Is RGX part of FCX (Freight Cost Extension )

Hello Gurus,
Is RGX part of FCX (Freight Cost Extension add on to R/3) ) ? Looking for your feedbacks.
Thanks

Hi James,
Under SCM: We have the following...
APO
F&R
ICH
EM
ExWM
Under APO you have
DP
TPVS
SDM
GATP
PP/DS
TM
SPP
SNP
Can you tell under which FCX falls under. Assuming routing guide is part of FCX.
Thanks

Similar Messages

  • Modify BADI for Freight Cost Extension

    SAP offers BADI /SAPFCX/RELV_PARMS to update user parameters in determining customer freight document relevancy.
    I am informed to use this BADI to code so that USER_UserParm1 can be populated. It is provided in function module /SAPFCX/CFI_RELEVANCE_CHECK.
    I have tried a variety of ways to understand how to update this BADI, but nothing has proven with an example or instruction.
    Has anyone update these BADI in FCX? Could you please instruct me on how to complete this?
    Much appreciated,

    Go to SE18 and create a new Z implemenation. Enter the name of the SAP provided BADI.
    The method with ABAP code will be created. Modify the code and activate.

  • Documentation about Freight Cost Extentions

    Hi,
    Can anybody provide documentation about the FCX freight cost extentions - Business process, reading materials and configurations?
    Thank you.
    Regards

    Jürgen,
    this presentation addresses the point about RCM and not specifically about FCX. It never says if I can implement FCX without a link to the Rail scenario that is explained and for which I'm not necessarily interested in. And it does not give enough details about it neither.
    I'm sorry you lost your time searching for this presentation in particular, but it's not the documentation that is asked for nor the answer to the original thread "Freight Cost Extensions" - business process, reading materials and configuration.
    Nevertheless, I will indeed follow your advice and contact SAP for it. I was hoping that since 2007 when this document was created, more information was reachable and someone on SCN would be able to help out without having to contact SAP directly.
    Thanks for your swift replies up until now!
    Salvador

  • Freight cost of Vendor consignment

    We have supplier sending us consignment goods by a trasnportation company, the transportation compnay charge us the freight cost , we have to pay the freight cost to the transportastoin company, and this cost should be part of the cost of  consignment goods.
    However the cost of consignment goods does not transfer to our company until we goods issue or transfer it to our own warehouse. How to handle this freight cost paying to the transportation company above and freight should be part of the materials value when we use it?

    Hi Anthony
    I am following the procedure as you describe  for the freight price condition 
    I copied it as a new condition and removed the accrual key and the Acct key
    AND the g/l postings are  NOT  happening for the freight  - I am missing something I think
    Hasina

  • MM Planned Freight Costs with

    Dear friend
    Does anyone could guide me to setting up the  freight costs by condition FRB1 to ECC put the value of condition as part of costs of material !
    Could you explain the behavior of MIRO(Accounting posting) with main item together with planned freight costs !
    We need to understand how the SAP input the freight costs into the main item.
    best regards,
    Ale

    Hi Aless,
                U have to inventorise freight condition
    This can be done by assigning accrual key in m/06
    in condition mark tick as accrual..
    Other than the Basic price all other condition types can be inventories. for this u have to do the following. at M/08 ( Pricing Procedure) You have to Flag Statistical Indicator(S) and you should give appropriate Account key and Accurals key( exampl FR1, FRE for Freight) and at M/06( condition type) for particular condition type u have to Flag Accurals an control data 2. If u do all the 4 then any condition type can be inventorised as per the business requiredment.

  • Free goods but want to freight cost updation upon GR

    Hi,
    Scenario:
    I have a PO with 20 line items and header freight cost.
    There are few more items in PO which are ticked as free goods.
    There is a stock of those materials with certain MAP.
    Freight condition has been configured as vendor GR so that it gets loaded on materials upon GR.
    Requirement is that
    Upon GR of this PO,MAPshould get updated with the freight cost for those materials also which have been marked as free goods.
    How this can be achieved ?
    Regards,
    manOO

    Hi Rang,
    Thanks for the feedback.However service PO is out of scope as client do not want to go for servicees.
    I could not understand your suggestion
    <u>you give PO to frieght vendor for freight value & in remarks you mention reciving as FREE GOODS from vendor xxxxx & do GR load cost to material & pay to freight vendor. (this is not advisible, but one solution for your problem).</u>
    I have to receive one material via purchase order as a free item but I need to pay vendor for the freight charges that will be incurred to ship this item along with all the other items in the same PO.
    Can you please explain me further as what you mean to say in your post.
    I should be able to load these freight cost on all the materials in PO including the material with 'free' indiactor.
    In short upon GR MAP should affect with freight cost as there will not be value addition of the material since received as free.
    Please suggest.
    Thanks in advance
    Regards,
    manOO

  • Purchase Order's Freight cost

    Dear All,
    I'm using SAP B1 2007B SL 0 PL 15. I have problems with the Freight cost on the distribution rule. It will not store the store or update the distribution rule code in PO, GR & Invoice. I have to manually tag the distribution rule code in the journal entry after the Invoices are posted. Does anyone face this problem or know how to solve this?
    Regards,
    Ken Seng

    Dear Ken Seng,
    You may check this: Re: AP Invoice type service with 2 profit center and JE without Dist. Rule.
    Thanks,
    Gordon

  • Freight Cost while Goods Receipt in STO

    Dear Experts,
    In SAP standard STO process, freight cost calculated while Material issued against STO ( 351/641 movement).
    Is there any way possible to calculate the freight at the time of goods receipt instead of at the time of Goods Issue..
    Thanks in Advance.

    Why do you want it at the time of GR?
    Anyways, you can not see or change the freight amount in MIGO. And I don't think there is any other way to post the freight amount other than 351/641 goods issue.

  • Reducing the Freight cost on material value for undelivered material

    Hi Experts,
    Summary :  The material supplier vendor needs to be paid for full quantity of material. The freight transport is allowed an under tolearance of 0.5% on the material to be supplied. If the delivered material quantity breaches the 0.5% under tolerance then amount at 1.5 times the cost of material for the shortage is to be deducted from the transporter. A dummy GR will have to be prepared for the undelivered quantity for which we do not want the freight cost to be loaded. The details scenario is mentioned below :-
    We have to make a Purchase Order with material code say ABC for procured of some material. Suppose we make a Purchase Order for 100 nos. at a Unit Price of Say Rs. 10/- for Material Code ABC on say Vendor M/s XYZ. A freight condition is maintained in the Conditions Tab and suppose the Freight is Rs. 10 per unit of the material.
    While preparing the Goods Receipt through MIGO, in the Freight Tab we select say freight vendor say M/s PQR against the freight condition and post the goods receipt.
    While doing Invoice Processing in MIRO, when we enter the combination of Purchase Order and Planned Delivery Cost the system will populate the vendor codes of both the supplier of material and the transporter. On selecting the transporter the freight amount will populate against which the invoice of the tranporter can be processed.
    In the Vendor Master of M/s XYZ GR-Based Invoice Verification is activated.
    The vendor is allowed an under tolerance of 0.5% (i.e. the vendor should deliver at least 99.50 nos. of the Purchase Order). If the vendor delivers 99.50 or more then there will be no deduction in the freight charges.
    But suppose the vendor delivers only 99.4 nos. of the quantity. Then we will prepare the GRIR for 99.4 nos.only. But while processing the MIRO we need to deduct 1.5 times the value of the material from the freight amount for the shortshipped quantity, i.e.
    0.1     no (99.5 u2013 99.4) X Rs. 10/- * 1.5 = Rs. 1.5 are to be deducted from the final payment from the freight amount of the transporter.
    The material supplier will have to be paid in full 100 nos. of quantity and will raise an invoice for 100 nos. A dummy GRIR for the 0.6 nos. of undelivered material will have to be prepared for processing the invoice for the 100 nos. of the material supplier and a dummy issue for 0.6 nos. of undelivered material will be prepared to remove them from the system.
    Hence the freight cost for this 0.6 nos. of undelivered material will also go into the cost of the material and increase the MAP by that amount. Also the goods issue Cost will also have the effect of the freight cost.
    We do not want to load the freight cost for the undelivered material in the value of the material.
    Can any one please suggest a solution for the same.
    Thanks in advance.
    AJ.

    Hi
    A PO Will be raised for full quantity of material say 100 nos.
    The material supplier vendor needs to be paid for full quantity of material.
    A freight vendor is maintained at the time of GR for material against the freight condition maintained in the Po.
    The freight vendor facilitates the delivery of the material from the vendor to the purchaser for which he is given an under tolerance limit of 0.5%. Any delivery below this tolerance limit, freight amount to the effect of 1.5 times the per unit rate of material x short fall below 0.5% tolerance will be deducted from the freight amount.
    A dummy grir will have to be prepared for the short delivered quantity for processing the invoice for the full quantity of the purchase order, as the vendor is going to raise the invoice for full purchase order quantity. The client does not want to load the freight cost of the undelivered quantity on the material value as it will wrongly show the MAP of the material. This shortshipped material will be issued to remove it from the system and the stock will remain for the delivered quantity only. The vendor is subject to gr based invoice verification.
    Please suggest a solution.
    Thanks in advance.
    AJ
    The freight transport is allowed an under tolearance of 0.5% on the material to be supplied. If the delivered material quantity breaches the 0.5% under tolerance then amount at 1.5 times the cost of material for the shortage is to be deducted from the transporter. A dummy GR will have to be prepared for the undelivered quantity for which we do not want the freight cost to be loaded.

  • Reducing freight cost for undelivered material

    Hi Experts,
    Summary :  The material supplier vendor needs to be paid for full quantity of material. The freight transport is allowed an under tolearance of 0.5% on the material to be supplied. If the delivered material quantity breaches the 0.5% under tolerance then amount at 1.5 times the cost of material for the shortage is to be deducted from the transporter. A dummy GR will have to be prepared for the undelivered quantity for which we do not want the freight cost to be loaded. The details scenario is mentioned below :-
    We have to make a Purchase Order with material code say ABC for procured of some material. Suppose we make a Purchase Order for 100 nos. at a Unit Price of Say Rs. 10/- for Material Code ABC on say Vendor M/s XYZ. A freight condition is maintained in the Conditions Tab and suppose the Freight is Rs. 10 per unit of the material.
    While preparing the Goods Receipt through MIGO, in the Freight Tab we select say freight vendor say M/s PQR against the freight condition and post the goods receipt.
    While doing Invoice Processing in MIRO, when we enter the combination of Purchase Order and Planned Delivery Cost the system will populate the vendor codes of both the supplier of material and the transporter. On selecting the transporter the freight amount will populate against which the invoice of the tranporter can be processed.
    In the Vendor Master of M/s XYZ GR-Based Invoice Verification is activated.
    The vendor is allowed an under tolerance of 0.5% (i.e. the vendor should deliver at least 99.50 nos. of the Purchase Order). If the vendor delivers 99.50 or more then there will be no deduction in the freight charges.
    But suppose the vendor delivers only 99.4 nos. of the quantity. Then we will prepare the GRIR for 99.4 nos.only. But while processing the MIRO we need to deduct 1.5 times the value of the material from the freight amount for the shortshipped quantity, i.e.
    0.1     no (99.5 u2013 99.4) X Rs. 10/- * 1.5 = Rs. 1.5 are to be deducted from the final payment from the freight amount of the transporter.
    The material supplier will have to be paid in full 100 nos. of quantity and will raise an invoice for 100 nos. A dummy GRIR for the 0.6 nos. of undelivered material will have to be prepared for processing the invoice for the 100 nos. of the material supplier and a dummy issue for 0.6 nos. of undelivered material will be prepared to remove them from the system.
    Hence the freight cost for this 0.6 nos. of undelivered material will also go into the cost of the material and increase the MAP by that amount. Also the goods issue Cost will also have the effect of the freight cost.
    We do not want to load the freight cost for the undelivered material in the value of the material.
    Can any one please suggest a solution for the same.
    Thanks in advance.
    AJ.

    answered

  • PO-Freight cost (header, diff currency with items) not distributed when GR

    Dear Gurus,
    I've one PO with freight cost at header level (1000 VND). In the PO, this freight amount shown to be distributed successfully to line item (value base, line item 1 is 300 VND, line item 2 is 700 VND). But when doing GR, the freight cost of each line item is NOT distributed but equals the total freight amount (line item 1 is 1000 VND, line item 2 is 1000 VND).
    In this PO, vendor is international vendor, goods in USD. Freight cost is in local currency (VND)
    The configuration for this freight cost condition is at Header level, Group Condition ticked; Calculation type: Fixed Amount; Scale Basis: Value. When the currency of freight cost and goods are the same (all in USD), I have no error as above.
    Please help to solve this issue.
    Thanks.

    Hi
    I am facing the same problem in my client. It would be great if you can share how you resolved the issue of Freight Cost
    Regards
    Athar

  • Post freight cost to a different a GL account during 411-K for consignment PO Process

    We are planning to implement PO consignment for one of the client.
    The scenario is, client pays the freight cost to the supplier in advance upon receipt of consignment stock .When consignment stock is moved to own stock (411k), during the movement of the stock we need to create two accounting entries one for the material cost and the other for freight cost such that the freight can be adjusted with advance paid freight cost. Freight cost can be settled manually with another PO but the requirement is moving average price of the material should include the  cost of material  and freight cost .
    For an example if the material cost is $100(PB00) and freight cost is $10(FAR1 - 10%), during 411k it  should create  two entries one for material cost($100) and the other for freight cost($10) which can be adjusted manually.
    We tried by adding freight condition (FRA1) in consignment info record along with PB00 –Gross price and in this case during 411k it is summing both the prices($110) and posting to one GL account and the same settles during MRKO  but what we are looking for is how we can split this into $100 and $10 .
    I know standard SAP does not support this this during 411k.
    I want to know if there is any User exit, pricing procedure, routines, etc...  Or any other way that can be used to achieve this requirement. Appreciate more detailed answer

    Hi,
       As you know, currently the delivery cost are not supported in consignment and pipeline settlement. The system design is explained in the note: 208555 - MB11 Delivery costs for pipeline and consignment.
       If you want delivery cost in consignment, you have to go for development. There should be additional entry for delivery costs in RKWA table. I am not sure about the feasibility, but still would like to share the below points:
       For creating additional entry in the accounting document while doing MB1B / MB11, you may check the BADI AC_DOCUMENT.
       You may refer the note: 165647 - Documentation: Enhancement RMVKON00 (MM-IV) which explains some enhancements related to consignment settlement.
    Regards,
    AKPT

  • MIRO - Credit memo considering freight costs

    Dear friends ,
    We need to process a Goods Return  to the vendor, but the goods has additional costs like Freight.
    So we are doing the reversal process as follow:
    MIRO - Credit memo
    => but when we process the credit memo the System brought together the freight costs.
          we need to return but not remove the freight costs from the material cost.
    MIGO movement 122.
    => here everything is ok.
    Question:
    How treat that situation where we need to keep the freight costs in the material account ?
    Best regards,
    Alessandro

    hi
    in that case, in miro header, there is a tab "details" here u have a option to enter unplanned dlvy cost.. u can enter ur unplanned dkvy cost.
    ref the link
    http://help.sap.com/saphelp_erp2004/helpdata/en/cb/370d3ae4533072e10000000a11402f/frameset.htm
    Edited by: Jayakumar Raju A.S on Aug 17, 2009 3:00 PM

  • No Freight cost on AR Down Payment Invoice

    Hello,
    My customer needs to create an 100% AR Down Payment Invoice based on a Sales Order with freight costs. But this is not copied across, plus you don't have the option to add this either..
    How can this be done, I don't see an option.
    Regards,
    Petronella

    Hi,
    Could that be manipulated with SDK?! (The down payment module does not have the option to add additional expesnes. It will only work with Line item totals.)
    Thanks for the other option, I'll advice the client about this.
    Regards,
    Petronella

  • Freight Cost based on postal code from alternative partner (occasional)

    Hi SAP experts!
    In standard SAP, the freight cost is calculated based on the postal code from WE partner (goods receiver).
    But my client have a situation where he uses an one-time customer as a goods receiver. In this cases the freight cost is being calculated wrong, because the SAP uses the tariff zone from goods receiver (WE partner).
    Does anybody know if there is a standard partner function to be used in order to consider the zipcode from the one-time customer instead ?
    Does anybody knows if there is a standard solution for this issue in SAP?
    Exemple:
    sold to party - client X - postal code NNN
    ship to party - client X - postal code NNN
    goods receiver - client Y - postal code AAA
    Then the freight must be calculated based on the postal code AAA.
    Thanks!
    Edited by: Fesuster on Dec 10, 2009 6:10 PM
    Edited by: Fesuster on Dec 10, 2009 6:13 PM

    k

Maybe you are looking for

  • Logical Database PCH

    Hi experts. I need to use the logical database PCH because is necessary to report on Personnel Planning data, my business requirement is get all the employees that participated in all  training course types. My development by a selection screen to pr

  • I got a new iPhone but I want to use my old one as an iPod

    When I plugged the iPhone into the computer the computer didn't let me  move any songs onto it so I reset the phone which didn't make any difference so then I took out the sim card which was my old one and didn't have any cell service on it but when

  • RAW images ... 0KB

    I have just started using iPhoto with RAW images from my Lumix G1... no importing problems so far BUT... I import a RAW image (with no jpeg thumbnail). iPhoto lists it as RAW at about 14MB. I have set Adv Prefs to save edits as TIFF, so I open the pi

  • How to integrate SQL table with the cahce

    Hi, In normal ASP.net application we use the sqlCacheDependency to integrate the SQL server with the cache in ASP.NET, so that any change in the SQL table row will replace the cache with the latest data. How to achieve the same in the Azure cache. We

  • Changing the 'system' password, and now the service is denied to start??? (WLS 6.0)

    I have been looking for awhile,.. and I haven't found this one yet.. I reinstalled weblogic.. (for reasons unmentionable, like deleting things accidentally, etc.. ) I had the chance to specify a new system password. After realizing that it likes to s