We can update the overhead to FG material through any one of the following
1. KGI2
2. CK11N
KGI2 - is for actual cost calculation and posted to Production order and settle the production order FG material
CK11N is plan cost of raw material and plan overhead cost calculated and updated in the FG material master through CK24.
Regards
Elangovan

Hi
Thanks for your valuable information.
MY Main basic objective is to update the plan price to Material master (FG) through CK11N, (price indicator in mm03 is S)
so i no need to run KGI2 is it.
I'm right or wrong
Kindly clarify
thanks in advance
regards
elango

Similar Messages

  • Prodn Order not calculating OH at KGI2 and WIP at KKAX

    I have created a prodn order and in the control TAB the RA key and OH key is attached . Iam not able to calculate the WIP and OH for the Order .
    PLease help .
    Nakul

    Pl make sure you have maintained rate for actuals in overhead % (S_ALR_87008275)
    Also check the base for OH calculation in costing sheet and confirm you have actual costs posted under corresponding cost elements.
    Lastly make sure you have right period and fy when you run KGI2.
    Same way for WIP makensure u have actual costs posted. Also verify whether you are getting any error log.
    Find out whether this issue is with one of theorders or in general. Check config and master data accordingly.
    Regards
    Subodh

  • Costing relevancy in BOM and CK11n

    hi,
    In BOM for an item i have maintained Costing relevancy as 1 (50% relevancy) which is a procurement item, but even after running Ck11n for the matrl iam getting 100% cost for the child item.
    Is there any other setting to be maintained.
    regards

    Hi,
    The reason SAP has provided that is during the computation of the inventory cost estimate & not for the standard cost estimate the field is considered.
    For standard cost estimate it is either / or situation, i.e. it is relevant for costing or not relevant, there is no % relevance for this.
    This is in place due to financial & reporting requirements where some parts might require a devaluation. So i would strongly suggest to discuss with your Costing consultant for this.
    However for this case, if you can let us know what is the reason you want to have this kind of partial costing done, the forum can provide some possible alternative if its a genuine business need.
    Regards,
    Vivek

  • "product cost flow in direct labour CK11n"

    Hi Gurus,
    In Material cost estimate with quantity structure CK11n cost of goods manufacturing COGM direct material cost is capturing. But in cost of goods sold COGS is not capturing.  What is the procedure for direct labour and expenses for individual costing. From FI to CO and how it will capture in cost sheet and CK11n. 
    Thanks in advance
    jaya

    issue closed

  • Activity quantities in CK11N

    Hello sap gurus
    When I try to calculate cost of my product at CK11N, it shows "0" (zero) quantities for my activities.  I checked this from routing screen (ca03), I can see quantities for each activities. So, I have quantity values for each activity in routing screen but somehow they come to CK11N screen as zero.
    How can I fix this problem, thanks a lot already.
    Best Regards

    Dear,
    Confirm us one thing.
    Do you see the Activity types along with Cost center in CK11N?
    Means, Like below
    PROD 1000 0
    SETUP 1100 0
    LBHR 1200 0
    Major things to look after is
    1. Routing - Cost elements have been included in OKTZ
    2. Activity types rates in KP26
    3. Activity types - Cost element category - KL02
    4. Lot size in Material master - MM03 - Costinf View 1 and CK11N and BOM
    5. Costing Variant configuration - OKKN
    Verify the above first
    Thanks

  • Value Field not fetching the data

    Dear COPA Experts,
    There has been an addition to the cost component structure for my current client. The cost component has been created and CK11n is showing the correct data for the correct cost component. I had to add value fields to my current COPA report to reflect the figures from the cost component. For that, I had created and activated the Value Fields in KEA6 and assigned it to the Operating concern in KEA0 and activated it. Then, I had assigned the value fields to the cost component structure in KE4R. I had then added the value field in the COPA form through KE95.
    When a new cycle is completed, It does not reflect the valuation in KE30 report. I had crossed checked in KE24 which is a standard report. The result in KE24 and KE30 report is same, i.e the valuation is not even reflected in KE24 report.
    Please guide me to where am I missing something?
    Best Regards...

    Hi,
      "When a new cycle is completed, It does not reflect the valuation in KE30 report". This statement is not clear. Are you expecting KEU5 cycles to populate this value field ? Normally this value field should be populated during billing (VF01) when the value of the cost component is populated in the value field.
    regards
    Waman

  • Batch-input for exporting cost calculation to a local file (ecc 6.0)

    Hi,
    we had a batch-input to export some data in a local file (excel format) in SAP 4.5B.
    We recorded transaction CK11 for a material number, we got Itemization screen and then we recorded menu' option "List . Export . Local file / Spreadsheet). If the batch-input ran in foreground it would produce required outputs (some excel files).
    Now we are migrating from 4.5B version to Ecc6.0; we recorded same transaction (both ck11 and ck11n, to be more ), but at execution time the window for local file saving never is displayed and B.I. stops with error.
    One difference is that now data are collected into a container,  instead that in a write list ...

    Hi again,
    the data i look for is a result of calculation of different tables so for every single product, it is calculated. In standart CO reports, there is no such report that give me that detail.
    Finally i managed to call print OK code, but it was in the foreground processing mode, i cannot run it on backround processing..
    I know i misuse the LSMW, but i think LSMW may have such flexibility to use such reports, thanks to SAP.. it was an adhoc report i tried to combine, so writing a program may be much more time consuming.

  • How to Post Actual Costs for Overhead

    Hi All,
       Kindly let me know the steps or T-Code as to how to post the actual costs for the Overheads.

    Hi
    Use the t.code KGI2 and post the actual costs for the Overheads.
    Award points if it is useful.
    Thanks & Regards,
    A.Anandarajan.

  • Pricing procedure in subcontracting process

    Dear gurus,
    Is there any difference between standard Pricing procedure and sub contracting pricing procedure. If there is any kindly explain the steps of configuration.
    Regards,
    Prashanth

    Hi,
    you can use subcontracting info records. Please check ME1M and CK11N transactions for your material.
    Please read the note 597686 in case import is involved in your process.
    Regards,
    Edit

  • SUBMIT_WRONG_TYPE

    I have a request for users to automate the running of 3 transactions.  Once of these is KGI2- Overhead calc.  But this belongs to a function group KAZB which can not be submitted from another ABAP program.  So I can going to stip out what I need from this Function group and create a custom report program which I can then call via the SUBMIT.  I just wanted to check if there was an easier way to call the transaction KGI2 and return without having to leave the user in the transaction..

    Instead of SUBMIT-ing to KGI2, why not use CALL TRANSACTION with BDCDATA to automate your process?

  • No change document  and no user exit is found   for CK11N tcode

    Dear All,
        After execution of the transaction CK11N  in CDHDR table i dint find any entry for change document.
    But there is a business object for this transaction :BUS2044 which has no event .
    As there is no event in the business object and there is no change  document also so how i will trigger this business object for CK11 transaction.
    I serached for user exits also but i dint find any.
    So can any body pls tell me how to trigger the business object for the transaction CK11.
    Thanks
    sharmistha
    Message was edited by:
            sarmistha das

    If there is no event it is difficult to trigger an event. So in any case you have to create your own subtype of BUS2044 and define the event you want to create.
    If there are no user exits (I assume you have also looked for user-exits of type BTE and BAdI, even substitutions) you are perhaps out of luck? Being out of luck in this context means you will have to resort to a modification.

  • CK11N , bom and routing not copied

    Dear all,
    At time of costing run through CK11N , bom and routing not copied I have checked all validity/ status /uses / lot size of bom and routing also . but when i will run costing for next month system has copied bom and routing .
    plz guide me

    Dear Surendra Patil,
    Check the costing variant that you use for executing CK11N, is it PPC1?
    If this is correct means check in T code OKKN and choose PPC1 and check for the quantity structure
    control and check the BOM apllication and the routing selection ID.
    This should match with your BOM that you have created and also the routing that you have created.
    1. Check the BOM status in CS03---> header.
    2.Check the status & usage of routing in CA03,generally it will be
    Usage                1    Production
    Status               4    Released (general)
    3. If you are using Production version check whether have you assigned proper routing group & counter
    and along with the BOM.Also check whether is the production version locked?
    Check & Revert back.
    Regards
    Mangalraj.S

  • CK11N and CK24

    Hi
    I have some problems here, I am using transaction CK11N ( Create material cost estimate with quantity structure)
    EVERYTHING SEEMS TO BE FINE, and when i hit save it flases showing " The cost estimate is being saved"
    when i than run transaction CK24  I.E PRICE UPDATE, ITS SAYING THAT " of 0 materials , 0 cost estimate were updated succesfully"
    and its shwoing message " No cost estimate found  for price update"
    I have checked everythin possible, like material master and seen the check in the controlling tab of quantity structure.
    what ele can I do?
    any ideas?
    its strange as when doing CK11N its actually saying " the cost estimate is being saved"

    Hi,
    I am showing you the path, just you follow it
    1. Go to CK24.
    2. Enter the Posting Period and Fiscal Year
    3. Enter Company Code, Plant and Material.
    4. In Processing Option, Tick the Test Run and With List Output
    5. Now Click on Marking Allowance
    6. Now your company code will show the green light. Now save it and come back to original Screen
    7. Now Execute. System will show the following Message. Of 1 materials, 1 cost estimates were updated successfully
    8. Now come Back and Save again
    9. Now remove the Tick Test Run
    10. Again click on Marking Allowance and again it will be in Green light.
    11. Come back to main screen.
    12. Now Execute again. Message will be Of 1 materials, 1 cost estimates were updated successfully
    13. Save it and come back again.
    14. Click on Release button and Execute it.
    This time material cost will be updated in Material Master.
    I hope it is clear to you now
    Regards,
    jigar

  • Mat standard price update in Mafg and DC plant at single runof CK11N

    HI,
    we have two plants US01 as Manfg and US02 as DC and we have same mat A in both the plants.
    If i do cost estimate in us01 and again in US02 and release CK24 then mat in both the plants are getting updated with following config.
    Will it be possible to update the stand price in both the plants at single  CK11N run without running in two plants seperatly.
    Special proc can be defined by PP guys or you can also define as below
    1. Go to OMD9
    2. Click on New entries: Enter your Plant = Plant 2 (receiver plant) "SP Pr Type" = Z1 and Proc Type = F;
    3. Under Special Procurement Secrion
    Enter U as special procurement and Plant 1 in the Plant Field (Transferring plant)
    4. Save this entry, and in Mat Master of Plant 2, specify F as Proc Type and Z1 as Special proc key
    5. Run CK11N in Plant 2... and release from CK24
    Thanks,
    sudha

    Dear Sudha,
    Special procurement is configured when there is a stock transfer from one plan to another plant. By this way there will be no new cost estimate in the receiving plant.
    Below document explains in details on the topic:
    http://www.sap-topjobs.com/SpecialPP/overviewdoc.pdf
    We also have transfer control configuration to avoid unnecessary costing estimates for already costed materials to get it transferred to the new material cost estimate when we have same components.
    Kind Regards
    Umapathi G

  • Std Cost Calculation in Sales Order - EK02 and by T-Code CK11N

    Hi,
    I have repharsed my question and described it point wise as still i am unbale to solve. Please help.
    1. I have defined a new cost relevance indicator Y with 110%. the managements wants to see 10% extra cost in the sales order on some meterials of the BOM. This is working fine with the costing variant defined for sales order costing EK02.
    2. When i run cost by CK11n, it calculates cost based only on indicator X irrespective of what indicator has been defined in the BOM, which is also ok.
    3.Further, the costing variants defined iin steps 1 and 2 are different and both are maintained by different T.Codes, OKY9 & OKKN
    4. We need a new csoting variant for sales order costing that calculates cost same as CK11n, I ahve tried but it calculates cost based on the indicator defined in BOM
    5. I want to understand exactly where in the configuration of casting varaint (OKY9) or configuration of cost relevance indicator (OS21) what do i have to change to take the effect
    Appreciate your support
    SAPXPT

    Hi
       Use substitution method and values arrived  based on 10% of the sale order value and  Use CK74N Additive cost before you run costing run.
    Hope this might help!
    Regards

Maybe you are looking for

  • How to create automatic creation of BP from customer and vendor master data

    Hi gurus, can any one tell how to create automatic creation of BP from customer and vendor master data. Please give me the steps. Thanks Sasikanth.

  • CF8.01 hacked.  Need info on patches

    Yesterday some of our hosted sites were hacked using code pasted below.  We're running CF 8.01 and I'm wondering if there is a cumulative secutity patch that we can apply or If I should just apply every security patch that I can find.  I noticed that

  • Radiobuttons and the focus event

    This is in AS2. Is there a 'onFocus' event for individual radio buttons,  or is it limited to the radiobutton group ? If there is a focus event for the buttons,  how to I set it up ?  I've set up an event listener with an 'onFocus' event,  'gotFocus'

  • Safari 5.0.6 keeps crashing. Here is the report:

    Process:         Safari [1606] Path:            /Applications/Safari.app/Contents/MacOS/Safari Identifier:      com.apple.Safari Version:         5.0.6 (5533.22.3) Build Info:      WebBrowser-75332203~3 Code Type:       X86 (Native) Parent Process: 

  • I can't see icloud in my preference system it's mobile me icon instead

    i can't see the icloud icon in system preferences it's mobile me instead how can i figure icloud