ITEM_SCOPE and RECORD_SCOPE Validation?
Hello,
I have a block with two optional fields. I want to be able to validate that either both are set or neither one is set. Seems like I'd need to use RECORD_SCOPE validation for that.
However this block has five other fields for which I have ITEM_SCOPE validation. I like having the ITEM_SCOPE validation on these fields because the user learns of their mistake right when they make it.
Is it somehow possible to do both kinds of validation for the same block?
Is there some other way besides RECORD_SCOPE to do the type of validation for my 2 optional fields?
You can leave the validation scope at item level and use a when-validate-record trigger to perform the validation. Something like:
If :optional_item1 is null then
if :optional_item2 is not null then
message('error');
raise form_trigger_failure;
end if;
else
if :optional_item2 is null then
message('error');
raise form_trigger_failure;
end if;
end if;
Similar Messages
-
I have a 3 GS iphone and longer have service with AT&T, who approved me for unlock. I followed instructions to connect to itunes and restore. Now my iphone displays "could not activate". "no sims card" with both my old AT&T sims and my valid (my phone was unlocked) Tmobile sims card. I have the IMEI number but not the serial number so can not get assistance from Apple support. Can someone help me figure out how to get apple to unlock this phone??? Thanks don
You cannot set it up without a SIM. You need to get one. Doesn't have to be active - you can get a used one on eBay for a buck or two.
-
I have the appropriate Adobe Acrobat 9 Standard software and a valid SN for that software; however, am getting an "Invalid Serial Number" error on installation...please help
Hi James ,
Make sure you are entering the correct serial number.Try it once again and check.
If it fails please get in touch with Adobe Support.Here is the link for the same.
https://helpx.adobe.com/adobe-connect/kb/connect-chat-support.html
Regards
Sukrit Dhingra -
Intel Matrix Storage Manager disables Windows Update and Windows Validation on Windows 7 64-bit
I have a Lenovo ThinkPad R61 8918CTO on which I did a clean install of Windows 7 Ultimate SP1 (64-bit) on a new Seagate Momentus XT 750GB drive. The installation was trouble-free, as were all of the post-install Windows Updates.
Then I installed ThinkVantage System Update 4.03 and used it to install most of the available Lenovo updates. Big mistake. I'll spare you a detailed account of the hours I wasted troubleshooting, rolling back to previous restore points, and doing more troubleshooting, but it turns out that installing Intel Matrix Storage Manager driver v. 8.9.2.1002 caused Windows Update and Windows Validation to fail.
Symptoms: Windows Update control panel can't check for updates and reports that the Windows Update service isn't running when it actually is. Online Windows Validation fails and the standalone Windows Validation utility won't install. Microsoft programs that require a validated copy of Windows (e.g., Microsoft Security Essentials) won't install.
Solution: Roll back the driver for the relevant SATA controller to the previous driver.
I've reinstalled ThinkVantage System Update 4.03 and hidden the proposed Intel Matrix Storage Manager update; since then, I've used it to complete my Lenovo updates without issue.
I hope this post will help other people with this problem find the solution a lot faster than it took me!This happened after installing a new advanced format drive with 4k-byte sectors, I'd guess. If the storage driver doesn't report the physical sector size to Windows, update fails.
I just ran across this myself (again) putting Win 7 on a T400.
I don't know why this is still going on. It may be that the update lists for older machines still have pre-AF-drive drivers listed.
FYI, another fix is going to the Intel site and installing the latest Matrix Storage Manager AHCI driver. This may be more desirable than rolling back to an older driver in some cases.
Z.
The large print: please read the Community Participation Rules before posting. Include as much information as possible: model, machine type, operating system, and a descriptive subject line. Do not include personal information: serial number, telephone number, email address, etc. The fine print: I do not work for, nor do I speak for Lenovo. Unsolicited private messages will be ignored. ... GeezBlog
English Community Deutsche Community Comunidad en Español Русскоязычное Сообщество -
XML Validation in PI 7.1 - Restart and skip validation possible, but how?
Hello all,
I read about schema validation in PI 7.1 and did a few tests on my own, but could not restart and skip validation for invalid payloaded messages. The documents say it is possible.
Anyone know how? Thanks.
BTW, I really think putting the schemas in server file system will cause a lot of authorization trouble in enterprises. No one gives access to the server filesystem and I don't think they will also like to open the required subdirectories for share. Asking the basis team to create the folder structures and maintaining schemas would be another pain. Don't you also think that SAP could find a better approach, like automatically uploading the schemas to the filesystem, or validating them from repository directly if possible?
Kind regards,
GökhanHi Gökhan,
I am facing the same issue.
I set up outbound xml validation in receiver agreement and tested it with valid and invalid messages.
The validation works fine.
But in case of validation error I tried to restart with skipping the validation. But this wasn't possible.
I am always facing the same valdiation error.
I already tried all different tools I know (sxi_monitor, message monitoring in rwb and in nwa)
I am working on PI 7.11 SP6
Did you find a solution for skipping the validation for a single message out of the monitoring?
I know that there is the possibility of deactivate the validation in receiver agreement but thid doesn't meet the requirement of skip the validation only for a single message.
Maybe anyone else faced and solved this issue already.
Thanks in advance
Jochen -
Outlook HTML and CSS Validator Problem
Hi,
I downloaded this
Outlook
HTML and CSS Validator for DreamWeaver 8
(WordMailSupportMacromedia.msi) but when I
followed
the instructions and went to the Browser Check settings,
"Microsoft Word" did not show up in the Target Browsers list.
Anyone know why or have a fix?
Thanks much!FederalWayDave wrote:
> Hi,
>
> I downloaded this
>
http://www.microsoft.com/downloads/details.aspx?familyid=0b764c08-0f86-431e-8bd5
> -ef0e9ce26a3a&displaylang=en for DreamWeaver 8
(WordMailSupportMacromedia.msi)
> but when I
>
http://msdn2.microsoft.com/en-us/library/aa338200.aspx#Word2007MailHTMLandCSS2_D
> reamweaver]followed the instructions and went to the
Browser Check settings,
> "Microsoft Word" did not show up in the Target Browsers
list.
>
> Anyone know why or have a fix?
>
> Thanks much!
>
you can open your html pages FROM Microsoft Word.
seb ( [email protected])
http://webtrans1.com | high-end web
design
Downloads: Slide Show, Directory Browser, Mailing List -
Validity and non-validity material
hi frnds
what is validity material and non-validity material ?
regardsHi Santosh,
Please go through this SAP help it may not give you Exact answer for your quiery but you can get some idea on Material validity.
http://help.sap.com/saphelp_47x200/helpdata/en/f3/7c8fe6a39411d19daf0000e8323350/frameset.htm
I hope it will help you,
Regards,
Murali. -
OLE DB Destination" failed validation and returned validation status "VS_ISBROKEN.
Hi
I have a package which has 10 sequence containers. Have 10 Flat File Source files and all is working perfect on BI Debug mode. When I deploy this package to server I am getting the following error.
I have changed the property Retain the same connection = True but same problem. I have changed the data flow task to Load Project instead of Load Into Project but in error message it is still showing the old name. I have tried to remove the whole step i.e.
Removed Load into Project Data flow with sequence container but I am getting the same error message.
I am not able to understand the reason. Any Idea why am I getting the same error message even I do not have the Data Flow named Load Into Package. It is in SSIS 2008 and being deployed on SQL 2012 server.
Message
Executed as user: NT Service\SQLSERVERAGENT. Microsoft (R) SQL Server Execute Package Utility Version 11.0.2100.60 for 64-bit Copyright (C) Microsoft Corporation. All rights reserved. Started: 15:28:32 Error: 2014-07-22
15:28:36.86 Code: 0xC020201B Source: Load Into Project OLE DB Destination [62] Description: The number of input columns for OLE DB Destination.Inputs[OLE DB Destination Input] cannot be zero. End Error Error:
2014-07-22 15:28:36.86 Code: 0xC004706B Source: Load Into Project SSIS.Pipeline Description: "OLE DB Destination" failed validation and returned validation status "VS_ISBROKEN". End Error
Error: 2014-07-22 15:28:36.86 Code: 0xC004700C Source:
Load Into Project SSIS.Pipeline Description: One or more component failed validation. End Error Error: 2014-07-22 15:28:36.87 Code: 0xC0024107 Source: Load Into Project Description:
There were errors during task validation. End Error DTExec: The package execution returned DTSER_FAILURE (1). Started: 15:28:32 Finished: 15:28:36 Elapsed: 4.39 seconds. The package execution failed. The
step failed.
Many Thanks.
MH
this the error log
starttime
endtime
event
source
message
57:26.0
57:26.0
OnError
Load Into Project
The number of input columns for OLE DB Destination.Inputs[OLE DB Destination Input] cannot be zero.
57:26.0
57:26.0
OnError
Load Into Project
OLE DB Destination failed validation and returned validation status "VS_ISBROKEN".
57:26.0
57:26.0
OnError
Load Into Project
One or more component failed validation.
57:26.0
57:26.0
OnError
Load Into Project
There were errors during task validation.
57:19.0
57:19.0
OnPostExecute
Load Into TrialBalance
57:19.0
57:19.0
OnPostExecute
Trial Balance
57:19.0
57:19.0
OnPostExecute
SSIS_LoadCheck_CoreManGroup
57:19.0
57:19.0
PackageEnd
SSIS_LoadCheck_CoreManGroup
End of package execution.
57:18.0
57:18.0
OnPostExecute
Load Into JournalLine
57:18.0
57:18.0
OnPostExecute
JournalLine
57:18.0
57:18.0
OnPreExecute
Trial Balance
57:18.0
57:18.0
OnPreExecute
Truncate TrialBalance
57:18.0
57:18.0
OnPostExecute
Truncate TrialBalance
57:18.0
57:18.0
OnPreExecute
Load Into TrialBalance
57:07.0
57:07.0
OnPostExecute
Load Into Journal Type
57:07.0
57:07.0
OnPostExecute
JournalType
57:07.0
57:07.0
OnPreExecute
JournalLine
57:07.0
57:07.0
OnPreExecute
Truncate Table JournalLine
57:07.0
57:07.0
OnPostExecute
Truncate Table JournalLine
57:07.0
57:07.0
OnPreExecute
Load Into JournalLine
57:05.0
57:05.0
OnPostExecute
Load Into UserName
57:05.0
57:05.0
OnPostExecute
UserName
57:05.0
57:05.0
OnPreExecute
Business Area
57:05.0
57:05.0
OnPreExecute
Truncate Table Business Area
57:05.0
57:05.0
OnPostExecute
Truncate Table Business Area
57:05.0
57:05.0
OnPreExecute
Load Into Business Area
57:05.0
57:05.0
OnPostExecute
Load Into Business Area
57:05.0
57:05.0
OnPostExecute
Business Area
57:05.0
57:05.0
OnPreExecute
Cost Centre
57:05.0
57:05.0
OnPreExecute
Truncate CostCenter
57:05.0
57:05.0
OnPostExecute
Truncate CostCenter
57:05.0
57:05.0
OnPreExecute
Load Into Cost Centre
57:05.0
57:05.0
OnPostExecute
Load Into Cost Centre
57:05.0
57:05.0
OnPostExecute
Cost Centre
57:05.0
57:05.0
OnPreExecute
Project Status
57:05.0
57:05.0
OnPreExecute
Truncate Table Project Status
57:05.0
57:05.0
OnPostExecute
Truncate Table Project Status
57:05.0
57:05.0
OnPreExecute
Load Into Project Status
57:05.0
57:05.0
OnPostExecute
Load Into Project Status
57:05.0
57:05.0
OnPostExecute
Project Status
57:05.0
57:05.0
OnPreExecute
Project
57:05.0
57:05.0
OnPreExecute
Truncate Table Project
57:05.0
57:05.0
OnPostExecute
Truncate Table Project
57:05.0
57:05.0
OnPreExecute
Load Project
57:05.0
57:05.0
OnPostExecute
Load Project
57:05.0
57:05.0
OnPostExecute
Project
57:05.0
57:05.0
OnPreExecute
JournalType
57:05.0
57:05.0
OnPreExecute
Truncate Table Journal Type
57:05.0
57:05.0
OnPostExecute
Truncate Table Journal Type
57:05.0
57:05.0
OnPreExecute
Load Into Journal Type
57:03.0
57:03.0
OnPostExecute
Load Into Entity
57:03.0
57:03.0
OnPostExecute
Entity
57:03.0
57:03.0
OnPreExecute
Account
57:03.0
57:03.0
OnPreExecute
Truncate Table Accounts
57:03.0
57:03.0
OnPostExecute
Truncate Table Accounts
57:03.0
57:03.0
OnPreExecute
Load Into Account
57:03.0
57:03.0
OnPostExecute
Load Into Account
57:03.0
57:03.0
OnPostExecute
Account
57:03.0
57:03.0
OnPreExecute
UserName
57:03.0
57:03.0
OnPreExecute
Truncate Table User Name
57:03.0
57:03.0
OnPostExecute
Truncate Table User Name
57:03.0
57:03.0
OnPreExecute
Load Into UserName
57:02.0
57:02.0
PackageStart
SSIS_LoadCheck_CoreManGroup
Beginning of package execution.
57:02.0
57:02.0
OnPreExecute
SSIS_LoadCheck_CoreManGroup
57:02.0
57:02.0
OnPreExecute
CoA
57:02.0
57:02.0
OnPreExecute
Truncate Table CoA
57:02.0
57:02.0
OnPostExecute
Truncate Table CoA
57:02.0
57:02.0
OnPreExecute
Load Into CoA
57:02.0
57:02.0
OnPostExecute
Load Into CoA
57:02.0
57:02.0
OnPostExecute
CoA
57:02.0
57:02.0
OnPreExecute
Entity
57:02.0
57:02.0
OnPreExecute
Truncate Table Entity
57:02.0
57:02.0
OnPostExecute
Truncate Table Entity
57:02.0
57:02.0
OnPreExecute
Load Into EntityMessage
Executed as user: NT Service\SQLSERVERAGENT. Microsoft (R) SQL Server Execute Package Utility Version 11.0.2100.60 for 64-bit Copyright (C) Microsoft Corporation. All rights reserved. Started: 15:28:32 Error: 2014-07-22
15:28:36.86 Code: 0xC020201B Source: Load Into Project OLE DB Destination [62] Description: The number of input columns for OLE DB Destination.Inputs[OLE DB Destination Input] cannot be zero.
22 15:28:36.86 Code: 0xC004700C Source: Load Into Project 22 15:28:36.87 Code: 0xC0024107 Source: Load Into Project Description: There were errors during task validation. End
Error DTExec: The package execution returned DTSER_FAILURE (1). Started: 15:28:32 Finished: 15:28:36 Elapsed: 4.39 seconds. The package execution failed. The step failed.
Hi MustafaH,
According to the error message(hightlight above), it seems it's a mapping issue that Naarasimha point out in the post above. Please check this carefully.
An OLE DB destination includes mappings between input columns and columns in the destination data source. You do not have to map input columns to all destination columns, but depending on the properties of the destination columns, errors can occur if
no input columns are mapped to the destination columns.
Reference form: http://msdn.microsoft.com/en-us/library/ms141237.aspx
In your post, you said that it is in SSIS 2008 and being deployed on SQL 2012 server. Do you mean that you create the package deployment utility by using SSIS 2008, and then implement SSIS deployment in SSIS 2012 environment? If so, you need to
convert the project to package deployment model to generate Manifest file in SSIS 2012. Please see:
Use the SQL Server 2008 version of Business Intelligence Development Studio to develop and maintain packages that are based on SQL Server 2008 Integration Services (SSIS)
Use SQL Server Data Tools - Business Intelligence for Visual Studio 2012 to develop and maintain packages that are based on SQL Server 2012 Integration Services (SSIS).
For more information, please see:
Interoperability and Coexistence (Integration Services):
http://msdn.microsoft.com/en-us/library/bb522577.aspx?ppud=4
If you have any feedback on our support, please click
here.
Elvis Long
TechNet Community Support -
Date and Time validation together...
Hi,
I want to have the date and time validation together. Is it posible?
I am not able to do it using "AT SELECTION-SCREEN".
e.g.
DATE1 - DATE2 is 12/22/2009 - 05/27/2010
TIME1 - TIME2 is 15:00:00 - 01:00:00
This will result in error because the time1 is more than time2 but it is correct when it is tied to date1.
I tries to validate them together but it gives the standard error all the time.
Please help me.
Thank you.Hi,
You could have a normal range for your date field and two parameters for the times...no?
SELECTION-SCREEN BEGIN OF LINE.
SELECTION-SCREEN COMMENT 1(33) ttime FOR FIELD p_time1.
PARAMETERS: p_time1 type t.
SELECTION-SCREEN COMMENT 54(2) tto FOR FIELD p_time2.
SELECTION-SCREEN POSITION 60.
PARAMETERS: p_time2 TYPE t.
SELECTION-SCREEN END OF LINE.
INITIALIZATION.
ttime = 'Time'.
tto = 'to'.
Kr,
Manu. -
I try to receive data from a SharePoint List by using REST Services. (_vti_bin/ListData.svc)
This approach worked fine for some days, until I get an error 400 with following error message:
"The etag value 1 specified in one of the request headers is not valid. Please make sure only one tag value is specified and is valid."
Hope anybody can help.
Many thanks in advance.
Hi,
According to your post, my understanding is that you had an issue about retrieve data form list using REST in SharePoint 2010.
I had created a simple demo to retrieve a list item, you can check with the following code snippets.
<script src="http://code.jquery.com/jquery-1.10.2.min.js" type="text/javascript"></script>
<script type="text/javascript">
_spBodyOnLoadFunctionNames.push("callCSOM");
function callCSOM()
$("#Button1").click(function()
ExecuteOrDelayUntilScriptLoaded(ready, "sp.js");
function getListItemById(webUrl,listName, itemId, success, failure) {
var url = webUrl + "/_vti_bin/listdata.svc/" + listName + "(" + itemId + ")";
$.ajax({
url: url,
method: "GET",
headers: { "Accept": "application/json; odata=verbose" },
success: function (data) {
success(data.d);
error: function (data) {
failure(data.responseJSON.error);
function ready(){
getListItemById('http://sp','ListB',2,function(data){
alert(data.Title);
function(error){
console.log(JSON.stringify(error));
</script>
<input id="Button1" type="button" value="Run Code"/>
Thanks,
Jason
Forum Support
Please remember to mark the replies as answers if they help and unmark them if they provide no help. If you have feedback for TechNet Subscriber Support, contact
[email protected]
Jason Guo
TechNet Community Support -
Data flow task error failed validation and return validation status "VS_NEEDSNEWMETADATA"
I have ETL with ~800 tables that I moving from Oracle to SQL Server (Prod Oracle -> Prod SQL)
Now the Oracle/SQL new version was came from vendor that I need to test, and for that I created new DEV environments for Oracle and SQL , the update includes updated new columns in exists tables and new tables . (DEV Oracle -> DEV SQL)
So what I tried to do is to take the old ETL(PROD) to change the connection to DEV servers.
Then I executing the packages from local laptop it's working, and if I trying to execute the packages from job schedule it's giving me errors : "Data flow task error failed validation and return validation status "VS_NEEDSNEWMETADATA"
I went to each table to check the columns if something different, and I was dropping some of the tables and recreated them in the destination but the error still shows. I also tried to change the package to "DelayValidation" to True but without
success.I do not understand the difference between "... if I going to change the Connection Manager to new connection" and "didn't change the Connection Manager, only changed inside the Server name / user/ pass" 800 tables.
What I see is some tables your packages sees in Dev (laptop) is not of the same schema once the package is deployed hence the metadata error.
Arthur
MyBlog
Twitter -
Memory Leakage while parsing and schema validation
It seems there is some kind of memory leakage. I was using xdk 9.2.0.2.0. Later i found that from this forum which contain a Topic on this and they (oracle ) claim they have memory leakage. And they have fixes this bugs in 9.2.0.6.0 xdk. When i used truss command, for each call to parser and schame validation, it was opening file descriptor for lpxus and lsxus file. And this connections were not close. And keep on openning it with each call to parser. I was able to diagonise this using truss command on on solaris. After making many calls, i was error message could not open file Result.xsd (0202). I am using one instance of Parser and Schema. And i am doing clean up for parser after each parse.
Later i downloaded, 9.2.0.6.0,
Above problem for the parser was solvedm but still the problem continued for schema validation. And even i tried with latest beta release 10.
And this has caused great troubles to us. Please can u look whether there is come sort of leakage. Please advice if u have any solution.
Code---
This below code is called multiple times
char* APIParser::execute(const char* xmlInput) {
char* parseResult = parseDocument(xmlInput);
//if(strcmp(parseResult,(const char*)"")==0) {
if(parseResult == NULL) {
parseResult = getResult();
parser.xmlclean();
return parseResult;
} else {
return parseResult;
Parser and schema are intialised in Construtor and terminated in Destructor.Hi, here is the complete test case
#include<iostream>
#ifndef ORAXML_CPP_ORACLE
# include <oraxml.hpp>
#endif
using namespace std;
#define FAIL { cout << "Failed!\n"; return ; }
void mytest(int count)
uword ecode;
XMLParser parser;
Document *doc;
Element root, elem;
if (ecode = parser.xmlinit())
cout << "Failed to initialze XML parser, error " << ecode << "\n";
return ;
cout << "\nCreating new document...\n";
if (!(doc = parser.createDocument((oratext *) 0, (oratext *) 0,(DocumentType *) 0)))
FAIL
if (!(elem = doc->createElement((oratext *) "ROOT")))
FAIL
string test="Elem";
for(int i=0;i<count;i++)
//test="Elem"+string(ltoa(i));
if (!(elem = doc->createElement((oratext *) "element")))
FAIL
if (!doc->appendChild(elem))
FAIL
//doc ->print();
//parser.xmlclean();
parser.xmlterm();
int main(int argc,char* argv[])
int count=atol(argv[1]);
mytest(count);
char c;
cout<<"check memory usage n press any key"<<endl;
cin>>c;
return 0;
-------------------------------------------cut here-----
Now, i cant use the xdk 10g because i work on a hpux machine. I have tried the above program with a count of 1000000. the memory usage at the end was around 2 gigabytes.
Could someone please please help me? :(
Thank you. -
Ive downloaded fifa 13 and in want to buy fifa points but when i purchase them it says contact itunes support. I have got apple id credit and a valid credit card payment on my accout but it still wont let me purchase it. What is the problem?
Contact itunes support.
It will be aconversation.
You will e-mail or express lane chat with them. They will answer you.
That is contact.
It sounds like you have not contacted them at all. -
ADDT Datepicker and spry validation don't work together
Datepicker and spry validation don't work together
the problem is in: /includes/wdg/classes/MXWidgets.js
(necessary to datepicker)
Does anyone have a solution??
ThanksHi Gabriele,
technically speaking, ADDT and the Spry framework have about nothing in common, and you´re going to stumble across many compatibility-related issues when trying to use them together.
Does anyone have a solution??
any regular user who´d like to provide a solution to this, would have to be a pretty skilled programmer and would have to know the "technical details" of both ADDT and SPRY very well to be of help -- I don´t think that you´ll find many folks here who are capable to do that.
However, why not making the date field required in ADDT ?
Cheers,
Günter Schenk
Adobe Community Expert, Dreamweaver -
WD Exercise : Validating and Non-Validating Actions
Hi Experts!
I am doing the validating and non-validating exercise based on the SDN document<a href="https://www.sdn.sap.comhttp://www.sdn.sap.comhttp://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sap.km.cm.docs/library/webdynpro/wd%20java/wd%20tutorials/web%20dynpro%20sample%20applications%20and%20tutorials.htm#6">here</a>.
When I download the already done application, it works quite well. However, when I try to make it on my own, I encountered following problems:
1. I could not write labels as [married since] on the radio button.
2. I could not do the data mapping from the view controller to the component controller.
As a result I have not been able to deploy the application.
The <a href="https://www.sdn.sap.comhttp://www.sdn.sap.comhttp://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sap.km.cm.docs/library/webdynpro/wd%20java/wd%20tutorials/using%20validating%20and%20non-validating%20actions.pdf">document</a> I am refering to, has a explanation of the application contents.
But does anybody know if there is a manual for creating this application?
Many thanks
Regards,
SudeepHi
For your problem
1.I could not write labels as [married since] on the radio button
Use the <b>text</b> property to assign labels to radio button
Check the sample whether its using radiobutton group?
2.I could not do the data mapping from the view controller to the component controller
You can only map from component controller to view controller.
Regards
Ayyapparaj
Maybe you are looking for
-
Automatic batch creation at VL01N
Hi, At the time of creating Outbound delivery in Tcode VL01N for particular material I want the batch field to take the batch number automatically. Setting : Material ( Batch option is already checked in material master). Is it possible. Pl explain.
-
Oracle Warehouse Builder 10.1.0.4 on Windows 2008 - 64 bits
Hi Gurus. I'm currently working with a customer who wants to migrate all their database-servers to Windows 2008 on 64-bits processors. They're using Oracle Database Enterprise Edition 10g Release 2 (10.2.0.4) and Oracle Warehouse Builder (10.1.0.4).
-
How do I fix a HTTP 403 error on my Mac using Safari? Is it possible to remove it? It's got everything locked up!
-
Setting up Foreign JMS Dest. to MQ: JMS Destination not found
I'm trying to set up a foreign JMS destination to an MQ queue. There are several steps you have to get right for this to work. I thought I did them all correctly, but when I deploy the app with an MDB that references the JNDI name, it says (in the co
-
Illustrator crashes repeatedly at startup
Hello, Illustrator crashes whenever I open it, I've been searching on this forum and on the basis of the answers trying to solve the posts .. but after trying I still have this problem. below is my crash log. Thanks Michael Process: Adobe Ill