Linking CO document and PP work center

Hi Experts
Can we link the costs in CO document along with line item and to a work center after production order confirmations?
Don't cross-post

Operations are carried out at a work center. In the R/3 System work centers are business objects
that can represent the following real work centers,
Whereas Cost Center is a cost object . The cost of work centers are absorbed in work centers. The relationship is maintained in table CRCO.
If you requirement is to have a report where you will show a report like
CO Document            Cost Center            Work Center
then i think we donot have any standard SAP report available and a custom report will be required for the same.We need to get the Cost center from the CO document and then get the work center from the cost center .. If you have a situation where you have a Cost Center linked to multiple Work Centers.... then some validation for deriving correct WC will be required..
Please let me know for any further clarifications..

Similar Messages

  • Please can someone tell me why I cannot reinstall my upgrade from lightroom 4 (lightroom 3 installed off disc with serial no) my hard drive crashed, and I am trying to get lightroom 3; 4 and 5 back on so that I can link my catalogues and continue work. I

    Please can someone tell me why I cannot reinstall my upgrade from lightroom 4 (lightroom 3 installed off disc with serial no) my hard drive crashed, and I am trying to get lightroom 3; 4 and 5 back on so that I can link my catalogues and continue work. I cannot install lightroom 5 until the upgrades from 4 are on the pc, (lightroom 3 installed off disc but 4 is a copy of the upgrade download I got when I bought it) These serial no's are legit and  are registered under my account with adobe, but it still gives me the Big Red Cross when I put my serial no in! Please can someone help. I am at a loss. Thx Heidi

    Please can someone tell me why I cannot reinstall my upgrade from lightroom 4 (lightroom 3 installed off disc with serial no) my hard drive crashed, and I am trying to get lightroom 3; 4 and 5 back on so that I can link my catalogues and continue work. I cannot install lightroom 5 until the upgrades from 4 are on the pc, (lightroom 3 installed off disc but 4 is a copy of the upgrade download I got when I bought it) These serial no's are legit and  are registered under my account with adobe, but it still gives me the Big Red Cross when I put my serial no in! Please can someone help. I am at a loss. Thx Heidi

  • Plerase can someone tell me why I cannot reinstall my upgrade from lightroom 4 (lightroom 3 installed off disc with serial no) my hard drive crashed, and I am trying to get lightroom 3; 4 and 5 back on so that I can link my catalogues and continue work. I

    Please can someone tell me why I cannot reinstall my upgrade from lightroom 4 (lightroom 3 installed off disc with serial no) my hard drive crashed, and I am trying to get lightroom 3; 4 and 5 back on so that I can link my catalogues and continue work. I cannot install lightroom 5 until the upgrades from 4 are on the pc, (lightroom 3 installed off disc but 4 is a copy of the upgrade download I got when I bought it) These serial no's are legit and  are registered under my account with adobe, but it still gives me the Big Red Cross when I put my serial no in! Please can someone help. I am at a loss. Thx Heidi

    BrightBluephotograph wrote:
    I cannot install lightroom 5 until the upgrades from 4 are on the pc,
    You don't need to have Lightroom 3 and 4 installed on your computer to install Lightroom 5.  Just install Lightroom 5 and input your serial number for 3 in the previous version box and your serial number for 5 in the upgrade box.

  • I am having trouble with the "numbers" app on my MacBook Air. I go to print my document and that works just fine. I cannot however return to the document after printing. What do I have to do?

    I am having trouble with the "numbers" app on my MacBook Air. I go to print my document and that works just fine. I cannot however return to the document after printing. What do I have to do?

    RR,
    Not to worry, you're not the first to expect Print to finish by returning you to the edit mode. The thing is that Printing is so hit and miss with this version of the app, you will probably want to stay in the Print window for more than one attempt.
    Jerry

  • Hyperlinks in linked Word documents don't work

    Hello All,
    I'm having a problem with hyperlinks and I'm hoping you can help me. I have a RoboHelp HTML 8 project built out of Word 2007 linked files. There's a dozen Word files right now, but I'm hoping to scale up the project eventually. Each file is a topic in the CHM.
    I have two problems when I generate the CHM:
    1. Links to anchors within the same Word document generate extra subtopic files. Each extra topic begins at the anchor point. The links work, but I'd like to avoid having extra topics cluttering the TOC.
    2. Links to anchors in other Word documents don't work at all. When I examine the HTML in Robohelp, I can see that RoboHelp has generated an empty link. When I link to a Word document without specifying an anchor point, the link in the CHM is to the document itself and not the topic, which is useless for my purposes.
    For example, the generated HTML for each of these types of links looks like this:
    <p>Link test: <a href="#_Using_Styles">Later in the same topic.</a></p> <== This one works, but generates an extra subtopic
    <p>Link test: <a href="" target="_self">To another topic.</a></p> <== This one doesn't work at all.
    Before you ask, yes, I have checked the "Convert References to Hyperlinks" box in the RoboHelp Word conversion settings. According to Adobe documentation, that's all I need to do... So what am I doing wrong?
    Thank you in advance for any suggestions,
    Susie

    I have an update: Adobe got back to me and confirmed that the  inter-document/inter-topic link issue is an actual RH
    bug. I'll check back in here when I have more news.

  • Tabular Form and Link to document and No Data Found error

    I have used this numerous times in an INTERACTIVE REPORT to link records out from the report to a document in a folder on our server and it works beautifully thanks to one of you guys who helped me a couple of years ago. In the column for which I want to use as a link I do the following:
    LINK TEST #ISO_NUMBER#
    LINK ATTRIBUTES a href=#DOC_LINK#; TARGET="_BLANK"
    URL #DOC_LINK#
    I've been banging my head against the wall trying to figure out why I keep getting a 'No data found' error in my TABULAR FORM. The good news is I figured out why it's happening. The bad news is I do need to link out to the documents listed in my tabular form that are saved on the server.
    Is there any other way to do this?
    Application Express 4.0.0.00.46
    TIA,
    Alexandra

    Finally back...
    I have a tabular form that lists documents stored on one of our servers. In an interactive report I can set up a link to those docs using the document number column in the IR. I can't get it to work in the same way on the tabular form. Hopefully the steps of the catalog process will shed light on what may be the problem:
    Step One
    1. User1 catalogs doument using standard form (page 3) on DOC_INFO table.
    2. Button on form redirects to Approval Tabular Form (for this example, page 100). This tabular form displays DOCUMENT_NUMBER (display as text saves state), APPROVER (select list), APPROVED(select list), RELEASED (select list) fields among others from DOC_APPRV_DOC table
    3. Add Row adds fields in #2 above and other fields
    4. User1 selects APPROVER in select list and Adds Row for all additional APPROVERS required
    5. User1 hits SUBMIT button
    Step Two
    1. User2 opens different page but Approval Tabular Form (for this example, page 200) on same DOC_APPRV_DOC table, restricted to :P101_USERNAME
    2. User2 uses APPROVED select list to approve or reject
    3. User2 hits SUBMIT button
    Step Three
    1. User1 opens Approval Tabular Form (page 100) with User2 (and all other documents requiring approval) results
    2. If rejected User1 uses Reset Approval checkbox and select list on User2's tabular form is reset
    3. If approved User1 uses Released submit list and and record is deleted from User2's tabular form
    The Problem
    User2 ought to be able to review each of these documents on the server. In other parts of my application, an interactive report is used, I've got a case statement in the report creating the link, and have the column itself setup up so that User2 merely clicks on the DOCUMENT_NUMBER on the report and he's redirected to the document itself.
    This works fine when set up the same way on the tabular form ONLY THE FIRST TIME a row is added. If I ADD ROW for any additional documents the DOCUMENT_NUMBER field on the tabular form does not populate on User1's form.
    The entire process works beautifully if the link is not set up.
    Note that from the standard form, the DOCUMENT_NUMBER is sent to a hidden item (default = :P3_DOCUMENT_NUMBER) in a region above the tabular form (page 100). This is then used to populate the DOCUMENT_NUMBER on the tabular form as the default value (:P200_DOCUMENT_NUMBER).
    Your thoughts? Thanks in advance!
    Alexandra

  • Work Center Changes need data for previous and new work center

    Hi All,
    I have a requirement as the organisation is going through RESTRUCTURING. In ECC in Plant Maintainance they are changing Work Center. E.G.
    Work Center OLD : ABC
    Work Center NEW : XYZ
    Now the requirement is I have data for ABC already coming in BI Prod. Env. Now when they will change ABC to XYZ the new data will come for XYZ.
    Reporting Reqmt:
    Data In Cube
    Work Center     No. of Maintainence Orders
    ABC                             10
    XYZ                             20
    When user run the report it should and gives input in Work Center variable as " XYZ" then
    XYZ -- 30
    Presently it is showing
    ABC --10
    XYZ --20
    They have list of OLD Work Center mapping to NEW Work Center.
    Now, Can anyone tell me is it possible to achive this scenario.
    Thanks,
    Mayank

    Hi,
    find the below link it has similar issue ,
    Re: mapping between old/new material codes in BW
    Regards,
    Satya

  • Linking word documents and auto-updating TOCs?

    Hi, all!
    I know InDesign a bit, but am about to embark on a project that I could use some help on. Im compiling all the different writing Ive done in the past four years into a little ebook. There are about 50 different essays/articles, each under four categories in the table of contents. Many need editing, and the ebook will require lots of moving things around and editing.
    So, is it possible to link Word documents like as you can do with images? I would like to have InDesign link to all the different word documents that comprise different essays, etc, so I can edit individual essays from Word and have them auto-update within InDesign. Also, is there a similar thing I can do with the table of contents, where it will automatically update the page number of a given entry when I rearrange it? These two things would save me much time!
    Thank you!
    Alec

    As much as you think you want to auto-update the Word documents, you don't.
    Yes, there is a way to link those Word files, but you will lose all formatting applied in ID each time you do update the linked files.
    Why don't you just make those changes in InDesign?
    Next, yes, you can create a TOC that will update page numbers automatically when the document(s) change.
    That is no problem.

  • Link between documents and update the version

    Hi
    I have linked documents between different sites in Sharepoint. When I change the contain in the main documents and the Version is change from 1.0 to Version 2.0. Now the version for the linked document is still Version 1.0 in the document
    list. How can I manage that the linked document shows the same Version number as the main document when it is updated?  

    Hi
    I copy the shortcut to the main document and add New document (link to a document) in a different folder than main documents.
    It is the documents version number as you can see in the Version history. Hope that is answer to your question.  

  • Linking Accounting Document and Controlling Document numbers?

    Is there a table that links accounting document number and controlling document number for the same transaction?
    I am reporting off of the controlling table COEP for cost element values and must to go to FI documents for payment information but I can't find any table that contains both CO and FI document numbers.  Are there any tables that contain both document numbers to help make the link in reporting?
    Thanks,
    Jeff

    I just want to know when we done PGI against sales order it genetrate an acconting document .
    Can any one tell me in which  fi and sd tables this entry filled.

  • Table Link for EQUNR (Eqpt Number) and GEWRK (Main Work Center)

    Hello,
    I need to fetch the main work center from equipment master. I need a direct table link between the equipment number and mainwork center. We are getting a link of equipment number (EQUNR) to work center (ARBPL) and a link of work center (ARBPL) to main work center (GEWRK). But the problem with this scenario is - main work center is not getting fetched from equipment master once work center is missing.
    We want a direct link through some table between EQUNR and GEWRK.
    Puneet

    Hi Puneet,
    Appreciate your problem !
    Many a times in such a situation (which I presume exists where no direct link is available between fields); we have 2 clear cut approaches -
    Approach 1:
    Develop a SAP Query, Functional Area/Infoset, and User Group ( using T code :SQ03,SQ02,SQ01 respectively )
    While developing Functional Area feed in these 2 tables (Table 1- equipment number (EQUNR) & work center (ARBPL) and Table 2 - work center (ARBPL) to main work center (GEWRK) with  work center (ARBPL) as the Primary Key- bridge to join these 2 tables.
    In SAP Query Development; you may take Plant as the Selection Field or any other field as per business requirement to make a search in the query.
    Now when you execute this query, you will get a complete Download of (EQUNR),work center (ARBPL)  and main work center (GEWRK) in one table.
    For SAP Query, you may also approach your ABAP Team Member. This is a cleaner approach than the other one.
    Approach 2:
    Take SE16 download of the Table 1 and Table 2 and join them in Excel (using vlookup if required).This approach is however limited to the data volume that you have to process.
    Please let me know, if you get stuck !
    Thanks,
    RAVI.

  • Link between HR data and Work center

    Dear experts,
    We have assigned operators in work center through HRMS. For the purpose of making a report we require the table into which the linking of work center data and the employee is made.
    In the table CRHD a field HROID is found.  This is an object id which links the work center with a table either in HR or in PP which provides the link between organisational unit/ employee. Can anybody tell us the name of the table with details?
    Please help us.
    Thanks
    Jaikishan

    Dear Vittalji,
    Thanks for your prompt response.
    Our requirement is as follows:
    We need to create a report on details of operations done by each operators / workers for a specified period. For this purpose following assignments are done.
    (HR module is not implemented yet.  But we have made attempt to maintain the employee master by customising HR module little bit)
    1.  Employee master created in HR. 
    2.  Went to work center maintainence (CR02).
    3. Selected HRMS button.
    4. Selected Work Center option.
    5. Clicked on HR work center
    6. Given same work center as production work center.
    7. Selected 'person' from ALV list data
    8. Clicked on create relationship button.
    9. Assigned the appropreate persons.
    By doing assume this we made assignment of persons to this work center since the name of persons are getting displayed.
    We have a report to list out the workcenter wise operation confirmations for analying the daily production.
    Now we want to incorporate the operators (persons) name into our report by whom the operation/production was performed.
    For this purpose, while refering the table CRHD, found a field HROID (an object id).  To fetch the details of persons / operators those we assigned to the work center we need the tables for linking this field HROID.
    Our questions are
    1.  Whether the process of assigning   operators above mentioned are correct?
    2. What are the table-links for completing our report. i.e. only for work center to concerned operators (HR).
    3. What does the HR Work Center mean?
    4. What are the difference between HR work center and production work center?
    Your help is requested. Points will be rewarded promptly.
    Thanks and Regards
    Jaikishan

  • How to add SAP BI or BEx Reports on Reports Work center link in WEB UI

    Hello All,
    I have question, How to add SAP BI Reports on Reports Work center link in WEB UI? I found an article on SDN but could not understand. Please provide all steps in detail.
    Thanks,
    BMW

    Hi BMW325ci (I hope you have the latest model )
    Here are the steps:
    1. have the BI team create a webversion of the report. (not required when calling a query directly
    2. create in SPRO --> CRM --> UI Framework --> UI Framework Definition --> Display SAP NetWeaver BI Reports in CRM the reports you want to display
         e.g. BI Report ID         Z_DYBE_GROSS_SALES_CUST_MAT
                Long description              Revenue per customer/materialgroup
                BI Object Type                  HT Template 3.x  (depending on your BI version)
                BI Object Key                 ZWCOPALM01_PPS_REVENUE_ARTG_V2
                BI System                      (when using the webtemplate, nothing needs to be filled)
    3. create in SPRO --> CRM --> UI Framework --> Technical Role Definition --> Define Navigation Bar Profile
        a. A logical link for each BI report.
           e.g. Logical Link ID ZDB-ACC-DE
                  Type    D BI report
                  Target ID       DISPLAY
                  Parameter       Z_DYBE_GROSS_SALES_CUST_MAT
                  Parameter Class CL_CRM_GEN_UI_BI_UTIL
                  Icon Name       GC_ICON_REPORTS
                  Title           Revenue per customer/mater.
                  Description     Revenue per customer/materialgroup
       b. Include in the relevant Report Work Center Link the logical links you have created in step 3.a
          e.g. Group ID        SLS-ACC-RE
                 LogLinkID ZDB-ACC-DE position 80
       c. Make sure that your work center link is assigned to the work center
          e.g. Work Center ID  SLS-REPORT
                 GroupID  SLS-ACC-RE position 10
       d. Make sure that your work center is assigned to your navigation bar profile
    at this moment the report is linked to a standard workcenter, which can be shown on the webui.
    4. In your business role, you need to of course make sure that the flags on the workcenter entries are set on show in menu and directly.
    This should give you the complete picture.
    KR,
    Micha

  • Link Between billing document and Accounting document

    Hi,
    Need the link between VBRK and BKPF.
    Req to VBRK-VBELN = BKPF-XBLNR.
    But length varies. Error occurs. Any other method to come for linking Billing document and accounting doc

    hi Meenakshi,
    Check with this i hope it will work
    you can have the data from BKPF through fields like AWKEY and AWTYP and VBRK (vbeln).
    in bkpf there is a field called AWTYP  in which you have to specify 'VBRK',and you have split AWKEY depending o upon the vbeln .
    bkpf-awtyp = 'VBRK'
    bkpf-awkey = vbrk-vbeln
    bkpf-bukrs = vbrk-bukrs.

  • Factory Calendar and Work Center

    Dear All
    I am confused between factory calendar and work center working.  Kindly guide me what factory calendar does and what work center does?

    Hello,
    Factory Calander :-- Factory calendar contain company specific dates such as alternate working Saturdays, Plant shutdown etc.
    You can create your company factory calendar via transaction code 'SCAL'.
    Assignment of the factory calendar by plant is done in transaction code 'SM30 - V_T001W'.
    An example of a SAP application that uses the factory calendar is the SAP MRP modules.
    Assuming that you have a specified an alternate working Saturday, MRP will postponed the planned orders to the next working day if it happened to falls on a non-working Saturday.
    Work Center :--
    Operations are carried out at a work center. In the R/3 System work centers are business objects that can represent the following real work centers, for example:
    Machines, machine groups
    Production lines
    Assembly work centers
    Employees, groups of employees
    t-code-- CNR1 - Create
    for more information go to this link
    http://help.sap.com/saphelp_smehp1/helpdata/en/40/8ac473d40943ddb23def12bdb33437/content.htm
    Thanks