Item getting confirmed for a material without stock

Hi
Issue: Sales Orders are appearing in the Delivery Due list, but the user is unable to create delivery.
Reason:Sales order item has got confirmed through V_V2 Transaction i e sales order allocation, but actually there is no stock of that materia. The line item is has complete quantity as confirmed in the item details screen in schedule lines tab. This is happening for the main item (non stock item) in material determination.
E.g.
Order created for mat A with Qty as 20. No stock for Mat A, but stock of 10 Qty available for Mat B, which is the substitute mat for Mat A. Order appears in Delivery Due List as 10 qty available for delivery. Delivery gets created for 10 Qty (Mat A as non stock item and Mat B as stock item rel for billing). Now in Sales order detail screen in Schd Lines tab, its shows Order Qty as 20, Delivered Qty as 10 and Confirmed Qty as 10.
Now V_V2 (rescheduling sales orders by material) is run for Mat A & B. Stock not available still.
After the allocation run, the item in the sales order for Mat A shows Confirmed Qty as 20 even though no stock is available.
Because of this, the Sales order appears in the Delivery Due List but cannot create delivery as there is no stock available.
How to avoid this confirmation of the main item in material determination when stock is actually not available.
Thanks & Regards
Madhu

hi madhu,
please check whether NEGATIVE STOCK is activated for that PLANT.
hope this clears your issue
balajia

Similar Messages

  • How to run MRP for Bulk Material without using LTP

    Hi, how can I run MRP for BULK material without using LTP.
    Thanks in advance
    BK

    Hi,
    Use trasnsaction code OPPQ and goto BOM Explosion and selection depends on
    Field selected
    No dependent requirements are created for informational purposes for bulk material items in the plant selected. This can improve system performance.
    Field not selected
    Dependent requirements are created for bulk material items in the plant selected. These dependent requirements are displayed in the planned order for informational purposes only. They are not considered in the net requirements calculation; that is, they are not included in material requirements planning (MRP) and are not displayed in the stock/requirements list
    Reg,
    Deepak.
    Edited by: deepak k b on Nov 11, 2008 6:56 AM

  • Production Order for a material without BOM and Routing

    Is it possible to create a production order for a given material without routing and BOM, I know we can
    create a production order for a material without a BOM (with a default routing) just wanted to check with
    the above criteria
    Thanks in Advance!!

    Members:
    Thank you for your valuable replies and time
    Santosh:
    Tried what you have mentioned, but system still picks up a default routing
    Kaushik:
    Maintained Default values in OPJG for the given order type, but system still picks up
    default routing
    Mangalraj:
    have no issue in creating a production order without a BOM, but I am trying to see
    is there a way where I can create a production order without a BOM and routing (not
    even default operation )
    Any suggestions on how to create a production order for a material without a BOM
    and routing (not even default one )

  • Is it possible to activate Batch Management for a material without Class?

    Dear Experts,
                           Is it possible to activate Batch Management for a material without having Class & Characteristics maintained. As my requirement is to procure Fuels in Batches only with external no. assignment without any parameters to be checked at the time of Goods Receipt? Batches are needed for Accountability purpose.
    Regards

    >
    Chandan H N wrote:
    > Dear Experts,
    >
    >                        Is it possible to activate Batch Management for a material without having Class & Characteristics maintained. As my requirement is to procure Fuels in Batches only with external no. assignment without any parameters to be checked at the time of Goods Receipt? Batches are needed for Accountability purpose.
    >
    > Regards
    Please check this answered link:
    Batch-classification view
    If you want classify a batch, then you should have maintained the batch classification in material master which is either class 022 or class 023 (depends on your batch level set in cusotmizing). The material class 001 has no impact on the batch classifcition, it is what it is: a classification for the material.
    Edited by: Afshad Irani on Jun 20, 2010 4:40 PM

  • Print out of line item wise tax for each material code.

    hello all,
    Requirement is that my client want to print tax of all item in purchase order seperatelyi.e.line item wise tax for each material type.
    is there any standard procedure available in sap?
    Your valuable input will be apperciable.
    Regards
    sumit bisla

    Take the help from ABAPer and give your requirment to print the tax at item level.

  • How do I get audio for my apps without headphones?

    How do I get audio for my apps without headphones?  For some reason I can only hear the audio for many of my apps through my headphones. I've got the latest version of the OS so I'm not sure what else to do.  Volume works fine for all apps that use video like Netflix and YouTube. Help!

    Instead of turning it off, try a reset. Press & hold the Power and Home buttons together for 10+ seconds, ignoring the red power-off slider, until you see the Apple logo.
    If the reset is not enough to knock a little sense into it, make sure that everything is backed up and restore the iPad to the factory settings.

  • Quantity getting confirmed in sales order without any stock.

    Hi
    My issue is that , the schedule lines are getting confirmed in sales order , even though i have not posted any stock. How to prevent this from happening ?

    Hi Jalaj001, 
    --Go to T.Code  MM02 & in Sales:General/plant data assign availability check as 01 or 02 instead of KP.
    --In MRP 1 -mention MRP Type as PD-Planned MRP
    --Go VOV6 & select your Schedule line category & check mark the Availability
    --Go T.Code OVZ9 & select your availability check control & uncheck the Check without RLT in Replenishment lead Time.
    Let me know if your problem is solved
    Regards
    Pradeep

  • Automatic TO creation and confirmation for a Material document

    Hi Dear All,
    i am new to MM andWM.
    I have to customization for auto transfer orders and confirmations for material documents what ever created with 101 movement type in Inventory Management. I have down configuration like below.
    SPRO->Logistics Execution->Warehouse Management->Activities->Transfers-> Set Up Autom. TO Creation for TRs / Posting Change Notices
    Double click on ‘control data ‘tab
    Hear for my warehouse I given input like   Auto TO = ‘1’,
                                                                             AddId = ‘select check box’.
    And in ‘Assign control’ tab for 101 movement type I have given input like below.
    Automatic TO = ‘1’.
    TO item can be confirmed immed. = ‘tick checkbox’
    Propose Confirmation = ‘tick checkbox’.
    Foreground/Backgrnd = ‘D’.
    After creating of Material document I am executing report RLAUTA10 in SE38.When I execute this report system showing message like ‘TO processing finished: TR total:   17, TO created:    0, Errors:   17’.
    If I check header details of transfer requirements in LB03, i am not seeing ‘Tick Mark’ in Auto TO Creation field.
    Can any one tell me what the mistake i have down or if i need to do any further configuration. Please help me regarding this concern?
    Thanks in Advance..

    Dear Steve,
    Thanks a lot for giving reply with what I need to do, but I am unable to see result.
    I have down configuration like below even though system not processing Auto TO creation. Can you explain me if I have down any mistake below.
    Click on ‘Assign’ button,
    Press on ‘New entries’
    WhN = ‘900’
    Reference Movement Type = ‘101’
    Movement indicator = ‘B’
    Movement type for Whse Mgmt = ‘101’
    TR create Transfer Requirement = ‘X’
    Immed.TO Creation
    Mail confirmation for background processing = ‘01’.
    GR date = ‘2’

  • How to activate split valuation for existing material having stock open PO,

    Hello,          
    How to activate split valuation for existing material in plant having stock and open PR,PO and Production order.
    Regards

    Hi
    It is not possible to activate in such case, u should not have any stock.
    With regards
    Pavan

  • Serial Number creation for a material with stock type

    Hi,
    I am not able to create the serial number for a material which should have valuation type, plant and storage location using the function module ITOB_SERIALNO_CREATE_SINGLE.
    There is no export or changing parametre for this function module for Valuation type(EQBS-LBBSA),
                    Plant(EQBS-B_WERK) and
                   Storage Location(EQBS-B_LAGER)
    Can any one suggest me the BAPI or function module to create a serial number for a material with valudation type, plant and storage location rather tan going for BDC to transaction code IQ01.
    (Note: We can create the serial number with valuation type manually using the transaction code "IQ01" for agiven material.)
    For suitable answers would be rewarded.
    Regards
    Badari
    Edited by: badari Narayana on Feb 10, 2008 5:20 PM

    I have the solution below.
    - Don't change Serial no. profile
    - Goods issue all stock with mvt 201 or 261 into temporary cost object and note your text.
    - Change Serial no. profile in material master
    - Goods receipt all stock (You may ref. material doc.) and you need to input serial number for all materials.
    Hope this solution can help you.
    Edited by: Saiyaman on Dec 9, 2009 5:33 PM

  • System allow GR for a material without profit center maintained it it while Doc. splitting is active

    Dears,
    My client in the Go-live phase and there is an issue related to GR a material without having a profit center in it's master data, the system allow receipt 100 PC and when reversing the GR from MIGO the system display the error "Balancing in profit center is not filled" !!
    so when we try to maintain a profit center in the material master data the system display error that the material already has a balance Q!
    i mean why is the system allow the GR  to happened if the material does not have a profit center
    Note: i checked the configuration for Doc splitting and it's already maintained in the right way !.
    Thanks and best regards,
    Ahmed Samir

    Hi,
    When GR is happens document splitting has not activated????
    Regd,
    Khan.

  • MIGO for Excisable material without entering Excise details in MIGO

    Hi Gurus,
    My Client purchases one material on which he is paying excise duties such as BED, E Cess etc. But actually he receives tax invoice some times after few days of  receiving goods from vendor. At the time of receiving goods , client get only a note from vendor  stating only quantity and no taxes are mentioned on it. How to do this Goods receipt. After that vendor supplies tax invoice,and we need to enter tax/ excise invoice number details .currently system is not permitting me to do MIGO without entering excise invoice number and date. How to do this. Please tell me.
    2. my another Question is what is the flow for purchasing or Raw and Capital goods incluidind excisable material.

    Hello,
    You can do Goods receipt and excise caturing/posting in different trasnactions.
    1. First you do goods recepit and on excise tab you just select Only part 1 entry for materials which are excisable ( PO with excise duty )and for materials which are not excisable (PO with out excise duty ) you can select no excise.
    2. For PO with excise duty - you can capture and post the excise in J1IEX transaction.
    Regards,
    Shailesh

  • Free item gets confirmed before main item if credit limit is exceeded

    Hi,
    I am facing an issue,My stock balance is 10000,in sales order ordered main item is 11000 and free items is 1100.IF the credit limit is not activated for the customer means,Scheduled quantities is coming perfect.
    Now,The customer's credit limit got exceeded and sales order is released via vkm3 the system is confirming only free items(Tann).It's not confirming main items(Tan).
    Kindly suggest me.
    Regards,
    Prabhu.

    Hi
    The only other way i see to stop is to tick / activate complete delivery indicator in Sales Order and use incompletion procedure or make this field as mandatory in customer master but in the second case it will be applicable for all orders for customer .
    Regards
    Rohit

  • Purchase Order With Sub Item Component List for BOM material..??

    Hi MM Experts,
    We want to create PO with a component list that should be appears under the main item.
    The component list is a mterial BOM.
    Ex:- bom MATERIAL - CATALOG1 (Non Stock Materials)
    COMPONENT 1 :-ABCD
    COMPONENT 2 :- XYZ.
    WHEN I ENTER THE BOM MATERIAL:- CATALOG1 IN /ME21N . Higher-Level Item-
    Automatically botom line should be appear component 1 , 2 as a Sub Item.
    how to configur this issue..?? Its a standard Ponot Subcontract
    Thanks,
    NAR.

    Hi!
    If you have correctly maintained the BOM in CS01, make sure that in ME21N you enter "L" as the item category, and then, in the field "material", enter the finished product (the header material in your BOM). Then, enter all other required fields.
    When all mandatory data has been completed in ME21N, go to the "Material Data" tab. Here you will see an icon named "Components". If you click this icon, the materials in your BOM will be listed here.
    So, please, do not expect the BOM to be displayed with mother and daugther segments in the item overview of ME21N. Instead, consider that you will only be able to see the components if you click the "Components" icon under the "Material Data" tab at item detail level.
    I hope this helps!
    Esther.

  • PR Item Text Different for same Material in the same Plant.

    I have a Query for SAP MM.
    Below is the Scenario:
    User raises a PR through SAP for a particular Material (Spare) which belongs to an Equipment.
    Let's say in Plant A, we have an Equipment 10001 & it has a sub-Equipment as 1000112 & further it has a spare which belongs to the sub-equipment as 1000001.
    Now when the user raises a PR for 1000001 then he wants to automatically populate the information in the Item Detail Text tab  such as:
    Equipment No.: 10001
    Sub-Equipment No.: 1000112
    The above text enables the vendor to track & source the correct material.
    The problem here is that the same material is being used in the same plant for another equipment also, hence we cant just update the PO text in the Material Master record.
    How to map the above in the std SAP system???
    Require your help / expert comments.
    Regards,
    Yogesh.

    Hello friend,
                      i feel that u want to send the material to the supplier of that equipment for sum work,
    then it would b better that u maintain the supplier model no. or manufacturing part no. which u can give in the detail.
    it would be better to give the manufacturer part no. The manufacturer can more easil track the part by giving the manufacturer part no, rather then giving your own SAP No.
    and regarding the SUB-Equipment and its part no. there is no standard functionality.
    Regards,
    yk
    Edited by: 1234_abcd on Apr 1, 2010 5:27 PM

Maybe you are looking for

  • Help needed in OID bulkload

    Hello experts, We have OIM enabled with LDAP sync. We have a requirement to bulkload users in OID direclty. I am trying to follow the steps provided in the link http://docs.oracle.com/cd/E25054_01/oid.1111/e10029/bulktools.htm#BEIIFDAG Could any one

  • Busines partner trading partner in TRM

    Hello Where can I enter the trading partner id (vbund) in the business partner? We have a business partner that is our counterparty in financial transactions. For consolidation preparation (in BCS for example) the trading partner has to be entered in

  • 6.5 vs 6.2 Dynamic calc member in basis of @allocate function

    I just converted from 6.2 to 6.5 and have run across a problem in the @allocate function. It appears that it does not resolve the dynamic calc member. Formula is:"Curr Fcst"=@ALLOCATE("SumInput"->"Curr Fcst", @remove(@descendants(@currmbr(Accounts)),

  • Front Row Movies When Hooked Up to Projector

    Hello- I hooked up my MBP to a projector to rehearse a presentation. Out of curiosity, I tried front row and went through the following... -Photos: Worked Great -Music: Worked Great -Podcasts: Great -Movies/Vid Podcasts: Sound, but NO video. I remove

  • Exclude stock reserved for production order from availability check

    Hi Experts, We have a problem in the availability check. There is a material used as selling product and components in the same time. When the material has been reserved completely for a production order, the new sales order still get confirmed despi