Hi all,,
can any one hlep me on Job work process and CIN related process for job work
Regards
Mastan Rao

Check these threads
[Re: Job work in SD subcontracting. |Re: Job work in SD subcontracting.]
[SD Enterprise structure |SD Enterprise structure]
thanks
G. Lakshmipathi

Similar Messages

  • GR for job work sales order

    Hi all!
      We do a mere job work for our customers. We receive the materials from customers, do some work on it and return back the same. For this i have created 2 material codes for finished and raw as non-valuated material(UNBW). Process is like i have created an enquiry(1300003) , created quotation(1400026)based on enquiry, created sales order(1500079) with reference to quotation and tried to receive the raw material in 501 E or 561 E  with reference to sales order.
    But when i tried to do goods receipt in MB1C (561 E) with reference to a particular sales order number(1500079) system throws me an error as below.
    Account assignment cannot be carried out because of different origin no.
    Message no. V1134
    Diagnosis
    The sales document to which you want to refer is based on sales document 1300003 and item 000010. Therefore, the settlement and possibly inventory management are carried out using the number of the preceding document.
    System Response
    This entry is not allowed.
    Procedure
    Enter the document and the item number of the preceding sales document.
    System is not accepting the sales order number as reference but its accepting the enquiry number when i do 561 E
    How can we solve this issue..
    Thanks in advance,
    Raj.

    Hi,
    1. create BOM - Customer materials are raw materials.
    2. Create a sales order with header materials .
    3. Maintain the pricing according to your requirement.
    4. the sales order with create a purchase requisition for the sub materials.
    5. based on this create a purchase order. Note create a account assignment for the sales order to puchase order with respect to job work.
    6. Do MIGO.
    7. Do billing to the customer.
    thanks
    Kuntla

  • Job Work Scenario / process mapping is required

    Hi Experts,
    This is the following system how the client is doing in legacy system and they want like that in SAP. is it possible in SAP?
    1. With out sales order they are doing the production ( customer will give Grey material )
    2. once production is done they packed the finished  material into BALE wise  that time they will maintain the bale packing slip for each bale wise
    3. They will raise the commercial invoice based on the bale packing slip
    4. once payment is done then only they can delivery the goods
    5. At the time of delivery again they will refer bale packing slip for that particular customer and they select the bales numbers and once it is picked stock will be updated and as well as E.B-4 Register will be updated .
    6. One IMPORTANT Point is at the time of delivery  some bales like suppose out of 10 bales 7 bales will go to export and 3 bales local (domestic )
    7. At the time of excise invoice for 7 bales they will raise excise Invoice (example number series 01E1220) and 3 bales domestic excise invoice ( example number series 01L1390) , in both the cases they are referring the delivery numbers
    but one more point directly client is not doing export they are sending to customer and customer is exporting
    8. How to map in the above cases pricing procedure and excise will calculate based on the (Job work Charges + Assessable
    I need guidance how to solve the issue
    I created 2 Sales Org like Domestic and Export
    if any further information please revert
    Regards,
    Prasanna

    First of all Thanks for reply,
    Sorry for the Late reply
    Here sales unit is in Meters and RG 1 Register also will be updated in Meters , EB-4 Register will be updated in Bales wise
    now i am explaining
    1. first customer will give the Grey material after one week and one month customer will give the program ( program means how he wants finished product ) for that program we designed new screen with Z-Table and also we designed program register new screen
    2. once we receive the grey material and program qty that time i will raise the sales order for program qty how much he wants and also for one program we will raise more than one sales order
    3. once production is completed partially they will pack the material into BALE wise suppose
    sales order qty is like that
    10  CO056864PL48M     2*2 Dyeing 48" Medium           100 meters
    20  CO056864PL48D     2*2 Dyeing 48" Dark                200 meters
    30  CO056864PL48ED     2*2 Dyeing 48" Extra Dark       300 meters
    40  CO057272PL62W     2*2 Dyeing 62" White               280 meters
    once production is done for the above sales order they packed into BALE wise like
    BALE Number 100 :
    10  CO056864PL48M     2*2 Dyeing 48" Medium          50 meters
    20  CO056864PL48D     2*2 Dyeing 48" Dark              105.50 meters
    BALE Number 101 :
    20  CO056864PL48D     2*2 Dyeing 48" Dark                90 meters
    30  CO056864PL48ED     2*2 Dyeing 48" Extra Dark     168 meters
    40  CO057272PL62W     2*2 Dyeing 62" White              180 meters
    like wise they will pack BALES once bale is packed for that particular BALE(S) they will raise the Commercial Invoice
    Once payment is done may be customer will ask the delivery after 2 or 3 months they will raise the delivery based on the BALE numbers and also we done the new Screen Design for BALE in that they will get customer wise list of BALES
    and also they don't refer multiple Sales orders they refer only BALE register from that they want to pick the material and also once they picked the material based on BALE numbers that time stock will be updated as well as EB-4 Register.
    but the Problem is suppose out of 10 BALES they will raise delivery 7 BALES for export excise invoice but they send to the customer and customer will do Export for that we go for ARE-3 and remaining 3 BALES they will raise Local Excise Invoice
    but i have created sales order as a domestic bcoz i have created 2 sales org like Domestic and export is there any problem like can we  raise export excise invoice for domestic customer ?
    If you any one having doubts please revert me
    Try to give me the solution how to solve
    Regards,
    Prasanna

  • Sales Process of JOB WORK

    HI
    We have new scenerio for JOB WORK PROCESS
    Customer will provide us the Raw Material and on proccessing it we will produce two diffrent finish goods
    which will be billed to that customer through JOB ORDER
    Can anyone tell us how to configure process into SAP .
    Regards
    PR

    hi
    Create Sales Order. And Purchase requisitionVA01,Check stock / requirements situation for finished product. MD04
    Check list of Purchase requisition     ME5A
    Create Subcontracting order with reference to the Purchase Requisition     ME21N
    MD04
    Post Goods Isue w.r.t to Subcontracting Order     MB1B
    Create Subcontracting Challan 4.5/4.6     J1IF01
    Create Billing Document     VF01
    Post goods receipt with reference to purchase order     MIGO
    Post invoice verification     MIRO
    this is process for job work ,
    this is for one proces another process as same for this document but this maintain the
    va01-vl01n(movement type 541)-j1if01 her u can cant maintanin any prise
    ofter comes to finshed product ,
    u can maintian this process:  jobwork charges
    va01_vl01n_vf01_j1iin
    u maintain the settings for vov8  delivary type only,
    in this process u can matain the vov8 for one document type ( it for only internaloreder  jobwork)
    ofter jobwork chages  vov8;maintain normaly
    for job work for other material /(rawmaterial)  u maintain  tcode for j1id - maitain the assessable value for revelant material and plant, and matain subcontract activae in material and chepted id comination,
    this  cin setting
    so u maintain the
    two ordr type one is jobwork internal order
    another one is job work charges
    and also maintain the copy controls(internla order)
    Order requirements :    001
    Combination requirmt:   051
    Header Data :           001
    Header Data Ext. Sys :  0
    Handling Units  :       000
    u maintian thia routines for header
    Sales doc. type:         jobwork internal ord
    Item category   :        Job work item
    Order requirements:    101   Item
    Item data:      901   Item(101 div change)
    Item Ext. System   :    0
    Business data  ;        2     Business Data
    this for item details for copy contols
    as same of internal order
    here comes billing
    it for coman billings routines

  • Does back ground jobs work process go to private mode or not

    Hi Experts,
    Can any one tell me
    Does back ground jobs work process go to private mode or not
    Thanks and Regards
    Dan !!

    Hi Dan,
    I do not think background work processes would go into PRIV mode.
    the orginal information was remove by Admin because provided by Cut and Paste from SAP Online Help.
    you will find it <a href="http://help.sap.com/saphelp_47x200/helpdata/en/7a/caa6f3bfdb11d188b30000e83539c3/frameset.htm">here</a>
    The distribution, participation in distributing or otherwise sending of this material is against the law. The material you are requesting is copyrighted material and available ONLY to customers of SAP. If you need such documents from the SAP Service Marketplace then you must have "S" user ID and login yourself to retrieve this material. If you do not have a "S" user ID then you should contact your own internal company groups responsible and request one or request them to retrieve the document for you.
    By participating and sending such documents you are at risk for legal action and a removal of your account here on SDN and BPX.
    DO NOT send material via email such as this! Further actions will result in officials within your company and your SAP Sales Account being notified and could result in legal action against you as an individual.

  • Conversion process(job work - MTO) delivery issue

    Hi All,
    We are unable to create delivery for a conversion process sales order(Job work - MTO) for which stocks are reserved from 5th nov 2011. The sale order is created on 5th nov 2011.
    We are getting the following error message: Message no. VL455 "The sales order you want to deliver, sales order 1101200011 with order type ZO03, either contains no delivery-relevant items or its delivery-relevant items have already been delivered."
    For the same sale order we are able to do the delivery from 23rd nov 2011 onwards.
    But we are not able to create deliver for the materials between 5th to 23rd.
    Please could any one suggest a solution for the above issue.
    Regards
    Srinivas
    Edited by: yenigalla on Nov 4, 2011 9:15 AM

    Hie,
    This is because the schedule line in the sales order has confirmed the date for delivery as 23rd novemner. If the material is available (it should be reserved for that sales order since it is MTO) at 3rd novbr then re-run the availability check in the sales order. This will confirm the date for delivery as 3rd novbr.
    Regards,
    Denish.

  • Customer Standard & returns Process for Job work Scenario issue

    Hi,
    According to My Job Work Scenarios
    Customer will give the Raw material like Grey (Non Valuated material )
    Normal Process :
    Once we created a sales order for 100 meters , at the time of production completion the finished stock will be increased or decreased like 110 meters or 90 meters
    1. At the time Delivery how system will accept over delivery and under delivery . i have seen the 2 fields in customer master  where we will we maintain the Percentages how system will determined
    2. Billing will be done by based on delivery qty and after that i have to raise the Excise invoice based on billing level
    my doubt is how can we know or Track  this sale order we delivered qty less or over ? is there any report available in standard SAP ? how to close the sales orders ? is there any mass close of sales orders ?
    3. At the time of Excise invoice they want to enter the Assessable manually how to do in SAP ?
    Return Process:
    1.  we will raise the Return Order based on document type RE , but in my case client will take the Return Goods and he will give the price of raw material like Grey how i am going to handle this situation ?
    2.How to process the excise related activities what the settings i have to do and what are the t-codes ( I think we can use J1IH ) i have to use
    3. What the documents will be generated
    Please guide me because i searched in Forum i couldn't able to find out
    is there any solution ?
    Regards,
    Prasanna
    Edited by: prasanna_sap on Jul 12, 2011 12:55 PM

    My answers are in BOLD. I have done some tests and my advise is based on the tests.
    First of all Thanks for Reply Mr.Typewriter,
    According to My Job Work Scenarios
    Customer will give the Raw material like Grey (Non Valuated material )
    Normal Process :
    Once we created a sales order for 100 meters , at the time of production completion the finished stock will be increased or decreased like 110 meters or 90 meters
    1. At the time Delivery how system will accept over delivery and under delivery . i have seen the 2 fields in customer master where we will we maintain the Percentages how system will determined
    Yes you can have limits to over and underdelivery in XD01 or VD51, depending upon either you want to give limits for a customer or for a cust-mat combination
    Can you please explain because my doubt is if i entered manually system will accept i want to restrict the end-user like for example he can enter over delivery 10 % and under delivery 5 % where i have to fix those percentage because if i am not fix End-User can enter sometimes over delivery 11 % and under delivery 10 % system will accept i want to restrict that
    3 steps -
    1. in VD51 create cus-mat info record, go inside the record by double clicking - give Underdelivery % & Overdelivery %, Save.
    2. in 0VLP, for your delivery item category, in field "Check Overdelivery" = B (Situation rejected with error)
    3. in OVM1, for message VL 064 change to E (error), this is for Underdelivery
    Now if sales order is created for 100EA. Underdelivery and Overdelivery = 10%
    Then user can NOT create delivery e.g. for 80EA or for 150EA.
    I have tested this.
    2. Billing will be done by based on delivery qty and after that i have to raise the Excise invoice based on billing level
    my doubt is how can we know or Track this sale order we delivered qty less or over ? is there any report available in standard SAP ? how to close the sales orders ? is there any mass close of sales orders ?
    In sales order in VA03, item level, Tab Schedule line - there you can see clearly Ordered Quantity and Delivered Quantity
    Even if it is Over or under delivery also
    Yes, see point 1
    The status of the order you can set/configure, if in XD02, in Tab Shipping, field = Partial delivery / item
    status can also be configured in VD52, field = Partial delivery / item
    This way you do not have to manually close the sales order, even if you have underdelivered. Select the option (A, B,...) which fits your business requirement best.
    3. At the time of Excise invoice they want to enter the Assessable manually how to do in SAP ?
    what about the solution for this point
    I don't know this point's answer
    Return Process:
    1. we will raise the Return Order based on document type RE , but in my case client will take the Return Goods and he will give the price of raw material like Grey how i am going to handle this situation ?
    Explain this more. (what are material you have sent to customer & what material he is wanting to pay for; are they different MMRs?)
    Two ways -
    One have different cond records with different MMR and prices (if Finished mat = M1, and raw material = M2); in MM01, Tab Sales org 1, you can have Sales Unit changes set.
    Second have a different pricing procedure for RE and another for OR.
    Customer will give the Grey Material ( Non - Valuated ), we send the finished Material to customer correct , Due to some reason customer return the Finished Goods that time Client will pay the Grey material value
    1 Questions -
    e.g. Grey mat = M2
    Finished goods = M1
    Q1. RE order shall have different material #s from sales orders, because RE shall have grey mat. & OR shall have Finished mat. Is that correct?
    Then - cond records in VK11 for different materials, for con type PR00 for M1 and M2; this is possible.
    2.How to process the excise related activities at the time of returns what the settings i have to do and what are the t-codes ( I think we can use J1IH if yes guide me based on that )
    What is the solution for this point
    I do not know this answer
    3. What the documents will be generated
    Are you asking documents to be generated for RE process? Delivery note has to be printed for the warehouse to do GR
    I mean at the time returns is there any excise related documents will be updated if yes tell me what are the documents ?
    I do not know this answer
    Regards,
    Prasanna
    Edited by: Typewriter on Jul 13, 2011 1:43 AM

  • Force FM execution on batch job work process

    Hi!
    Is it possible to asynchronously start FM execution on batch job work process?
    Additions:
    CALL FUNCTION func STARTING NEW TASK taskname.
    CALL FUNCTION func IN BACKGROUND TASK.
    starts FM execution just on another dialog process.
    Context of requirement:
    There is a program that may be logically splitted into two parts:
    - dialog part where data is collected from user input
    - BAPI call with a tons of parameters(structures, internal tables) formed on user input
    So the problem - system dump by timeout during BAPI execution.
    The only solution is to execute BAPI functionality on work process without timeout limitations - batch job work process.
    There may be two approaches:
    - pass parameters to report and schedule its execution in background job. But here arise question how to pass these dynamic parameters? SAP memory doesn't available for background job work process and "SUBMIT WITH FREE SELECTIONS texpr" seems to be intended for LDB or anyway not for such purposes.
    - force FM execution on background job work process - so how if it possible?
    Appreciate your suggestions.
    Regards,
    Maxim.

    Hi Maxim,
    Look at this example program where the user can run it online to enter the input values in the selection screen and then the program just goes into background mode, basically achieved by submitting the same program again skipping the selection screen. This is one more option for you.
    REPORT ztest.
    PARAMETERS: p_vbeln LIKE vbak-vbeln,
                p_bkrun NO-DISPLAY.
    DATA: ls_vbak LIKE vbak.
    DATA: v_answer,
          v_jobcount LIKE tbtcjob-jobcount.
      IF p_bkrun IS INITIAL.
    *-- not background processing
        CALL FUNCTION 'POPUP_TO_CONFIRM_STEP'
             EXPORTING
                  textline1      = 'This may time out.'
                  textline2      = 'Do you want to run in background?'
                  titel          = 'Warning!!!'
                  cancel_display = space
             IMPORTING
                  answer         = v_answer.
        IF v_answer = 'J'.
    *-- run in the background
          CALL FUNCTION 'JOB_OPEN'
               EXPORTING
                    jobname          = 'ZTEST'
               IMPORTING
                    jobcount         = v_jobcount
               EXCEPTIONS
                    cant_create_job  = 1
                    invalid_job_data = 2
                    jobname_missing  = 3
                    OTHERS           = 4.
          IF sy-subrc <> 0.
            MESSAGE ID sy-msgid TYPE 'E' NUMBER sy-msgno
                    WITH sy-msgv1 sy-msgv2 sy-msgv3 sy-msgv4.
            EXIT.
          ENDIF.
    *-- submit the program in the background
          SUBMIT ztest
            WITH p_bkrun = 'X'
            WITH p_vbeln = p_vbeln
            USER sy-uname
            VIA JOB 'ZTEST' NUMBER v_jobcount AND RETURN.
    *-- close the job
          CALL FUNCTION 'JOB_CLOSE'
               EXPORTING
                    jobcount             = v_jobcount
                    jobname              = 'ZTEST'
                    strtimmed            = 'X'
               EXCEPTIONS
                    cant_start_immediate = 1
                    invalid_startdate    = 2
                    jobname_missing      = 3
                    job_close_failed     = 4
                    job_nosteps          = 5
                    job_notex            = 6
                    lock_failed          = 7
                    OTHERS               = 8.
          IF sy-subrc <> 0.
            MESSAGE ID sy-msgid TYPE 'W' NUMBER sy-msgno
                    WITH sy-msgv1 sy-msgv2 sy-msgv3 sy-msgv4.
          ENDIF.
          EXIT.
        ELSE.
          CLEAR v_answer.
        ENDIF.
      ENDIF.
      CHECK v_answer IS INITIAL.
      SELECT SINGLE * FROM vbak
                      INTO ls_vbak
                     WHERE vbeln = p_vbeln.
      IF sy-subrc <> 0.
        WRITE:/ 'Invalid Order Id.'.
      ENDIF.
    END-OF-SELECTION.
      CHECK v_answer IS INITIAL.
      IF p_bkrun IS INITIAL.
        WRITE:/ 'Here is the result running the program in foreground.'.
      ELSE.
        WRITE:/ 'Here is the result running the program in background.'.
      ENDIF.
      WRITE:/ ls_vbak-vbeln,
              ls_vbak-vkorg.
    Let me know if you have any questions.
    Srinivas

  • Work in process discrete jobs

    I can't understand why is it possible in work in process(discrete jobs) to Move assemblies even if you haven't issued components to that job,it means that you can complete assemblies without issuing material why is that the case please clarify.

    Sometimes you have shortages of a component and the component is such that it can be added to the assembly a little later.
    The above functionality allows you to move past an operation so you can record that it was attempted/done partially.
    But by keeping the material requirement open, you can keep track of what needs to be issued to the job once the onhand is available.
    If your client does not want this to occur, you can either make the component operation pull or create a personalization /customization on the move screen that disallows the move if any push component is not issued.
    A lot of companies manage this by creating reports that show unissued material. You can do that too.
    Sandeep Gandhi

  • Complete job work process

    hi,
    What is the complete process for job work process,when we are receiving the material for job work processs.
    Regards
    prabudh

    Background jobs run in a special type of work process—the background work process—that is different from dialog work processes in two ways:
           1.      A dialog work process has a run-time limit that prevents users from interactively running especially long reports. that limit is always in effect for dialog work processes. No such limit applies to background work processes.
           2.      Background work processes allocate memory differently than dialog work processes so that background work processes can become as large as they need to in allocated memory to allow for processing large volumes of data.
    <b>Use</b>
    Using background work processes also lets you optimize both background or dialog processing. In “night” mode, more servers can offer more work processes to accommodate background processing jobs that are scheduled to run when there are lower numbers of interactive users. In “day” mode, you could limit background processing to fewer servers and/or fewer background work processes.
    When a time-driven scheduler is activated, it starts the jobs for which it has free work processes. If there is another background processing server, then the scheduler on that server starts the remaining jobs for which it has capacity, and so on.
    <b>PROCESS</b>
    Assigning the program to the variant in T/C SE38
          Enter the Program,
          Enter Variant Radio Button ON,
         Name the Variant
    Assigning the varient job to its importancy & Frequency in T/C SE36
       Enter Variant Job Name -- Save,
       Class--- Save ,
       Period Values---Save
    Executing the Varient Jobs in T/C SM37
       Enter The Jobname --- Execute
    Hope This Works For you..Reward if its helpful
    Regards,
    Rajasekaran.

  • Service Sales & Job work

    Dear Experts
    My requirement is I am having manufacturing plant for my production related activities and i will do job work for third party.I want to have control on the inventory like what materials are coming in going out related to job work.Is there any Material Master has to be created and how to map this scenario in standard SAP system.
    Thnx
    MK
    Edited by: MOHANA KRISHNAN on May 15, 2010 10:54 PM

    >
    MOHANA KRISHNAN wrote:
    > Dear Experts
    >
    >
    > My requirement is I am having manufacturing plant for my production related activities and i will do job work for third party.I want to have control on the inventory like what materials are coming in going out related to job work.Is there any Material Master has to be created and how to map this scenario in standard SAP system.
    >
    > Thnx
    > MK
    >
    > Edited by: MOHANA KRISHNAN on May 15, 2010 10:54 PM
    For the above scenario to work, you need to use MATERIAL TYPE "DIEN" which is used for services. Maintain master data for services there, then while doing PO, use account assignment with material DIEN and then MIGO and then MIRO, here no service entry sheet required. You can do MIGO for service receiving against PO.

  • Query regarding Job work senario in India

    dear all,
    i am facing a strange problem
    i m having some Customer who sent material on (4)(5) a or 57F4 challan for job work. In that case only labour charges are charged no excise duty will charged, but how i will take the material "in" in to system,from which transaction code and which movement type i used. Also the storage location should be different for that ?
    It Dose not hit the RG1 Register.
    can any body help me to solve this
    please please solve the problem
    regards
    pankaj
    [email protected]

    Dear Pankaj
    1. Then i will suggest to use DIEN Material type , which will not be valuated, as
    it is customer's stock
    2. Then you recieve the material from Customer, which is non-valuated.
    This you can do in MIGO.
    3 Then you make a production order with BOM, where component will
    be material given by customer and FG will be Material you are going
    to send along with byproducts.
    3. Once material is process(or produced) then you can make a seperate jobwork sales order type and deliver it
    4. Finally bill it for services rendered.
    If you use Services you will not get stock of customer's material in the system.
    But if you use non valuated material you can get the stock. So ask if stock
    is required???
    As no excise entries are required you need no worry about CIN part
    I hope it is clear....
    Regards
    Jitesh

  • Return of customer job work

    Hi gurus,
    i  have another scenario regarding return in customer job work,
    if a customer is sending us a material for painting we are taking that material as customer job work where we follow the following steps
    sales order--goods received of raw materialproduction planning- delivery---- invoice
    now say if the customer finds that the outcome was not satisfactory then he is going to return the finished material back to us and again we will make it proper and send it back to the customer and we have to deliver it free of cost or may be we will take some charges.
    so can any one tell me how can i map this job work return scenario.
    looking forward for your reply.
    Regards,
    Subhrangshu

    hi,
    there is an process called REWORK ORDER in SAP BB.
    please check under the name of V45
    there is a BLOG written by brahmakumar please check it
    this might be help ful to you.
    regards,
    balajia
    Edited by: balaji timmampalli achari on Nov 13, 2010 3:41 AM

  • Solution for job work material

    Dear All,
    Please provide me what is the best solution or procudure for job work material (for production), also confirm me what effect of component price in Bom.
    Thanks

    Hi vivek!
       Thanks for your reply..
    But what is the need of creating PO's.. I am simply receiving the material(non-valuated) form the customer and do some service in it and send it back to him.. I will process this via sales.. But my question is whether should i create a material master for each time i receive a new material since its one time job and weekly we r receiving around 100 new materials.
    Thanks,
    Raj.

  • JOB WORK SECANRIO.

    Dear Gurus,
    We recevie a material for Job Work in our plant .to process this material we have use certain of our in house raw materials and then send it back after processing .
    the material coming into our plant is enter as Non Valuate material as its coming for Job work..
    the raw material in our plant which we are consuming is valuted materials.
    My query is can we can we include the these valuated raw materials in the BOM of non valuted material code and consume them via a Process order ,when we create Job work perocess order for this JOb work.
    Thanks in advance
    Regards
    Ram

    Hi Lakshman,
    thanks for the reply
    you are right.we are the subcontractor.
    the material comes into our plant from another party and we process the material in our but we use certain our material.
    when we create  BOM there no error as such.
    will there be any costing or service tax issue or sale tax issues in this case
    Thanks in advance
    Regards
    Ram

Maybe you are looking for

  • Outgoing Payment

    Dear Experts I am making a Pld report on outgoing payment in which i  want to display payment method ..cash or bank.. how can i distinguish between  cash and  bank payment   because in OVPM  table when cash payment is made it stores G/L Code..in case

  • Contacts not visible in SMS inbox

    Yesterday i did a reset on my nokia N97 to set it back to the factory settings. I copied my contacts to the phone memory, but now when I get a text message I only see the phone number instead of the name attached to it. The names are in the Contacts,

  • Conditional Calculation/Filter in Crosstab

    Hi All, Is there a possibility to make conditional calculation in a crosstab ? I want to filter some records, if their key figures are under a certain value. There is a possibility to write formula for that key figure and suppress related records (e.

  • Lightroom 2 colour/darkness vs Lightroom 1

    I have just upgraded to lightroom 2 and all images appear too dark, too contrasty and with a slight colour cast. The strange thing is that lightroom 1.4 is still on my machine, and, when looking at the same picture through Lightroom 1.4, the result i

  • Time dimension BPC10

    Tried to use Time dimension in one of the reports in BPC10NW. The expansion of Time dimension is following the alphabetical order. Example: If Q1 of a year is expanded, its showing up Feb, Jan, Mar. Same is the case with other Quarters(Q2/Q3/Q4). All