Hello,
Anybody knows how is posible that the available of an internal order is negative? What´s more we have activate Availability Control.
Is it a system error?
Thank you very much in advance.
Patricia Guevara.

Hello,
Thank you very much ibn advance. I do´not require anything. We are in PSA and because of the year change we have observed that in 2008 my client has negative available in the internal orders (because of the goods receipts in 2008) and we do not know how because the budget is zero.
Because of that it´s available is negative, and we do not know how this have ocurred if the Availability Control is activate.
The normal situation is that when my client wants to receipt a purchase order the system issues an error because there is not budget in 2008 (It is yet zero).
Do you understand me?
Is it a system error? I think so.
Thank you very much in advance.

Similar Messages

  • Internal Order Budget - Availability Control

    I have done the budget profile, entered the budget figures, created internal order budget with the required profile.  However, when I entered the fi document with this statistical IO, system does not give any message as per the tolerance setting actions.  I tried to run the activate availability control again.  But the system gives a message that availability control is not activated.  Why this is happening ?  Where can I see the availability control is activated for this Internal order ?

    Hi
    1. Check if your order is released
    2. Check in budget profile (OKOB) if activation type is "1" and whether you have checked "overall" or not....
    3. Hope you have defined tolerance limits against the combination of contr area and budget profile
    Regards
    Ajay M

  • BP 613 error message in internal order budget availibility control

    I Define Tolerance Limits for Availability Control 50% has a react "2    Warning with MAIL to person responsible"
    but it  get a error message
    Item 001 Order 20000001 budget almost exhausted .It should be a warning but get error.
    Would someone help me?

    Hi
    Note down the message number.
    Go to T.code OBA5 input the Application Area first two letters of the message number and look for the message number (the other digits in the message number).Change it from E to W under online and Batch.
    Hope your issue should be resolved
    Good Luck
    Hari

  • Error while posting transaction to Internal order

    Hi
    We tried to make a transactions to the internal order, having available amount and we have posted the transaction less than the available amount yet received a yellow error message that the internal order budget almost exhausted. We checked the internal order budget it transaction KO22 and our prospective booking fit to the budget. But still we were unable to post because of the internal order budget. We could only solve to increase the budget with a bigger amount so we could reprocess the file.  Why is it always that the report shows budget is available but we are unable to post due to insufficient funds. Only on adding more funds we are able to post the transactions.
    Which is the correct report to view the budged is available and utilized.
    Regards
    Venkat

    S_ALR_87013019

  • Internal Order budgeting not checking at the time of FB60

    Dear All Experts,
    Very Good Morning !
    I have configured IO budgeting with Overall Planning ticked budget profile. I have assigned budger profile to Order type also.
    In KO23 I have given limit also of Rs.10,000 /- for overall and yearly 2011 Rs,5,000 /-. In define tolerance I have maintained two entries as below : 1 is with 01 Group wich will check PO's and 2nd one is 04 Group which will check Financial account document. ( I hope this correct, If not please rectify me ). In tolerance limit I have given 3 as a error should throw.
    I refer this thread [Internal Order Budget - Availability Control|Internal Order Budget - Availability Control; from our SDN forum. I activated budget control from KO23 and referring KO30 now system is showing GREEN Availability control is active.
    Now when I am running FB60 with assignment IO, system is not throwing any error, warning , it remains normal posting is happening.
    If anybody has gone through the same issue, experts inputs / guidance will be very helpfull.
    Regards,
    Revati Joshi.

    Your tolerance limits are fine
    Let me put you some points here.
    Creating IO
       1. Investment Profile is mandatory for Capital projects
       2. If you are using Investment management, then check IM32, & IM52
       3. KO02 - Check  - Investments tab - IM Program and Position ID assinged or not
       4. Need to assign the budget in both Controlling area currecny and object currency (KO12, & KO22)
       5. Availability control should be Active - KO30
       6. Planner plofile - KP04 - Just press F4 and check - if there are any created for your controlling area
       7. Check if you have any line itesm already posted to the IO - KOB1, KOB2, KOB3
    Now, the actual plan is - KPF6 and KDF6
    Here you need to input the below details
    Version                    0
    From Period               01
    To Period                      12
    Fiscal Year          2011
    Order                                           input the order
                      to
             or group
    Cost Element                              which Cost elemtn you are going to post in FB60
                      to
             or group
    Enter those details and in next screen - give the amount for that cost element.
    Now o and post in FB60
    Hope it helps
    Thanks

  • Authorization object for Internal order

    Hi experts,
    My requirement is while creating the PO using the internal order as reference  i need to check the internal order is valid for that user or not.
    Is there is any standard authorization object  for internal order is available using which i can validate the internal order by assigning this authorization object in the user role.

    Hello,
    When you try to create internal order and once you get the error.
    Open another session with /OSU53
    This gives you the details of authorization objects or transaction codes you are lacking.
    Provide this to security administrator of your team.
    Hope your problem will be solved.
    Regards,
    Ravi

  • Can we create a Budget & Availability Control for revenues with internal orders?

    Dear SAP Gurus,
    I have created an expense budget with the help of an internal order and have assigned the same to an expense GL (cost element). I have done all the necessary system settings and the system gives an error message when the F-02 document posting exceeds the budget.
    My query is, I want to replicate the the above for revenue postings. I have done the same system settings for revenue posting however the system does not give an error when the budget amount is exceeded.
    Can I please get some assistance with this requirement?
    Best Regards,
    Akshay

    Hi Akshay,
    System will not give the error in the case of Revenue GL. Because all the revenue GL will be hit for credit. It means it will update negative against the budget available. It means
    Current Budget-(-Revenue Budget)= Current Budget + Revenue Budget= Available Budget
    Because of this system will never give the error.
    Regards,
    Ankit Agarwal

  • Internal Order settlement "Acquisition value negative"

      Hello,
    Internal Orders Settlement Process (TRX KO8G) Received the message "Acquisition Value negative in area 01" for I/O # 850100 & 861650 when attempting to run the February 2014 Settlement.
    What went wrong? How can I resolve this issue?

    Hello,
    There are 2 ways to solve this issue.
    1. Check why there is a negative value posted on this asset? If the posting is correct, then
    or
    2. Allow the negative value posting in Asset master (AS02) ->Depreciation areas-> Double click on the depreciation areas -> Negative posting.
    I suggest you to not to check the option "All values allowed", because you may loose the flexibility of negative value posting.
    Hope this helps

  • Buget Availability check on PR for Internal Order

    Dear experts,
    Is there any configuration in SAP where we can check the PR Valuation price against the Budget availability in Internal Order?
    Thank you

    Dear YEN,
    We need to set up
    Define Tolerance Limits for Availability Control
    in Customization to keep a check in on the valuation amount in the Purchase Requisition/Purchase Order/etc...
    Controlling Area
    As maintained in your organization
    Profile
    As maintained in your organization
    Availability-control activity group as
    ++     All activity groups
    Availability control action
    1     Warning
    2     Warning with MAIL to person responsible
    3     Error message
    Usage in Percentage
    eg 80%
    90%
    Give points if above data was Helpful
    Thanks and regards,
    Vikat Verlekar

  • Budget Process (Linked the maintenance Order into Internal Order) in EAM

    Dear Experts,
    Scenario for Repair & Maintenance with only MM & FICO module live w.e.f. 2007 (PM not live)
    Process Managed thru Internal Order (Order Type: RPMT)
    Budget managed through Investment Management (IM); Budget is directly entered against the IO using transaction IM52
    Scenario for Repair & Maintenance with only MM, FICO & PM module live (PM went live in 2010)
    It was proposed to assign budget against each Maintenance Order.  Since the number of maintenance orders being used is very high, it was decided to link the MO & IO so that budget will be assigned to the IO and when the MO is settled against the IO, the budget in IO can be deducted accordingly. The proposed process to assign budget in Internal Order against each Maintenance Order are given below-:
    1.)     In EAM process one can plan/procure material and External Services only when the Maintenance Order is created & released but practically it has to be planned long before any Maintenance Activity (Maintenance Order to be linked with the estimate so that PO can be created against the estimate).
    2.)     The no. of Maintenance Order generated in EAM Module is very large as Maintenance order is created for almost each and every maintenance activity. It is cumbersome to allocate the budget to each and every maintenance order. There should be a single estimate for maintenance activity (as in MM module) and that should be linked to maintenance order so that the actual cost of Indent/Service Entry Sheet can be deducted automatically from the estimate (Maintenance Order is to be linked with estimate).
    3.)      While doing return Indent the cost of return material is not being added to the maintenance order automatically (Maintenance Order is to be linked with estimate).
    4.)      If Material & External Services not planned in the maintenance order (estimate), the user must be able to do that through Internal Order (estimate), hence the Internal Order must be link to the Maintenance Order. They should able to record the planned & actual cost in the maintenance Order.
    Process followed:
    1.) Created Internal Order in KO01 for Repair & Maintenance Order Type
         Assigned budget to Internal Order thru IM52
    2.) Created PM order and assigned Internal order against Settlement Order in tab  
         u2018Locationu2019 and in Settlement Rule with 100%. In this Section attach the Internal  
         Order with selection type u2018ORDu2019. 
    3.) Released both orders and issue the Material for particular Operation and then   
         determine the Cost for material .After that performed MIGO for consumption of
         materials.
    4.) Settled the PM order in KO88.
         Settlement process was successfully saved.
    Problem faced:
    After posting the goods movement (against each Maintenance Order) and settlement of the maintenance order against IO, we still find the budget assigned to the IO is not consumed/deducted.
    1. Actual cost of maintenance is not reflected in the internal order
        immediately. We have to run cost settlement (t-code KO88) for the
        maintenance order each time the actual cost is incurred in the maintenance order.
    2. Also in the case of return indent, the value of returned material is not directly 
        added to the available budget of internal order.
    3. When the material is issued from store through the reservation generated by 
        maintenance order, system does not check for budget in the internal  
        order/maintenance order while issuing material from the store.
    4.  It must not be allowed to create reservation from the internal order of order type
         RPMT.
    5.  In case of external service in the maintenance order, the unit of
         measure in the requisition is set to u201CD (days)u201D by default. System does not allow  
         changing the unit of measure in the requisition (it should allow to change the unit
         of measure or set the unit of measure u201CJOBu201D).
    6.) When the material is issued from  the store through reservation generated  in
         maintenance order, system does not check for budget in Internal Order  
         (estimate)/Maintenance Order while issuing material from store.
    Thanks & Regards
    Deepak Soni

    Hi,
    1. Actual cost of maintenance is not reflected in the internal order
    immediately. We have to run cost settlement (t-code KO88) for the
    maintenance order each time the actual cost is incurred in the maintenance order.
    As per the standard system budgeting is done against the actual cost only. And until you settle your order the actual cost from
    maint order are not getting transfered to IO. Once they are transfered system is checking for the budget.
    2. Also in the case of return indent, the value of returned material is not directly added to the available budget of internal order.
    This is similar to first point, when you return goods there will be negative cost on the order, this has to be settled until that system will not compare the IO budget with maintenance order actual cost.
    3. When the material is issued from store through the reservation generated by maintenance order, system does not check for budget in the internal order/maintenance order while issuing material from the store.
    The budget you have assigned is at IO, how can system will check the budget while issueing goods for maintenance order. We may have to develop or use some user exit over here. Which will trigger checking of budget from the settlement receiver IO for that maintenance order.
    I think you may have to go for development. These are my observations from my experience.
    Regards,
    NNR

  • Internal Order Budget Issue

    Hello,
    I have one of the scenerio related to Internal order
    My Budget is planned in KO22 as follows.
    2012   1000 INR
    2013   1500 INR
    I created PR of Rs 1300 with delivery date as 15.01.2013. Hence after Pr creation the commitment will go and seat in year 2013.
    But if i did GR against same PR/PO in year 2012 then system should give error as per configeration that budget amount for 2012 is exceede.
    But instead of this i am able to do GR and avaiable amount in report shows negative amount.
    I have done all config related to this, and working fine for all other nornal scenerios. So is anyone have faced this problem. so please provide some solution for this.
    Reg,
    Harry

    Hi Harry
    As per standard system design goods receipts and service entries
    are not subject to availability control checks - see note 46209.
    You can overcome this restriction, however, by means of a user exit
    as described in note 696362.
    br, Guido

  • Internal Order not allowing to decrease budget amount

    Dear Experts
    We have to close Internal Order no. 800001526 but system is not allowing to decrease budget amount from Rs. 2606000
    Regards
    Ajeesh

    Hi Ajeesh,
    I happen to go with Manikumar, because in the recent post we see either actuals/commitments Zero only, but when we see at your first screen, there we see total value (either actual/commitment) as 5212000, which is double of your budget i.e. 2606000, that's why there it is giving negative budget value of -2606000 (i.e. 2606000-5212000) which implies your budget has exhausted.
    So when you post with 5212000, system hasn't stop you as you might have not had availability control or had tolerance limit for more than 200%.
    Please if at all it is testing server, why don't you create one more order and check?
    Regards...
    Jose

  • PS Budget Report S_ALR_87013558 shows negative available amount

    Hi ,
    We activated Availability control in our Project System. We created a project, WBS elements, network activities. Then setup the budget (WBS level) then release the budget. Purchase requisitions were made to PO items, some were receipted and some are still in Commitment. We also added the cost for Travel and Accomodation but haven't posted any actual cost for these network activities. Then when I generated S_ALR_87013558 the budget available amount shows a negative balance.
    I already run CJEN to reconstruct the table, CJBN to recontruct the availability control balance but it still generating the same negative available balance.
    We setup our tolerance limit to raise an error once the budget reached 100% but in this case it should already been triggered before reaching zero but it didn't happen.
    Any solution for the problem is greatly appreciated.
    From this going forward any cost that need to be added to the project triggers the error message BUDGET EXCEEDED! it supposed to been triggered before the negative available amount on the report was reached.
    The report show that I have an amount presented on the following columns:
    ACTUAL
    COMMITMENT
    REMORDPLAN
    ASSIGNED
    I already checked the individual network activities to checked if the balance showed in the RemOrdPlan is correct using the formula REMORDPLN = MAX(0, PLAN - (Actual+Commitment)) and it is consistent with the amount presented in the report.
    thanks
    sunil

    Hi,
    Some ideas :
    1st. Try to check the history when the AVAC activated. It could be AVAC activated after PR/PO created.
    2nd. Try run cj31. Compare the value there with the report S_alr_**** . If the value is not match , you should apply some notes. It could be your AVAC not working properly.
    3rd. In order to prevent any futher issue for another project. Try to CJBW, CJEN and CJBN, for all projects (one time only). Put some budget on it. Next step do background schedule (CJEN after that CJBN) let say for weekly for all projects.
    Hope can give you some ideas.
    Cheers,
    Nies

  • Including down payment made to vendor in the internal order

    Hi all
    My requirement is like this.
    We use IM and IO(Capex orders) for procuring and capitalising assets. We are able to assign all the costs of procuring assets (both APC and incidental expenses to the internal order). We use purchase orders and assign the internal order while raising purchase order.
    Sometimes we do make Down payments(advances) without raising purchase orders. My question is how to include this down payment made in the internal order. We cannot assign any internal order while making the down payment. But, can we include this down payment made to vendor in the internal order(commitment) while making down payment or after that.
    FYI:I came to know that there is some functionality in Controlling (Project systems) where we can assign the down payment made to the internal order after making payment.But, i do not know how to do that.
    Pls somebody reply me.
    Thank you very much in advance.
    Regards,
    Vishnu
    VST-IT.
    Pls somebody answer my query.

    The functionality is available in Controlling. I dont know about PS.
    I need to know how to do it.
    Regards
    vishnu
    Pls anybody suggest me on this issue.

  • Standard report for settled internal orders

    Hi All,
    Is there any standard report available in Asset for settled internal orders.
    We can able to see in S_ALR_87013019.  But all Internal orders are appearing.  I am not able to see settled orders.  How to identify those... (Like flag color difference should be required for settled and open).
    Thanx in advance.
    Regs,
    Bhaskar

    Hi All,
    Is there any standard report available in Asset for settled internal orders.
    We can able to see in S_ALR_87013019. But all Internal orders are appearing. I am not able to see settled orders. How to identify those... (Like flag color difference should be required for settled and open).
    Thanx in advance.
    Regs,
    Bhaskar

Maybe you are looking for

  • UCCX 9.0 outbound progressive dialer doesn't

    Using UCCX 9.0.2-10000 in the lab.  Attempting to set up demo for customer for next week. I have the outbound dialer set up, but it's not attempting to make a call (never hits the gateway).  In pulling the MIVR logs, I'm seeing something strange (see

  • MS Analysis Services and SAP BW

    Hello! I need to solve the following problem: The data for analysis is kept in MS Analysis Services. That data must be exported from it to BW. But the primary task is to create appropriate InfoCubes in BW. Can that Infocubes be created in BW automati

  • Safari crashes as soon as I touch address bar

    I am so aggravated right now. I have 3rd gen iPad. As soon as I got it out of the box and configured it, Safari crashes. It was all factory settings and no other apps were installed. So I contact support and they do an exchange. I got the new one tod

  • Parsing a File Name into A Timestamp and Applying it as Metadata

    Hello,<br /><br />I am working on a lo-fi photographic documentation project, and the camera I am using does not record EXIF information. The extent of the metadata it provides is in the naming convention which is in the format of "DD-MM-YY_HHMM.jpg"

  • Proper object oriented design for factory class

    I have a factory class (UserFactory) it is capable of creating two types of classes (Customer and Employee) that extend User. User is an abstract class. At present any class could create a Customer of an Employee. How do I restrict access to the cons