Is possible forecast from DP to PPDS w characteristic use with CDP block?

We have set up a test scenario with CDP (Characteristic Dependant Planning) setting to utilize Block Planning and I want to send the demand quantities from DP to PPDS, in a way that the characteristic sent with the Demand Plan (eg Product, Location and Colour = Red) will then match the block when creating the PPDS order (eg Block = Colour Red)
I have tried 2 methods so far which have not worked, and I am wanting to find out if it is possible to send demand planning volumes to use with PPDS CDP Blocks?
Following the process outlined in these areas
Planning with Characteristics
http://help.sap.com/saphelp_scm70/helpdata/en/fa/e943401a306f13e10000000a1550b0/frameset.htm
PPDS and planning with characteristics
http://help.sap.com/saphelp_scm70/helpdata/en/a2/90b83b06855a4ae10000000a11402f/frameset.htm
Cannot use CBF and CDP together on the one client
I have tried these 2 methods.
1. Setting up CBF (Characteristic Based Forecasting) in DP and trying to send these to PPDS CDP. That was before I found the above help guide that tells me this is not possible. The data went across from DP to PPDS, but the results were a mess, the wrong values to the wrong characteristics.
2. Tried sending Demand planning with standard characteristics from DP to PPDS, and this initially looked like it would work. Consumption group, Product, Location, ZCOLOUR (created a BW type info-object called ZCOLOUR which I put in the DP Planning object)
But when sending to PPDS, the COLOUR = RED comes over as a "desciptive characteristic", which is different to the manually created forecast in PPDS which is colour = RED within CLASS ZZZBLOCK Characteristic ZCOLOUR (Value = red), which comes up as a seperate tab on the requirement.
So the two ZCOLOURS of the infoobject ZCOLOUR and the Characteristic within Class 400 ZCOLOUR do not talk to each other ,and PPDS does not recognize the object, so cannot create any PPDS orders with block relevant characteristics.
The SAP help just talks about "create an ECC sales order" to use to feed demand into the CDP Blocks, so possibly it is not possible to map Demand Plan data to PPDS CDP Blocks. Has anyone got this to work?

Please check the following:
Use consumption group with CBF characteristics. The CBF characteristics need to be in the consumption group!
The consumption group has to be assigned to the u2018demandu2019-view of the
product master
The assignment of the consumption group to the release settings (transaction
/SAPAPO/MC90)
If you want to Make-to-Stock Segment implement the BADI:
From a configuration point of view it is required to activate the BAdI
/SAPAPO/DM_BADI_CONF and add following line of coding to the method
CONFR_FILL:
method /sapapo/if_ex_dm_badi_conf~confr_fill.
  et_stra_details-plnvp = 9.
endmethod.

Similar Messages

  • SQL server(PC1) --- PC2: Login failed. The login is from untrusted domain and cannot be used with windows authentification

    Hey,
    I'want to make connection from my laptop(xxx.xxx.xxx.xxx = A) to a fixed computer(SQL server xxx.xxx.xxx.xxx =B). My connection string = "Provider=SQLNCLI11; Data source:name-pc/SQLEXPRESS; Integrated circuit=SSPI;Intial Catalog=Database name for visual
    studio C#.
    Laptop -> PC1 : Eror
    It works when i use localhost or 127.0.0.1 and i can read my database without any problems if i install SQL server on my laptop. Know i install it to PC1 and uninstall on my laptop. When i change the name-pc by an ip-adress i get this error: Login failed.
    The login is from untrusted domain and cannot be used with windows authentification. I did some research on multiple forums where they say about Local security policy(secpol.exe) but i don't have this file. 
    PC2-> PC3: work fine but i want to work with my laptop and i don't understand why it isn't working with my Laptop. 
    Can someone help me?
    Thx a lot and sry about my english(its a disaster) 
    Thibaut

    Hello,
    Yes, for the Windows Authentication to work you should be using the same Windows account and password.
    Are you willing to create SQL logins inside SQL Server and allow your users to connect to SQL Server using SQL Authentication
    instead of Windows Authentication? That could be a solution on a workgroup network.
    Hope this helps.
    Regards,
    Alberto Morillo
    SQLCoffee.com

  • Can Station Gloabals from different versions of TestStand be used with TestStand 2010?

    I have an older version of TS - ver. 4.01.  I just renewed my subscription and have 2010 now.  Can StationGlobals from one version be copied directly into the cfg directory of a different version?  It appears to work, but I want to make sure there are no underlying problems.

    Hi,
    Seems like you have answered your own question. When TestStand closes it will update the StationGlobals.ini file so if you were going to have any problems you probably would have seen it then.
    Regards
    Ray Farmer

  • Release Of Forecast From DP To SNP (For Some Locations, Only Baseline)

    Dear All,
    Generally, we follow the following procedure....In the month begining, we generate the baseline forecast for all the locations (we are having around 20 branches). Then we used to open the DP planning book for a couple of days to our branch persons so that they are able to feed their correction. After which we release the final forecast i.e. Baseline Forecast +/- Branch correction to SNP for further proceesing.
    This month, we opened the planning book (as usual). Branches did  the branch correction. But on final checking, we found that around 4 -  5 branches have done corrections / updations very vagely i.e. roughly. So, we wants to ignore their branch correction.
    My query be that is it possible that while releasing the Forecast from DP to SNP... can we release baseline forecast for selective five branches and for the rest of the branches, we wants to release final forecast key figure i.e. Baseline +/- Branch correction.
    Kindly advise further.
    With Best Regards,
    Sanjeev Chugh
    17-NOV-2010 (AN)

    Sanjeev
    You have not mentioned at what level you are doing the forecasting. If forecasting is done at material- branch level then what you are asking can be achieved easily. All you have to do is go to /n/sapapo/mc90 ( or create a release profile) and for the branches for which you want to release baseline forecast , you have to specify the baseline forecast keyfigure in the input and specify the material branches in the i/p criteria. For adjusted forecast you have to use another variant and specify the adjusted forecast key figure and the corresponding material branches.
    Iam not sure how your requirement can be achieved in case you are forecasting @ material level.
    Thanks
    Aparna

  • Release forecast from DP to R/3

    Hi Experts,
    In DP, I have lowest periodicty is month but in R/3
    What is the possible way to release forecast from DP to R/3 from Monthly to daily bucket?
    Thanks in advance...
    Thanks & Regards
    Sujay

    Hi Sujay,
    Is it possible for you release from APO DP to SAP R/3 in monthly bucket and then disaggregate in daily buckets?
    There is also a BADI in APO   BADI /SAPAPO/SDP RELDATA , which can be checked for your requirement,
    Regards
    Datta

  • Error logs in job releases forecast from DP to SNP-"Matl does not exist"

    Hi Everyone,
    I am facing error logs in the batch job which releases forecast from DP to SNP
    Forecast release job - Weekly - Through background job
    Forecast category - FA
    Error 1: - Characteristic combination appears on batch job log with an error that
    "GMC does not exist " Even though it exist in R/3 and APO
    All products with error message "Product does not exist" from do exist and have Forecast in Product View
    Error 2: - Deleted KCC keep showing up on the Demand Forecast release job log as errors even though they are invalid KCC and were deleted previously. How do they get removed from error log so they don't get created again
    Material does not exist on the APO Product Master, in R3 there is a delete flag and the MRP type is set to X1 ,it does not exist in the APO Product Master and does not exist in R3.
    Request you to kindly provide any way forward which may be causing error logs of the job
    Thanks in advance,
    Mrigendra Sharma

    Hi Mrigendra,
    Please re-initialize the SNP planning area (program : /SAPAPO/TS_PAREA_INITIALIZE) and then check the consistency by executing the program: /SAPAPO/TS_LCM_CONS_CHECK. If you observe any inconsistency in the log/spool, then re-run the program: /SAPAPO/TS_LCM_CONS_CHECK to observe all green.
    It is recommended to run the consistency program after any master data change. The initialization program should be run at least weekly.
    Try transfering the data again from DP to SNP to see if the error reappear.
    Hope this helps.
    Regards,
    Nawanit

  • Is it possible to save / extract data from a MS SQL database 2008 using lookout 6.2?

    Is it possible to save / extract data from a MS SQL database 2008 using lookout 6.2?
      Now a days we are saving / extracting data in a excel spreadsheet, but we would like to do that using a database because it is better.

    You can use ODBC connection to work with SQL Server database.
    Use SQLExec object to execute the SQL statement. Here is a KB about the SQL statement.
    http://digital.ni.com/public.nsf/allkb/4ADEEA04CD24AE0B862565E20002A16F?OpenDocument
    To write data to spreadsheet is more straightforward because Lookout has built-in spreadsheet object. But you need to write SQL statement by yourself to interact with other database.
    To read the data back is the same way. Just use "select" SQL statement to query. You can use Datatable object to query.
    The "Data Source" can be "DSN = data source name;". The data source name is configured in Control Panel->Administrative Tools->Data Sources(ODBC).
    Ryan Shi
    National Instruments

  • Is it possible to get 2-ch signals from TDS2012 oscilloscope at the same time with LabVIEW "7.0"?

    Hi, everyone.
    I've been trying to get the signals from 2-ch of Tektronix TDS2012 oscilloscope at the same time using IVI connection with LabVIEW "7.0"
    I've already searched this developer zone for the answer.
    I've tried the famous example: "IviScope - Acq Dual Wfm Edge Triggered.vi"
    and it gave me the error message like:
    Error -1074110451 occurred at IviScope Initialize With Options.vi
    Possible reason(s):
    Driver Status:  (Hex 0xBFFA600D) Primary Error: (Hex 0xBFFA600D) The Config Server module is not present on the system.
    I think I've installed all~ the required softwares for IVI. For example, ICP 2.2, IVI engine 2.0.46, and tktds1k2k ivi (instrument driver for tds2012, in fact this one is for LabVIEW "7.1"... :-P)
    TDS2012 and my computer is connected through HPIB(GPIB) and it is shown on the MAX (a GPIB instrument as well as an IVI hardware asset)
    I've tried GPIB connection but it gives me asynchronous signals...
    Is it possible to get 2 signals at the same time with LabVIEW 7.0(not 7.1 or higher) by any means?
    What in the earth is the "Config Server" in this case?
    I don't need to sticking to IVI and any method to achieve my goal will be welcome.
    Could anyone give me the hint for this problem, plz?

    I think your problem is that the instrument specific driver is version 7.1 and you are using the class driver with 7.0. You can create your own 7.0 driver by downloading the LabWindows driver and using the Import CVI Instrument Driver under the Tools>Instrumentation menu.
    Since you don't seem to have a good reason to use IVI, why don't you try the native LabVIEW driver at http://sine.ni.com/apps/utf8/niid_web_display.download_page?p_id_guid=E3B19B3E9139659CE034080020E748.... I believe you have all of the functions to setup each channel and then when you trigger the scope, both channels will be captured. You would then transfer each waveform separately. The data is always read sequentially but that's not important as long as both channels are triggered at the same time.

  • Is it possible to set a song in my itunes library as a ringtone straight from my phone, without having to use my computer?

    Is it possible to set a song in my itunes library as a ringtone straight from my phone, without having to use my computer?

    Hi,
    According to your post, my understanding is that you want to make the Workflow Tasks work out with a pre-determined due date that it's 2 days from today in your client list workflow.
    I recommend that you can create this client list workflow as below in your environment.
    Then, you can go to “Start Options” to check “Start workflow automatically when an item is created”, publish this workflow and test if it works.
    When an new item is added in the client list, its corresponding Workflow Task is shown as below:
    Best Regards,
    Yumi Fu

  • Consume forecast from production plant

    Hi gurus,
    can i request you guys to help me out in this scenario.
    Scenario:
    1) we have plant A (a dsitributiuon center so to say, no production activity happens at this plant) and we have plant B where the actual manufacturing happens. There will be Planned independent requirements loaded into MD61 of plant B. we will not load any forecast in Plant A. Both Plant A and Plant B will get sales orders from the customers.
    we will bring hte material from Plant B to Plant A using a STO.
    now the question is what settings do i need to do such that the sales orders received in Plant A reduces the forecast in Plant B for a given material. Is this posssible at all?
    I have tried in the system and i cannot reduce the forecast from Plant B when the sales order is created in Plant A. Are there any settings that i'm missing.
    thanks
    ravi

    Hello
    I suggest you to use strategy 63.
    As it is stated on the following link from the on-line help, this strategy can also be used as a cross-plant version of strategy 52.
    Planning w/ a Planning Material and w/o MTO (63) - Demand Management (PP-MP-DEM) - SAP Library
    See Cross-Plant Planning for more information.
    BR
    Caetano

  • Transfer of forecast from SNP to ECC

    We are using transfer profile to transfer forecast (9ADFCST) from SNP to ECC.
    We find that the original forecast is not transferred, but only the unconsumed  (Original fcst - sales) forecast is transferred.
    Is there a way to transfer the original forecast from SNP to ECC?
    Thanks,
    Ashok

    Hi JD,
    Thanks for your response.
    Yes, we had thought of doing that, but we are transferring the forecast based on requirement strategy for each product in product master data in SNP.
    Though DP has all the original forecst, it does not have req. strat. as a selection criterion for SKU.
    For example-- if the req. strat. is 20 then create VSF orders in ECC, if it is 30 then create VSE orders in ECC and if it is 32 do not transfer to ECC.
    So we have to fall back on SNP to transfer the forecast using that product selection criterion.
    But in SNP the forecast is consumed by sales order/deliveries and only the "remaining" forecast (after all the consumption have taken place) is transferred.
    We had tried /sapapo/dmp2 to transfer original forecast, but it does not work if the "Planning Assembly" field is not checked in the product master. And we do not use that field in our product master data.

  • Release of forecast from DP to R/3

    Hi SCM Gurus,
    I am facing problem related to release of forecast from Demand Planning to R/3. When I check for PIR in R/3 no PIR is there.
    1) the product and location are maintained in APO & R/3.
    2) Location Split is maintained.
    3) MPOS with only Product and Location.
    4) PA with one KF of forecast. Disaggregation based on different KF.
    5) Period for Storage bucket and Planning Mucket in Month.
    6)Created Transfer Profile.
    7) created back ground job.
    8) Maintained Publication.
    Still when i release the job no PIR is created in R/3.
    Am I missing any steps . Gurus. pls help..
    Regards,
    Sanjay

    Hi,
    Can you check the Time bucket profile of the Planning book using which you are releasing the forecast to R/3.
    The Time bucket profile which is used for releasing should have only one periodicity(Eg: Either Months, Weeks, or day).
    Best Regards
    Raghu

  • Interested in bringing Past Due forecast from MRP Forecast Sets to ASCP

    We are on 12.1.3 (EBS and ASCP) and are interested in bringing a week of past due forecast from MRP Forecast set into ASCP. We are running EDD plan.
    Following have been enabled but no luck yet, open to suggestions or explanations.
    1. Include Past Due Forecast = 5
    2. Spread Forecast Evenly = checked (as we are in weekly buckets)
    3. Demand Time Fence control = checked on plan options
    4. Item are enabled for Demand Time Fence days = 0
    5. Complete Collections and Plan have been ran.
    Observation - Since the week start date is on Monday, when the plan ran from Tuesday, it brings the forecast for current week from Tuesday of that week onwards breaking into days. But it doesn't bring in forecast for Monday or prior week days.
    Per ASCP guide, Include Past Due Forecast is useful only in case of Oracle Demand Planning.
    Any help in this regards is appreciated.
    Thanks in advance.

    Hi,  
    This is the Advanced Collections Financial community.  I believe you are looking for a Manufacturing community.  
    Thank you
    Christine Williams
    Oracle Support,  Global Advanced Collections SME
    -----If my response assisted you on this matter, please feel free to click on the Correct Answer button, or Like the response.

  • Is it possible change from OS X 10.6.8 to OS X Mavericks directly?

    is it possible change from OS X 10.6.8 to OS X Mavericks directly?

    Yes. You ust meet the system requirements:
         OS X Mountain Lion - System Requirements
           Macs that can be upgraded to OS X Mountain Lion
             1. iMac (Mid 2007 or newer) - Model Identifier 7,1 or later
             2. MacBook (Late 2008 Aluminum, or Early 2009 or newer) - Model Identifier 5,1 or later
             3. MacBook Pro (Mid/Late 2007 or newer) - Model Identifier 3,1 or later
             4. MacBook Air (Late 2008 or newer) - Model Identifier 2,1 or later
             5. Mac mini (Early 2009 or newer) - Model Identifier 3,1 or later
             6. Mac Pro (Early 2008 or newer) - Model Identifier 3,1 or later
             7. Xserve (Early 2009) - Model Identifier 3,1 or later
    System requirements for Mavericks ar the same as those for Mountain Lion.

  • Create Forecast from one location porduct to other location product

    Hi All,
    I have a business scenario trying to design process in APO -DP.Two Plants in R/3 (1001 and 1002).
    Plant-1001, produce  material A using raw material B.
    Plant -1002,  Produce C  and sale to plant 1001. Physically material B and C are same but in R/3  material  B and C  are different numbers.
    I am trying to design this scenario in APO- DP  like whenever Plant 1001 run forecast for material A, it should generate forecast for material B(raw mat in 1001) and material C (finish product in 1002).
    I tired to understand if APO-DP BOM functionality can be used but in this case system asked me maintain material C in plant 1001, which i am trying to avoid.
    This seems to be common business scenarion. I'll appreciate any quick advice or help to understand how to map it in APO-DP.
    OR
    Is there anyway to transfer forecast from one location product to another different loaction product.
    Thanks
    Kumar

    Hi Kumar,
    1) Your scenario seems like realignment of location products.
    2) You can achieve this using realignment planning in APO DP
    3) The transaction to do this is /SAPAPO/RLGCOPY
    4) Here, the history of one location product will get copied or maintained to transfer
    to another location product
    5) You can select one or more key figure data to get copied to your new
    location products from the existing history.
    Regards
    R. Senthil Mareeswaran.

Maybe you are looking for

  • Library develop report with report painter in Cost Center Accounting

    Dear experts! Now, I'm getting some issue about finding library for developing report with report painter. Really, i don't know libraries that are used to develop report with report painter for Cost Center Accounting. Can tell me about them? Help me,

  • FND_FORM.EXECUTE session_flag parameter

    Hi From the Order Entry form I need to open a custom form . This form has logic to perform some weight optimizations and then update the Order details. If I open the new form using FND_FUNCTION.EXECUTE by passsing session_flag as 'N' everything works

  • Printing all permutations

    Hi, My sister is a CS student, and she currently learns recursion. She's got an exercise is to write a program that gets an array of integers and recursively prints all of its permutations (all elements in all possible orders). For example, if the in

  • How to enable USB drive and CDwrite in Trusted Solaris.

    hello I installed Trusted Solaris extensions in an X86 desktop and after that the cdwrite disappeared, the usb drive is not detected. How do I enable the CD writer and the zip drive ? I have a file to be copied urgently, the USB drive doesn't work, t

  • Lost deleted and sent messages

    Hi Folks, I recently changed over my pop account to imap. It's working fine but when I send mail or delete a message they don't show up in the sent or trash folders. Any idea where they are stored now or how to assign them to the appropriate folders