Link between batch stock and stock transport order no.

hello all,
my client want the report for stock in hand against batch and sto no..in standard tcode mb52(stock in hand) we can see the stock against batches.but i want the report for which sto no. stock is recieved corresponding to batch.
pls tell me from which table and field i should pick data for stock against sto no.
thanks in advance for ur valuable input
regards
simran
caution-- we are using two step procedure with stock transport order for transferring the material between plants

S

Similar Messages

  • Link between notification number and meter reading order in ISU

    what is the link between notification number and meter reading order in ISU. i have written a program to close all open notifications but now i want the program to close only notifications with closed meter reading orders but i cant find the link between meter  reading order and notification

    HI timothy
    you can tell me how do you solved this issue?
    how i can match reading Order with the order in Work Management?
    i need some configuration?
    thanks in advance
    Miguel

  • How to set up Batch Management and stock determination ?

    Our client deals in various food articles and wish to use batch management and shelf life functionality.
    Details are
    While doing the goods receipt, batch no. as supplied by vendor will be entered. There is no requirement of batch no. generation. Thus batch no. as supplied by vendor will be used for identifying the stock. It will be also having fix shelf life and will be entered while doing the goods receipt. Now at the time of goods issue for consumption, or stock transfer to other plant system should propose the batch no. for material which will be having earliest expiry date (For ex. on 15.01.2010 we receive the goods with batch no ABC having expiry date as 31.03.2010 and we receive another lot on 20.01.2010 with batch no. XYZ having expiry date on 25.03.2010, then while doing the goods issue for consumption or stock transfer, system should propose the lot with batch no. XYZ and not ABC). How to achieve this?
    As I am new to batch management please provide detail configuration steps for batch management and stock determination. We are not using warehouse management.
    Thanks in advance,
    Satish

    Hi,
    Please refer below link
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/LOBM/LOBM.pdf
    Regards,
    Nitin Amritkar

  • Link Between Service Notification and Sales Order

    Hi All,
    In our business process, we will create sales order from Service Notification and we can see the same in the Document flow. But when i check in the VBFA table, there are no entries. I would like to know how the document flow is updated without updating the VBFA Table or is there any other table gets updated for this flow.
    Please guide me.
    With Regards
    Vinu.N

    Hello Vinu
    For one Sales Order # figures in Notification header table- VIQMEL-VBELN.
    Similarly Notification # figures in Sales Order Header table- VBAK-QMNUM
    That is a solid link right there.
    I Also guess technical objects like Equipment, Serial number also form link between the Sales and Service Documents.
    Also check out the logic in document flow program RIBELF20, may be it will give you the clues to the problem.
    Hope this helps.

  • Availability check for Make to stock and Make to Order

    Dear All,
    Client is selling   Make to stock and make to Order material.
    How and what settings need to do for Avaialbility check.or we can use standard one.
    I hope in case of Make to Order availability check may not happen.
    Please correct me.
    Thanks in advance.
    Regards,
    Shrikant

    hi,
    yes for make to order we dont have AvChk.  for make to stock items u need to follow the
    below configuration.
    Availability check
    1. Availability check is an integral part of the business process that determines if the required delivery quantity can be met on a required delivery date. For this purpose the system takes into account pre-delivery activities such as scheduling for picking or packing times and the time taken to produce or obtain the material. It also performs several background functions such as Backorder processing, rescheduling and ATP quantities.
    2. Backorder processing: processing of a sales order that has not been fully confirmed or not confirmed at a certain delivery date.
    3. Rescheduling: is a proposal of how u2013 confirmed quantities already assigned to a sales order can be reassigned to other sales orders that have a higher priority.
    4. Available to promise (ATP): is a process of checking the available quantities of a material. The ATP quantity consists of warehouse stock + planned receipts (incoming stock) u2013 planned issues (outgoing stock). to examine stock on hand (CO09) proceed to logistics u2013 sales & distribution u2013 sales u2013 environment u2013 availability overview.
    5. Replenishment lead time (RLT): is the time taken for the material to become available either internally (in house production) or externally (from a vendor). The most important things to consider during an external procurement are purchasing and MRP 2 (procurement) views of MMR where the processing time for purchasing, planned delivery time and goods receipt processing time are taken into account. On the other hand internal procurement is based on in house production time (MRP 2 view) goods receipt processing time or alternatively RLT time, which is found on MRP 3 view.
    6. RLT (Replenishment Lead Time) is the time taken for the material to become available. RLT is only used when doing an ATP check (Available To Promise). The value of RLT for a material is specified on material master record.
    7. There are three types of availability checks u2013
    Check on basis of ATP quantities.
    Check against product allocation.
    Check against planning.
    Configuring Availability check through Checking Groups u2013
    1. The checking group + checking rule determine how the availability check is to be performed.
    2. The checking group determines whether and how the system checks the stock availability and generates requirements for material planning. The checking group defines what type of requirements will be passed on i.e. summarized requirements (daily/weekly) or individual requirements for each sales order.
    3. The checking rule applies to how the availability check is to be carried out at the transaction level. Note that you must define checking rules for each individual application such as for production orders for example. In Sales and Distribution, the checking rule is specified internally within the system and cannot be changed.
    4. The checking rule, in conjunction with the checking group, determines the scope of the availability check for every business operation; that is, which stocks, receipts and issues are to be included in the availability check and whether the check is to be carried out with or without the replenishment lead time.
    5. Briefly explaining the above u2013 checking group determines which type of requirement to be passed on to MRP whether it be individual or summarized and checking rule which is at the transaction level and can be configured independently for each application module, determines which stocks, receipts and issues to be taken into account. For performing an availability check checking group has to work in conjunction with checking rule.
    6. Advantages of individual processing over summarized processing u2013
    Backorder processing is possible.
    You can access (MD04) order, line and schedule line individually which gives a greater control on available stock and requirements placed on stock.
    The system automatically uses individual requirements in case of special stock items.
    7. Required data for the Availability check to be carried out u2013
    The Availability check must be switched on at the requirement class level.
    The Availability check must be set at the schedule line level.
    A requirements type must exist by which the requirements class can be found.
    A plant must be defined in the sales order for each schedule line item (in other words plant must be defined for every material in MMR).
    A checking group must be defined in the material master record in the MRP3 screen in the availability check field.
    8. Configuring Availability check and defining Checking Groups u2013
    Checking groups are introduced into the sales order based on the setting in the material master record.
    SAP standard checking groups are 01 u2013 summarized requirements and 02 u2013 individual requirements or you can create your own by copying the standard ones.
    Total sales and total deliveries columns are there to configure a checking rule to sum up requirements to post to MRP either individually or by day or week.
    Block quantity required can be set if you want several users to be able to process the material simultaneously in different transactions without blocking each other.
    The no check indicator is CHECKED when you DO NOT want the system to carry out ATP check.
    9. Defining material block for other users u2013 the block check box is an indicator that enables you to block material master records of a particular material during the availability check and restrict other users from accessing same master record and reserve the material. If the block is not set, two users can confirm the same material at the same time for two different orders, not knowing if the stock is available or not. If you select this field, the material is blocked during the availability check and other users cannot: a) Make changes in the material master record. b) Create purchase orders for the material. C) Create orders for the material.
    10. Defining default values for checking groups - Checking groups are introduced into the sales order based on the setting in the material master record.
    However if there is no entry present in the material master record for the checking group, a default value can be set here, depending on material type and plant.
    This default value will be used by the system depending on the material type mentioned in MMR and plant in sales order.
    If an entry exists, this default value is over written by MMR.
    11. Controlling Availability Check u2013 in this section, you tell the system what stock on hand and what inward and outward movements of stock it must take into account when performing the availability check in addition to whether or not to consider the replenishment lead time.
    12. These settings are based on the checking group that is assigned to the material master record and the checking rule that is predefined and assigned to the sales and distribution transaction.
    13. These settings carry out control both for sales order and delivery as well. This is due to the fact that you may want to include specific stock or incoming stock for the sales order, yet at the time of the delivery only include physical stock on hand waiting to be shipped.
    14. It is possible to indicate to the system that you would like the availability check NOT TO CHECK the stock at the storage location level. This indicator is used to set the scope of the availability check.
    15. It is used to switch off the check at storage location level. You create a reservation for a particular storage location. However, the scope of the availability check is set in such a way as to exclude the storage location. In this case, the system carries out the check at plant level only and does not take the storage location into account that is specified in the reservation.
    16. Should you not want the system to automatically check RLT, you may indicate so here. RLT is the time taken for a material to become available. It is only used when doing an ATP check and is taken from MMR.
    17. Defining the elements in the availability check entirely depends on the business needs, but a few tips are given under u2013
    When controlling the Availability check at the time of the sales order, a purchase requisition does not necessarily indicate by it is going to come into the plant.
    A shipping notification on the other hand - a confirmed purchase order u2013 is a good indicator of receiving stock on a specified date.
    It is always recommended not to select the shipping notifications for the delivery requirements type as you may not actually receive the stock into plant or warehouse for which you are creating a delivery.
    regards
    anand

  • Negative stock and Stock below safety stock

    Hi,
    Both negative stock and stock below safety stock create procurement proposals - internal or external.
    But what is the difference between them?
    Thanks in advance.

    Hi,
    NEGATIVE STOCK:
       Negative stock function used when you want to post Goods Issue quantity that larger than the book quantity.
    For example: you have stock of material A000 = 90 qty and you want to Goods Issue with 100 qty.
    Negative stock function is not relevant for the procurement, It can only use for the excess qty issue to to the production than stock qty. System will not create PR .
    You need to do configuration setting to use this function.
    Cust: In customizing negative stock are must allow for a valuation area, Plant and Storage location level.
              In addition you can set the special stock at plant level such as
    Consignment
    Material provided to vendor
    consignment stock at customer
    sales order stock
    project stock
    returnable packaging with customer
    returnable transport packaging
    Application: The indicator for negative stock is with the storage data in the material master mast be maintained.
    Note: It is possible for unrestricted use and blocked stock only.
    With the standard price, There are no special features to the negative stock. But with the Moving average price , a price diff account can be posted to when goods are received.
    STOCK BELOW SAFETY STOCK.
    The Safety stock should cover any excess material consumption that may occur during the replenishment lead time as well as the normal requirements when deliveries delayed.
    The Safety stock is therefore part of reorder point.
    You do not required any special setting to use safety function. Just need to maintain the safety stock level in the material master.
    If stock reduce below safety stock, system will create procurement  proposal i.e Planned order or Purchase requisition.
    I hope it will clear your query.
    Ashish Panchal

  • What is the link between 2lis_03_bf,2lis_03_bx and 2lis_03_uM

    HI,
    what is the link between 2lis_03_bf,2lis_03_bx and 2lis_03_uM.is these datasources to be loaded in the order.can anybody explain me

    Hi
    These three datasources are related to inventory. BF is for opening stock, BX is for material movements and UM is valuations. Before loading this data into BW you need to maintain some settings in R/3 side.
    According to  SAP NOTE:315880.T-code BF11.Activate the flag NDI will reflect in table  "TBE11" For the entry "NDI".
    2. set the application indicator 'BW' to active using Transaction 'BF11' . which will make tick mark(x) for the field AKTIV for the APPLK ='BW' in table TBE11.
    3. Activate the PROCESSKEY under "Maintain Industry Sector"
    4. Generated "STOCK INITIALIZATION" for 2LIS_03_BX.
    5. Filled setup tables for "INVENTORY CONTROLLING"
    6. Scheduled the InfoPackage for 2LIS_03_BX with update mode "GENERATE INITIAL STATUS.
    then load BF and UM
    There is a PDF available how to load inventory..just search for it in SDN.
    REgards
    Ram

  • Link between Business area and Material master

    Hi guys
    Is there a link between Busines area and material master, i am getting an error when I am trying to Move part of material stock from unrestricted stock to Project stock by 411/Q.
    Error
    Business area xx changed to yy
    Ideas?
    sam

    Hi
    Yes Business area has a link with MMR
    Business area determination is through by three rules
    1. Plant and item division
    2. Sales area( sales orgdistribution channeldivision )
    3. Sales org, distribution channel and item division
    Here item division means the division in MMR that is basic data 1 tab and sales org 1 tab
    This division field forms the main link between Business area and MMR
    Regards
    Raja

  • LINK BETWEEN BATCH & OPERATION NO

    HI ALL
    I GENERATE A BATCH IN A PROD ORDER  AGAINST A OPERATION NO . NOW I GENRATE A Z REPORT , IN REPORT I WANT OPERATION NAME AGAINST THE BATCH NUMBER BUT I DONOT FIND THE LINK PL TELL ME THE LINK BETWEEN BATCH NO & OPERATION NO.
    REGARDS
    NAVEEN

    Hi Naveen,
    Ok if you need to get workcenter name then logic goes as below.
    From AFRU table get AFRU-ARBID.
    And Get Workcenter name from CRHD Table using OBJTY EQ 'A' and OBJID EQ AFRU-ARBID. If you need Workcenter Text also then write code as below mentioned query:
    SELECT SINGLE AOBJID AARBPL B~KTEXT_UP INTO ICRHD
            FROM CRHD AS A INNER JOIN CRTX AS B
              ON AOBJID = BOBJID
            WHERE A~OBJTY EQ 'A'
            AND   A~OBJID EQ IAFRU-ARBID.
    Hope, this is what you require.
    Regards,
    Arpit

  • Is there any link between movement types and documents

    hi
    is there any link between sales doc and movement types ?
    is it the only source dependig on schedule line movement type will determined?
    if with out order we are doing delivery how system will determine movement type
    Thanks in advance

    Hi,
    Deliveries that are created without reference to order , contained movement type because to process a delivery you need to have some of the control criteria that are copied from sales document header to delivery document header, as system processes delivery in that way ,that is why you will find default order type is assigned to the delivery document type ie DL. .which helps the delivery document to process without reference to sales document.
    In Addition to above information,
    In VOV4,
    DL+ NORM +   +    -DLN
    In VOV5,
    For Itemcatagory DLN+        --CN
    From this schedule line category CN,movement type 601 is taken during without reference to order –delivery creation.
    MCM

  • What is the link between schedule lines and delivery document item level

    Can any one please explain me what is the link between the schedule lines of the order/scheduling agreement and the item level of the delivery.
    Is there any link between VBEP and LIPS ?

    Hi
    Most of the item level data in delivery doc is copied from Schedlue lines in Sales order for eg delivery date
    So u may say that schedule line in sales order becomes the line item in Subsequent doc that is in Delivery doc .
    The table u are talking about i.e VBEP is related to sales doc and it contain data for Schedule line in sales order and the other table i.e LIPS give the delivry doc related data at item level.
    Hope this help

  • Link between EKKO, EKPO and KONP

    Hi,
    can someone help me out to trace the link between EKKO, EKPO and KONP tables?
    regards,
    ravi.

    Hi Ravi
      KONP is conditions table.
      If we need the conditions(prices) of a purchase order, we can get it from EKKO, EKPO & KONV.
      1. Extract KNUMV from EKKO.
      2. Using EKKO-KNUMV - Extract conditions from KONV where KONV-KNUMV = EKKO-KNUMV.
      3. We can find item prices where KONV-KPOSN = EKPO-EBELP.
      Hope this helps you.
    Kind Regards
    Eswar

  • Table link between contract document and billing document

    Hi,
    Please let me know the table link between contract data and its billing plan nnumber.
    Regards,
    bhaarathi.

    VBKD is the Table name
    if Ordertype "G"  <--- that means It is a contract
    From VBAK and VBAP you can get the Contract Details for the Order Type "G"
    Go to Table VBKD, with the contract and get the billing plan .
    FPLNR <--- is the Billing plan
    Here you get the relation Between Contract and Billing Plan

  • Link between structure indicator and labellig system (PM-FL)

    Hello,
    I'm facing a problem to associate one of my alternative label with a precise structure indicator.
    In our system (R/3 4.6c), we have activated the alternative system in order to use a 40-char-long label for our functional locations. We also created a structure indicator to represent these 40 characters.
    When changing this alternatice label, the system shows the structure indicator of the main label. On my opinion, it is normal because I've found no customizing point that allows me to link the alternative labelling and the structure indicator. Am I wrong?
    If you ever encountered this problem, could you please help me find a way to solve it?
    Best regards,
    Annabelle

    Hello,
    sorry I couldn't answer your question sooner.
    The situation is this one :
    - functional locations have assigned  primary labels. These labels are created according 43 (out of 44) structure-indicators which help in representing a structure of technical objects. Thanks to the object type, we created a link between object type and structure indicator through a specific table.
    - Two functional locations can have the same ID with distinct localisations.
    - a secondary label has been created in order to generate a 40-character-long ID that is necessary to have a unique ID for each functional location.
    - We have a specific structure indicator (the 44th) that represents a 40-character-long text.
    As both labels are mandatory in the solution, is there a customizing point where we can link a non-primary label with a defined structure-indicator?
    Thanks for your help.
    Annabelle

  • PLs. find link between a case and its activities?

    Hi ,
    I need a function module or a table relation  in order to make a link between a case and its activities.
    and also want to know the relation between *crmd_orderadm_h-guid with SCMGRECP01-PHIO_ID. *
    Please help me .

    Hi,
    you can try vice versa
    CRMD_CMG_CASE_AT-CASE_GUID = SCMG_T_CASE_ATTR-CASE_GUID
    SCMG_T_CASE_ATTR-EXT_KEY =  CRMD_ACTIVITY_H-EXTERN_ACT_ID 
    CRMD_ACTIVITY_H-GUID =
    CRMD_ORDERADM_H-GUID
    Regards,
    Sumeet

  • Table for link between Accounting document and Billing document

    Which is the table for link between Accounting document and Billing document ?
    Thanks & Regards

    Ø Go to SE16N, enter table BSAD
    Ø In the Reference Field (VBELN) enter the Billing Document no. 
    Tips:
    Ø Make sure that only those billing documents will be considered whose accounting documents actually exists
    Ø No Accounting documents will be displayed for Credits, Free of charge orders and those acc. Documents which have been cancelled.

Maybe you are looking for

  • The Firefox sign is no longer at the top of my page and mozilla search has changed to google and I can not find how to get it back.

    I was talking about how much I liked the Mozilla search with friends and when I looked at my home page the search engine had changed to Google. Also, when looking at all the instructions that referred to the Firefox box, I did not see it and I do not

  • VPN issue on 10.8.5 - is there a way to do a full reset?

    Regardless of where I am connected from (various different WIFI networks), I am not getting  a login prompt for all of my VPN connections (all Cisco IPSec). This symptom only started manifesting aftrer I got my maboook back from Apple after a repair

  • Master Collection Trial

    Where can I download the Master Collection Trial? The sitehttp://prodesigntools.com/adobe-cs6-direct-download-links.html does not work, Adobe pls why is it being hosted on a 3rd party webby

  • Grey shadow left after titles appear in Flash slideshow

    Hi, the producers of the Flash slideshow product i am using do not know the reason for this problem. When the slideshow runs, titles we composed using the product dashboard (as a Dreamweaver plugin in Dreamweaver CC) appear. The titles are dynamic an

  • Using cursor on table of records

    I'm trying to use cursors on a passed in table of records and I get a compilation error on the cursor definition that states that the table must be defined (but I'm passing the table in). Here are the types: create type input_record_t as object ( fie