Maintenance Plan Numbers created by system is out of sequence

Hi,
I have set the internal no. range of maintenance Plan as 100000000 - 199999999, I found system is generating plan no. as 100000001, 100000002, 100000010, 100000011.
I have also checked the selection criteria on IP15 and IP24,
Please tell me why maintenance plan nos. are being changed (e.g, 100000002, )? how could I handle this?
Regards,

The jump in number range is usually caused by standard buffering settings.
This topic has been duscussed many times before.
Please seach this forum using "number range" and "buffer"
PeteA

Similar Messages

  • What is the best practice in order to create flow in a single maintenance plan?

    Hi All,
    What is the best practice in order to create flow in a single maintenance plan.
    1st Check Database Integrity (Check DB)
    2nd Rebuild Index 
    or 
    1st Rebuild Index
    2nd Check Database Integrity (Check DB)
    Grateful to your time and support. Regards, Shiva

    Use the Maintenance Plan Wizard to create a maintenance plan:
    "This topic describes how to create a single server or multiserver maintenance plan using the Maintenance Plan Wizard in SQL Server 2012. The Maintenance Plan Wizard creates a maintenance plan that Microsoft SQL Server Agent can run on a regular
    basis. This allows you to perform various database administration tasks, including backups, database integrity checks, or database statistics updates, at specified intervals."
    LINK: http://technet.microsoft.com/en-us/library/ms191002.aspx
    Kalman Toth Database & OLAP Architect
    SELECT Video Tutorials 4 Hours
    New Book / Kindle: Exam 70-461 Bootcamp: Querying Microsoft SQL Server 2012

  • Counter Base Maintenance plan.

    Hi all,
    I had created counter base maintenance plan, speciefied equipment,in equipment maintained measuring point.
    Then I created measuring point document, in this I had put 50 volt as my reading & click on SAVE,
    then system immediated give masage create noti/service order.
    if Yes then it create service order.
    Now my question is is there any need to shedule maintenance plan?
    Please tell me process of counter base maintenance plan.
    kapil

    Hi
       Maint plan for coutner
               Create the maintenance plan with maintenance strategy(IP11) which suits the performance parameter. Assign proper maintenance item to maintenance plan.
    If only one measurement point is created for technical object then it will be automatically picked up otherwise select appropriate among the available once. Set the scheduling parameter according to requirement & specify the start reading. Start reading is in reference to which maintenance plan starts scheduling.
    Example: Maintenance cycle is 90 run hrs., Start reading is 6 hrs and annual estimation given in measurement point = 360 Hrs (1hrs/day). Scheduling period = 365 day. Current Measuring point reading = 1 hrs on 1st Jan 06.
    Schedule plan on 1st Jan 06.
    Call no.     @Hrs     @Date
    1     6+90=96     1st April 06
    2     96+90 = 186     1st July.
    System schedule call date based on annual estimation and its keep on shifting as counter reading increases with time. System will trigger the call object on schedule date even if measurement reading will not reach the specified value.
    Scheduling of maintenance plan
    Once maintenance plan is created it needs to be scheduled at regular interval. Single plan can be scheduled by IP10 and Multiple plan by IP30. (Called Deadline monitoring) This can be done manually or batch job can be created.
    hope this will help. also please refere saphelp.com for further info
    regards
    krishna jois

  • How to change the main work center and  work center of each operation when generating work order by maintenance plan

    Dear experts,
    I face a problem that system get main work center from equipment master data as a default main work center in maintenance plan when creating maintenance plan. however, if main work center in equipment is changed later, the change will not synchronize to related maintenance plan. if work order is generated from maintenance plan, main work order in order is defaulted from maintenance plan instead of updated work center in equipment.
    another problem is that, for those orders generated by maintenance plan, the work centers in  operations is defaulted from task list in maintenance plan. in most case, work center in task list is dummy. Actually the work is done by work center in equipment master data.
    My expectation is how to auto replace the main work center and work center of operations in work order with the one in equipment master data if order is generated by maintenance plan? is there any standard configuration or enhancement/BADi that can help with this requirement?
    thanks!
    Wesley

    Wesley,
    Sorry - development is the only way.
    Another option is to create a batch program that runs before your IP30 run(s) and updates any maintenance items and task lists with the correct work centres.
    PeteA

  • Automatic Material PR generation from Maintenance Plan/Order

    Dear All,
    I required some setting related with Automatic Material PR generation from Preventive Maintenance Plan/Order.
    Query:  how can i set the non stock material so that when my maintenance plan gets generated then system will automatically generate the material PR for that Non stock material mention in task list.
    Thanks
    Sushant

    Operations & Components can be defined only in task list, not in Maintenance Plan. While defining components in task list, you have no option to select the Item category.
    So, define BoM for the Equipment with appropriate Item category, select those materials in task list, so that you can get the PR for components from Maintenance Order.
    Instead, you can define the components directly in PM Order as well.

  • Copy GOS attachment from maintenance plan to order

    Hello,
    we use maintenance plans to create maintenance orders.
    The idea is to attach checklists and other documents (excel, word, pdf) to the maintenance plan and this should be copied to each maintenance order. We attach att the moment this documents using GOS.
    Is there a standard way to copy document attachments from plan to order?
    Or has one of you realized a solution for this requirement?
    Thanks a lot.
    Kind regards
    Manfred

    Hi,
    PRT is Production Resources / Tools.
    PRT can be an equipment or a material or document or even a free text.
    Simply, it is an object/item that is required to carry a particular application.
    There are other benefits os PRT as well.
    Comprehensive documentation is available online.
    You can attach a document as a PRT by:
    1. Select the task list operation & click on PRT push button below operation list.
    2. On PRT selection dialog box, select "Document" push button.
    3. You will get relevant fields for selecting a document from DMS.
    4. Select your document & save.
    Regards,
    Vijay

  • Strategy in Maintenance plan

    Hi Gurus,
                  Can we change strategy in maintenance plan after creating it.
    thanks in advance
    Sameer

    Sameer,
    No it is not possible to do this. You would have to create a new plan.
    Regards
    Narasimhan

  • Mark maintenance plan items for deletion or delete them

    Hello,
    due to an user missunderstanding we have some maintenance plan items in our system which are not required (table MPOS).
    Is there a way to mark such items for deletion or to delete them completly?
    Thank you
    Kind regards
    Manfred

    Hi,
       I think ther is no way to directly delete the Maintenance items, u have to assign them in a dummy maintenance plan then make MP inactive , set deletion flag & Archive ... thus it applies to Maintenacne items also check this link http://www.sapfans.com/forums/viewtopic.php?t=173192
    regrds
    pushpa

  • "Value cannot be null" error when trying to edit or create Maintenance Plan in SQL Server 2008

    I have SQL Server 2008 installed on Windows Server 2008 64bit, every time I try to open or create a new Maintenance Plan I receive the error:
    Value cannot be null.
    Parameter name: component (System.Design)
    Program Location:
       at System.ComponentModel.Design.DesignerHost.System.ComponentModel.Design.IDesignerHost.GetDesigner(IComponent component)
       at Microsoft.DataTransformationServices.VsIntegration.DtsDesignerService.OpenDesigner(String connectionString, Object connection, String objectUrn)
       at Microsoft.SqlServer.Management.DatabaseMaintenance.MaintDesignerMenuHandler.Invoke()
    And in the Design view screen
    "Microsoft SQL Server Management Studio is unable to load this document: Could not load type 'Microsoft.SqlServer.Dts.runtime.Wrapper.IDTSPackageSigning100' from assembly 'Microsoft.SqlServer.DTSRunTimeWrap, Version=10.0.0.0, Culture=neutral'. 
    I have searched for a possible solution and have tried some suggestions of registering the msxml6.dll but and have installed VS2008 SP1 but I'm not in a position where I can do a full reinstall of SQL Server right now. Any help is appreciated. My SQL server
    environment information is below. 
    Microsoft SQL Server Management Studio
    10.0.1600.22 ((SQL_PreRelease).080709-1414 )
    Microsoft Analysis Services Client Tools
    2007.0100.1600.022 ((SQL_PreRelease).080709-1414 )
    Microsoft Data Access Components (MDAC)
    6.0.6002.18005 (lh_sp2rtm.090410-1830)
    Microsoft MSXML 3.0 4.0 5.0 6.0 
    Microsoft Internet Explorer 8.0.6001.18943
    Microsoft .NET Framework 2.0.50727.4206
    Operating System 6.0.6002

    I digged a little deeper and figured out it was a missing directory/file in %TEMP%. Seems some CleaningTool removes all files/directories in %Temp% and after that SSMS was not working any longer. The missing file is actually not needed, but the
    missing directory causes the "Value cannot be null" error.
    My missing file name was:
    C:\Users\<username>\AppData\Local\Temp\2\6vvdaozf.tmp
    But the file name changes on every startup.
    So my missing directory name was:
    C:\Users\<username>\AppData\Local\Temp\2
    After creating a empty directory with the name "2" in %TEMP% all went back to work fine for me.
    I'm not sure the directory name is every time the same, but you can discover your missing file with the process monitor from Sysinternal Tools and filters to "Process Name is ssms.exe" and "Path contains AppData\Local\Temp"
    Hope this helps other people to solve their issues too.
    Thank you!! When I run %temp% it takes me to "C:\Users\Admin ...~\AppData\Local\Temp\some random number". At first the random number was 3, after I logged off and back on it was 2. My temp variable in enviromental variables is correct. I looked on another machine
    running SQL2008 and temp is correct there. If I try to rename the numbered folder SSMS stops working. Any idea?

  • Management studio error while creating/editing maintenance plan

    Hi,
    I had MS SQL 2012 enterprise edition installed and everything was working fine. Later I removed MS SQL 2012 and re-installed. Now when I am trying to create maintenance plan I am getting below error. When I click Yes system allows me to go through the maintenance
    plan wizard and create new plan but when I want to edit it give me same error and it doesn't open screen to edit the plans. Can you please provide solution to below error?
    Microsoft SQL Server Management Studio
    The 'Microsoft.DataTransformationServices.VsIntegration.DtsPackage, Microsoft.DataTransformationServices.VsIntegration, Version=11.0.0.0, Culture=neutral, PublicKeyToken=89845dcd8080cc91' package did not load correctly.
    The problem may have been caused by a configuration change or by the installation of another extension. You can get more information by running the application together with the /log parameter on the command line, and then examining the file 'C:\Users\pac\AppData\Roaming\Microsoft\AppEnv\10.0\ActivityLog.xml'.Continue
    to show this error message?
    Yes   No   
    I tried repair option from MS SQL 2012 setup but it didn't solve the problem. This is my production system and it has TFS 2013 and it's database. Please let me know how severe this problem is? Is it something to be worried about in future? How do I solve
    this error?
    Regards, Premal Acharya

    Hi Michelle,
    Thanks for your reply. I resolved this issues yesterday by installing SQL Server
    Management Tools Complete. I suspect that
    Microsoft.DataTransformationServices.VsIntegration.DtsPackage, Microsoft.DataTransformationServices.VsIntegration
    DLL files were having issues. When I searched my system I could only find Microsoft.DataTransformationServices.VsIntegration.DLL and
    Microsoft.DataTransformationServices.VsIntegration.DtsPackage.DLL file was missing. 
    When I re-ran the MS SQL setup to add new feature I selected Management Tools Complete and after installation this error was resolved. Though this has solved the issue for now I feel the error shouldn't have come with Management Tools -
    Basic installation as I had installed MS SQL Server before with Management Tools - Basic and it had worked without any issues. 
    For now this issue is resolved but it will be of good help if I can know the cause of this error and what could be the possible solution. 
    Thanks.
    Regards, Premal Acharya

  • Error When Creating Maintenance Plan

    Hi, recently I upgraded to sql server 2008 R2 from sql 2008, everything went OK and my server is up and running since 10 days.
    This evening I wanted to modify a maintenance plan that backs up all DBs which I run on command, I started to get "MSSQL server management Studion is unable to load this document: SSIS object name is invalid. More specific errors would have been raised explaining
    the exact naming problem".
    I tried creating a new one, directly and using the wizard, I get a dialogbox error :
    TITLE: Microsoft SQL Server Management Studio
    Exception has been thrown by the target of an invocation. (mscorlib)
    ADDITIONAL INFORMATION:
    Creating an instance of the COM component with CLSID {AA40D1D6-CAEF-4A56-B9BB-D0D3DC976BA2} from the IClassFactory failed due to the following error: c001f011. (Microsoft.SqlServer.ManagedDTS)
    Creating an instance of the COM component with CLSID {AA40D1D6-CAEF-4A56-B9BB-D0D3DC976BA2} from the IClassFactory failed due to the following error: c001f011. (Microsoft.SqlServer.ManagedDTS)
    BUTTONS:
    OK

    It turns out that the unregistered COM in dts.dll located in
    in command line chnge directory to this path C:\Program Files\Microsoft SQL Server\100\DTS\Binn
    run the following from the command line:
    REGSVR32.EXE dts.dll
    disconnect from management studio and reconnect, it shld work now

  • [svn] 2700: With the Marshal Plan, when create an instance of a manager, we need to talk to the system manager.

    Revision: 2700
    Author: [email protected]
    Date: 2008-07-31 21:12:03 -0700 (Thu, 31 Jul 2008)
    Log Message:
    With the Marshal Plan, when create an instance of a manager, we need to talk to the system manager. Unfortunately sometimes these manager instances can be created before the Application class is created and/or before the systemManager property is set on the application. So to get the reference to the system manager from the manager instances, we can't use ApplicationGlobals.application.systemManager. We need to use SystemManagerGlobals.topLevelSystemManagers[0] instead. This property is set in the SystemManager constructor, and fortunately for us, Flash runs your root display object's constructor before anything else, even before static initializers (atleast ones not defined in SystemManager or a dependency of it).
    QE: Yes
    Doc: No
    Bugs: SDK-16207, SDK-16208, SDK-16209
    Reviewer: Alex
    Ticket Links:
    http://bugs.adobe.com/jira/browse/SDK-16207
    http://bugs.adobe.com/jira/browse/SDK-16208
    http://bugs.adobe.com/jira/browse/SDK-16209
    Modified Paths:
    flex/sdk/branches/3.0.x/frameworks/projects/framework/src/mx/managers/CursorManagerImpl.a s
    flex/sdk/branches/3.0.x/frameworks/projects/framework/src/mx/managers/ToolTipManagerImpl. as

    an instance p for Point class is created like this?
    Instead we can create and instance of Point class
    as:
    Point p = new Point();
    Can any one of you explain this?Your Point() constructor doesn't throw exceptions, so there's no need to catch them. The Class.forName() and Class.getInstance() methods can throw exceptions, so it's necessary to handle them if they arise. Check out the docs for those methods, it lists what exceptions they can throw.
    http://java.sun.com/j2se/1.5.0/docs/api/java/lang/Class.html#forName(java.lang.String)
    http://java.sun.com/j2se/1.5.0/docs/api/java/lang/Class.html#newInstance()
    2) In the above Class Point what is the use of
    creating an instance of Point with in that Point
    class?
    static Point origin = new Point(0,0);
    What the reason to create an instance like this
    within the same class. We can create this instance of
    point
    class when ever we need. There doesn't seem to be any in your code, since that variable is never accessed. It could be useful if you wanted to have a Point that was shared across all instances. This is not a good example of that though.

  • How do I create Notifications automatically from Maintenance plans

    Hi folks
    I have a new requirement from a client.
    They would like some of their Maintenance plans to automatically create Notifications which can later be converted to maintenance orders.
    Please let me know what configuration chnages i need to carry out.
    Thanks, Felix

    HI
    goto SPRO>Plant Maintenance and Customer Service>Maintenance Plans, Work Centers, Task Lists and PRTs>Maintenance Plans>Set Maintenance Plan Categories-->
    new entries , enter PM notification slect call object as 2 notification and ref obj100 or copy existing from NC.
    tehn at the time of creating plan IP42, slect this and yu get option to enter the notification tyrpa nd other deatisl
    -ashok

  • Create settlement rule for Maintenance plan

    We have a requirement to create a maintenance plan and assign a settlement rule to the same. I was able to create the maintenance plan using MPLAN_CREATE. I created the settlement rule using the function module K_SRULE_SAVE_UTASK. My problem is when I go to IP03 to check if the settlement rule has been created for the maintenance item, it is not found. When I go to IP02 and click on create and go into the settlement rule maintenance screen, I'm able to see the settlement rule created using the function module.but in the MPOS table, I don't see the indicator IND_ABRVO ( settlement rule indicator ) being maintained.
    Can you please help in finding out what I'm missing.
    Edited by: Sujay Venkateswaran Krishnakumar on Dec 31, 2009 11:34 AM

    Sri Vas,
       Is this specific to a particular WBS element or does it happen for ANY WBS element? The WBS element may not have been setup properly.Check the same WBS element directly by going to the WBS element change transaction.Also check the account assignment and status of the WBS element that Ramesh had suggested. If the WBS element has been defined properly,Try changing the settlement rule to a cost center  and see if you still get this error.
    Regards
    Narasimhan

  • Maintenance Plan - Tasks are not executing in the order they were created

    I've created a new maintenance plan to perform differential backups but the tasks I created don't necessarily seem to execute in order all the time.  These are the tasks and order assigned when I created the plan using the Maintenance Plan Wizard:
    Back Up Database (Differential)
    Clean Up History
    Maintenance Clean Up Task
    Here's the deal...When it executes in the order they were created (above), all my old backups are deleted successfully.  However, there have been instances where, for example, the Maintenance Clean Up task executes before the
    Clean up History task.  When this happens, only one of my backup files is deleted successfully but not the second (I have two .bak files needing to be removed).  Furthermore, I noticed that the backup that wasn't deleted when it should
    have gets deleted at the next increment when new backups are created.
    Again, this does not happen when the tasks run in the sequence shown above.  Only one old backup gets deleted (instead of two) when one of the above item is out of sequence.  Strange behavior to say the least.
    Any feedback on this will be appreciated!

    If you do not set up precedence constraints it runs all tasks at the same time.
    Please see "8. To define a workflow between tasks:"
    http://msdn.microsoft.com/en-us/library/hh710041.aspx

Maybe you are looking for