Investment Mangement:  Missing Years to Budget

Hi Everyone,
When entering into IM32 or IM52 to add budgets to a particular program for 2010, I'm getting an error message stating that "Annual budget 2007 less than distributed budget".  When choosing the "Period" drop down, 2007 does not appear at all to choose.  It begins at 2008 and ends in 2015.  We've definitely have budgets from 2007 and I know this by entering into IM32 and choosing the approval year as 2007 on the selection screen but that year is not a part of the 2010 approval year as an option.  Can anyone assist me on this one because it seems that I will always receive that error message until the year is added to the program.
Thanks for the help,
Pete

Hi Kealin and ALL!
That was the answer.  By chaning the PAST on the time frame, I was able to get back the year that stated there was an error.  Now my question is this:  We only have 1 Budget profile for all investment programs.  If 2006 and 2007 were supposed to drop off due to the time frame that was set in OIB1, why did I get an error stating that the budget was below the amount that should have been there?  Will I continually get this error every year?
Thanks!

Similar Messages

  • Creation of Budget using Last Years Actual budget

    Hi,
    1) Is it possible to create new budgets using copy function to copy last years' actual budget to create a new budget.
    2) Also copy budget from one fund center/commitment item to another fund center/commitment item
    If it is not the standard functionality then how this can be done.
    Regards,
    Jyoti

    Hi,
    You can copy budget via FMCYLOAD - Generate Budget Data activity. You can define reassignment strategy restricting it to CBV year-end process in FMYC, and thus, making available copying from one budget address to another.
    Regards,
    Eli

  • How to get missing year and months

    hi,
       I have to get count of each month of each year using SP
    the parameters are date range , it can be
    more than one year.
    the problem is, in database there is data for few months only , but user can enter a big date range.
    and i have show each month's count, if it does not exits then each month should show 0.
                 one approach was to get the count existing data for each year-month in a temp table, then loop through to insert missing year-month and finally select them.
                second approach was to create temp table of year-month which is passed from parameter, buy subtracting two dates. then use left join to get the above result.
    please suggest if there is any other way to accomplish the task?
    yours sincerely

    Can you show sample data + expected result?
    SELECT COUNT(*) ,MONTH(dt) m, YEAR(dt) y FROM tbl
    GROUP BY MONTH(dt), YEAR(dt)
    but , I am only guessing, moreover , if you are using SQL Server 2008 and onwards take a look at grouping sets fetaure
    SELECT custid, empid, YEAR(orderdate) AS orderyear, count(qty) AS qty
    FROM dbo.Orders
    GROUP BY GROUPING SETS
      ( custid          ),
      ( empid           ),
      ( YEAR(orderdate) )
    Best Regards,Uri Dimant SQL Server MVP,
    http://sqlblog.com/blogs/uri_dimant/
    MS SQL optimization: MS SQL Development and Optimization
    MS SQL Consulting:
    Large scale of database and data cleansing
    Remote DBA Services:
    Improves MS SQL Database Performance
    SQL Server Integration Services:
    Business Intelligence

  • Investment mgt:Error while distributing budgets using IM52 transaction code

    I am getting an error message"Availability control can not be activated for hierarchial projects" when I distribute budgets using IM52  transaction code in Investment management.
    Can you please tell me why and how to solve it?
    Edited by: aravind  reddy on Aug 19, 2008 4:34 PM

    I am getting an error message"Availability control can not be activated for hierarchial projects" when I distribute budgets using IM52  transaction code in Investment management.
    Can you please tell me why and how to solve it?
    Edited by: aravind  reddy on Aug 19, 2008 4:34 PM

  • GM - Multiple Budgets by Grant Year & FM - Budget by FY

    Hello,
    We are changing our business process and would like to have separate budgets per award year in GM. The scenario is as follows:
    - One grant with multiple cost objects (each cost object represents a different award year)
    - We need to budget, bill, and report in GM based on these budgets by cost object
    - We need to budget by fiscal year in FM
    Has anyone solved this problem for themselves, or can offer any suggestions?
    Nancy

    Hi Nancy, it seems that your scenario can be solved using time-slices. You can check the Time sppliting rules under GM Budgeting custimizing. And the Grant master data - Tab Budget Validity Periods.
    I hope this helps you.
    Regards
    César

  • Xfce4 : window manger missing a section???

    In the settings manager there is a button called 'window manger' when I click on that window manger button up pops a window that looks something like this...
    file:///usr/share/xfce4/doc/C/xfwm4.html#keyboard_shortcuts
    for anyone who has xfce4 installed with doc's
    The problem is, I do not have the bottom section on the right side. I have the windows shortcuts, but not the command shortcuts window. This is the one that matters, I do not care about the other one. How do I get this functionality??? Why was it removed??? It should be added back in.
    Last edited by jacko (2007-12-05 20:15:52)

    I just installed 'lineak' and got my keyboard functionality like I prefer it, so for now I will stick with this app. Thanks for pointing out that they re-arrange the settings, wish they would update the doc pages as well then.

  • Investment mangement

    Hi,
    Can u help ??
    I am unable to create the settlement rule and post any cost the investment project under Manage AUC checked.The error displayed is "You can not post to asset so & so in investment management"
    The asset class is 4001 AUC as investment measure
    thanks
    S.B.Kulkarni

    Hai Kulkarni
    Can u tell about the scenario?
    check ur settlement profile( Under Valid Receivers-Fixed asset is been set to Settlement rule required/optional. also check in the default values) and is the profile is been mapped to the project profile.
    regards
    Pratap

  • Missing year 1927 in calendar

    When I try to create a birthday date for a contact using the year wheel the year 1927 does not apear. I can set it by selecting the year 1926 and if I need the year 1926 I can set it by selecting 1925 and so on.
    But when I syncronize it to my Outlook it changes the date set on the iPhone one day before the initial date.
    Is this a bug on the iPhone?
    How can I fix it?

    Odd. 1927 is there when I set a birthday. All the years seem to be there (as they should) - I scrolled back to about the time of the Black Death, then, because my curiosity was piqued, I kept going. The list stops at 0001 (and there are two 0001 choices at that end of the wheel, so that's likely a bug, unless there's a hidden biblical agenda in there...).

  • Migrating from iphoto to photos - missing years of pictures

    Updated to Photos application yesterday.....   When I opened it, I noticed all photos from 2000 - 2010 were GONE!!!! The previews still showed in the Photos app, but the original master was not in the library any more so I could not export the photos or email them.
    Subsequently did a time machine reset, but since time capsule is only 1TB apparently overnight a new backup of my photo library had been done (50.000 pictures) and time machine was forced to purge the old library. So, the backup was useless.   By going back in time machine I also lost the previews that Photos had cached, so now literally thousands of photos are forever lost....
    Very, very, very disappointed.

    Creating a Photos library should not have damaged the iPhoto library. All those photos should still be in the iPhoto library (assuming managed files, the usual case). Launching iPhoto should work (after an initial warning) and show them all.
    Also, if backing up your photo library (either one) causes Time Machine to flush the previous version immediately or even overnight, your Time Machine volume is not large enough. The sizing guideline for the Time Machine volume (either a Time Capsule or a regular external drive) is usually quoted somewhere around three; that is, the Time Machine volume should be three times as large as the used space on the volume(s) being backed up at a normal level of update activity. A higher ratio allows more look-back at a given activity level or more activity with the same look-back period.

  • Budget effected for current year for changing a PO of last year

    Dear Controlling firends,
    I am a MM guy and facing the titled difficulty. The problem is ,suppose a Po had been created in last fiscal year and at that time budget for last year has been consumed as committed. But now when I am changing that particular PO ,even trying to reduce the PO Value than the original one ,it is observed that the revised value is being again showing as committed from this year, current budget. That means the system is treating this change in amount as a new PO of the current year. My FICO collegue is not able to figure out what is the wrong in such behaviour .
    Will some one look into it aand find the solution as it is badly required to be solved without which everything is being messed up.
    Anticipating immediate response from expert CO SDNers.
    Dhruba

    Are you on 11.1.1.x or 11.1.2.x?
    If in 11.1.1.x then you can add asymmetric columns,
    if you are on 11.1.2.x version then you can "add column" with specific members from dimensions, here is little more info:
    Setting Row and Column Layout
    Cheers..!!!
    Rahul S.

  • CJ36 -BP - 164 - Capital investment budget exists for & - update not allowe

    Hello Friends,
    We are trying to post supplements using CJ36 for a WBS,but the system giving the error message saying that
    " BP - 164 - Capital investment budget exists for & - update not allowed"
    Please give some idea on this.
    Thanks IN Advance
    Best Reagdrs
    Trupthi

    Hi,
    Even though CJ35 and CJ38 are both transactions to perform budget returns, it is important to know that they are working slightly different:
    a) via txn CJ38 you return money exactly for the WBS elements you indicate an amount for. So if you indicate 1 COP for
       WBS element XX alone, the return is only being carried out for this WBS element. Since this WBS element is
       not (directly) attached to an investment program position, this is not a problem.
    b) via txn CJ35, however, as per system design you return money for the WBS element you indicate  p l u s  for all WBS elements lying on the hierarchical path above, in order to guarantee that the budget remains consistent (= check error free).
       So by indicating 1 COP for WBS element XX, the system  also  tries to return the same amount from the overlying WBS element YYY.
    Since this WBS element, however, i s  attached to investment program position of investment program, the system blocks this posting because this program position forsees budget distribution and thus budgeting is allowed via budget distribution  o n l y  (txn IM52) -  see e.g. F1 help for indicator 'Budg.dist. ovrl' in the master of the investment program position.
    So basically you can say that txns CJ35 and CJ36 are not suitable for projects attached to investment program positions that forsee budget distribution. Please check your transaction IM52.
    Please check if this fits with your scenario.
    Best Regards,
    Vanessa.

  • Thumbnails building on launch, impermanent and missing several years

    When I open it, Aperture always wants to generate thumnails (70,000+, for a library of 190,000 referenced files).
    I'm working with a fresh install of 3.4, a new plist.
    If I let the thumbnails build until done, it apparently makes no difference the next time (after quitting and relaunching Aperture).  The same thing happens.
    Looking at the package contents, I see that although I have pictures in my referenced library going back to 2005, the Thumbnails folder shows folders beginning at 2008.  So several years of thumnails are evidently missing.  (That's probably around the time I switched from iPhoto to Aperture as my photo organizer and editor.  That might be a red herring, or is there something qualitatively different about those former-iPhoto Masters?)
    So how do I make a permanent set of thumnails for those missing years, so that I don't have to either wait a long time for the program-slowing activity to complete, or manually cancel the 70,000+ temporary rebuild every time I launch Aperture?
    Thanks for any advice.
    Patrick

    Leonie,
    Thank you again! 
    The 2008 thumbnail folder appears to include only the normal monthly activity, but inspect files numbers in each (using command-i to look at numbers of items in each folder, in each month) I do indeed find one day in 2008 that includes multiple-thousands of thumbnails.  I conclude that it must be the date I imported a huge iPhoto library. 
    That explains why I appear to have a thumbnail for each picture, going back to the first photo by date (2005), in spite of the (redundant) rebuild that wants to happen automatically with each launch of Aperture.
    I intend to do your recommendation:  to manually highlight all photos prior to 2008 and generate thumbnails.
    However, while waiting (expecting a long delay before I received an answer--I was wrong about that--thanks again!), I highlighted those same photos, and did a "reprocess from masters".  That will take me a long time.
    Then I will try the generate thumbnails.
    Then I will report back!
    Even on a blazing fast machine--MBP retina, with 750G flash drive, and Masters stored on 6TB raid via thunderbolt-eSata--these things take time!  And I'm mindful to try (to change) *one thing at a time* to see if it fixed the problem, so that I can benefit from (and share with others) a simple cause-and-effect confidence that I fixed a problem.
    FYI:  I have been stalled in my editing now for almost 48 hours.  Two days ago, my formerly reliable Aperture editing procedure began to freeze (spinning beach ball) while I tried so fairly routine edits on pictures.  I'm not sure the editing problem still exists, because I have allowed myself to become side-tracked by this rebuild issue, thinking I might solve my editing problem in the process.  However, the two might be completely unrelated.
    I'm still trying to figure out what I changed (if anything) that might have caused the spinning beach ball.  I can think of only one thing, and it has to do with previews--but I had better put that aside for now, until I can move ahead with this thumbnail issue (or just ignore it, if I can't fix it, as I was doing before the problem occurred, without apparently affecting the editing efficiency, prior to 48 hours ago).
    I have customers waiting patiently, but Aperture is stalling my ability to generate income.
    Were it not for this community--and particularly your help over the last 24 hours--I would be much more anxious!
    Cheers,
    Patrick

  • Report - Date wise Actual Expenditure, Committment, Available Budget

    Hi Experts,
    We have SAP PS in place. We are using the same for our Internal Investment Projects. We allocate budget as an " Overall " value & not for a specific " Period ".
    Our Management wants a report which should give an information as per details given below.
    Requirement - On a given date (Example 31.08.2010) system should able to give data on " Actual Overall Expenditure till the given date ", " Committment till the given date " & " Available Overall Budget till the given date ".
    In report S_ALR_87013558, sytem gives the above values only if Budget is allocated as " Year wise/Period wise" & not if allotted as an " Overall Values " to the project.
    Does any body has got an idea about any such report available in the system or do we need to develop this report?
    Thanks in anticipation.
    Warm Regards
    Ashok

    S_ALR_87013558 also gives Overall budget, all you have to do is scroll the horizontal bar and see each and every column or otherwise see the column display settings whether it has been selected or not.
    Also, S_ALR_87013558 report will not give details upto a specific date. It gives details upto current date(the date on which the reprot is executed)
    One more thing, Budget can be either overall or fiscal year wise. There is no period wise budget. 
    To my knowledge, only line items reports can be run for a specific date, but in all other Std. reports you can go to the details of period level not at date level. If at all you want a report at date level, then you will have to develop it,
    Edited by: Ahmed Rifaee on Sep 22, 2010 1:10 PM

  • We've updated computers at the radio station...now missing an 'important' FX feature query

    Good Morning fellow users,
    We've updated our computers at the 6 radio stations I work for...all 6 production rooms and studios (for those not using VoxPro, myself included:)) to newer, core 'i' machines from the old school Pentium 4s we had which were on their last let (yet ran Audition 3.X) just fine. The newer machines are nice. They're signifcantly quicker chewing through mp3s, conversion betweeen and to different formats...but obviously, it's older softare that isn't able to take advantage of 64Bit or Multiple cores...so other than having a more reliable, speedier version...until we can convince the 'suits' to be that we need to bump up to the latest version, we'll be using said 3.X
    That said, one of the main features we've been unable to figure out how to get back to our defaut 'edit' screen is the little volume knob that pops up while a segment of the audio is selected. IE, you've clicked and dragged a portion of the existing audio in the edit screen to 'turn it white'. In the little area above selected audio file, in the 'white/selected' area....we (used to) have a small volume icon that allowed for automatic amplifcation with a simple click and drag of the mouse (either right or left for volume 'up or down'). It looks as though the engineer did re-image each machine with the corporate Audition disc---however, it's showing as Audition 3.0 in the "About Audition" tab under Help. Isn't or wasn't there an updated to at least 3.1 or 3.01?  Just wanted to double check as I run the 'new' Audition on my Macs for my home business--and I'm really enjoying it:)  However...3.X, IMHO is one of, if not THE Best Wave editor...for it's time, in the History of Wave/Simple editing and production on the run. Since the Syntrillium/Cool Edit days, I've used it (since transitioning from SAW in the mid 90's).  So it's been a bit tough to get acquainted with my Mac version....I just don't see the update happening in 'corporate' radio for some time. It took a whole lotta time, effort, and bureaucratic BS just to get the new hardware. We'll go to battle for the software in this year's budget (not to be distributed til next year---likely 3rd or 4th quarter:))....so must make do with the 3.X for now.
    Lastly, we're gettin a studder after a quick edit. Say I'm cutting a 30 second spot...4 or 5 seconds of dead handles, maybe a slip in the middle...total of 43 second sound file. I quickly cut the front handle, but left click dragging to the start, hit delete, hit space bar....studder, studder for about 2-3 seconds before it works itself out. Is there a cache setting I'm missing somewhere? If I go back and play from the beginning the file is just fine. No issues. Just that initial playback after edit. It's annoying but not a deal killer. Easily gotten used to. 
    In radio, as our jobs (and hats we wear) have become more and more "Life in the production room" producing for smaller markets, voice-tracking, commercial and audio produciton/voice over--again, for the smaller markets that these days are running 'jock-less'....Audition has easily become my number 1 tool in the box. Just a couple quirks I'd like to get worked out for the rest of our air/prod staff. I was, in fact, very happy with the older machines---each of our 'Workspaces' set up as we liked. Unfortunately, we ALL know how the engineers work. They get the new machines, pull the old, re-image and THEN send out that email. Ugghhhhh!  After almost 30 years in the buz, I sometimes miss when ALL they dealt with was RF and transmitters:)  We fixed our own 'work-stations' by writing out 3x5" index cards and bulk erasing carts, donuts (reels), and opening fresh, new vinyl from the labels:)
    Thanks for your time!
    Jer

    Thanks MusicConductor
    Have I in some way 'messed' with the RealTek driver by disabling sounds? After reading your reply I actually went and looked at the back panel of the computer. I was blown away...as you're correct, we are using the internal/stock sound card!  That's never been the case, as our engineer has always put a pro card---usually, if memory serves, a PCI/PCI-E Digigram card. However...with this new workstation he put in, he's utilizing the onboard, RealTek software/stock internal solution.  To date, it's worked well...however, Audition crashed last week and we had to do a full install of the program again yesterday. Cut both yesterday and today's shows and the stuttering is back. Sounds in Windows are 'off' and cache/buffer sizes have been increased. I'll continue to play this week...and I still have to update to 3.01 after the fatal error with the software last week.
    Thanks again...and if there's something I should not do with the Realtek software, can you be more specific?  I'm not sure I've messed with anything pertinent. We've got both ins and outs (from the sound card) separated into stereo RCA for both in and output. Sound quality seems to be just fine. (No noise/hiss or otherwise unnecessary or unwanted artifacts).  Maybe this is the issue. The onboard sound card. As I mentioned, in past systems we've used Lynx or Digigram pro cards. I'm kind of surprised to see us using the internal/stock card. As you say though, we've gone through some evolution with the isolation and performance of on board sound.  The RealTek driver version is 6.0.1.6392. One other question....in 'shared' mode...should I be running 24bit 48000Hz or 24bit 44100Hz?  Again...this is primarily used for saving down to MP3, transferring to our proprietary "Next Gen" system in generic MP3 flavor...so Next Gen can wrap it in it's own proprietary WAV format. In this case, is there a reason I shouldn't just be running it at 16bit 44100? In the control panel I have it set to 'No sounds' in sound scheme and in the lower "Program Events' box, I've selected '(None)'. Is this as 'deep' as I can get in the sound settings?
    Thanks again. This stuttering isn't normal...and with the inherent speed increase (CPU) and RAM update, as well as a speedier drive (7200rpm), I'm not sure the cause. The last and older system (Pentium IV) was also updated to Windows 7---so it did work fine with the current OS albeit on the older spec'ed machine.
    J

  • Budget carry forward

    Dear Experts,
    I have doubt regarding the budget carry forward.
    I'm using PS with Investment Management.
    Now I need to carry forward the budget from 2008-09 to 2009-10 fiscal year.
    I have the following transactions:
    IM:
    IM27 - Open New Approval Year
    IM27_CLOSE - Closing Old Approval Year
    IMCAOV - Budget Carry forward
    PS:
    CJCO - Budget Carry forward
    CJCF - Commitment Carry forward
    Can any one please tell me what is the hierarchy for the above transactions?
    Do I need to carry CJCO, CJCF and then IM27, IM_CLOSE & IMCAOV? or first I need to carry out for IM and then do for PS?
    What is the flow? Please advise me on the above.
    Thanks in Advice,
    Regards,
    Praveen.

    hi
    Do the following steps:
    PS:
    CJCO - Budget Carry forward
    CJCF - Commitment Carry forward
    IM:
    IM27 - Open New Approval Year
    IM27_CLOSE - Closing Old Approval Year
    IMCAOV - Budget Carry forward