Manual reservation for Project Stock / wbs element

Dear Gueus,
In Project base Industry,
For Production order confirmation I want to transfer Project stock of raw Materials from Main Storage stock  to Production WIP stock,  from this WIP Stock,  I will consume raw mtl at the time of Order confirmation.
Now at the time of Manual Reservation in MB21 system is not allowing  311 Q  Mvt type  for Project stock reservation.
Is there any other procedure / t- code to reserve project stock.
Pl guide me for the same.
Thanks
Umesh

Hi,
A word of caution, before processing any mass transactions such as COHV etc, its always better to double check the data. Reason is because the program performs mass update & any reversal would be a time consuming process.
Now for mass confirmations of orders via COHV
1. Execute COHV, in the first screen, select Order Headers, specify the order numbers in the field. If you have saved the list as a text file, then click on multiple selection & click the green icon at the bottom right corner, specify the file & the orders will be read.
2. In the tab - Mass Processing, select confirmation for the field Function & if you want to execute immediately, then select the same in execute function. Depending on your rqmt, you can have the log & also output the logs.
3. Click execute or F8, then select all the orders & then click on the mass processing drop down icon & click execute. The processing begins in foreground. Once the processing is done, system puts out a log showing the once which were confirmed & the once which were not able to be processed & the reason for the same. (For background processing, select the same in mass processing tab in the selection screen).
Please note, for order confirmation to take place the status has to be REL, also if any user status is active, check if the same allows confirmation.
I would strongly suggest, first try in your sandbox server & once you're familiar with its processing, then proceed to use in production system.
Hope the above helps.
Regards,
Vivek

Similar Messages

  • Project stock (WBS element) not consider in QA07 Transaction

    Standard SAP transaction QA07 for Deadline monitoring of batches not
    considering project stock (WBS element) for the same
    Kindly suggest for your possible solutions as we are going to fully equipped with
    project system and its stock must be
    considered for background scheduler of recurring inspection
    Waiting for your kind and immediate action
    With Regards,
    Kunal Sheth

    Hi!
    We regret to inform you, that the report RQAAAS10 ( QA07 ) does not             
    support project stocks.                                                                               
    For better understanding of the transaction QA07, I would ask you kindly        
    to review the documentation for the report RQAAAS10.                                                                               
    Here are the Requirements for this report:                                                                               
    'The batch master data corresponds to the selection conditions.                 
    Only those batches that full fill the following conditions are examined:                                                                               
    -the batch status is "released".                                                                               
    -the unrestricted-use stock is greater than zero.                                                                               
    -the stock is not in a HU storage location'                                                                               
    This means that all 'special' stock locations, like for example project         
    stock, will be not relevant for this transaction.                                                                               
    Unfortunately SAP not able to provide a workaround for your                  
    issue, with the exception of a customer own development. In this case           
    you can copy the report and make the correspondent adjustments needed.          
    Best regards
    Erika

  • Transaction Data for Project Definition & WBS Element of Project System(PS)

    Hi all,
       We want to install the Project Systems and the requirement is to report on the following fields:
    Project Definition  (Project Definition   PROJ     PSPID)
    Project Definition  (PS Short Description PROJ     POST1)
    Project Definition  (System Status  CNJ_STAT     STTXT_INT)
    WBS Element         (Project Type       PRPS     PRART)
    WBS Element         (Short ID             PRPS     POSKI)
    WBS Element         (Person Responsible     PRPS     VERNR)
    WBS Element         (Company Code     PRPS     PBUKR)
      R/3 Table Names and Field names are in brackets.
      0PROJECT_ATTR & 0PROJECT_TEXT are DataSources of 0PROJECT Master Data.
      0WBS_ELEMT_ATTR & 0WBS_ELEMT_TEXT are DataSources of 0WBS_ELEMT Master Data.
      How can I find the transaction data for those above fields, PLEASE ?
      Thanks in advance.

    Hi
    Kindly check the following data sources:
    0PS_CLM_CST ( Costs of a Claim)
    0PS_CSH_NTW ( Network plan payments)
    0PS_CSH_NWA ( Payments on network plan process)
    0PS_CSH_WBS ( Payments on WBS element)
    0PS_DAT_NTW ( Network dates )
    0PS_DAT_NWA ( Dates network operation)
    0PS_DAT_PRJ ( Date project )
    0PS_DAT_WBS ( WBS Element Dates)
    0PS_NAE_EVA ( Progress in Network Activity Elements)
    0PS_NTW_EVA ( Progress in Networks)
    0PS_NWA_EVA ( Network Activity Earned Value)
    0PS_ORD_EVA ( Order Earned Value)
    0PS_WBS_EVA ( Earned Value WBS Element)
    hope this helps!
    best regards,
    Thangesh

  • CJ20N: handle Z table's related to project and wbs element

    Hi there,
    The requirement is to handle Z table for project and wbs element.
    Example:
    ZTAB1 has fields: pspnr | field1 | field2 (for projects)
    ZTAB2 has fields: pspnr | field3 | field4 (for wbs element)
    I found an enhancement that can read z table into internal table, i read it into screen and no problem.
    I use it for wbs element too.
    The problem is when the project has several wbs element's in tree, and the user navigate and change them.
    I can't control the data in internal tables, since the user is swithcing.
    How does the standard sap control the memory from each wbs element and project?
    How can i read and save it separatelly?
    Thanks in advance,
    Edited by: orgasmics on Nov 22, 2010 9:37 PM

    Hi,
    try table <b>jest</b> with key = prps-objnr
    Andreas

  • Locking of  the Project and WBS Elements at a single step.

    Hi Experts,
                    My client requirement is to lock the complete project and wbs elements so as not to allow any further postings to the project, I knew that we can lock the project or WBS individually by setting the lock status, but i want to lock the complete project  at one step, Is there any possible standard setting to sort out my Issue if not give me the solution.
    Thanks & Regards,
    RAM.

    V RAM PRADEEP REDDY wrote:
    it is possible to set a lock for Project Definition & WBS Elements at a single shot or not.
    >
    >
    may be the below explanation will be helpful.
    You can open the project in CJ20N for example and can set the lock for project definition and also you can set the lock for WBS element without saving and exiting from CJ20N, after setting the lock for both project definition and WBS Element you can save and exit.
    It is not possible to select more than one object and set lock with one click.

  • Manual reservation for order category 20 not allowed

    Hi,
    We are getting the error message "Manual reservation for order category 20 not allowed" when trying to manually create a Reservation Order charged to a network through transaction code MB21.
    Anyone knows how to solve this?
    Will appreciate feedback. Thanks!

    Hi,
    You would need to add this component in your WBS element & then the MRP run will generate a reservation for this. You cannot create a manual reservation using 281 mvt in MB21.
    Refer sap note 43924, read the paragrah under 'cause and prerequisites' means that according to SAP's standard design, reservation for Network is supposed to be automatic, not manual. However, if manual reservation is really needed, do apply the solution provided.
    Hope the above clarifies.
    Regards,
    Vivek

  • Moving Average Price does not get updated for Project Stock

    Hello Experts
    We have an Engineer-to-Order implementation for our client. Accordingly procurement is done per project. Each Project issues its PRs which are then converted to POs and recieved into Project Stock.
    While assigning the material to the Network activity in Project (using material component) the system uses the price found in the material master (MAP or STD) as a planned cost appended to the project.
    Problem:
    while procuring the material, when we receive it into Project Stock (Mvt 101 Q + ) the Moving Average Price in the material master does not get updated. this way all newly created material master will never have a moving average price, thus whenever we try to assign them to the project we receive an error message (Cost for Material Component ###Mat.Num### cannot be determined.
    Question:
    How can I get the system to update moving average price (for all types of stock) based on procurement for project stock.???
    Your help is kindly appreciated.

    I'm sorry for the confusion
    Case:
    The T-code is CJ20N Project Builder in PS module
    we are assigning material components to network activities under a certain WBS element in the project.
    there is a function in the Project Builder to calculate the cost of a network. it uses the costing variant assigned to the network which is PS02 (We get the error here)
    The costing variant has a valuation variant which lists a series of strategies  to get the material price. Planned 1 if not then STD if not then MAP. (you can choose between many options via a drop down menu) you can choose 5 consequent options.
    The MAP that the valuation variant is coded to get is the Plant Stock MAP -- Or the Project Stock MAP but only Per WBS element.
    The MAP that the Actual postings update is the Project Stock MAP only Per WBS element.
    This means that if you use a material component to purchase material 123 Acc.As. Q for WBS X for 10 $ then you try to assign a new material component with the same material 123 to WBS Y, the system will not get a MAP. because it's stored in QBEW per WBS element.
    This way the system will never get the MAP right.
    However, we don't always use project stock to procure for projects, for some requirements we can assign and use plant stock as well for Projects. that way we need the MAP from plant stock.
    In the Valuation Variant you can use a User Exit Strategy. The user exit's name is COPCP005
    My Suggestion is:
    Use the User Exit COPCP005 to calculate the { Total value / the total quantity (MAP) from QBEW + Total value / total quantity (MAP) from MBEW } / 2
    which is the MAP for both plant and project stock together, since that we are going to use both.
    Q: Is this correct !?

  • Report on Settlement - Project wise/ WBS element wise

    Hello Friends,
    I am looking for a report on settlement which will include the senders - Projects or WBS elements and Settlement receivers and the amount settled in the any period for a particular fiscal year.
    Your response will be rewarded.
    Vishal.

    Hi,
    Pls refer CJIC and CJID.
    Regards,
    Amit

  • How to capture the different sold-to party for a single WBS Element

    Hello,
    The client wants to automatically populate the Partner field in the WBSE. The Sold-to party that is indicated in the Sales Order will be the same with the Partner Field in the WBSE. I would like to ask regarding on how can we capture the different sold-to party for a single wbs element, since in our project there is a system constraint where it is not possible to have multiple u2018sold tou2019 rows assigned to partner field in the WBSE.
    Hoping for your suggestions and comments. Thanks in advance.
    - Irica
    Edited by: Irica Vaile Dalisay on May 25, 2011 3:45 PM

    Try using the Customer Enhancement

  • Account determination for project stock delivery (for movement type 281Q)

    Hello
    We are trying to carry out delivery for project stock (CNS0) using  movement type 281Q.
    We notice that there is no account modifier availalbe for this scenario resulting in error during PGI. However, we can do PGI after changing the config of account determination without account modifier.
    Since working without an account modifier is not acceptable for various business reasons, we must have an account modifier defined. We are wondering why SAP has not provided a standard solution for dealing with project stock delivery.
    Can any one please suggest how to deal this situation.
    Thanks and warm regards,
    Jagadeeesh

    We have business requirement as stated below:
    We need to procure materials for specific Projects but also want to track the stock for the Project by value in the invnetory. In other words, the encumbrance of the procurement needs to take place against the Project but we want to be able to take it into inventory as a valuated stock and issue to the WBS whenever it is required.
    Is this possible?  What we know is that as soon as we give reference of the WBS for the Procurement, it gets expensed to the Project and we cannot value manage in inventory.
    The reason for this requirement is there is a long time between when the item is procured and when it is used for the project. Till such time we have to track the Project items in the inventory as any other stock but its still tagged for the project and encumbrance would need to have happened
    Any ideas on how to deal with this will be appreciated
    Thanks
    Noornie

  • Settlement of Project through WBS Element

    Hi
    I tried to execute the transaction code CJ8G for settlement of WBS Element i got the following error
    You cannot use this transaction type to post to this asset
    Message no. AA834
    Diagnosis
    The transaction type entered belongs to transaction type group 15. According to the specifications for this transaction type group, posting with transactions types belonging to this group are only allowed in specific asset classes (for example, asset classes for assets under construction).
    The asset to which you are posting belongs to class 440000 (chart of depreciation LILK). You cannot post to this class using the transaction type you have entered.
    Procedure
    Check the asset number entered. You may want to allow posting with this transaction type group for the asset class of the asset.
    Please advise the solution for the aforesaid error
    Thanks and Best Regards
    Shekhar Yecham
    Edited by: Shekhar Yecham on Sep 16, 2008 7:45 PM

    Hi Shekhar
    In order to settle project to Asset you have to ensure that you have an asset class  which has a tick for investment measure.  once you create an asset class which manages investment measure , you should be able to that particular asset class. you can then further settle asset from this asset class to any other asset class.
    hope this help you
    thanks
    sanjeev

  • Manual Reservation for Maintenance Order

    Hi,
    Can anyone suggest some procedure so that I can stop automatic reservation creation from Maintenance Order (Transaction:IW31, type PM01, Category 30) and create manual reservation for the same.
    Presently Manual reservation is not allowed for Maintenance Order.
    Thanks
    Satadal

    To the best of my knowledge this is possible. To the best of my knowledge G/L account determination for every material happens after a series of checks are done internally by SAP. By checks I mean the sequence of steps as customized by the consultant in the configuration. Now at the end of the sequence if SAP has not succeeded in identifying a G/L account it will open up a tab in which u can manually enter the G/L account. For non-stock item you can anyway enter it.
    I would suggest that you post this query in the MM forum also.
    thanks
    Bala

  • Manual reservation for order category 30 not allowed

    Gurus,
    I want to do manual reservation for order category.In MB21 when i try to do the reservation the system in giving the error message
    Manual reservation for order category 30 not allowed
    What should be done to overcome this.
    In the order one component is given,i want to issue additional component,this is where i am encountering the problem.

    The Standard System would not allow you to create a reservation manually against a Maintenance Order Whether you change the Res / P Req Indicator to Never. Still  the System would generate the Reservation for the Stock Materials. Purchase Requisition could be created manually against the Order but reservation is not. The Movement types used for reservations are 261/262. Kindly elaborate on the requirement, may be a work around is there.
    If you want to skip the goods movement against reservation step, you should enable the back flushing indicator against the stock material in the General Data View so when you would be entering Confirmation against the order, the goods movement would be automatically posted against the reservation created automatically from the Order without you having to bother about the reservation.
    Edited by: Usman Kahoot on May 31, 2010 1:50 PM

  • CJ9B - error message when copy locked project or wbs element

    Dear Expert,
    Tcode CJ9B is for copy planning wbs element/project and every month i need to unblocked all the project or wbs that not use (locked) one by one to make CJ9B able to run without any error.
    Is there any way to do mass change on wbs element or project as i unblock one by one in tcode CJ02?
    Please advice what is different between CJ9B and CJ9F? Is it same doing copy planning wbs or project?
    regards,
    ng chong chuan

    For the locking and unlocking you can use CJ20n  -->WBS element overview instead of the CJ02 so, you can make mass locking and unlocking of WBS  all the WBS elements of project atleast.
    CNMASS tcode is for the mass changes in PS but same will not work for hte system status change.
    One workaround is that you write BDC via SHDB txn and user that BDC to change the status of all the WBS for which you wanted to  lock/ unlock .
    You can also use LSMW also.
    Regards
    Nitin

  • Result Analysis with transaction code KKAJ for Top level WBS element

    Hi Experts,
    we have four level WBS structure with level 1 and level 4 with all operative indicators active
    when we are doing Result analysis by using KKAJ for level 1 WBS element, System is taking all level 4 wbs elements also into consideration.
    Is there a way to run results analysis using KKAJ only for level 1 wbs elements for multiple projects, avoiding the level 4 WBS elements.
    SAP version 4.6C
    Please suggest.
    Thanks in advance
    Chakravarthy

    Hi
    refer this thread posted a few days back
    Ajay M

Maybe you are looking for

  • What's the best way to use business objet?

    Hi all, Anybody can explain what's the more efficient way to retrieve data from the database by using business objects? I would like to load business partners information, but I'm using SBob object and recordset and it is very slow... If anybody have

  • Version of XSLT supported in OSB 10g & 11g

    Hi Can you please tell me the XSLT versions that are supported in OSB 10g/11g ? Thanks

  • 1841 router IOS problem

    I need help getting the IOS on a compact flash that somehow got erased so now I have to use the second 1841 in my lab to boot up the IOS on the first one. I also have IOS 15.4 that I want to put on both routers. I know I am supposed to be able to tft

  • Where is the Moderator of the Forum?!

    While opening forum to review the questions I was shocked with Spams sent over OTN forum. Where is the Moderator of the Forum and Who will delete all these spams and WHEN?? Additionaly these type of messages were posted under this topic too! http://i

  • Problem with primitive data types range

    long longVal = 9898989898L x 9898989898L x 9898989898L; System.out.println("Calculation Long Value :-- "+longVal); print ans : -6203015489226638616 but right ans : 970002030010999083816674818792 please help me how to calculate this equation. Edited b