Logical system name conversion.

We are performing a logical system name conversion of a client and its taking long time due to huge DB Tables like COEP.
Is there any process to speed it up ? Also what will be the consequences if Consutants workin the Other clients of the same system.

Hi Narendran,
what problems would it create ? i am looking for some specific ones as i too would know that if a user works during the process the database tables which are getting updated with a new logical name would get corrupted and there is a possible chance that the table for eg VBRK woiuld be having a few entries with the old LS name. But my thoughts were in this direction. This report first converts the table T000 and then TBLST from where the MANDT and LOGSYS gets picked up many times. if they are converted every new entry which is entered will be having the new name and the old names are under the process. so how risk is it ? to allow a user to work is what i am looking for. This might be putting a test to SAP code but i am looking for this test as analysing this report would help us in many ways. you must be knowing that this report may run upto weeks, we had this experience in the last client copy and i am trying to check on this reports behaviour.

Similar Messages

  • System Copy  and Logical system name conversion

    Hello All,
    Can any one let me know some inputs over these few queries.
    1. How much time would a 500+GB clients take for Export and reimport after the system copy.
    2. What would be run time of the BDLSS report ( Converting the logical system names) for a typical 1500 GB QTY system
    The requirement is my QTY has 3 clients, and i would like to refresh it with my PRD data. How do i safely perform thia activity with the least downtine possible and please note, the clients are around 500+ GB huge..
    Thanks in advance for your inputs.
    Rgds,
    Sri

    Hi Frank,
    the parameters of my installation are as folows.
    Appl Serv : OS - AIX (5.2 Version) and CPU's - 4 (Mem 20480) ::: DB serv : OS - AIX(5.2 Version) and CPU - 6 (Mem 22528)
    The DB version is Oracle 9.2
    We are on 4.7 enterprise version of SAP with SAPKA62055 patrch level.
    br
    Sri

  • Conversion of logical system name fails

    Hi,
    when trying to transport a transformation on BW7 the logical conversion name is failing. When i check the setup (on rsa1 menu "Conversion of logical system names") it seams to be ok on source and target system.
    Any tips to solve this ?
    thx in advance

    Hi,
    when you are not maiantained the logical systems properly , then you will get that error when you are transporting the objects
    in Bi production system ( to which server you are moving objects) in that  you should maiantain the all logical systems as below
    1) for examaple BI deve --- BI prd
    one logical systm should be bi Dev to BI prd
    2) ECC production connected to BOI production
    Then one more logical assignment  ECC prd to BI prd
    normally those two you are maintained i think so.
    but when you are moving the objects from the BI development to Bi production
    the daat sources are pertaining to the ECC developmet
    so that ECC deve to BI Dev ( here there is no problem)
    when those daat source s you are moving to production it shows error
    because that ECC deve Data source logical system should be changed to BI production
    so you main tain one more logical system ECC dev to ECC PRD
    in your BI system
    Then try reimport the same.
    Thansk & Regarsd,
    sathish

  • Conversion of logical System Name

    Hi,
    I have read somewhere that Conversion of logical System Name is part of BW System check Before go live. Can someone explain the purpose of it.
    Thanks in advance
    krish

    Hi,
    There are two different activities related to this, if you have done the system copy then for changing the logical system name we will run BDLS transaction. Check the below link for more information,
    [http://help.sap.com/saphelp_nw70/helpdata/en/33/c823dbaea911d6b29500508b6b8a93/content.htm]
    But if you want to move the source system dependent objects from one system to another system then we maintain the source system and target system mapping in target system.
    For transport method you can maintain the system names as suggested by Gaurav and you can check that in table RSLOGSYSMAP or you can directly maintain entries in this table.
    Regards,
    Durgesh.

  • Conversion of logical system names

    Hi
    Must the Conversion of logical system names be set up in each client.
    I.e in the BW production client do I have to go and setup what the conversion is between before the transport and after the transport.
    Also if I then go into this view and want to add my conversion detail, and the system doesn't exist (in table) do I have to create the entries in Dev and Transport it through?
    Corne

    Hi Corne,
    If the correct entries don't exist in the underlying tables, you have maintain it in SPRO.
    The entry in the table is cross client. hence it has to be done in Dev.
    Go to SPRO -> SAP Netweaver -> Business Intelligence -> Links to Other Source Systems -> General Connection Settings
    -> Define Logical System
    1. To create a logical system, choose Edit -> New Entries.
    2. Enter a name for the logical system that you want to create.
    3. Enter a description of the logical system.
    If you want to cange this entry:
    a) Select the appropriate line.
    b) Choose Edit -> Change field contents.
    c) Enter the new text.
    d) Choose Replace.
    4. Save your entries.
    Roy

  • Logical system name change

    Hi all,
    Now my BI development is pointing to R/3 development. R/3 logical sytem name is bbbclnt100. Now all my datasources are pointing to this logical system. Our basis people are going to change the logical system of R/3. Please tell me the repercussions? what will happen to my datasources?
    Thanks in advance

    Anni,
    Change logical system name and run BDLS job to adjust. Do not change souce system. If you change source system all transfer rules will get deactivated.
    Check: [Conversion of Logical Systems|http://help.sap.com/saphelp_nw70/helpdata/en/33/c823dbaea911d6b29500508b6b8a93/frameset.htm]
    Search forum for more links.
    Srini

  • Idoc Acknowledgements -  Logical System Name

    All,
    Stuck with a few issues with Idoc Acknowledgments which I hope SDN can help me with. For ease of understanding the problem, am splitting this into 2 Scenarios ,
    <u><b>Scenario 1</b></u>
    <b>SAP R3 (Idoc ) - XI - File ( Business Service)</b>
    R3 Triggers Idoc to XI and XI sends this as a File to the target Application. AleAdudits can be sent back to the R3 system as shown in <a href="/people/saravanakumar.kuppusamy2/blog/2005/01/20/configuration-tips-for-a-business-serviceintegration-process-to-send-back-ale-audit-idoc">this</a> blog by Saravana by adding the Logical System Name to the Business Service.
    <u><b>Issue :</b></u>
    R3 has configured Partner Profile with respect to XI and this cannot be changed. To send the Idoc Ack's back to R3 we need to add the Corresponding Logical System Name to the Business Service.
    The problem is - what if the Idoc is to be sent to 2 Different Business Service / Systems. The R3 expects an Acknowledgment with XI as the sender partner but we cannot share the same logical system across different Business Systems / services . The easiest solution seems to be to create different partner profiles in R3, one for each Business System / Service. But this is not possible currently.
    <u><b>Scenario 2: </b></u>
    <b>R3 - XI - BPM - Target</b>
    Idoc triggered from R3, are sent to a BPM and then from the BPM to a file. Everything works fine.
    But, the problem lies that when the Ack needs to be sent back to R3, The ack errors out because no Logical System Name is associated with the BPM.
    We do not want to add another logical system name to the BPM  and  thereby create another partner profile and the problem is similar to Scenario 1.
    <u><b>Solutions Explored</b></u>
    1. In the ACK_IDOCAdapter , I tried to select option Take Sender From Payload and Take Receiver from Payload.
    But this does not seem to help. I can see the trace in MONI saying the ACK_IDOC adapter is choosen  to send the ack back to R3 , but it does not take the Partner Names from the payload of the AleAdudit and errors out with  error <i>Unable to convert..</i>
    2. As this AleAduit is sent from XI back to R3 and is not a R3 (AleAduit) - XI - R3 (aleaduit) case, adding a entry as shown in Section 6 in
    <a href="https://www.sdn.sap.comhttp://www.sdn.sap.comhttp://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/903a0abc-e56e-2910-51a8-9dc616df56eb">this</a> document will not help.
    Has anyone tried something of this sort. Any known solutions?
    I hope the description of the problem made sense, if no, do let me know.
    Regards
    Bhavesh

    Bhavesh,
    Your problem as i understand -> <i>The problem is - what if the Idoc is to be sent to 2 Different Business Service / Systems. The R3 expects an Acknowledgment with XI as the sender partner but we cannot share the same logical system across different Business Systems / services . The easiest solution seems to be to create different partner profiles in R3, one for each Business System / Service. But this is not possible currently.
    </i>
    If the IDOC is sent to 2 different business services/systems/Integration Processes, then it is very logical that an ALEAUDIT be sent for each of these business systems/services. Ideally, you SHOULD NOT look at sending a common ALEAUDIT for different recievers in XI, the reason being, failures could happen only for one receiver and NOT for others. Failure could be in the mapping/content conversion. I am assuming here that you are configuring XI to send back "ALEAUDITs" only for System Error Acks(hoping it is possible, since i see 3 XXXs in the IDXNOALE table).
    So, it is logical that you configure a different LS in R/3 for each reciever system/service/IP, all these LS's will have one entry for ALEAUDIT in the Inbound params entered in WE20.
    If your intention is to send ALEAUDITs back only in case of errors, it makes sense to create an entry for each receiver in R/3. If not, then it is a limitation.
    Regards
    Saravana

  • BI:Logical system name has been changed for This System

    Hi, Gurus,
    I want to Use my IDES SAP ERP 7.0 as my BI system for training purposes,when iam executing the transaction RSA1 in the system it is giving message
    "Logical system name has been changed for
    system"
    I Have changed the entries in table "RSADMINA" and maintained the Client no as 100 (My base client for BI) which i have copied from 001.
    When iam executing the Transaction RSA1 in 100 it is giving above mentioned error ,whereas in 001 it is working fine.
    Please Help . ..
    I tried to change the system logical name by "bdls" but it doesnt worked........

    Hi Deepak,
    Check the entries in table RSLOGSYSMAP (this is meant for correct conversion of logical system names for tansports).
    You can easily maintain the entries using tcode RSLGMP.
    Hope it helps.
    Grtx
    Marco
    PS I'm not a basis guy but do you have a correct BI installation yet?

  • Logical system name for acknowledgement in BPM

    Hi,
    I have a szenario:
    IDOC --> BPM --> MAIL
    Inside BPM I check the message and depending on an xml-element I stop the process or I send the message by mail.
    When I stop the process the BPM sends back an acknowledgement and in SXMB_MONI I can see an error of the acknowledgement:
    "Sender Test_BPM_IDOC_TO_MAIL kann nicht in ein ALE Logisches System umgeschlüsselt werden" (Sender can not convert in a ALE logical system)
    What can I do?
    Possible Solution 1:
    I can define my BPM "Test_BPM_IDOC_TO_MAIL" as a logical system (including WE20 for ALEAUD).
    Possible Solution 2:
    I can enter an existing logical system name in the "adapter specific attributes".
    BUT it is not use the same logical system name twice (BAD ... or is there a workaround?
    Is Solution 1) a common way?
    Thanx
    Regards
    Wolfgang Hummel

    Hi,
    there are many ways:
    some for aleaud are described in my book:
    <a href="/people/michal.krawczyk2/blog/2006/10/11/xi-new-book-mastering-idoc-business-scenarios-with-sap-xi"><b>Mastering IDoc Business Scenarios with SAP XI</b></a>
    >>>>Is Solution 1) a common way?
    no this is not good a good idea
    BTW
    you can also supress aleaud raport IDX_NOALE
    Regards,
    michal
    <a href="/people/michal.krawczyk2/blog/2005/06/28/xipi-faq-frequently-asked-questions"><b>XI / PI FAQ - Frequently Asked Questions</b></a>

  • Logical System Name Not appearing in the Business System

    Hi,
    Initially we had created a Technical system with Client 700 without a "Logical System Name" in SLD. hence the 'logical system name' in 'business system' was also Blank.
    Now, since we are implementing the IDOC to file scenario; we need to maintain the "Logical System Name" in the client and which in turn should reflect in our Business System in SLD.
    Though we maintained the Logical System Name in the Technical System --> Client --> Logical System Name; we are unable to see the same(Logical System Name) in Business System ('Integration' tab)
    Please also note that Business System is of the ROLE: Integration server.
    When we go to business system in SLD ---Integrtaion tab ---Logical System Name -- is still blank.
    Can anyone please help us to update the 'Logical system name' in Business System in SLD?
    Regards,
    Rehan

    Hi Sunil,
    I followed your link till
    Bussiness System -> select your bussiness System -> in Below pane u will find Details of your bussiness system ->amongs the various tabs available select Integration Tab->U will See option for technical system beside that u will see option for change ->click this ->u will be taken to Logical system ->there u define u r logical syatem name and then save the entries.
    When I clicked the option chnage ---> "Change Associated Technical System" appeared, It didn't take me to Logical system.
    But in turn I clicked hyperlink corresponding to Technical systems, it took me to technical system --> clients tab --I have entered the Logical system name.
    When I go back to Business system again its not showing the Logical system name in Integration tab.
    regards,
    rehan

  • IDOC sender: Error in Logical system name?

    Hi,
    In my current project, the IDOC sender system logical name is P2PCLNT100 but the SLD system name is P2P.
    Its an IDOC to proxy scenario. At the receiver system side, the schemeAgencyID is getting populated at P2P and not P2PCLNT100, due to which there is an error on the receiver's side.
    Following is already checked:
    1. SLD has maintained the proper logical system name for the P2P system
    2. The IDOC xml on the XI system has the sender port properly populated as P2PCLNT100
    3. I have also debugged the program on the receiver side and fails at a point where it checks the logical system name from the database BBP_BACKEND_DEST.
    On the receiver system, the followed error is shown as follows:
    - <STANDARD>
      <CONTROLLER />
      <FAULT_TEXT>An error occured within an XI interface: SLD system P2P is not known Programm: SAPLBBP_BD_MAPPING_SAPXML1; Include: LBBP_BD_MAPPING_SAPXML1F1Y; Line: 96</FAULT_TEXT>
      <FAULT_URL />
      <FAULT_DETAIL />
      </STANDARD>
    Thanks in advance for the useful answers.
    Sowkhya

    Hi,
    1. R/3 system's logical system name and SLD business system's logical system name has the same.
    Is there a need to have the business system name in SLD to have the same name as R/3 system logical name?? As far as my knowledge goes, business system and logical system need not have the same name. Correct me if in the case IDOC sender scenario is different..
    2. SLDCHECK shows following message:
    Summary: Connection to SLD does not work
    The issue still persists. Will SLDCHECK correct solve the issue?
    Regards,
    Sowkhya

  • Logical system name in business system (SLD)

    Hi,
    While creating business system in SLD what should give for the logical system name?
    Should the logical system name exists in ABAP stack or the new one?
    Thanks.

    Hi,
    If you are creating the BS for SAP R/3 in SLD means we have to give the LS name which we had in SAP R/3( goto SALE and take the LS from there)
    Goto Assign LS-----take the client which you are using for SAP R/3 and take the LS name assigned to that Client
    Regards
    Seshagiri

  • Logical  system name to be updated while client copy--URGENT HELP REQUIRED

    Hello All,
       I have a  query regarding the "Logical System name" updation during Client copy.
      When we make a client copy(SRM Masters) for the Production system(SRM),the Old Logical system name for backend(which is attached to the SRM masters) gets copied to the new Client (Copy) which needs to be updated.
      There is  a  std transaction BDLS through whcih w e can change the current Logical system name to  a  new one but this  seems to work fine for System copy but not for Client copy.
      So when i make  a client copy of  SRM masters  for Production system,is there  any other std  way wherein i can change the "Logical system name " for the  backend or  do i have  to write a  CUSTOM program wherein entries  for  the Backend Logical system name in tables like CRMMLSGUID will  be updated  with  the new  Logical system name?
       Any help on this is  appreciated.
    Thanks & Regards,
    Disha.

    Disha,
    Yes, I did it twice and it worked fine.
    The R/3 GUID is sent by the OLTP system (R/3) in R/3 message header.
    SRM checks this GUID in CRMMLSGUID table.
    If is not the same one, then replication process fails.
    The only solution I found was to delete this entry. It is automatically recreated with the new GUID with the next replication, with FM CRMT_OLTP_LOGSYS1, called in BAPI_CRM_SAVE.
    Look at OSS note 588701 & 765018 for deletion of CRMMLSGUID.
    The issue is exactly ours: around system/client copy.
    In an CRM environment, this is more critical, because we make a huge use of the middleware. But in our case, and especially after system/client copies, we can go, even if SAP does not guaranty anything, because we don't care about "old" replicated data (I don't care about old BDOCs, that should even be deleted after processing).
    We have to take some risks sometimes...
    Rgds
    Christophe

  • Reg: Table name where logical system name will store in R/3 and CRM..

    Hi
    We are trying to replicate the sales order from CRM 5.0 to ECC 6.0. we mainatined publication, site, subscription and rfc connections. When the sales order is created in the CRM the BDOC is getting posted but it is picking up the wrong logical system which we were using earlier. Due to this wrong logical system, out-bound queue is getting generated in CRM but In-bound queue is not getting generated in the ECC.
    Can anybody tell me where (in which table) we need to modify the things for getting the correct logical system.
    Regards

    Hi,
    In CRM:  look for the table CRMMLSGUID. This should have the logical system name of the R/3 that it is connected to CRM and also the GUID. To check if the GUID is correct cross check with GUID from R/3 table CRMPRLS.
    In R/3: look for the table CRMRFCPAR. This will give you all the RFC connections that R3 is connected to. If you want to check whether the CRM RFC value is defined correctly compare it with RFC destination in the Administration Console (smoeac) from CRM.
    If the entries are matching then the systems are connected correctly if not you need to look at the RFC destinations from SM59 transaction.
    Hope this helps.
    Thanks,
    Karuna.

  • Logical System and Logical System Name

    Hi,
       I would like to create the following  and please tell me how do I go about doing this. I am doing this because I am trying to implement both RFC/Idoc to File and File to Idoc/RFC. The basis admin guys are unavailble at the moment so I am on my own at this moment.
    Creating a port(I suppose I need to do this on the R3. What are the steps involved)
    Create a Partner Profile

    Hi Sonia,
    For XI communicating with SAP R/3 through Idocs ALE settings need to be done,
    just go through the following steps and Configure ALE :-
    SAP XI
    1) RFC Destination (SM59)
    a) Choose create.
    b) Specify the name of the RFC destination
    c) Select connection type as 3 and save
    d) In the technical settings tab enter the details SAP SID/URL and system number#.
    e) Enter the Gateway host as same details above SID/URL.
    f) Gateway service is 3300+system number#.
    g) In the Logon /Security tab, enter the client user & Password details of Destination system.
    h) Test the connection and remote logon.
    2) Create Port (IDX1)
    a) Select create new button
    b) Enter the port name as SAP+SID (The starting char should be SAP)
    c) Enter the destination client.
    d) Enter the RFC Destination created in SAP R/3 towards other system.
    e) Save
    3) Load Meta Data for IDOC (IDX2) a) Create new
    b) IDOC Message Type
    c) Enter port created in IDX1.
    SAP R/3
    1) RFC Destination (SM59)
    a) Choose create.
    b) Specify the name of the RFC destination
    c) Select connection type as 3 and save
    d) In the technical settings tab enter the details SAP SID/URL and system number#.
    e) Enter the Gateway host as same details above SID/URL.
    f) Gateway service is 3300+system number#.
    g) In the Logon /Security tab, enter the client user & Password details of Destination system.
    h) Test the connection and remote logon.
    2) Create Port (We21)
    a) First Select Transactional RFC and then click create button
    b) Enter the destination port name as SAP+SID (The starting char should be SAP)
    c) Enter the destination client.
    d) Enter the RFC Destination created in SAP R/3 towards other system.
    e) Save
    3) Create Partner Profile (WE20)
    a) Create New
    b) Create the Partner no. name as same the logical system name of the destination system.
    c) Select Partner type LS
    d) Enter details for Type: US/USER, Agent, and Lang.
    e) Click on the + button to select the message type.
    f) Select Partner no. and LS which ever create above.
    g) Select Message type
    h) Select Process code related to the Message type.
    I) save.
    In SLD – System Landscape Directory
    TS for R/3 (Logical system):-Assign the client name created in R/3 as Logical system Name.
    Ts for Third Party (Logical system):-
    BS for SAP R/3 (Logical system):- Assign the client name created in R/3 as Logical system Name.
    BS for Third Party (Logical system):-Enter the XI logical system name.
    In Transaction SALE
    Define and Assign the logical system name.
    Regards,
    Ashwin M
    Reward If helpful

Maybe you are looking for

  • PHOTOSHOP ELEMENTS 12 in WINDOWS 8.1 "die Konfigurationsdateien dieses Produkts sind beschädigt"

    I cannot install PHOTOELEMENTS 12 in Win 8.1. Windows Installer announces every time "die Konfigurationsdateien dieses Produkts sind beschädigt". I tryed with TEST-DOWNLOAD from Adobe and from a CD, that i have bought. What can I do?

  • Icc colour profiles by print labs

    how can i set the colour printing profiles thas required by my on line print lab .thats needed for colour management used incolour profiles is ther ac to upgrade elements 12.this is required to go the correct colour when images are set onto a cd for

  • Illustrator CC tooltips

    I'm currently using Illustrator with a Wacom Cintiq 22hd which is great fun, but there is one annoying thing which I was wondering if there is a fix to that I'm missing.  When tracing and wanting to pick up paths or anchors, the little green text tha

  • Preprocessing BADI for SD_SALESDOCUMENT_CREATE

    Hi All, Can anyone tell me the BADI's available for the RFC SD_SALESDOCUMENT_CREATE. I am looking for a BADI to handle the preprocessing logic before creating a Salesorder. Any help is appreciated. Thanks, KC.

  • Shell Script Authentication

    How do you make like a dialogue box appear when I am using sudo scripts?