1. Check If any filter is applied form Project center ribbon.
2. Ask Project Manager to Open the project then check whether that user is present in project team or not if yes then ask him to publish the project plan.
3. IF user himself is project manager ask him to open project from MPP then publish it.  
Open MPP connect to project server --- then form enterprise project list select the project name then save and publish the project also ask him to assign one task to user who is not able to see the project link.
Ask admin to check whether project got deleted accidentally. 
kirtesh

Similar Messages

  • Moved Premiere Elements 10 project Error: "Project is not compatible with current version of Premiere Elements"

    After moving an entire client folder from an external hard drive to an internal one, the client's video, created in adobe premiere elements 10, will no longer open in adobe premiere elements 10. It appears to be loading the project, and instead of completing, the following error message is displayed: "The project is not compatible with current version of Premiere Elements."
    The same thing occurs when attempting to open the archive files.
    New projects, and unmoved projects behave properly.
    Moved projects receive this error.
    I'm running Windows 7 Home Premium SP1 on a solid state drive (SSD) (c:/), where premiere elements is installed
    My documents, including the project I need to work with are on my "storage" drive (HDD). it is (f:/)

    txnoda
    Archiving Aspects of this.....
    First let clear the matter of the "archiving" as a life saver.... We do not appear to be on the same wave length.
    a. I am talking about File Menu/Project Archiver with its Archive project and Copy project options. This feature is a safety net to save you when you
    inadvertently disconnect source media from the project file. With the Archive option (Trimmed Folder result), you get saved to the computer hard drive (safe keeping) a copy of the project file plus copies of the media that were taken to the Timeline. With the Copy option (Copied Folder result), you get copy of the project files plus copies of much more.
    b. Instead, you appear to be talking about "archiving" in the context of AutoSaves. AutoSaves are saved snapshots of the project at various phases of the edit. They suffer from the same shortcomings of the original project that has been disconnected from its source media.
    When you import media into a project, all you get are copies of the originals in the project. But, those copies need to trace back to originals at the locations where they were when first imported into the project. Moving, renaming, deleting files/folders that went into the project after the project save close leads to some very time consuming messy situations.
    What to do....
    If you can, put everything back the way it was. If not.....
    Let me emphasis some factors..
    You wrote
    After moving an entire client folder from an external hard drive to an internal one, the client's video, created in adobe premiere elements 10, will no longer open in adobe premiere elements 10. It appears to be loading the project, and instead of completing, the following error message is displayed: "The project is not compatible with current version of Premiere Elements."
    Here you mention specifically "client's video". Later you detail with .mod files converted to .avi. What kind of .avi? If you have converted to AVCHD.avi or H.264.avi, they have been found not to be compatible with Premiere Elements. You should not be able to import them into any new or old project.
    From what you described, I am envisioning
    "Video" Folder
    which contains 2 folders named
    "Timestamped Folder" with .avi files
    and
    "DVD" Folder with the project file (project.prel)
    The project file has many files generated automatically in the course of it workflow. Where do you have them going?
    (See Premiere Elements  10 Edit Menu/Preferences/Scratch Discs). If you have the Scratch Discs directed
    "Same As Project", then we would expect all those files to be going to the DVD Folder in the above scenario.
    If we could open the project and get greeted with some "Where is the file.....?" messages, that might give us some hope.
    But that is not the case.
    Consequently from what you have said, I am suggesting that the path of least resistance is try to recreate the "before".
    Please review and consider.
    ATR
    Add On...Not sure if it will assist in the matter, but the following is the link to Adobe's document related to troubleshooting
    damaged projects.
    Troubleshoot a damaged project file | Adobe Premiere Elements

  • PE 13 - Project not compatible with current version of premier elements

    I have PE 13 (recently installed on a system that also has PE 10)
    I archived in PE 10 to a location, openend up the project with PE 13 and it appears to open just fine.  I then save and close it and try to open it up a 2nd time and it fails with the error: "Project Not compatible with current version of premier elements"
    I attempted to move all the media outside of the "Copied_XXX" folder per the troubleshooting steps, but it still fails even with all the media in a different location.  Funny thing is that it knows about the media still because it appears in the loading content status bar at the very bottom left of the screen.  it completes all 600 or so loads, but they are definitely not on timeline or listed in project assets.
    Windows 7 Professional is the OS.

    stegeler
    There is no guarantee that a project created in an earlier version will open in a later one. The classical recommendation is to finish a project in the version in which it is created.
    If you do want to try to edit the project created in the earlier version in the later version, then make sure to work from a copy of the original. Once you edit the project created in the earlier version in the later version, you cannot go back to edit the later version edited project in the earlier version.
    If you have your Premiere Elements 10 project archived, then you do not want to go moving copies of the project's source media outside that Copied Folder. The copy of the project file in that folder needs to trace back to that copied media in that Copied Folder. What you are seeing in Premiere Elements 13 is probably conforming of audio and video files, processing of rendered files, and such, maybe even some indexing. You do not want to proceed in Premiere Elements 13 until you do not see any further activity in the progress bar at the bottom right of the workspace. Have Premiere Elements 10 and 13 been on the same computer?
    How did you open the project file in the Copied Folder - right clicked the project file, Open With, and then selected Adobe Premiere Elements 13? What is the duration of the Timeline of the original project in 10?
    Have you been working with a copy of the Copied Folder and its contents?
    More on this in the morning.
    ATR

  • Deployment finished with warning when I deploy projects!

    Dear All,
    I got the error message when I deploy 2 related projects to J2EE, what is the reason? Thanks.
    2011-5-27 15:37:57 /userOut/deploy (com.sap.ide.eclipse.sdm.threading.DeployThreadManager) [Thread[Deploy Thread,5,main]] WARNING:
    [003]Deployment finished with warning
    Settings
    SDM host : IBM205928
    SDM port : 50018
    URL to deploy : file:/C:/DOCUME1/ADMINI1/LOCALS1/Temp/temp3258717415907093402cateomp~asc.ear
    Result
    => deployment not executed : file:/C:/DOCUME1/ADMINI1/LOCALS1/Temp/temp3258717415907093402cateomp~asc.ear
    Unresolved dependencies found for the following SDAs:
    1.: development component 'eomp/asc'/'cat'/'CNP_CRMASCTR_D'/'20110527151357'/'0'
    dependency:
           name:     'eomp/survyapp'
         vendor:     'cat'
    There is no component either in SDM repository or in Deployment batch that resolves the dependency.
    Deployment will be aborted.
    Deployment exception : Got problems during deployment

    Hello
    I tried to deploy all components that I can find, but it is still wrong.
    Do you know how to check these components which need be deployed? Thanks ...

  • My project is finish with final cut 4 when i  export on quick time a window open and says (error 34 ) is anyone knows what is the problem tanks DENIS

    my project is finish with final cut 4 when i export via quick time a window open and says (error  34 ) what is the problem .
    i've made many transfers before and every time it was excellent thanks   denis

    Is the external formatted tmac OS Extended?
    It should be.
    Al

  • What to do when you are finished with a project

    I just purchased adobe photoshop elements 11 and edited my first photo and now i am finished with it.  How do i get that photo to re save as a new JPEG file?  If i go to mmyu media organizer it says that it is currnetly being edited, but im done and dont know how to get the picture unlocked.  Thanks

    In the Editor use File >> Save As
    Choose a different file name and click OK
    Then do: File >> Close
    That will unlock it in Organizer.

  • Autonumber formats change after topics are linked across projects

    We are going from Robohelp HTML x5.0.2 to Robohelp HTML 8.0.2.208, so there is obviously a huge learning curve that we are working through.  We generate to WebHelp and merge 15 projects into a published master.  Our users view the output on our intranet using Internet Explorer 7.
    We loved the autonumber format feature in version 8 (particularly the additional bullet styles available and no longer needing to manually renumber steps when something was inserted or deleted), but have run into a problem.
    The autonumber items work fine in the projects and when generated and published into the merged master, but when we need to add a link from a topic in one project to a topic in another project it changes the bullets and numbering.
    Example: 
    We have a topic in Project A that references a topic in Project B (both projects are part of the merged master).
    We insert a link in the Project A topic to the topic in Project B (using Insert Hyperlink - Link To - File).  Everything in both A and B look fine at this point.
    We preview the topic Project A by clicking on "View Selected Item" (eyeglasses) and then click on the link we inserted to validate it works.  This causes the topic in project B to now have stutter-text for bullets and numbers (i.e., what used to say "1. Step" now says "1. 1. Step").  As more links are added to that topic, it adds more bullets and numbers to the linked topic:
    1.     1.     1.     Procedure
    ●       ●       ●       Bullet
    o       o       o       Bullet2
    §        §        §        Bullet3
    □       □       □       Bullet4
    This does not happen when adding links to topics that are in the same project, only when linking to topics that are in another project.
    All of our topics are created directly in RoboHelp; we do not import files from Word, FrameMaker, etc.  Each of our projects has the same style sheet (we created 1 CSS file and copied it into each project so that they were all identical).
    All of our version 8 projects were created from scratch in version 8, and we have been importing our version 5 topics one by one (and deleting the version 5 styles assigned to them), then applying the applicable version 8 style to each line.  We have attempted creating brand new topics in version 8 to make sure no old legacy version 5 code imported from an old project was causing the issue, and it still happens.  We have tried manually cleaning up the HTML code for the topic and it happens again once a cross-project link is added back to that topic.  We also tried the "Convert RoboHelp edited topics to HTML" to try to get around the XHTML restrictions and it still happened to everything that was an autonumber format, so it appears the issue is something with that one of these.  We created styles for each autonumber format we wanted to use (using the options available for Paragraph styles in the Robohelp Style editor), this is a sample of one of them:
    p.Bullet {
                    list-style: rh-list;
                    x-list-class: rl-p-Bullet;
                    x-list-level: 1;
    rh-list.rl-p-Bullet {
                    x-level-count: 1;
                    x-lvl-1-format: "<x>";
                    x-lvl-1-type: disc;
    While it would be really great to have the additional features of the autonumber format, it may not be a viable option for us since it is only available on the paragraph level and Robohelp 8 does not appear to play well with bullets and numbers in anything other than the list level.  I'm thinking I may need to abandon our current style sheet that uses autonumbering and start over with a new style sheet using only the limited bullets and numbering available on the list level (or possibly go old-school and just use the bullet and number toolbar buttons to add formatting to normal text).  We are about 8,000 topics into our conversion of 40,000.  Any suggestions are greatly appreciated.  Thanks!

    I'd love to send you the test projects I set up, but unfortunately my company has blocked that ability.  I created brand new blank projects in Robohelp 8 using the default style sheet with an autonumber bullet and numbered step added and nothing else.  I thought this bare-minimum approach would be the best way to make sure it wasn't something we had set up incorrectly that on our end.  I used the default First Topics in each project and added numbered and bullet texts using the style sheet to Project 1 and then added a link to that topic in Project 2.  I didn't even generate the projects and I still had the issue when I previewed the Project 2 topic and clicked the link.
    I've attached a copy of the info on the topic in Project 1 and the code behind the scenes for it below:
    First Topic
    1.     1.     1.     Procedure
    o       o       o       Bullet
    o       o       o       Bullet
    2.     2.     2.     Procedure
    Code before link in Project 2:
    <?rh-list_start level="1" an="1" class="rl-p-Procedure" ?><p class="Procedure">Procedure</p><?rh-list_end ?>
    <?rh-list_start level="1" an="1" class="rl-p-Bullet" ?><p class="Bullet">Bullet</p><?rh-list_end ?>
    <?rh-list_start level="1" an="1" class="rl-p-Bullet" ?><p class="Bullet">Bullet</p><?rh-list_end ?>
    <?rh-list_start level="1" an="1" class="rl-p-Procedure" ?><p class="Procedure">Procedure</p><?rh-list_end ?>
    </body>
    </html>
    Code after link in Project 2 was added and clicked:
    <?rh-list_start level="1" an="1" class="rl-p-Procedure" ?><p class="Procedure">1.<span
    style="font: 6.0pt 'Times New Roman';">&#160;&#160;&#160;&#160;&#160;</span>Procedure</p><?rh-list_end ?>
    <?rh-list_start level="1" an="1" class="rl-p-Bullet" ?><p class="Bullet"><span
    style="font-family: 'Courier New';">o</span><span style="font: 6.0pt 'Times New Roman';">&#160;&#160;&#160;&#160;&#160;&#160;&#160;</span>Bullet</p><?rh-list_end ?>
    <?rh-list_start level="1" an="1" class="rl-p-Bullet" ?><p class="Bullet"><span
    style="font-family: 'Courier New';">o</span><span style="font: 6.0pt 'Times New Roman';">&#160;&#160;&#160;&#160;&#160;&#160;&#160;</span>Bullet</p><?rh-list_end ?>
    <?rh-list_start level="1" an="1" class="rl-p-Procedure" ?><p class="Procedure">2.<span
    style="font: 6.0pt 'Times New Roman';">&#160;&#160;&#160;&#160;&#160;</span>Procedure
    Code after link in Project 2 clicked a second time:
    <?rh-list_start level="1" an="1" class="rl-p-Procedure" ?><p class="Procedure">1.<span
    style="font: 6.0pt 'Times New Roman';">&#160;&#160;&#160;&#160;&#160;</span>1.<span
    style="font: 6.0pt 'Times New Roman';">&#160;&#160;&#160;&#160;&#160;</span>Procedure</p><?rh-list_end ?>
    <?rh-list_start level="1" an="1" class="rl-p-Bullet" ?><p class="Bullet"><span
    style="font-family: 'Courier New';">o</span><span style="font: 6.0pt 'Times New Roman';">&#160;&#160;&#160;&#160;&#160;&#160;&#160;</span><span
    style="font-family: 'Courier New';">o</span><span style="font: 6.0pt 'Times New Roman';">&#160;&#160;&#160;&#160;&#160;&#160;&#160;</span>Bullet</p><?rh-list_end ?>
    <?rh-list_start level="1" an="1" class="rl-p-Bullet" ?><p class="Bullet"><span
    style="font-family: 'Courier New';">o</span><span style="font: 6.0pt 'Times New Roman';">&#160;&#160;&#160;&#160;&#160;&#160;&#160;</span><span
    style="font-family: 'Courier New';">o</span><span style="font: 6.0pt 'Times New Roman';">&#160;&#160;&#160;&#160;&#160;&#160;&#160;</span>Bullet</p><?rh-list_end ?>
    <?rh-list_start level="1" an="1" class="rl-p-Procedure" ?><p class="Procedure">2.<span
    style="font: 6.0pt 'Times New Roman';">&#160;&#160;&#160;&#160;&#160;</span>2.<span
    style="font: 6.0pt 'Times New Roman';">&#160;&#160;&#160;&#160;&#160;</span>Procedure
    Logically there is no reason that clicking on a link that is outside of the project should be able to recode the topic being displayed, but it is.

  • Link between Project and Sales Order

    Apart from sales order can we have a link between project and customer master ??
    I know that WBS element assignment can be made in sales order but i want to have link between
    customer master and project. I don't want any user field or text field in sales order.
    Any idea ?
    Regards
    Ashish

    Yes Mr Ashish!
    As far as iam concern there is no link between Project & Customer Master, you have to link it with SALES order, I had check in XD03,XD01, the complete customer master, i didnt find any field in customer master which links with Project.
    I'll let you know if i find any links.
    Regards,
    ANSAR

  • PDF art in FM gone in linked RH project output

    I'm using TCS2 to link FrameMaker 9 books into RoboHelp 8 projects. In my book's FM files, there are many anchored frames containing PDFs imported by reference. (This is a practice that's been recommended by Dov Isaacs of Adobe and seems to work fine in all other respects.)
    When I link the Frame book into a RH project (following the tutorial by RJ Jacquez), the PDFs are incorrectly rendered as solid white images with the correct dimensions but no image content. JPGs and PNGs from Frame work fine, but the PDF-based images look better than the others in my regular PDF deliverables. Also, the larger size of the JPGs and PNGs causes so much overhead in FrameMaker, I can barely scroll them. Open and close times are likewise unacceptable.
    Has anyone else encountered this Tech Comm Suite problem with PDF-based images in FM not being converted properly in a linked RH project, and if so, do you know of a fix or workaround?
    Thanks in advance,
       - Dan Thornton

    I'm using TCS2 to link FrameMaker 9 books into RoboHelp 8 projects. In my book's FM files, there are many anchored frames containing PDFs imported by reference. (This is a practice that's been recommended by Dov Isaacs of Adobe and seems to work fine in all other respects.)
    When I link the Frame book into a RH project (following the tutorial by RJ Jacquez), the PDFs are incorrectly rendered as solid white images with the correct dimensions but no image content. JPGs and PNGs from Frame work fine, but the PDF-based images look better than the others in my regular PDF deliverables. Also, the larger size of the JPGs and PNGs causes so much overhead in FrameMaker, I can barely scroll them. Open and close times are likewise unacceptable.
    Has anyone else encountered this Tech Comm Suite problem with PDF-based images in FM not being converted properly in a linked RH project, and if so, do you know of a fix or workaround?
    Thanks in advance,
       - Dan Thornton

  • Using Dynamic Link for projects cut in Premiere and effects in AE.. Rendering Question..

    Hello,
    So this baffles me. I've been working a lot in Premiere CC lately with ProResHQ green screen material. I send the sequence or individual clips using After Effects by right clicking on the clip in Premiere and selecting Create After Effects Composition...
    So I do my thing and when it comes time to render, I select render from IN to OUT in Premiere and wait. Now here's my question. If I select render in Premiere, it will be very sluggish until I click on the After Effects icon in my dock which brings the app to the foreground again. For some reason, this will dramatically accelerate my render speeds in premiere after I re-select the AE app. Why is this doing this?
    I'm using a new Mac Pro trashcan tower 3.5 clock speed. 64GB ram. Dual D700 graphics card. I am using a USB3.0 drive for my editing and the internal drive on the tower for the scratch. I'm getting a Lacie 1TB little bigdisk thunderbolt2 that will be my prime scratch and video location for future stuff.
    Thanks for your help -
    R

    Generally speaking, there is no 'one & only' proper workflow. Just keep in mind the following:
    - not all effects and transitions are properly translated when travelling from PrPro to AE;
    - in Dynamic Link scenario PrPro communicates with AE projects via single instance of headless AE, which creates a bottleneck. See this good old thread on Dynamic Link workflow, pay attention to Todd's comments;
    - since AE allows to set a DI as a proxy to dynamically linked comp, with reasonable amount of dynamically linked comps in PrPro project you can enjoy the best of both worlds, instantly switching between a DI and dynamically linked comp back and forth with no needs to replace anything in PrPro timeline. Test on your own with which amount of dynamically linked comps setting DIs as proxies still work. For my rig test 30 min sequence built out of 935 dynamically linked comps, which are just source footages in their own comps, hence, the equivalent to rendered DIs set to proxies, takes around 27 hours to render, while 30 min sequence built out of the same 935 source footages renders in real time.

  • How to de reporting on links between projects

    All,
    Whats the best known way to create a report on links between projects. I want to provide the PMO of my customer with a report, where they can see:
    1. Delivery dates
    2. whether changes are accepted
    3. Who is delivering to whom
    Regards,
    Sander

    Hi Sander,
    Are you using the
    deliverables/dependencies feature? In case you are, I'd suggest you to use the following tables from the Reporting DB:
    [dbo.MSP_WssDeliverable]
    [dbo.MSP_WssDeliverableToProjectLinks_UserView]
    [dbo.MSP_WssDeliverableToTaskLinks_UserView]
    You'll find in the 2 last tables the relation between the delivrables. The delivery date will be found in the first table.
    Hope this helps,
    Guillaume Rouyre, MBA, MCP, MCTS |

  • Addition of custom links on Project Details screen to update Project

    Hi,
    I request help to implement a customization in Ms Project Server 2010. I would like to add a custom link on lefthand side menu of Project Details page. The link would display a page with key fields. On entering information in the fields and clicking Submit,
    a custom code that triggers MS SharePoint 2010 workflow should be triggered.
    The user triggering the workflow will only have read access to the Project. I would like to get technical information and code snippets to implement the requirement. Any help in this regard would be appreciated.

    Hi,
    I'm not a developer thus I'll let other folks jump in but I'd have 2 comments:
    If the user triggering the workflow needs to enter values in custom fields and do kind of a save operation as per your description, he cannot have only read access to the project. He needs a read-write access.
    Note that folks on this forum kindly give on their spare time to help the community about concerns, questions and issues on Project. What you are asking for looks like more to a consultation request (due to the fact that you are not yet facing any issues
    since you haven't even started working on it), meaning what we do in our daily job (and are paid for). Hope some colleagues can anyway give you some tracks to start.
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, P-Seller |

  • File not found in Link Between Projects Window - test no edit rights to other file

    Hi,
    I am doing a test to see if i can create a link by typing the link path (f.i. <>\plan2\1) in the predecessor column without having edit rights to the other plan.
    I expect this to be possible as the edit in the other plan (creation of link) is only done after the change is accepted through the LBP (link between projects) window. Besides, when i do it to both my own plans, in this LBP window i get 'create external
    link' as difference to accept.
    When I do it on Project Server 2010 to a plan I do not own or having edit rights on, I got the message 'file not found'.
    Is this message related to what I am trying or does it have another cause?
    Does someone know if what I want can be done?
    Rgds
    Sander

    Hi Sander,
    I confirm that for creating a link between projects, you need to have access in read-write to both files.
    Indeed creating such a link will write in both files information about successors (in the source file) and predecessors (in the destination file).
    Note that if you only need to update the successor, you don't need anymore to open in read-write mode the source file, since you won't write any more information in it.
    Hope this helps.
    Guillaume Rouyre - MBA, MCP, MCTS

  • I currently have a D-Link DI-604 broadband router with windows computers.  How can I add wifi to the network for use with ipad?  Can I use AirPort Express?

    I currently have a D-Link DI-604 broadband router with windows computers.  How can I add wifi to the network for use with ipad?  Can I use AirPort Express?

    Yes. You can directly connect an 802.11n AirPort Express Base Station (AXn) using an Ethernet cable. The AXn would then just need to be configured as a bridge to allow the D-Link to continue to provide both NAT & DHCP services for all network clients connected to either router.
    In this configuration, the AXn would broadcast a wireless network for your wireless network clients to connect to.

  • Linking Two projects in oracle projects

    Dears,
    I need to know how it's possible to link two projects together in one project?!
    Regards,,
    Ahmed Fazary

    Hi,
    Are you expecting project program related functionality. A program is a group of related projects linked together in a hierarchy. If you define the project as program then u can link multiple project under the program.