Internal Order: Change Co Code and Controlling Area

Hi,
We have setup internal order -> <i><b>customised</b></i> order type, to store data regarding our projects. The setup involves choosing a Controlling Area which will inherit the Company Code (1:1 mapping between controlling area & co code) once we Create the Order (transaction KO01).
The field Company Code is greyed out and not maintainable.
There is no posting involved. Just for storing data related to the projects (cost centre is defined though).
A problem occurs when our client asked to change the company code field from A to B. I used transaction KO02 and tried to change it from "Environment" -> "Set CO area" but the change is not reflected later once I go into the Master Data screen.
Since the Company Code field is already greyed out in the Master Data screen, I also can't make changes there.
I tried changing the Screen layout (i.e. Order layout) of the field selection in IMG, but also not working.
Does anyone has any other ideas? Many thanks in advance.
Kind regards,
Nik

Since, you have one to one relationship between company code and controlling area, you will not be able to change the company code in order master.
If there are multiple company codes attached to same controlling area, then you need not enter company code in the order master. For this you will need to make company code as optional field in the field status for order type.This will facilitate posting from multiple company codes (attached to same controlling area) to the same order.
If company code is entered and some postings takes place then system will not allow you to change the data.
Regards
Rakesh Pawaskar

Similar Messages

  • Profit center assign in Copany code and controling Area

    where Profit center assign in Copany code and controling Area ?

    Hi,
    Company code, Controlling Area, Profit centre, Cost centres are created by FI/CO functionals.
    Pl. discuss with your FI/CO counterpart.
    My suggestion is that, don't create yourself, because it integrates to lot of other areas.
    Just for learning purpose, you can go to SPRO-Controlling-Profit centre accounting.
    Madhava

  • How to get new company code and controlling area in SRM

    Hi SDN,
    we are on SRM 5.0.
    Our finacial experts want to implement a new company code and controlling area.
    In SRM I can set up a new company code easily in ppoma_bbp and import a new plant from backend for the new company code.
    When testing in EBP I get the error: "company code xyz not available in controlling area zzz"
    So I need to import the new backend controlling area, too. How can I get the second controlling area in SRM?
    Thanx for help,
    matthias

    Hi Muthuraman Govi  and Sanjeev,
    in fact I can see in backend in transaction KS03 (show cost center) there in the F4s, which comp.code + controll area combinations are valid and have indeed cost centers assigned.
    So I have a new valid comp.code and a new valid cont.area.
    The new comp.code belongs to the new contr. area.
    In SRM I set the BUK attribute as described by Sanjeev (I had that already done). Still, if it is like you say, why do I get an error in EBP when trying to buy products from the new plant in the new company code...
    Is there any more config.work necessary in backend or SRM?
    kind regards, matthias

  • Determining Profit Center,ECC Co. Code and Controlling Area in CRM campaign

    Hi Experts,
    My requirement is to capture the Profict Centers, ECC Company Code and the controlling area in CRM Marketing Plans/campaigns. Is it possible? We need to this data to flow to ECC subsequently when we go further with the sales cycle, i.e. Leads, Opp, ECC Quotations, ECC Sales Orders etc.
    Can we use Sales Organization with CRM Marketing Plans/Campaigns to get these details therein? Please let me know what are the possible ways of doing that?
    Thanks alot in advance.
    Regards,
    Neeraj

    Hi - We have the same requirement.   We have PS in ERP.  We have run into a issue where the Profit Center and Company code are required, but on the Marketing Plan they are not there, we don't have key figure planning.
    Can you provide details on how to enable this via Key Figure Planning.
    Thanks,
    Manish

  • Issue in Assignment of company codes to controlling area  TKAO2 and OKKP

    Hello Gurus,
    I configured company code and controlling area in development client  and transport to Testing client.But in QA client I can see  in the Table TKA02 and respective assignment of company code to controlling area .But if I am checking in TCode OKKP and selecting Controlling area and checking the company codes assisgment there is no asssisgmnet. is this issue relating to transport as I am FICO consultant not geting solution.
    This issue pertain to only one  controlling area other controlling area with there company code assignment is correct.
    Thanks a lot
    Edited by: Manu Rathore on Apr 7, 2011 8:56 AM
    Edited by: Manu Rathore on Apr 7, 2011 8:58 AM

    Hello Balaji,
    But I transport everything through one transport request and I haven't maintain any sequence.can this issue  be due to mine non maintaining   of sequence in transport request or something else?
    if so How to solve it.
    Many Many Thanks
    Manu

  • How do I change the phone number attached to my Icloud? All the codes and stuff are being sent to my old number.

    How do I change the phone number attached to my Icloud? All the codes and stuff are being sent to my old number.

    Hello Babyygrl23,
    Welcome to the Apple Support Communities!
    It sounds like your iCloud Apple ID has a phone number associated with it that you would like to update. If this is the case, after signing in to the linked website below, you will see a section on the left side of the screen labeled Phone Numbers. You can edit the phone number associated with that account from there. 
    Apple - My Apple ID
    Cheers,
    Joe

  • Internal Order process config details and process flow

    Hi All,
    Please help me,
    I need process flow and configuration for assets to buy from vendors and store it and sell to our stores.
    how to config Internal order configuration step by step and post to Asset management. (Instead of normal sales for revenue account).
    Thanks and regards

    Dear Ravi,
    1. first create an internal order through KO01. That internal order type should be for investment purpose.
    2. Give the relevant detials and go to investment tab and give investment profile.
    3 Then in toolbar go to extras and select "asset under construction". An asset under construction would be created and give the details of this asset.
    4. Then release the internal order in KO02.
    5. Then go to GB60 and post a invoice with this internal order as account assignment object.
    6. GO to KO02 and in extras see the order balance. that amount would be reflected in the order.
    7. now go to KO88 and execute the internal order through which your internal order will be credited and AUC which you created would be debited.
    8. Now go to KO02 and see the order balance it would show 0 as it is moved to AUC.
    9. Now to go to settement rule and give the asset to which u want to transfer this amount and take the category as FXA and give the detials.
    9. now go to KO02 and change the status of internal order to "TECO complete".
    10 Now go to KO88 and execute the order and now the AUC is credited and your asset is debited.
    This is the exhaustive steps which i think wil solve your purpose.
    But make sure the configuration about the order type and investment profile are properly maintained.
    Thanks
    sap firdo

  • Automatic creation of Company Code and Sales Area Data for Customer Master

    Hi,
    We have a organisation structure setup with multiple company codes and sales areas.
    A customer will be created using VD01 via the Sales Order VA01. Because the customers are created using VD01 we need to automatically extend the customer for the various company codes and sales areas. The data on these views will be populated using reference customers.
    Any recommendations on the best approach (technically) to auto extend the customer master would be appreciated.
    I'm reluctant to use BDC's because of performance. We are in a Retail environment.
    Thanks in advance
    Craig

    The sample code has been taken from the SAP notes - in which have the affected as outlined in the example.
    The codes does not do what my requirements are, which is to identify the next available number in isolation of the BP type.

  • I am trying to find a function module or BAPI for internal order change. I

    I am trying to find a function module or BAPI for internal order change. I did come across a function module ALE_INTERNALORDER_DB_CHANGE which directly updates the internal order using insert statements. Can i use this for internal order change or this is any other Function module for updating the internal order.
    I dont want to use BDC as a option. Please suggest.

    This is possible using the Rotator Component Widget from Infosemantics.com.au but it is only compatible with  SWF output, not HTML5.
    Go to this page and scroll down to the video tutorials about the Rotator Component widget:
    http://www.infosemantics.com.au/adobe-captivate/youtube-video-tutorials

  • Assignment of Company Code to Controlling Area

    Hi All
    Please see if you can help me out.
    I am working on a Singapore project.
    I have 4 company codes say 2000,3000,4000,5000 which have been assigned to a company SGSS.
    Then I created a controlling area S001.
    I successfully assigned Company Codes to Company & Company Codes to Credit Control Area 5100.
    But when I try to assign my Company Codes to Controlling Area S001, the system throws a problem saying,u2019 Data in Company Code 2000 is not maintainedu2019.
    I have maintained all the data in Company Code 2000. But as per my knowledge we donu2019t maintain u2018currency, fiscal year variant, and chart of accountsu2019 in Company Code. All these fields are maintained in u2018Controlling Area S001u2019.
    __Data in company code 2000 is not maintained.__
    __Message no. KT294__
    __Diagnosis__
    __Assignment control requires that the currency, fiscal year variant, and chart of accounts are all maintained in the company code. At least one of these settings is not maintained in company code 2000.__
    __Procedure__
    __Complete data maintenance in company code 2000. Only then can you assign company code 2000 to controlling area SG01 possible.__
    Please see if anyone can bring some light on thisu2026..
    Thanks & Regards

    Hello,
    You need to fulfill two basic rules to assign two or more
    Company Codes under the same controlling Area:
    Operating Chart of Accounts shall be the same for all
         Company Codes.
    Fiscal Year Variant shall be same for all Company
         Codes.
           However, the fiscal year variant in the controlling area and the company codes
           can have different number of special periods. The number of posting periods
           must be the same.
    Please recheck that you have fulfilled these.
    Regards,
    Ravi

  • Difference in local currency and Controlling area curr in COEP/COSP table

    Hi,
    We had successfully done a depreciation run and the document got posted. However when I looked in COEP and COSS table, there was difference in the amount for local currency which is USD and the controlling area currency (USD). There is no exchange currency translation. Please guide me to fix this.
    Thank you
    DS.

    It would be better to understand if you can detail. Is your Company Code currency and Controlling Area currency same?
    If different, You need to activate "All Currencies" check box in your Controlling Area
    srikanth

  • Diff btwn Comany Code and Buiness Area

    Hi Frnds,
    Can anyone please let me know the clear difference btwn company code and business area and what are the advantages and disadvantages of these organizational units ?
    Under which cases we can go for having a company code and not business area?
    Expecting answer ASAP
    Thank you
    Regards,
    Sharon.

    This could help you....Picked it up from some documentation I had...Hope it helps
    A common requirement which seems to be of concern to some, is to be able to produce Financial Statements, specifically Balance Sheets by some entity other than the legal entity (I shall call this the SBU - Strategic Business Unit).  These SBU's are either below the legal entity or sometimes run across the legal entities.
    If this is a requirement on your project, the first step is not to take this 'stated' requirement entirely at face value.   Dig a little deeper - ask for examples of current reporting, use "what-ifs", to determine the real or practical requirement.  Sometimes it is not a full Balance Sheet that is required, especially if the SBU's are not fully autonomous, but more specifically the ability to report some Balance Type information by SBU in order.  For example to provide some ROI type reporting.
    If this is the case, the options are broader and implementation and use may be simpler.
    The options in SAP are to implement the SBU's as :
    SAP Business Areas
    SAP Company Codes, if they do not run across legal entities
    SAP Profit Centres
    These options are discussed below.  Note that requirements or impacts in other modules must also be considered and may influence this decision. Organisation Structure and Integration must be properly understood.
    1. SAP Business Areas
    The SAP Business Area is an FI organisational element which is intended to provide Financial Statements below or across company codes.  The standard GL, financial statement functionality and reporting all support this.
    However it is important  to understand how SAP implements this, because it is by no means the same as the company code.  The following points must be noted:
    SAP company code will always be in balance, all the time, document by document.   The SAP Business Area will not. IE: it is possible to post a DR to one Business Area and a CR to another, or to leave one line item with a blank business area.
    Business Area is not a mandatory field.  It is dangerous to attempt to force this.  It is not always possible for the system to determine the appropriate business area, it will then post a blank business area (unless you have 'forced' a substitution, which often just has the effect of replacing 'blank' with some other default).
    SAP 'rectifies' this out of balance situation by providing period end programs which 'clean up' and post adjusting journals or inter-business area journals depending on the situation.  See the documentation on these period end programs in the GL module.
    Reporting by Business Area is available during the month (albeit out of balance) and visible within GL accounts. Compare with Profit Centre implementation below.
    2. SAP Company Codes, if they do not run across legal entities
    This is potentially a dangerous route, because of the possible across the board impact on day to day operational transactions, not just in FI, but in other modules. 'Test' all scenarios. SAP intends the SAP company code to be implemented as the legal entity and thus there is fairly 'rigorous' functionality around the company code.  If you decide to implement SBU's as SAP company codes, you want to be sure that the majority and the key business transactions will be within one SBU.
    In order not to compromise legal entity reporting, you should only take this option if the SBU's are subsets of a single legal entity.  You can then use the standard multi- company summarisation reporting, or the consolidation functionality to provide your legal entity reporting.
    3. SAP Profit Centres
    This could be a good option if you do not require full/rigorous balance sheet by SBU, but are looking for some ROI type information.  Standard configuration exists to :
    flow revenues and expenses automatically through to Profit Centres.   (Expenses via cost centres, and revenues through a fairly complex 'assignment to profit centre' configuration logic) 
    transfer at period end balance sheet info such as payable, receivable, fixed assets, material stocks and work in process
    allow specification of additional Balance Sheet accounts to be transferred.   You must then ensure that a profit centre has been nominated on all the line items, or else a default profit centre will be used.  The issues with some accounts here will be the same as with attempting to force or identify a business area.  See above.
    Standard reporting is available to do ROI reporting, however this will of course only be available after the period end programs have been.

  • I got an iPhone 4 a week ago. I synced my iTunes once and now I want to change what albums and playlists are on my phone. When I try to do this, iTunes threatens to remove all my apps. Of course, Apple's support is no help.

    I got an iPhone 4 a week ago. I synced my iTunes once and now I want to change what albums and playlists are on my phone. When I try to do this, iTunes threatens to remove all my apps. Of course, Apple's support is no help. I know there has to be a way to add and remove whole albums and playlists like on the music tab on the device, so please don't tell me to uncheck/delete everything from my iTunes that I don't want and re-sync. That is not helpful and not the issue. How do I get around it threatening to remove all my apps?

    On the MacBook, go to System Preferences > Security & Privacy > Privacy > Advanced > Disable remote control

  • Different Company Code with same fiscal year variant and controlling area

    Hi
    I have three company codes in three three different countries: 1000 (ABC India), 2000 (ABC Inc, US), 3000 (ABC Dubai)
    But our consultants have assigned only one fiscal year variant V3 and one controlling area 1000 (with fiscal year variant v3)
    So what problem one may face because of above settings and what is ideal setting for such scenario
    Edited by: Meenu_ND on Oct 18, 2010 2:35 PM

    I have one leading ledger and two non leading ledger (i.e Group ledger and IFRS ledger). But Fiscal year variant is not mentioned for both the non leading ledgers.
    So i think it will take V3 only for non leading ledgers too.
    And in your solution, since India is main company, fiscal year variant for leading ledger needs to be V3 only.
    What if i keep non leading ledger as fiscal year from Jan to Dec. Then it will be:
    Leading Ledger: April to March
    Non leading ledger: Jan to Dec
    In above case, do i need to create separate controlling area ?
    Edited by: Meenu_ND on Oct 19, 2010 10:43 AM

  • Company code currency and controlling area currency

    Hello gurus,
          I have doubt can any body clarify me
    My company code currency is INR where as my controlling area currency is EUR. now my question is controlling gets all the data from functional modules like FI,MM,SD.. all the modules are maintained in INR ( Company code currency).
    but my controlling area is currency is EUR.
         Because of the above scenario what is impact
    Regardsm
    sankar

    Hello
    I have almost similar question...
    When executing a profit center report for a company code with another currency (SEK) than the Controlling Area currency (DKK) I get the figures in DKK. When executing a Cost Center report for the same area I get the figures in SEK because of 'Object currency' in RPC0.
    Will I not be able to get data in Profit Center reports in SEK without make a currency 'translation' where I have to choose an Exchange rate type and date?
    Thanks in advance
    Best Regards
    Søren Kirch
    LOGSTOR

Maybe you are looking for

  • How can I change my registered email address in itunes?

    I want to change my apple email address from a btinternet account to my @me.com account but it wont allow me to change it to a 'mobileme' account, why is this or how can I change it as I want to close down my btinternet accounts

  • After creating an apple ID it says it has to verify my email adress and will send an email with a verification link. I never get the email.

    I created an iapple id and it said it had to send me a verification email to verify my email adress. It said ....email sent please click on link. I did this several times and although it says email sent...i never get the email.

  • A Flex time success story

    I posted this in the Logic Express section but it's also related to Logic Pro so I wanted to make sure users of Logic Pro who may not check out the LE section hear about this success. I’ve run into some surprisingly great Flex results recently. I’m n

  • Exporting Quality??  64 or 192?

    64 is significantly much easier to deal with in uploading to iTunes and servers. The material is primarily voice. What's the STANDARD for podcasts (and for audio products). Is 192 necessary?? I have been downloading at both speeds and it's VERY annoy

  • Apps in dock

    there dont sat in the dock when add them....ever since i updated to lion this has been happening.....i gotta add the again and again after each restart...