Loading failed from ECC to BW due to sharing port with XI system

Hi,
I need some help here, currently my company has 2 sandbox systems, one for ECC(R/3) and another one is for XI/BI netweaver 2004s. Since the BI box is shared with XI, we have problem everytime we load the data to the BI master data/ods/cube .
It seems there is something wrong with the data port setting/configuration.
The error message that was given in RSMO transaction always showed:
"Errors while sending packages from OLTP to BI
Diagnosis
No IDocs could be sent to BI using RFC.
System Response
There are IDocs in the source system ALE outbox that did not arrive in the ALE inbox of BI.
Further analysis:
Check the TRFC log.
You can access this log using the wizard or the menu path "Environment -> Transact. RFC -> In source system".
Error handling:
If the TRFC is incorrect, check whether the source system is fully connected to BI. In particular, check the authorizations of the background user in the source system."
Now after checking this in TRFC in source system and BI system, there was nothing wrong, no IDOCs was listed there or got hold up. We have checked the user authorization with our basis here, we use id called PIREMOTE that has same setting as SAP ALEREMOTE id. So we are not sure what went wrong since the connection in SM59 seemed to be working fine.
When we checked into Details tab at the RSMO screen for detail explanation, we got the following message under Transfer (IDOCs and TRFC) section:
"Request IDoc : Application document not posted
Info IDoc 1 : sent, not arrived ; Data passed to port OK
Data Package 1 : arrived in BW ; Processing : Selected number does not agree with transferred n "
We believed that the error could be related to the partner profile and data port setting in WE20/WE21 in source system (DEVCLNT150) and BI system (NWDCLNT001). It seems that the data is pointed to XI port rather than BI port since the ECC-XI work demo worked fine and ECC-BI work demo ended up in trouble.
The R/3 system partner profile (DEVCLNT150) and BI system partner profile (NWDCLNT001) has setting as following
in outbound parameters:
with Message type RSINFO (IDOC basic type RSINFO) and RSSEND (IDOC basic type ZSNB004),
both message types are pointing to BI data port (NWDCLNT001)
The inbound parameters cointains message type RSRQST (process code RSRQ).
I have been trying to search the solution for weeks, but i couldn't find the right solution.
I tried to change the partner profile setting but instead it didn't work for XI and BI so i set the setting back to original after complaint raised by XI team.
We don't want to lose the current connection that we have for XI system since they use it for XI demo, but in the same time we need to send data to BI system for our demo purposes.
Please advice any steps or solutions that work. Do we need to clean up some SAP tables that setup the port or do we need to run some transactions?
Any opinions are welcomed.
Thanks,
Hendy

For - planning , please take a look at SAP Extended Financial Planning rapid-deployment solution:  G/L Financial Planning module.   This RDS captures best practice integration from BPC 10 NW to SAP G/L.  This RDS (including content and documentation) is free to licensed customers of SAP BPC.   This RDS leverages the 0FIGL_C10 cube mentioned above.
  https://service.sap.com/public/rds-epm-planning
For consolidation, please take a look at SAP Financial Close & Disclosure Management rapid-deployment solution.   This RDS captures best practice integration from BPC 10 NW to SAP G/L.  This RDS (including content and documentation) is also free to licensed customers of SAP BPC.
https://service.sap.com/public/rds-epm-fcdm
Note:  You will require an SAP ServiceMarketplace ID (S-ID) to download the underlying SAP RDS content and documentation.
The documentation of RDS will discuss the how/why of best practice integration.  You can also contact me direct at [email protected] for consultation.
We are also in the process of rolling out the updated 2015 free training on these two RDS.  Please register at this link and you will be sent an invite.
https://www.surveymonkey.com/s/878J92K
If the link is inactive at some point after this post, please contact [email protected]

Similar Messages

  • Unable to load Materials from ECC to Cloud due to UoM errors

    Dear experts,
    We are working to set up the ECC integration with C4C through HCI, we maintained all necessary settings in ECC and HCI.
    When we are trying to send Material data from ECC to C4C they are failing in Cloud with error "Solve Configuration Issue in Code List Mapping for field MeasureUnitCode with value PCE", but we maintained all the Material specific UoM in cloud and mapped them with ECC values in Code List mapping.
    Can someone give your input in which scenario this error comes and how UoM Conversions gets updated in Cloud, like ECC Material master.
    Thanks & Regards
    Naren..

    Hi Naren,
    we have experienced a similar problem when loading materials from ECC to C4C.
    What we have seen is that you have to:
    - maintain the basic UoM of the material in C4C
    - maintain all the UoM mentioned in the conversions for the material
    - maintain the Code Mapping for these UoM if the codes are different from ECC and C4C
    Nevertheless we had a problem for materials that in ECC in the UoM conversions section of master data have conversions like: 1 MTR = 1000 MMT (1 meter = 1000 millimeter).
    In C4C we have activated UoM MTR and MMT, and MMT is defined as 0.001 MTR. So the conversion rate is defined in C4C.
    If ECC sends this conversion for the material to C4C we have an error.
    We have solved it modifying the mapping in HCI for the iflow *.erp2cod.material.*: in the mapping, the conversion element is not transferred if the basic UoM is MMT and the conversion UoM is MTR.
    This is an example and a simple workaround that allows us to load these materials.
    Maybe could be useful.
    Regards
    Piero

  • Failed to load XML from the package file "" due to error 0xC00CE556 "Invalid at the top level of the document.Line.

    Using Installation wizard to deploy SSIS packages from DEV server to QA server package store cause this error;
    Failed to load XML from the package file "" due to error 0xC00CE556 "Invalid at the top level of the document. Line 773, Column 93". This happens when loading a package and the file cannot be opened or loaded correctly into XML document.  This can be the
    result of either providing an incorrect file name to the LoadPackage method or the XML file specified having an incorrect format.  Please who have the idea of how this issue can be resolved?BI Developer

    Hi ,
       for this Error one and only one solution 
    go to view Code, line number and Column number shown in error message,
    and Remove code from there till last and save it,  it happens when we are moving Package from one server to another server. and VS adds some lines of code at the bottom of package
    something like this 
    andles="1" allownudging="1" isannotation="0" dontautolayout="0" groupcollapsed="0" tabstop="1" visible="1" snaptogrid="0">
        <control>
          <ddsxmlobjectstreaminitwrapper binary="00080000921400008c040000" />
        </control>
        <layoutobject>
          <ddsxmlobj>
            <property name="LogicalObject" value="{BBFB0E
    Remove this code and save package it will work.  
    hope this will help to Developers who are searching for same ......... :) 

  • Error while loading data from ECC to BI

    Hi BW Experts,
    while loading data from ECC 6.0 to BI  i got error in details tab of the infopackage as datapackage 1  arrived in bw processing not yet finished.
    Could any one help me out?
    Thanks

    Amar,
       please check the source system job status. If its successfully completed then we can expect data load sucess in BW side.
    to check source system status: RSMO> select related load>in Menu Environment-->Job overview in source system.
    once this over check the TRFC or IDocs struck
    if TRFC, chk in TCode-SM58 or from environment select TRFC from source/data warhouse.
    if you are finding TRFcs are in stuck just select and run manually to complete.
    M

  • Source System Creation in BI to load data from ECC 6.0

    Our ECC 6.0 and BI 7.0 is one server. I would like to load data from ECC 6.0 to BI. How to create source system? I have source system for flat file and Data Mart (Myself source system) but don't know how to create source system to laod data from ECC 6.0. Please provide step by step guide.
    Thanks.

    Check here:
    https://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/c0751ba5-b7a8-2b10-6d97-e91e85c0fafa
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/0087780d-81b0-2a10-eb82-86e1062f1a2d
    http://www.saptechies.com/connectivity-file-system-in-sap-bi/
    http://help.sap.com/bp_biv370/html/index.htm
    Thanks...
    Shambhu

  • BPC 7.5 : Is it possible to load data from ECC to BPC

    Hi,
    Is it possible to load data from ECC to BPC in BPC 7.5 Netweaver version.
    Thanks
    Prasad Bobburu

    Option 1 -
    ECC -> BW -> BPC NW (Standard, or recommended for NW)
    Option 2
    ECC -> BW -> Openhub / Flat file -> BPC MS
    This is more common for SAP customers, who are using BW, but running MS version
    Option 3
    ECC -> ABAP Extractor Program (generated flat file) -> BPC
    Again a more common for SAP customers using BPC MS
    -Kiran Malineni

  • While loading data from r/3 to bw error 8 /error in source system is coming

    while loading data from r/3 to bw error 8 /error in source system is coming . how can i solve this problem .

    Check source system connectivity.
    Tcode RSA1 --> Source System RClick --> 'Check'

  • Adobe reader cannot open in protected mode due to an incompatibility with your system configuration.

    I keep getting the error message: Adobe reader cannot open in protected mode due to an incompatibility with your system configuration.
    I have Windows 7 Home basic Service pack 1 and have already uninstalled and re-downloaded Adobe reader XI twice. I have also read other threads on this forum, and
    tried the suggestions, including running Kaspersky anti-rootkit, no threats were found.
    My Adobe reader shortcut icon shows a small blue and yellow shield in the bottom right (I uninstalled Windows essential protection), but the problem prevails.
    I would rather get to the root of the error and fix it and not just disable protection mode!
    Please help.

    Hi,
    Please refer to the solution in:- Error: “Acrobat Failed to Load core DLL”.
    Also, may want to try disabling all Non-Microsoft Startup Services.
    Ref : http://helpx.adobe.com/x-productkb/global/disable-startup-items-services-windows.html
    Regards,
    Nakul

  • Cannot open in proctected mode due to an incompatibility with your system configuration

    cannot open in proctected mode due to an incompatibility with your system configuration once turned off I still can't open adobe reader

    Hi vballmc,
    Would you please give me more info?
    1) Where are you seeing the message - on Adobe Reader, Adobe Acrobat, Internet Explorer, or something else?
    2) What operating system are you using?
    3) What version of Adobe Acrobat/Reader are you using? (You can check it at Help > About Adobe Acrobat/Reader menu.)
    Thank you!
    Rebecca

  • Adobe Reader cannot open in Protected Mode due to a problem with your system configuration.

    From Adobe website:  "Note that this list is not regularly maintained as Protected Mode now runs transparently in the background and it is unlikely that users will experience issues."
    This explanation on the Adobe website does not explain what the problem is with the "system configuration".  What is the system configuration problem?

    Hi Steve,
    As mentioned on the troubleshooting page as well normally application like antiviruses, encryption and system maintenance tools causes this kind of problem. These software software intercepts some system calls for the Reader sandbox. Could you please check if you have any of these kind of software installed? Could you please answer following question then I would be in better position to help you?
    1. Version of Reader being used
    2. OS
    3. What happens if you choose launch unprotected? Do you see a failure or Reader launches?
    Thanks

  • Data load fails from DB table - No SID found for value 'MT ' of characteris

    Hi,
    I am loading data into BI from an external system (oracle Database).
    This system has different Units like BG, ROL, MT (for Meter). While these units are not maintaned in R3/BW. They are respectively BAG, ROLL, M.
    Now User wants a "z table" to be maintained in BW, which has "Mapping between external system Units and BW units".
    So that data load does not fail. Source system will have its trivial Units, but at the time of loading, BW Units are loaded.
    For example -
    Input Unit (BG) -
    > Loaded Unit in BW (BAG)
    Regards,
    Saurabh T.

    Hello,
    The table T006 (BW Side) will have all the UOM, only thing is to make sure that all the Source System UOM are maintained in it. It also have fields for Source Units and target units as you have mentioned BG from Source will become BAG. See the fields MSEHI, ISOCODE in T006 table
    If you want to convert to other units then you need to implement Unit Conversion.
    Also see
    [How to Report Data in Alternate Units of Measure|https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/b7b2aa90-0201-0010-a480-a755eeb82b6f]
    Thanks
    Chandran

  • Load data from file extremely slow due to refresh

    Hi
    I am loading a data from a csv file to an existing table in a PeopleSoft schema on Oracle 11G. The process works fine except that it takes an extremely long time. I suspect that this is because SQL Developer is refreshing the table list on the left hand side which for PeopleSoft 9 takes a long time because there are 65,000 tables in the schema. If my suspicion is correct it would seem a bit strange that I would need to refresh the table list when I am importing into an existing table. Can anybody confirm this ?
    As a side note I have tried DBMS_STATS.GATHER_DICTIONARY_STATS (or something like that) but this has not improved the performance of loading the large object lists into the LHS or the object details in the RHS with PeopleSoft 9 - is there a way to improve this performance.
    Cheers
    Mark

    There are many possible reasons for slow performance, not least the fact that sqldeveloper is probably inserting a row at a time. The best tool for this kind of job is sqlldr which is generally blisteringly fast.

  • CIF STEPS to load data from ECC to APO from Process chain

    Hi,
    i try to create on ECC system a process chain in order to execute the CIF program for updating APO Material/Plant Master data on DELTA mode .
    I am not sure that the procedure is correct, at the moment i put on a chain:
    - Step 1 Program RIMODGEN with a specific variant
    -Step 2 Program RIMODACT2 with a specific variant.
    Is necessary a third step with RIMODACT2 in order to deactivate the integration model?
    On APO we have to insert other standard step in order to complete the delta update?
    Any experience on similar situation?
    Thanks,
    Veronica

    Veronica
    You do not need a third step. You do not need to deactivate the model. In fact, it is not recommended to do so. You do not need any step in APO.
    If your CIF setup is correct, the first two steps should be enough.
    If by 'Delta', you mean field value changes to material/ plants in an existing integration model, you dont even need to do CFM1/ CFM2 if you have setup transaction CFC9 for BTE (online transfer).
    Rishi Menon

  • Upgrade from ECC 6.0 EHP5 to EHP7 issue with PO header

    HI Experts,
    We  Upgrade the  Ecc 6.0  recently  from EHP 5 To EHP 7. In EHP 5 when we select the PO type  (REW - Reject ) in ME21N , Reject tab will appear at header level.
    In EHP 7 When we enter the PO type (REW - Reject ) in ME21N ,Reject tab will not appearing and  it is asking for the organisation elements  and vendor .After entering the all the organisation data only reject tab appear in header level.
    My client wants EHP 5 Functionality in EHP 7.What clould be the reason to behave like this.How to achive this requirement.
    Regards,
    Venkat.

    Hi Krishna Rao,
          It is proved lot of times if you are upgraded new enhancement package in the server then enhancements need to re-check and  do manually development in new server  and retesting in quality server before moving  to Production server. 
    Ask Abaper to check whether enhancement updated in new enhanced server . If no then Abaper need to update manually.
    Regards,
    Ravindra

  • Premiere CC 2014: Message on loading project from older version: This project was last used with Mercury Playback Engine GPU acceleration (CUDA)...

    After installing Adobe CC 2014 I have each time a message when loading an old Adobe pro project. Message:This project was last used with Mercury Playback Engine GPU acceleration (CUDA), which is either not available or not certified on this system. Mercury Playback software will be used. I have very recent HP Zbook 15 with a NVIDIA Quadro K2100M. At webinar today it was explained how to solve this, but sound was not understandable at my machine at that moment. Help? What need I to do.

    Problem is solved since yesterday via Adobe helpdesk. It appeared that the newest driver for the NVIDIA were note present. So after downloading the new drivers it work. But I think Adobe should mention those issues when they launch new versions of Adobe CC like in June.

Maybe you are looking for