Hi Experts:
I'm trying to input the lower and upper specification limit on inspection plan. I created my inspection characteristic but when I trying to digit the values, the systems erase that and give me the values from the inspection characteristics
Any idea?

Hi Deihus,
1.     While creating MIC you create it with upper, lower and target limits.
2.     The same MIC when you use in inspection plan, all the control indicators and lower, upper values get copied in to inspection plan from MIC.
3.     In fact this is the reason you can use this characteristic for several material.
Kindly excuse me as I could not interpret the term when I trying to digit the values . To digit value means what?
Whether you want to put different values in inspection plan rather than getting copied from MIC? If yes, you can do so. Just overwrite the values on QP01/QP02 and save.
Regards,
Anand
Edited by: Anand Rao on May 16, 2011 10:50 AM

Similar Messages

  • Lower specific limit and upper limit

    Hi, we are entering the lower specific limit and upper limit as 100 and 200 in qp02 screen for certain MIC. The table name mentioned as QFLTP, which is a structure. I want to know in which table this values were saved?

    Dear Yadav
    Use PLMK or QAMV if you want to get the specification from the lot. In this the values will be E which can be interpreted
    for eg 5,5000000000000000E+01  means 55
    9,0000000000000002E-01 = .9
    Regards
    Gajesh

  • How to maintain minimum price limit and maximum price limit for a condition

    Hello Gurus,
    Goodmorning,
    How to set minimum price  limit and maximum price limit for a pricing condition type  where we will do this ?, is it possible to set in VK11 ?
    Note- I   can see  minimum and maximum setting in condition type  pricing - in  SPRO but  not seen anything in VK11 condition record maintaince  . so how to maintain in condition record( VK11-Minimum limit  price and Max limit  price )
    Looking for your inputs 
    Thanks in advance
    Regards
    Venkat

    hi,
    in VK12
    select the condition record - goto blue ladder icon
    there you can maintain scales
    like lower limit and upper limit.
    balajia

  • How to Run a Request Set on specific days and at specific hours

    Hi community,
    The question is simple, how to rin a Request Set on Specific Days and at Specific hours?
    Let me explain the scenario.
    E-Business Suite, Release 11.5.9.
    We have a request set under Sysadmin user. This Request set is running 24x7, during all year, and we want to restrict the execution from Monday to Friday since 08:00 a.m. to 20:00 p.m. in order to increase the productivity of our system and more over, to avoid the size increase of a table (OE_EXPOSURE_INTERFACE)
    The Request Set includes 5 Requests:
    10. Workflow Background Process.
    20. GUZMAN: Cálculo metodo pago en pedidos.
    30. GUZMAN: Exposición de crédito externo.
    40. Credit Exposure Import.
    50 Initialize Credit Summaries Table.
    As you can see three of them are standar Oracle Order Management Processes and two of them are custom Oracle Order Management Processes; and the requests must be executed in that order.
    We have just thinking about to create a Custom Manager with a workshift from Monday to Friday since 08:00 a.m. to 20:00 p.m., and include the requests as specialization rules or assigning those request to a Request Type and then include that Request Type as specializated rule, but this does not assure us that the request will be executed in that order.
    Any suggestion?
    Thanks a lot for your answer in advice.
    Luis.

    Hi Anchorage,
    It could be a solution, but not the exact solution that we want. Let me say why.
    With the Request set we have the security that each concurrent request is executed when the prior one finishes; is that to say 20, does not begin till 10 finishes, and 30 does not begin till 20 finishes and so on. The most critical concurrent requests are 40 and 50, cause those are the ones that import an external credit exposure in the OE_EXPORURE_INTERFACE table (40) and are the ones that delete those external credit exposures imported (50). The problem is (and we do not know why) that these actions makes grow the size of the table and each time the 40 and 50 processes takes more minutes to finish. That's why we need to truncate the table in order to avoid the excesive grow of itself.
    Making each process independent, with a begining time and hoping and expecting that the following one does not begin till the prior one ends is not an admisible or realizable solution due to the problem with the 40 and 50 processes.
    So at the end, we need a request set in order to know that each one began when the prior one ends.
    And Due to in order to truncate the table, as I said before, the processes that have a relationship whit it, must be stopped (just the 40 and 50 processes) prior to the truncation.
    So as you see, it is difficult, very difficult.
    Regards.

  • Can ALV Grid show credit limit and excess credit limit but do not sum them?

    Can ALV Grid show 100,000.00(in ???1) and 84,260.94(???2). Not sum them up.
    Credit limit, Inv. Curr, Inv. Amount, Amt in LC, Excess Credit Limit
    100,000.00     USD     1,594.20     5,260.86     84,260.94
    100,000.00     USD     263.84     870.67     84,260.94
    100,000.00     USD     1,935.60     6,270.38     84,260.94
    100,000.00     USD     806.70     2,613.30     84,260.94
    100,000.00     USD     214.98     696.43     84,260.94
    100,000.00     USD     8.50     27.42     84,260.94
    ???1     USD     4,823.82     15,739.06     ???2     
    USD     4,823.82     15,739.06

    Hi Sandeep,
    Please refer to the bold figure as they are the credit limit and excess credit limit for 1 vendor.
    It is not right if sum the credit limit and excess credit limit.
    Is it ALV cant handle this type of requirement?
    Is there any way to solve this?
    Credit limit, Inv. Curr, Inv. Amount, Amt in LC, Excess Credit Limit
    100,000.00 USD 1,594.20 5,260.86 84,260.94
    100,000.00 USD 263.84 870.67 84,260.94
    100,000.00 USD 1,935.60 6,270.38 84,260.94
    100,000.00 USD 806.70 2,613.30 84,260.94
    100,000.00 USD 214.98 696.43 84,260.94
    100,000.00 USD 8.50 27.42 84,260.94
    100,000.00 USD 4,823.82 15,739.06 84,260.94 <--subtotal line
    USD 4,823.82 15,739.06 <-- total line
    Edited by: Check Chuan Kuan on Feb 24, 2011 10:03 AM

  • Setting a Default Organisation Message Size Limit and a Higher Limit on an Individual Mailbox

    Ok.  So here's the problem.  I've read all the articles on setting message size limits for Organisation, Transport Send Connectors, Transport Receive Connectors, setting precedence, etc., but they don't detail how to solve this problem.  
    One person in our organisation is to get a raised message size limit for sending and receiving internally and externally.  I've already set up limits on the Organisation Transport Global Settings, Send Connectors, Receive Connectors, etc.  So,
    as this individual requires a higher limit, I've raised the limits on their mailbox, and the aforementioned connector settings, etc., except the
    Organisation Configuration / Hub Transport / Global Settings / Transport Settings / Maximum Receive
    and Send Sizes.  The theory is that I can keep these two values at the original lower setting as these are overridden by the individual's new, higher, mailbox settings, but they will continue to act as the default for other existing mailboxes
    and newly created mailboxes.  Right ?  Wrong!  For the individual's mailbox, this will only raise the limit for messages sent internally (not to or from external email addresses).  
    Now, I could change all existing mailboxes to have the old default lower limit using a PowerShell / EMS command, but this wouldn't work either.  Newly created mailboxes will still default to the new larger limit.  Most of our mailbox creation is
    scripted, though some are created manually.  I don't want to alter the script and inform the admins as this is too much work and admins will forget about the new limits.  TBH, I'll probably forget about the new limits.  That's just a messy inefficient
    approach.  What I want is to set a new default for message size limits, with the original low limits.  I.e., a setting that applies to existing mailboxes with no explicit message size limits set, and also newly created mailboxes, but not any mailbox
    with an explicitly specified higher message size limit.  Any mailbox with explicitly specified higher limits should be able to send larger messages both internally
    and externally.  Can anyone help ?  Like I said, I've already read the articles so I don't need links to these thanks.  I'm more looking to people who have done this kind of thing already. 
    BTW, we are using Exchange 2007 SP3.  It has a mailbox server Single Copy Cluster (SCC) with two nodes.  It also has two Client Access / Hub Transport servers.  Just so you know ;-)
    -- huddie
    "If you're not seeking help or offering it, you probably shouldn't be here."

    Hi huddie71,
    Thank you for your question.
    I've raised the limits on their mailbox, and the aforementioned connector settings, etc.,
    except the Organization Configuration / Hub Transport / Global Settings / Transport Settings / Maximum Receive and Send Sizes.      
    By my understand, we could modify the global settings by the following path:
    Organization Configuration / Hub Transport / Global Settings / Transport Settings / Maximum Receive and Send Sizes.      
    Because it will work on existed user and new user without explicit message size limits sets.
    If there are any questions regarding this issue, please be free to let me know. 
    Best Regard,
    Jim
    Hi Jim-Xu.  That would result in everyone getting an increased limit.  I only want one person to have an increased limit.  See the 2nd paragraph in my original post.
    -- huddie71 ~~If you~re not seeking help or offering it, you probably shouldn~t be here.~~

  • Ho to convert to lower case values and upper case

    hi
    pls let me know how to convert the varlues to lower case
    and how to conver values to uppoer case
    whichis funtion module to do so?
    regards
    Arora

    Hi,
    <b>TRANSLATE</b>
    Converts characters to strings.
    Syntax
    TRANSLATE <c>  TO UPPER|LOWER CASE
                  |USING <r>.
    The characters of the string <c> are converted into upper- or lowercase, or according to a substitution rule specified in <r>.

  • Transaction in specific time and on specific event

    Hi!
    I have a question. (Who doesn't .. :-) )
    How to run some transaction in some specific period in time, for example every hour, and on some specific event in the system?
    Tnx,
    Mirek

    For the first part, put the transaction in a procedure and submit the procedure to DBMS_JOB package, so it will run after every specified interval.
    For the second part you can specify certain event level triggers, and call the procedure of those triggers
    <BLOCKQUOTE><font size="1" face="Verdana, Arial, Helvetica">quote:</font><HR>Originally posted by Miroslav Grgec ([email protected]):
    Hi!
    I have a question. (Who doesn't .. :-) )
    How to run some transaction in some specific period in time, for example every hour, and on some specific event in the system?
    Tnx,
    Mirek<HR></BLOCKQUOTE>
    Hope this helps,
    Naveen

  • How to correlate a specific Idoc and a specific XI xml message

    Hi, I have an Idoc and want to find the belonging xml message in XI. There are more than 90 xml messages to pick from, so I hope there are some other methods to find it, instead of looking inside each one!
    Thanks!

    Hi Rune,
    for that task you have to extend the standard monitoring. Plz have a look at <a href="/people/alessandro.guarneri/blog/2006/02/14/super-message-monitor-for-sap-xi Message Monitor for SAP XI</a>
    Regards,
    Udo
    Message was edited by: Udo Martens

  • Material specification and Inspection plan - Task list usage

    Dear Friends,
    In inspection type  Task list usage is assigned
    For Example
    inspection type 01  -  usage - 03
    inspection type 05  -  usage - 05
    inspection type 06  -  usage - 07
    inspection type 10  -  usage - 06
    In my scenario i want to use all the above inspection type for a product
    if i use mateial specification there is no any problem with my  Task list usage
    If suppose i use inspection plan do i need to create different inspection plan with different usage
    or is it possible to create one inspection plan with all the above usage
    what about universal usage 03  can i use it
    i try to use but system does not triggering inspection lot
    can any one Suggest some ideas
    Many Thanks & Regards
    Raj

    Hi Raju,
    All of first pls understand the concept of Task list and specification.
    If you need to inspection any material in very systematic manner, where you will have well segregated operations where the appropriate Work Centers will be bind and under that hierarchy MIC will be attached. The inspection will be governed by some inspection points. And according the the same Samples will be calculated. When you wanna go with all these functionality then you must have to use Task list (Inspection plan).
    And if you don't wish to have these functions then simply go with the material specification.
    Now it comes the actual query about task list usage.
    If there is a common inspection plan is supposed to be used for all the inspection types for your material then you can prepare only one inspection plan, put ant of the Usage to it it can be 05 or 03 universal. But what you have to do is,
    Go to SPRO->Quality Management->Quality Inspection->Inspection Lot Creation->Maintain Inspection Types Execute and set the Task list usage as the same it is set in the inspection plan for all those Inspection types for which that common inspection plan is supposed to be used.
    Note:- There is no any link between inspection lot creation and task list usage of inspection plan.
    Regards,
    Shyamal

  • Specifications and Inspection Plans

    Hi,
    I have few questions regarding Specs and Inspection plans.
    1) What is the primary purpose of specifications(CG02 transaction)?
    2) What is the use of specficications in QM and EHS modules?
    3) How are specifications related to Inspection plans?
    4) What is the business advantage by enabling specification data to be copied directly into Inspection plans?
    Thanks in adavnce
    Vishnu

    The idea is that you can maintain all the specs in the EH&S module in one place.  Specs are used of course to evaluate the material and make sure the material is what it is suppose to be.
    The transferring however of the specs from the EH&S module to QM however leaves a lot to be desired.  I don't recommend it at this time.  If  you attempt to do it, plan on bringing in a consulting partner or consultants.  You'll probably wind up doing a lot of coding to make it work for you as there isn't much flexibility or functionality as it is currently delivered.  All IMHO.
    Craig

  • Sale Order / Project specific Inspection Plan

    Dear All,
    I want to create Sale order or Project specific inspection plan for a material. This is because, my  customers want some specific inspection requirements for individual materials, which are assigned to Sale order or project. I want to inspect the material after receipt for these specific account assignments. I do not want to assign the customer because, my single customer may give different sale orders with different inspection requirements.
    But in inspection plan, i can not see the assignment of sale order / project as i can see in Rate Routing.
    Can anybody tell me about this?
    Regards,
    Prashant Kolhatkar

    Create a Material ONE as Configurable Material. Assign 300 Class Type Class with Charcateristics created through CT04 Transaction which in turn linked to MICs.
    Create another Material TWO with same Class but not configurable but is a Variant of Material ONE (MRP 3 View)
    Maintain Configuration Profiles for both Materials.
    In Material TWO, for insp. type details click on Insp. by Config indicator.
    Whenever a Sales Order is created, maintain the requirements from the Customer in Characteristics and save the Sales Order. Against this Sales Order whenever a GR is made for respective Production Order inspection lot is created against the specifications given by Customer and not that maintained in inspection plan.
    Best Regards,
    K. Raghavendra Nayak

  • Strictly lower or upper specification limit

    Hi Experts,
    Do you know if it is possible to maintain strictly lower/upper specification limits ?
    For instance: 30 < measured value < 40
    Currently I have to entered 30,01 <= measured value <= 39,99 (depending on the number of decimal places)
    Thanks in advance
    Best regards
    Amaury

    Hi
    I think this is not possible but in that case you have to put the maximum or minimum value in UL & LL which is acceptable to you always.
    or
    use User Exit :
    QEEM0011 --->User exit: add. functions before valuating insp. characs

  • What is the significance of Safety Upper Limit and Lower Limit

    Hello Experts,
    I was trying to create a generic datasouce in rso2 , while setting the delta specific field I have selected date field and I need to know the significance of other two input fields provided over there:
    Safety Interval Upper Limit.
    Safety Interval Lower Limit.
    and check box Real Time Enable.
    Thanks,
    Vijay

    Hi Vijay
    Safety Interval Upper Limit of Delta Selection This field is used by DataSources that determine their delta generically using a repetitively-increasing field in the extract structure. The field contains the discrepancy between the current maximum when the delta or delta init extraction took place and the data that has actually been read. Leaving the value blank increases the risk that the system could not extract records arising during extraction. Example: A time stamp is used to determine the delta. The time stamp that was last read is 12:00:00. The next delta extraction begins at 12:30:00. In this case, the selection interval is 12:00:00 to 12:30:00. At the end of extraction, the pointer is set to 12:30:00. A record - for example, a document- is created at 12:25 but not saved until 12:35. It is not contained in the extracted data but, because of its time stamp, is not extracted the next time either. For this reason, the safety margin between read and transferred data must always be larger than the maximum length of time that it takes to create a record for this DataSource (with a time stamp delta), or it must display an interval that is sufficiently large (for determining delta using a serial number). Safety Interval Lower Limit This field contains the value taken from the highest value of the previous delta extraction to determine the lowest value of the time stamp for the next delta extraction. For example: A time stamp is used to determine a delta. The extracted data is master data: The system only transfers after-images that overwrite the status in the BW. Therefore, a record can be extracted into the BW for such data without any problems. Taking this into account, the current time stamp can always be used as the upper limit when extracting: The lower limit of the next extraction is not seamlessly joined to the upper limit of the last extraction. Instead, its value is the same as this upper limit minus a safety margin. This safety margin needs to be big enough to contain all values in the extraction which already had a time stamp when the last extraction was carried out but which were not read. Not surprisingly, records can be transferred twice. However, for the reasons above, this is unavoidable. these are used to determining the delta in a datasource: 1. Time stamp - The field is a DEC15 field which always contains the time stamp of the last change to a record in the local time format. 2. Calendar day - The field is a DATS8 field which always contains the day of the last change. 3. Numerical pointer - The field contains another numerical pointer that appears with each new record .
    also dwload this How to Generic Delta doc https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/84bf4d68-0601-0010-13b5-b062adbb3e33
    2.
    You can determine the upper limit of the time. To do this, you specify a time period relative to the current date. The time unit for the time period can be specified in days, weeks, months, quarters, years, posting periods, or fiscal years.
    The upper limit can also be rounded down to the end of a time period by selecting another, additional time unit, so that, for example, only complete months or years can be archived when a date field is selected as a selection characteristic for the time slice. The time slice defined in this way contains the complete time period before the upper limit calculated.
    1. If delta field is Date (Record Create Date or change date), then use Upper Limit of 1 day.
    This will load Delta in BW as of yesterday. Leave Lower limit blank.
    2. If delta field is Time Stamp, then use Upper Limit of equal to 1800 Seconds (30 minutes).
    This will load Delta in BW as of 30 minutes old. Leave Lower limit blank.
    3. If delta field is a Numeric Pointer i.e. generated record # like in GLPCA table, then use
    Lower Limit. Use count 10-100. Leave upper limit blank. If value 10 is used then last 10
    records will be loaded again. If a record is created when load was running, those records
    may get lost. To prevent this situation, lower limit can be used to backup the starting
    sequence number. This may result in some records being processed more than once;
    therefore, be sure this DataSources is only feeding an ODS Object
    Hope this will help you
    Thanks & Regards
    Kiran

  • Can I limit the number of appointments made by everyone at a specific time and place?

    I want to limit the number of people who make an appointment at a specific time and place.  Can I do this?

    Which Adobe software are you using?

Maybe you are looking for

  • IPhoto 9.6 Will Not Work

    I installed iPhoto 9.6, and I'm able to access the app, but once in iPhoto I get a dialogue box stating, "The photo library needs to be upgraded to work with this version of iPhoto." When I click "upgrade" in the dialogue box, iPhoto shuts down. I ha

  • Mini dock 433820U for T400

    I purchased a ThinkPad Mini Dock Plus Series 3 mobile (433820U) for my T400 Model 2767-DV2 It won't dock my T400.  I read that that this mini dock does not work with old T400.  Can anyone confirm this.  Thanks.

  • Do I need to render after finished editing in FCE?

    I'm finishing my very first FCEHD3.5 project (the whole audio & video editing part). DO I HAVE TO RENDER ANYTHING befor recording to the camera, using the method that you described? (I used some photos in my project and they look "funny" while played

  • Font type in bookmarks

    hi all when i open my bookmarkpage i find the fontzise to small, i tried to change fontsettings in prefereces, but this only applies to actual webpages, not the lines of text in favorites, is there a way to increase font size?

  • Help iMac update 10.6.3 to 10.6.7!! error updating SL combo

    I upgraded from leopard 10.5.8 to SL 10.6.3 yesterday. Everything went smooth until i tried software updates I'm trying to get the 10.6.7 update combo but i get this error everytime the update has finished installing. It says some error occured, the