P.S Please mark helpful answers

  • How to remove Variable-Values prior to transporting to prod-system?

    Hi specialists,
    I've got the following problem:
    We've got a mixed BEx-client-environment with user using BEx 3.5 as well as BEx 7.x.
    So I create workbooks with BEx-Analyzer 3.5 and transport them from the developement-system to the production-system.
    The problem: Obviously the variable-selection that I used at last in the developement-system is saved in the workbook. So let's say I tested the query in the dev-system with "DE01" as value for the company_code on the variable screen, then this value is saved in the workbook and transported to the prod-system.
    In the production-system the value is not replaced anymore by the users permitted company-code values (the variable is based on the users permissions), but the user has to remove this "DE01" manually and has to enter all his personal company-codes manually - which makes the permission-bases-variable senseless.
    Even if I clear all variable-values in the developement system (which is not possible for mandatory variables) prior to saving the workbook, the issue is the same: This time empty fields are presented in the prod-system, but the permission-based-variable isn't set correctly - the field stays empty (=exactly as it was when I saved the workbook in the dev-system).
    So, how can I clear the variable-screen-values before I save and transport the workbook to the prod-system? The only way (and it is certainly not the recommended one) i found: If I cancel the query at once after having confirmed the variable-screen and save/transport that query, then the variables seem to be really empty and the permission-based variables in the prod-system work.

    So, when user run the report in production, they will have to remove # for mandatory variables and put thier value.
    Mh - most of our reports have variables for "company_code","sales_org" (for example).
    Normaly this fields are not mandatory but optional.
    But: Normaly if the user opens such a variable-screen (for the first time) the company_code and sales_org are preset according to the users permissions for this chars.
    If I follow your description, then the variable-screen would open with "#" or "" - but wouldn't be replaced by the user's permitted values anymore :/ - hence the phone rings because the users didn't manage to restrict the variables to their permitted values.
    Maybe this is a case for an oss-message for the area BW-BEX-ET-USAB Userability Frontend....

  • Best Practice: Migrating transports to Prod (system down etc.)

    Hi all
    This is more of a process and governance question as opposed to a ChaRM question.
    We use ChaRM to migrate transports to Production systems. For example, we have a Minor BAU Release (every 2 weeks), a Minor Initiative Release (every 4 weeks) and a Major Release (every 3 months).
    We realise that some of the major releases may require SAP to be taken offline. But what is SAP Best practice for ANY release into Production? i.e. for our Minor BAU Release we never shut down any Production systems, never stop batch jobs, never lock users etc.
    What does SAP recommend when migrating transports to Prod?
    Thanks
    Shaun

    Have you checked out the "Two Value Releases Per Year" whitepaper for SAP recommendations?  Section 6 is applicable.
    Lifetime Support by SAP &amp;raquo; Two Value Releases per Year
    The "real-world" answer is going to depend on how risk-adverse versus downtime adverse your company is.  I think most companies would choose to keep the systems running except when SAP forces an outage or there is a real risk of data corruption (some data conversions and data loads, for example).
    Specific to your minor BAU releases, it may be wise to make a process whereby anything that requires a production shutdown, stopped batch jobs, locked users, etc. needs to be in a different release type. But if you don't have the kind of control, your process will need to allow for these things to happen with those releases.
    Also, with regards to stopping batch jobs in the real world, you always need to balance the desire to take full advantage of the available systems versus the pain of managing the variations.  If your batch schedule is full, how are you going to make sure the critical jobs complete on time when you do need to take the system down?  If it isn't full, why do you need that time?  Can you make sure only non-critical batch jobs run during those times?  Do you have a good method of implementing an alternate batch schedule when need be?

  • Integration Directory Objects Transport Using the File System

    Hi
    I am trying to do the IR and ID Objects Transport Using the File system... I am able to Transport the IR Objects and IMport in to QA ... but when i try to Import ID objects its giving me the error...bcoz all the ID objects pointing to theSAP R/3 DEV system ( Interface Detremination, receiver determination ...)... do i have to config something in SLD ..so when i import the ID objects in to QA system it points to correct SAP R/3 QAS system...
    and we are using single SLD for all the DEV , QAS and PRD system
    SV
    Edited by: S V on Oct 15, 2008 4:08 AM

    Hi,
    You will have to configure transport targets like for different business systems in your dev environment, there shouls be corresponding Business systems in QUA environment. For more details refer the link
    http://help.sap.com/saphelp_nw2004s/helpdata/en/ef/a21e3e0987760be10000000a114084/frameset.htm
    Thanks!

  • No service for system X client Y in the integration directory

    Hi guys and gurus,
    I've struggling with the following case for a couple of months (!!) and still I can not make it. I have to say that I am coming from the MM modules but trying to set up a ICH demo by myself during my spare time.
    I send an idoc from R/3 to XI using program RSMIPROACT and I get message <b>No service for system SAPR3I, client 800 in Integration directory</b>. Even though, idoc has status 03 (Outbox).
    - I have created a technical and business system.
    - Connections work properly in SM59
    - Port XIDOCPORT with RFC XIDCLNT100 maintained txn WE21
    - Partner XIDCLNT100 (LS) with Outbound parameter:
      Idoc name - Port created. txn WE20.
    - IDX1 maintained in XI system.
    Is there something missing?
    This is my first post but points rewarded if somebody takes me out of this hole.
    Thanks,
    Ivan.
    key words: ICH, Note 940313 IDoc adapter: Error messages in SM58, <a href="https://service.sap.com/sap/support/notes/940313">Idoc Adapter : Error Messages in SM58</a>, No service for system SAPABC client 123 in the integration directory,

    Hi ,
    Create a technical system and bussienss system of type WEB AS ABAP and use this bussiness system for source system in XI and try it.
    Thanks & Regards,
    Sekhar

  • SLD Business system not appearinn in Integration Directory Configuration

    Hello,
    I have configured a business system in SLD(defined a Technical system,assigned it to a business system),but when i go to
    Integration directory and assign a business system without a partner,I am not able to see this business system.
    can any one please help.
    regards
    kaushik

    environment -> clear SLD cache

  • No service for system SAPNID, client 800 in Integration Directory

    Hi All,
    I am getting “No service for system SAPNID, client 800 in Integration Directory” in tRFC monitor (SM58).
    My scenario is IDOC to File.
    I did following step in R3.
    1.     Created RFC destination pointing to XI systems (name:XID)
    2.     Created IDOC port (name: SAPNID) and use above (XID) RFC in RFC destination.
    3.     Create Partner Type LI (Partner No. 3000) and add message type “ORDERS”, set the receiver port (SAPNID) created above.
    XI Side.
    1.     Create Technical System (Name : XID)
    2.     Business Systems (Name: R3XID)
    3.     In Integration Repository.
    •     Created Data Type
    •     Import IDOC “ORDERS.ORDERS04”
    •     Created Message Interface
    •     Created Message Type
    •     In Mapping Object created Message Mapping and Interface Mapping.
    4.     In Integration Directory
    •     Created the Scenario (name : “FILE_FROM_IDOC”)
    •     Assign Business Systems as “R3XID”
    •     Create communication channel(name: “FILE_ORDERS_COM_CHNL”)
    •     Create Receiver Determination
    •     Interface Determination
    •     Receiver Agreement.
    IDOC is triggered correctly but in tRFC monitor I am getting following error
    “No service for system SAPNID, client 800 in Integration Directory”
    With regards
    Sunil

    Hi Udo/Renjith and Rakesh,
    Thanks for quick reply and appreciate you help.
    Now I can say that there is some problem with my Technical Systems or Business Systems, let me give you details regarding my Technical/Business systems.
    During post-Installation i created Technical/Business System, following are the details regarding these systems.
    <u><b>Technical Systems.Detail</b></u>
    System Name:  XID 
    System Home:  crmides 
    Installation Number:  INITIAL Change...
    Release:  640 
    Description:   
    Administrative Contact:   
    TMS Domain:   
    TMS Transport Group Name: 
    Clients: 100 800  Add...
    Message Server: XID crmides  
    Central Application Server: crmides_XID_00  
    Secondary Application Servers:  Add...
    Internet Transaction Servers:  Add...
    Installed Products: SAP EXCHANGE INFRASTRUCTURE, SAP EXCHANGEINFRASTRUCTURE 3.0 XID
    SAP R/3, 4.5B XID on crmides
    SAP R/3, 4.6C XID on crmides
    Add...
    Installed Software Components 
    Business Systems:
    1. R3XID
    2. SAPNID
    Earlier I have only one Client (100) and One Busines Systems (R3XID)
    My XI Systems is “XID” Host : “crmides” Client : “100” System Number : “00”
    My R3 Systems is “NID” Host : “netbw” Client : “800” Systems Number : “02”
    <u><b>Business Systems Detail</b></u>
    Name:  R3XID 
    Description:   
    Administrative Contact:   
    Business System Role:  Integration ServerApplication System 
    Pipeline URL:http://crmides:8000/sap/xi/engine?type=entry   
    Integrated Business Systems:  SAPNID
    Group:   (No Group Assigned)Edit Groups... 
    Transport Targets:   
    Technical System:  XID on crmides Change...
    Client:  <b>100 of XID</b> 
    Logical System Name:  SAPNID 
    Installed Products:  SAP R/3, 4.5B XID on crmides
    SAP R/3, 4.6C XID on crmides
    SAP EXCHANGE INFRASTRUCTURE, SAP EXCHANGEINFRASTRUCTURE 3.0 XID
    Software Components:  ABC, 1.0 of knack
    R/3 CORE 4.5B
    SAP ABA 4.6C
    SAP ABA 640
    SAP APPL 4.6C
    SAP BASIC JAVA LIBS 6.30
    SAP BASIS 4.6C
    SAP BASIS 6.40
    SAP GUI FOR WINDOWS 4.5B
    SAP GUI FOR WINDOWS 4.6C
    SAP GUI FOR WINDOWS 6.20
    SAP HR 4.5B
    SAP HR 4.6C
    SAP ITS 4.6B
    SAP ITS 4.6C
    SAP J2EE ENGINE 6.30
    SAP J2EE ENGINE CORE 6.30
    SAP JAVA TECH SERVICES 6.30
    SAP JCO 6.30
    SAP SOFTW. DELIV. MANAGER 6.30
    XI ADAPTER FRAMEWORK 3.0
    XI CONNECTIVITY SE 3.0
    XI TOOLS 3.0
    During Post Installation I had one Technical Systems (XID) and one Business Systems (R3XID), after that I created one more Business Systems (SAPNID).
    <u><b>SAPNID Business Systems Detail</b></u>
    Name:  SAPNID 
    Description:   
    Administrative Contact:   
    Business System Role:  Application System 
    Related Integration Server:  R3XID 
    Group:  (No Group Assigned) 
    Transport Targets:   
    Technical System:  XID on crmides Change...
    Client:  <b>800 of XID</b> 
    Logical System Name:  SAPNID 
    Installed Products:  SAP R/3, 4.5B XID on crmides
    SAP R/3, 4.6C XID on crmides
    SAP EXCHANGE INFRASTRUCTURE, SAP EXCHANGEINFRASTRUCTURE 3.0 XID
    Software Components:  ABC, 1.0 of knack
    R/3 CORE 4.5B
    SAP ABA 4.6C
    SAP ABA 640
    SAP APPL 4.6C
    SAP BASIC JAVA LIBS 6.30
    SAP BASIS 4.6C
    SAP BASIS 6.40
    SAP GUI FOR WINDOWS 4.5B
    SAP GUI FOR WINDOWS 4.6C
    SAP GUI FOR WINDOWS 6.20
    SAP HR 4.5B
    SAP HR 4.6C
    SAP ITS 4.6B
    SAP ITS 4.6C
    SAP J2EE ENGINE 6.30
    SAP J2EE ENGINE CORE 6.30
    SAP JAVA TECH SERVICES 6.30
    SAP JCO 6.30
    SAP SOFTW. DELIV. MANAGER 6.30
    XI ADAPTER FRAMEWORK 3.0
    XI CONNECTIVITY SE 3.0
    XI TOOLS 3.0
    I do not know whether SAPNID is required or not, earlier I used R3XID as Business Systems at the time of configuration now I changed it to SAPNID. I am getting the same error in both the case.

  • Could not see Transport using CMS in Integration Directory

    Hi,
    I have Changed the Parameter setting to true in Integration Builder for Integration Directory and Integration Repository. When i login into Integration Directory i cannot see the option Transport using CMS in Export. I can only see Transport using File system.
    Please help me out in configuring the CMS correctly.
    Thanks,
    Fahad

    Hi Fahad,
    This thread answers ur question
    CMS Transport mode unavailable in Integration Directory
    cheers,
    Prashanth
    P.S Please mark helpful answers

  • Transporting Integration Directory objects between N and N+1 landscapes

    I have a question regarding the transport of Integration Directory objects.
    We are implementing N+1 PI 7.3 (java only) Development and QA systems. The N+1 PI systems are a copy of the Production Support (N) PI Development and QA systems. As part of the N+1 build we will also configure the business systems in the SLD for this landscape. Is it possible to transport objects from the "N" landscape into the "N+1" landscape? These changes would only be new objects that would not overwrite anything in N+1. For anything that is also being changed in N+1 we would perform manually. Is there anything special needed when setting up the business system in the SLD for this scenario?
    Thanks!

    Thanks Barry
    That menu option is available to me too but there is no option to use CTS+ in the pull down list. 
    I can't visit imageshack from work so I can't see your screenshot but I'd bet you have the option to export using "Open CTS+ Organizer" on the first menu too - I don't. 
    I've obviously got some config missing but, given I can transport ESR and SLD objects, I'm struggling to know what.
    Edited by: Murray Nicholas on Sep 3, 2010 12:39 PM

  • Refresh System Data in Integration Directory PI 7.11

    Hey,
    I have setup a new technical system and a business system in SLD, but now I still can't find it in Integration Directory.
    I knew from the later PI Version, that there was an option to transfer SLD data to integration directory, but now I can't find it
    anymore.
    Can anybody help?
    Thanks!
    Michael

    I have setup a new technical system and a business system in SLD, but now I still can't find it in Integration Directory.
    I knew from the later PI Version, that there was an option to transfer SLD data to integration directory, but now I can't find it
    Tools (or right-click in ID) --> Assign Business System --> follow the wizard...it will assign the business system from SLD to ID

  • Basis: No service for system , client  in Integration Directory??

    Hi All,
    IDocs from SAP QA are not being sent to PI QA. I see error in SM58 in SAP QA as: No service for system , client  in Integration Directory.  Please dont jump to asnwers by looking at above error. I could fix that, but thats not the real problem.
    Because I have checked
    1) SLD home page ---> Technical Landscape --> Select Web AS ABAP --> Select the technical system --> Clients ---> Click on the client used as Business system --> Here look for the logical system is defined (No Problem here, as logical systems is defined).
    2) ID---> Click on Objects --> Service Without party/Party > Double click on business system>On the tright side--> Service --> Adapter specific Identifiers ---> Check IDoc Adpater, Logical System (No Problem here as I see Logical System).
    But I can't find values R/3 System ID and Client under "IDoc Adapter and RFC Adapter". I think thats problem here, when I click on "Compare with SLD" in edit mode, values are not getting populated into R/3 System ID and Client. It makes think there is communication error from ID to SLD. How I do confirm if its the real problem?
    3) Checked Note 940313 - IDoc adapter: Error messages in SM58, No problem here
    4) Did SLDCHECK from PI QA, works fine, no problems here
    Both PI DEV and PI QA pointing to the same SLD. When I send IDocs from SAP QA to PI DEV, everything works fine. I can't send IDoc from SAP QA to PI DEV (changed RFC des to point to PI QA, it shouldn't be a problem).
    How do I find out if communication between PI QA - ID is workign fine with the SLD? Is there any other issue you can think of causing the above error?
    Thank You,
    Indrasena Janga

    *I have trobleshooted  a similar issue. In my case also the tRFC failed with the error "No service for system SAP, client 400 in Integration Directory".There were 11 IDOCS associated with this tRFC and when I saw control record of first IDOC,in sender information ,the sender partner number was wrong.Instead of "SAPSID",it was found as just "SAP".Where as the remaining ten were maintained with correct sender partner number.remaining ten IDOCS were dependant on first one.
    Thanks,
    Varada Reddy

  • Importing new business systems into Integration Directory PI 7.1

    Team SDN,
    Team We have presently upgraded to PI 7.1(inline upgrade XI 3.0 was the older version).  There are some changes like Import of software component version from SLD to ESR. intially we use to do in Xi 3.0 by selcting tools and import, but now we have to do different manner like going to ESR click on new and under work areas we have SCV. Do we have any new procedure fro importing business system into integration directory PI 7.1.
    Please share with members if wht are the new changes in PI 7.1 work proceses  like the one i mentioned above importing SCV(please don't start ESR and blah blah) any real issues wht we will encounter in termsof PI 7.1
    Thanks SDN.

    Hi Madhu,
    If you want to create a communication component for a business system from the System Landscape Directory (SLD), choose the Business System menu option.In the wizard, select a business system from the SLD and create a communication component for it in the Integration Directory.
    refer below link..
    http://help.sap.com/saphelp_nwpi71/helpdata/EN/3e/60653f0c9fa075e10000000a114084/content.htm
    Regards,
    Raj

  • Error while assigning Business Systems in Integration Directory

    Hi,
    I'm getting an error when trying to assign the business systems in the integration directory.
    The error i'm getting exactly is "access to object list of type BusinessSystem using the internalEOAService BusinesSystemAccessor failed " .
    I've cleared the SLD_cache and checked it but the same error.
    The business systems are appearing when i tried the transaction code SLD_CHECK and is in green status.
    what might be the error.

    Hey
    just want to make sure,are u using communication channel with party or without party.
    also make sure that user has sufficient authorizations
    http://help.sap.com/saphelp_nw04/helpdata/en/c4/51104159ecef23e10000000a155106/content.htm
    Thanx
    Ahmad
    Message was edited by:
            Ahmad

  • Business Service (vs) Business System in Integration Directory.

    Hi to all,
    I want to know the best practice for using Business Service and Business System, Then
    When we should go for Business Service instead of Business System in Integration directory? Can any one give me suggestion for me .
    Thanks,
    Vikram.C.

    Hi Vikram,
    >>Business System: It represent a specific application System in the SLD.
    Business Service: It represents an abstract service and are used in Cross    Company Process.
    >>When we should go for Business Service instead of Business System in Integration directory?
    Its purely used in the Cross Company Process, i.e. whenever you are communicating with external system.
    regards

Maybe you are looking for

  • How do I use a Java script in place of a standard link?

    Hi! I'm very new to html and totally unfamiliar with Java. Basically my html has a link like this: Mr Nobody and I didn't like how easy it was for spammers to harvest that email address from my website. I looked at this site http://www.bronze-age.com

  • I have stopped too many scripts in Firefox and I can't open any websites in Firefox anymore. I just get blank pages. What do I do now?

    3 websites gave me this message:- "A script on this page may be busy, or it may have stopped responding. You can stop the script now, or you can continue to see if the script will complete." I chose to stop the script each time. However I have stoppe

  • Want interview quesstions of apex

    hi friends can anyone help me out with possible interview questions of apex ....and i would also like to know whats the diffrance between J2EE and Oracle Apex thanks in advance rommy

  • How to assign Users to process roles?

    Hi All, I have designed a process and I have consolidated all the roles, when I intiate the process from the runtime workset it asks to assign users to these roles(I have consolidated all the roles to three mail roles). The problem that I am facing i

  • ./crsctl check status error...

    Hi, i have installed 10gR2 CRS(10.2.0.1).i am getting following error when issue the command root@rac1$./olsnodes -n rac1 1 rac2 2 root@rac1$./crsctl start crs Attempting to start CRS stack The CRS stack will be started shortly root@rac1$./crsctl che