Issue importing "Project End Options" preferences

Hi,
I am having issues importing preferences. All seem to work perfectly except the Start and End > Project End Options (it actually changes the Action here, but it changes it to Loop Project - I am wanting Close Project)
The Adobe Captivate Help says: All preferences in your current project are modified according to those set in the preferences file.... So, am I doing something wrong? 
Thanks
LAG

Hi,
Even I could see this issue in Captivate 4. The only way is to change the "Project end action" after importing the prefernces.
And good news is that this issue has been resolved in Captivate 5.
Regards,
Vikranth.

Similar Messages

  • Project end option - Open file or URL and Close project

    Hi,
    I am using Captivate 4.
    Is it possible at the end of the movie to close it and also to open a URL?
    Thanks,
    Merav.

    Hi Merav
    You could probably accomplish it by creating an Advanced Action to carry it out. But there are some caveats.
    * You would need to ensure the URL were opened in a new window
    * Your Advanced Action would need to carry out the Open URL or file bit as the first step
    * Closing the project will prove unreliable. This is explained in the link I pointed you to the last time I replied, Click here to view
    Cheers... Rick
    Helpful and Handy Links
    Captivate Wish Form/Bug Reporting Form
    Adobe Certified Captivate Training
    SorcerStone Blog
    Captivate eBooks

  • Got an email stating my Creative Cloud Membership ends tonight, yet I'm all paid up and the card I'm using to pay for it is good.  I have two very important projects going on and can't afford to have CC go down.  Please help!

    got an email stating my Creative Cloud Membership ends tonight, yet I'm all paid up and the card I'm using to pay for it is good.  I have two very important projects going on and can't afford to have CC go down.  Please help!

    You have 3 CC under same Adobe ID out of which one purchased on has expired, you are getting notification due to this.
    Creative Cloud Photography plan (one-year)
    Desktop Subscription
    Mar 30, 2015
    The other two are active, however it is advisable to have one CC under one Adobe ID.
    Regards
    Rajshree

  • Issues "Importing Fireworks HTML"...

    Howdy!
    I am creating a website in Dreamweaver CS3, and I am currently having some issues importing Fireworks HTML.
    Here's some background information with my project...
    I began with creating an HTML template in dreamweaver. I then created a Fireworks project with an Image Swap and a drop down menu. I then exported the Fireworks project into HTML (which I used the "Use CSS for Popup Menus" option in the export options). After I use the "Import Fireworks HTML" on my Dreamweaver template in Dreamweaver CS3, the popup menus from the fireworks HTML is placed in very odd positions on the template.
    Here are a few pictures to show you what I mean:
    This is the exported Fireworks HTML all by itself, in the correct positioning...
    This is what it looks like after I use the "Import Fireworks HTML" option in Dreamweaver...
    Anyway, in the second picture you can see that I have multiple icons, and these icons also have Fireworks-created popup menus. When I import these separate Fireworks-HTML-created icons individually, it is a non-issue.
    Is there a workaround for this issue? Or is this the first time anybody has seen this??
    Any answers would be greatly appreciated!
    Thanks all!!

    Which FW? Which DW?
    Murray --- ICQ 71997575
    Adobe Community Expert
    (If you *MUST* email me, don't LAUGH when you do so!)
    ==================
    http://www.dreamweavermx-templates.com
    - Template Triage!
    http://www.projectseven.com/go
    - DW FAQs, Tutorials & Resources
    http://www.dwfaq.com - DW FAQs,
    Tutorials & Resources
    http://www.macromedia.com/support/search/
    - Macromedia (MM) Technotes
    ==================
    "tommytheduke22" <[email protected]> wrote
    in message
    news:e190ft$j4c$[email protected]..
    > When I'm trying to import my Fireworks image/html into
    Dreamweaver I'm
    > getting
    > an erroro code (The correct file os not the correct
    format. Please select
    > an
    > HTML file which was exported from Fireworks).
    >
    > The problem is I AM exporting it from Fireworks. I
    created a Nav Bar in
    > fireworks, then exported the HTML and Images. Then in
    Dreamweaver I
    > clicked on
    > the insert fireworks HTML. The selected the file!
    >
    > WHAT IS UP!!!
    >

  • Where do deleted projects end up? PLEASE tell me that they are recoverable!

    I just deleted an untitled project from Aperture 2.1 which contained 1700 duplicate images that another named project contained.
    Deleting the untitled project ALSO deleted my named project along with ALL of my images, all of my edited images that I just spent a week editing. My named project is still in the contents of my Aperture library, but is empty except for two files - Album.implicitAlbum and Info.apfolder
    Where do deleted projects end up? Someone please tell me that I am not screwed here.

    I agree that backups are necessary, however there is a big difference in work flow between writers and photographers.
    Writers (writing novels) usually aren't under as tight a deadline as photographers. I have to have my edited images uploaded to the wire service within a very short time after shooting them. Taking an hour or more to backup a 3TB Aperture library to a vault isn't an option until the images are edited and sent out whereas saving a text document takes no time. Maybe I need several smaller libraries but until Apple makes it easier to switch between libraries on the fly that is going to have to wait.
    What I am trying to get an answer to is why this "untitled project", which was apparently created after my original titled project, (the images within were rated and edited just like the project I was working in), blew away my masters in the titled project when the untitled project was deleted. I didn't import them to the "untitled project". I didn't copy them to the "untitled project". I wasn't aware that the "untitled project" existed until I saw it and deleted it.
    Additionally, where did the files go? They are not in the trash, there is no Aperture directory in the trash as has been the case in the past, and there is no sign of them anywhere.
    Anyone?

  • Issue on Projected Income Tax (Payroll India)

    Hi Experts
    We have upgraded the system with SP_HR Component patch level 64 and configured SAP Note 1568264.
    We have an issues on Projected Income Tax.
    Scenario :
    Monthly sal : 25000/- and paid the same to employee in Apr, May 11.
    In the month of June employee has LOP for 2 days and paid 22000/- against June 11.
    Now system is calculating projected IT based on 22000/- for the remaining months i.e., 22000*10= 2,20,000/-.
    Showing projected income tax as 2,20,000+50000 = 2,70,000/- (should be 3,00,000/-)
    Please suggest the possible ways to resolve this.
    Appreciate your help.
    Thanks
    Venkat Babu Kurada

    Hi Experts,
    New issues rise Now....
    For New (mid month) joinee at the first month Exemption U/S 10 is calculated based on the Conveyance Allowance amount *12 months (or no. of remaining months for financial yr end), but in my client income tax Exemption U/S 10 based on the actual salary (not earned salary) from the first month onwards.
    For example :
    Employee X,
    Joined date 15.08.2011,
    Conveyance Allowance = 800 INR. Earned Conveyance Allowance for 15 days = 400 INR.
    While Start Payroll for the period 5th (August) 2011. The WT /130 Exemption U/S 10 = 3,200 (400*8). Based on this Conveyance Allowance The Exemption U/S 10 calculated, But I want to calculated the Exemption U/S 10 at first month (august 2011) based on follows,
    August month earned Conveyance Allowance = 400 INR + Actual Conveyance Allowance per month =800*7 =5,600.
    Exemption U/S 10 = 6,000 INR.
    Please give me some solution
    Thanks and regards
    Mohan .V

  • Issue in Project Performance Report

    Hi,
    I'm facing several issues in Project Performance Report (PPR), although the setups seem to be correct.
    The Project has a scheduled start date of 02-Apr-12 and end date 14-Nov-13. The transaction start date is 31-Mar-12 and end date is 14-Nov-13.
    We entered some transactions (preapproved batches) for the dates 31-Mar-12, 01-Apr-12 and 6-May-12.
    Ran the cost distribution program, viewed that the exp items are cost distributed.
    Then ran the Update Project Resource and Base Summaries Data program followed by the Update Project Performance Data but the PPR page did not show the actual data.
    Post that ran the Refresh programs and actual cost data was visible in the Task Summary and Resource Summary pages of PPR but not in the main page.
    Ran the Refresh programs again and now the actual cost data is displayed in the main page but in the Task Summary and Resource Summary pages the actual cost has got doubled.
    So two issues:
    1. Why it did not populate the actual data once we ran the Update programs?
    2. Why has the amounts got doubled in some pages?
    This is very critical. Any insights would be of great help. This is happening for a few projects. I must say the behaviour of the PPR programs is very inconsistent. You never know what to expect.
    Regards,
    Sri

    Hi,
    I'm facing several issues in Project Performance Report (PPR), although the setups seem to be correct.
    The Project has a scheduled start date of 02-Apr-12 and end date 14-Nov-13. The transaction start date is 31-Mar-12 and end date is 14-Nov-13.
    We entered some transactions (preapproved batches) for the dates 31-Mar-12, 01-Apr-12 and 6-May-12.
    Ran the cost distribution program, viewed that the exp items are cost distributed.
    Then ran the Update Project Resource and Base Summaries Data program followed by the Update Project Performance Data but the PPR page did not show the actual data.
    Post that ran the Refresh programs and actual cost data was visible in the Task Summary and Resource Summary pages of PPR but not in the main page.
    Ran the Refresh programs again and now the actual cost data is displayed in the main page but in the Task Summary and Resource Summary pages the actual cost has got doubled.
    So two issues:
    1. Why it did not populate the actual data once we ran the Update programs?
    2. Why has the amounts got doubled in some pages?
    This is very critical. Any insights would be of great help. This is happening for a few projects. I must say the behaviour of the PPR programs is very inconsistent. You never know what to expect.
    Regards,
    Sri

  • Bulk Project Site option isn't working in project server 2010 migrated from PS 2007.

    Hi,
    I am doing a test migration from epm 2007 to epm 2013. 
    So first, i need to migrate the project server 2007 to project server 2010. i have 2 separate environments for EPM 2007 and EPM 2010).
    there is no problem in migration process and i successfully migrate entire PWA 2007 to 2010, except Workspaces (Project sites).
    Bulk project site option is not helping. I have tried 4-5 times with different PWA 2007 databases (PWA1, PWA2...) but this option did not work. and errors in queue are WSSWebDoesNotExist(16405) and GeneralQueueJobFailed(26000).
    Then next time while migrating all over again i kept the same port and same PWA name then bulk project site option worked.
    Question is, Do i need to keep the same PWA name and same port for the new upgraded PWA??,  one more issue regarding this is that if don't keep the same PWA name and i open the project site and click on the "Project web app" back link, it
    redirects me to old PWA site which doesn't exist and give me page not found error (Obviously).
    Below, you can see the both scenarios.
    my previous PWA 2007 site, say  - http://epm2007:2222/PWA
    When  -  migrated PWA 2010 site, say  - http://epm2010:3000/NewPWA    (Bulk project site update just doesn't work)
    When -  migrated PWA 2010 site, say  - http://epm2010:2222/PWA    (Bulk project site update worked)
    Whats the solution of this problem. is there any utility or query to link all project sites correctly?
    Will i face the same problem while migrating PS 2010 to PS 2013??
    Thank you.
    sandeep

    Hi,
    I would say it is easier to keep the same PWA name between 2007 and 2010 (no need to have the same port).
    If you want to move to a new PWA URL maybe you can use stsadm backup/restore as detailed in this article?
    http://technet.microsoft.com/en-gb/library/ee662500(v=office.14).aspx
    Hope this helps
    Paul

  • Clear Project Cache option .cpd

    Hi,
    I'm using RH8. When my project was taking forever to open up, from past experience I knew it was due to a large .cpd file. Sure enough, it was up to 11 MB and after deleting it, the new .cpd file is only about 1 MB now. Opens much faster now. RoboHelp 8 has the option "Clear project cache (.cpd file) before opening any project". By default this is not checked off. If I check this off, will this put a halt to the issue of getting large .cpd files? Any reason not to check this off?
    Thanks!

    When I use the Clear Project Cache option .cpd, I also get tons of broken links.
    The only solution that I have found that works for me is:
    1. Make a backup of your project.
    2. Delete the CPD file and the XPJ file.
    3. Then, open RoboHelp and from RoboHelp, open the HHP file.
    When you use this method, the conditional tags are usually gone from the Conditional Tag pod. All you have to do is add new conditional tags with the same name as the conditional tags that you had in the project.
    You can open the last backup file and make a list of the conditional tags, then add them to your project.
    Good luck,
    Debbie

  • Project Server 2010 - Import Project Wizard - Local Resource Import Error

    Using Project Server 2010 SP2 with admin rights when I encountered the following error:
    Steps:
    Upon importing a local mpp file with Import Projects Wizard
    Mapped Resources.  Some were mapped to enterprise resources and others were left as local.
    Following completion of import process (mapped task fields, and save), the resources that were marked as "keep as local" were imported to the server as enterprise resources.
    I have never encountered this issue with previous versions of project server and am wondering if anyone else has run into the same issue and if there is a patch?  The error is consistently repeatable and I will check utilizing the account
    of someone without admin rights to see if it happens there as well. 
    It appears that in proceeding to validation step, the import field is automatically defaulted to Yes when proceeding to step 2.  If the user doesn't manually flag this back to No, then the resource is imported to project server.

    Hi Luis,
    I just ran a quick test and I couldn't reproduce your issue with PS2010 SP2. My local resources have been kept as local resources after the import process whereas the resources with a similar name than enterprise resources have been mapped with enterprise
    resources.
    Not sure which CU I have but I'd suggest you to upgrade to the
    latest CU.
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, P-Seller |

  • Issues Importing MP3s

    Hello all!
    Has anyone had any issues importing files into iTunes (11.1.11), using one of the following methods:
    1) File > Add to Library
    2) Drag and drop from the Finder window
    I've had nothing but issues importing files into iTunes - everything just beach balls!
    The MP3s I want to import are fine to play - no corruption etc - but I think the issue lies with iTunes.
    Anyone remember the File > Import File / Import Folder option? I feel that the coding hasn't worked properly since the update (nor did it work on the previous version of iTunes) and it'll crash if you try to just import a folder or folders. It's OK if I go into the folder and highlight all the tracks and import them, but defeats the purpose if you want to import several folders.
    I'm just frustrated that Apple have managed to break something that seemed to be working well into something that is a little sloppy.

    Hi,
    I have not had any problems adding files using file > add to library. The only time I've had a problem when the file kind was not shown as Mp3 Audio. This was because the file name did not show .mp3 and kind was "document" rather than mp3 audio. Could this be the cause?
    Jim

  • Issue importing Siebel data model into OPM

    I am using OPM 10.2 and havaing a issue importing the Siebel data model in to OPM. I also have 10.2 Siebel connector installed on the desktop.
    In OPM I cannot see the Siebel --> Import Data Model option in the menu.
    Is there any configuration change that need to happen in OPM to do this?
    Edited by: SP1D3R MAN on 17/11/2011 18:02

    1. Make sure that you have the Siebel Connector 10.2.1 from Oracel Software delivery Cloud (formerly E-Devliery), there was a bug with the earlier 10.2 where the Policy Modeling Plugin was not working.
    2. Make sure that the files Oracle.Modeling.Siebel.Exchange.dll, Oracle.Modeling.Siebel.Plugin.dll exist the the Plugins sub-directory of Policy Modeling (default location C:\Program Files\Oracle\Policy Modeling\plugins)
    3. Make sure you are using Policy Modeling 10.2
    if you need to manually copy the dll's they can be found in the siebel connector download at program files\Oracle\Policy Modeling\plugins\

  • Disable "Import From Enterprise" Option

    Hi All,
    I am using trial version of Xcelsius Engase Server 2008. There are some issue with this.
    1) I want to connect this with Live Office. While In Manage Connection option i am not getting Live Office connectivity.
    2) In file Menu "Open From Enterprise" option is disabled.
    3) In Data Menu "Import From Enterprise" option is disabled.
    To enable the "Any Map Add-on" option I have used this version.
    Now can anyone tell me in which trial version, i got all these feature?
    Or is there anything that i was missing to enable all options.
    Thanks in Advance,
    Rishit Kamdar

    Rishit,
    1) I want to connect this with Live Office. While In Manage Connection option i am not getting Live Office connectivity.
    Anil - You need to have BusinessObjects Xcelsius Enterprise installed to work on Query as a Web Service (QaaWS) or LiveOffice...
    2) In file Menu "Open From Enterprise" option is disabled.
    3) In Data Menu "Import From Enterprise" option is disabled.
    Anil - Install BO Enterprise server, and check if it is enabled...
    -Anil

  • Automating Project Info in Preferences?

    Hi,
    Is there any way to automate the Project Info in Preferences?
    It only appears when the project is open, as I create lots of
    videos how can I automate all the info like web address, email
    address, copyright info etc... instead of typing it every single
    time?

    Hi there
    One option would be to create a seed project that contains all this information. Then when you need to create a new project you just open the seed project and peform a Save As.
    Other than that, please alert Adobe using the Wish Form.
    Click here to visit the Wish Form/Bug Reporting Form
    Cheers... Rick
    Click here for Adobe Authorized Captivate and RoboHelp HTML Training
    Click here for the SorcerStone Blog
    Click here for RoboHelp and Captivate eBooks

  • Issue importing ProRes files

    Just bought Premiere CS6.  Have an issue importing ProRes files.  Have searched a dozen forums and FAQ pages, and not got a clear or functional answer.  I'm trying to find a phone number for Adobe Product support.  It is almost evil.  Every page takes me to either a FAQ page, or this forum, or back to the page I started at, never arriving at the product support number that is promised with the purchase of the product.
    Anyone got a suggestion?
    I've already posted my issue on this forum several days ago, but received no answer as of yet.
    When I try to import a ProRes file into Premiere CS6 (latest ver.) all that comes in is the audio track.
    I've come across rumours and hints in various forums that suggests I should be able to import and edit ProRes in CS6, just not export ProRes.  Which is fine.  It allows me to do an edit on a Windows platform (in the studio where I'm working) and then I can bring the project back to Mac and output the master as ProRes.
    Help please!!
    Ben

    I modified the title to reflect the issue your having sine it sounds like a phone # is no longer your priority now. I'm glad installing QuickTime fixed it for you. It is listed as a system requirements and we do recommend having it to avoid situations like yours. Many have worked for some time without it with little or nor problems.
    As for the support number, I'm not sure what Number that would be either, but it seems like customers usually get good answers in a timely manner just by being on here. Welcome.

Maybe you are looking for

  • Anyone here got a recommendation for a certificate provider?

    Hi I am about to blow $550 on a 3 year certificate and I would like to know anyone's experiance with this kind of stuff. For me this is a lot of money just to put a 12 letter string on an installer. Who is the best company for this kind of "product"

  • Phtos on ipad to macbook pro

    Question?  I don't know if this has been covered already but I could not find a thread that specifically addressed this situation.  Just bought a new Macbook Pro 15' Retina.  Reasoning behind this is my late 2009-10 iMac's hard drive failed and not a

  • About bapi with java

    hi expert's ,          i wanted to know how we can do bapi with java ...?          how we can retrive data from java.           means what will be the coding for java?                may be m not able to explain but plz help me with this... Regards P

  • Scroll Up Problem - need to use Italics & Regular Typeface!!!!!!@@@!#

    I am making a "scrolling" text for the end of a movie in Motion. I used the "Scroll Up" Behavoir & typed directly onto the Screen using a Text called Trade Gothic. I used a combination of Bold typeface with some parts in Bold/Italic. It works fine un

  • JDK 1.4.2 for Intel Xeon 64 bit

    Gurus, I am installing ECC 6.0 on Windows. I am unable to download the JDK 1.4.2* for Intel xeon processors on 64 bit running Windows Server x64 standard edition. Been to the site  http://java.sun.com/j2se/1.4.2/SAPsite/download.html, to download JDK