Mass change of Profit center in Cost collector

Hi
On FERT materials profit center was and i have created cost collectors for all fert materials.
How I can correct mass change of profit center on Cost collector.
ty

Hi,
You can use the MASS transaction code for changing of Profit Center for your FERT Materials.
Sateesh

Similar Messages

  • Add Profit center to cost collector

    Hello SAP Guru
        Is it possible to add a profit center to a cost collector which is already is in use.If yes then how ?
    Thanks in advance.

    I am geeting below warning message .Please suggest me what to do :
    You need to change the profit center -> See long text
    Message no. KO 372
    Diagnosis
    You want to change the profit center, although you already made
    postings on product cost collector 700270 for the previous profit center.
    Procedure
    If you wish to change the profit center, you need to settle the
    last period, and no more postings should be made after this.
    Notes
    Order values may already be updated on the assigned profit
    center During reassignment, the system only updates the new order values on the
    currently assigned profit center.

  • Change of Profit Center in Cost Center

    I'm trying to change Profit Center 2000 to 3000 in Cost Center Change Screen. We would like to effect the changes in the future from April 1, 2011.
    An error message appears, Changing profit center from 1000 to 3000 is not permitted.
    Someone please advise.
    Thanks,
    Aldo

    HI May be you are assigning profit center belongs to different company code, so then accounting will not be in proper so its giving that error search the profit center to that company code and assign and then save.

  • RE - Change profit center and cost center after LO activated

    Hi ppl, One question. Is there any harm if we change the profit center and cost center of the business entity, building, rental unit only after the lease out has been activated?

    No need to change the cost center, as you want to have valid from date as 01.10.2010.
    Having profit center before that date is not an issue and does not have any negative impact.
    Regards,
    SDNer

  • Changes to Profit center assigned to cost center

    Hi
    We have a scnario in which the profit center assigned to the cost center master has to be changed. We have been advised also to  change the validity period of the same from the date of change of the profit center .However, the cost center has been used to for some data postings with the old profit center maintained in the cost center master. Now my query is:
    1. What is the impact of changing the profit center in cost center master? In our case, some data has been posted to the cost center when the old profit center was maintained.
    2. Why should we change the validity period of the cost center after changing the profit center assigned to the cost center?
    3. Also, what is the way to transfer the entries which have been posted to the old profit center to the new profit center?
    Regards
    Sanil Bhandari

    hi,
    1) The impact of profit center is more in the cost center. when ever we assign profit center to cost center. the cost will be updated automatically. so there is no direct posting in profit center only statstical posting are generated.
    2) second one when we want to create profit center first chek it out profit center valid and upto. if same is not maintained in creation of cost center . so u must have to change the validity periods
    3) i am not sure this one i thing 7KEH OR 1KEF TC is there any way tommorow i will give the answer this questions.
          if my answers are wrong plz correct and replay to my id [email protected]
    thank you

  • Mass change of profit centers in Product Cost Collectors

    Gurus,
    My client has a requirement of mass change of Profit Centers in Product Cost Collector (Transaction Code KKF6N). Is there any way of doing this using LSMW or anything else?
    I had tried with LSMW Recording, but there is a particular production version associated to profit centers in KKF6N tranasction, because of this I couldnt go to particular production version and update the profit center.
    So, Is there any easy way doing this?
    <REMOVED BY MODERATOR>
    Thanks,
    Kalikonda.
    Edited by: Alvaro Tejada Galindo on Jun 9, 2008 6:29 PM

    Kiran,
    I have tried with Recording and problem solved.
    Thanks,
    kalikonda.

  • Document change/display - Profit Center / Cost center name

    Hi,
    We have a requirement where client wants to display the profit center and cost center names (short or long) when displaying or changing a parked or a posted document. As we all know SAP shows only the profit center and cost center code and not the description during the document display. After all the deliberations, this seems to be an important piece of information while posting a parked document or even viewing it as a posted document.
    What are our options?
    Any help is much appreciated.
    Regards,
    Subodh

    Thanks for your response Tamim.
    Profit center / cost center naming is following a different convention and we are in a roll out phase, therefore we can't think of first item.
    About match code, the requirement is not so much during the posting but primarily while releasing the parked document or viewing the parked / posted document - they want to see the description along side profit / cost center.
    I was looking for clues on any utilities / enhancements / BTE that I may use to bring extra fields during document display.
    Regards,
    Subodh

  • Change profit center - in cost center - IDOC error

    HI Experts,
    One of our users changed a profit center in a cost center in the middle of the month.
    As our message control is switched on warning message only, he could save the cost center.
    The problem occured by automatically created idocs which are creating internal orders for each of these cost centers. The idocs cannot be processed due to the error message:
    You have changed the profit center from x to y. This is only allowed when the corresponding configuration was made in Customizing. Then this message is only a warning, which you can ignore.
    I went to message control again and changed batch processing as well for W, only field "standard" (grey) I was not able to change.
    We still get the some error message. Could anybody help how we could get rid of this problem and process the idocs?
    Resetting the profit center in the cost center did not help.
    Creating a new analysis period in the cost center did not help either...
    Thanks,

    Hello,
    You switch off the message in OBMSG transaction code.
    Regards,
    Ravi

  • Change the profit center of the cost center.

    Hi Friends,
    I want to change the profit center of the one cost center but system is not allowing because the posting done against this cost center. i transfer the value of that cost center in other cost center then i tried but system dose not allow.
    following error is coming.
    Changing profit center from 101257 to 101271 is not permitted
    Message no. FAGL_ORG_UNITS011
    please provide the solution.
    Regards,
    MAhesh

    HI,
    system behaviour is explained in SAPNET note 1358080, there you find also how to change the message. Check the consequences carefully in test client...
    best regards, Christian

  • Cost center change of Profit Center

    Hi,
    We wish to change the profit center of a cost center.  I know that all postings going forward will use the new profit center and any historical postings to the cost center will remain on the old profit center.
    However is there a way to move all the historical postings to that cost center to the new profit center.
    I have looked into 9KEO for this and wondering if there is a program already written that does this automatically without working out what values posted to individual account numbers and years etc.
    Regards,

    Hi,
    There is no such a program; you will have to your analysis and make manual internal PCA document.
    Regards,
    Eli

  • Assinging Profit center to Cost center - KS02

    Hi,
    When I assign profit center to Cost center, I am getting following error.
    Tran id: KS02
    Error message: Check Consistency of field, as transaction data already exists.
    Can anyone help me on this ?
    Thanks,
    Shalini.S

    Hi Shalini,
    When you try to change the profit center in the cost center master data, the system will issue warning message KS149, but will allow you to make the change.
    Rewards me if it useful
    Regards
    Ravinagh Boni

  • Change of Profit Center

    Dear All
    My Client want to change the assignment of some profit centres (for which transactions have been posted) to Cost Centres.
    The system is not allowing to change the profit centres as data is already available in the profit center.Request to help me in this regard
    Thanks & Regards
    Subbu

    Hi Mr PAN,
    IAM GETTING THE FOLLOWING ERROR MESSAGE WHILE CHANGING THE PROFIT CENTER
    Changing profit center from 5000 to 4100 is not permitted
    Message no. FAGL_ORG_UNITS011
    Diagnosis
    You want to change the profit center from 5000 to 4100. However, this is not permitted because transaction data already exists for the account assignment object. Changing the profit center in this instance can lead to inconsistencies in FI.
    Example:
    There are costs on a cost center (WBS element) to which profit center A is assigned. If the profit center in the cost center master record were now changed to B and the costs then distributed to other cost centers, the currently assigned profit center - that is, profit center B - would be credited. Profit center A, however, would still have a debit posting.
    System Response
    The action is terminated.
    Procedure
    If you want the change in profit center to be possible, you can convert this error message into a warning message. You do this in the IMG activity Change Message Control (work area FAGL_ORG_UNITS, message number 011). In this case, however, you need to examine the possible effects that the change in profit center would have on the relevant balance sheet in FI.
    Regards
    Subbu

  • Change the profit center in the material master

    dear All,
    we need to change the profit center but the system is not letting because the is stock.
    i was thinking if we issue this stock on any cost center, change the profit center and then cancel the issuing material document ...
    what do you think ,,,, would this effect the accounting badly ?? if so,, please recommend other ways

    tej yadav wrote:
    Hi, The only solution to change the "PROFIT CENTER"  for you will be to maintain message MM335 in OMT4 as a warning, then change the Profit center & again change it to error.
    Are you really thinking this is the right approach?
    ever thought about how the posting are made in the other modules then? We dont live on an MM island, so a solution  has to cover the requirements of the connected modules as well.
    if you had received stock to a material with profit center A, then value is posted to profit center A.
    if you change the profit center  in material master to B while you have stock, the value of earlier receipts will not move from profit center A to B, they stay at A.
    The next goods issue for this material is made against the profit center B.
    this results in having a postive value at profit center A (which will never go away) and having a negative value at profit center B (because you had never received to profit center B what you just issued)
    Because of this you should not change the message settings.
    Florian LINTNER wrote:
    Hi!
    >
    > post the goods issue in the prior period.
    > Change the profit center.
    > And post a new goods entry with the date of today..
    >
    > regards
    > flo
    you cannot issue anything in the prior period if everything is already issued in the current period.
    One should obtain the quantityof previous period in material master accounting view.
    Finally you have to have zero stock in current and previous period before changing profit center.
    How you approach this is based on the fact if the current period stock is bigger or smaller than the previous period stock.
    if current period stock is bigger, then issue previous period stock with previous peiod date, and issue remaining stock in current period.
    if current period stock is smaller than previous period stock, then you have to write on the delta in the current period, and subsequent issue the total stock in the previous period.
    seesen_rs wrote:
    Your approach is right. when we had this issue we solved through created dummy material and issue it to dummy material, change the profit center and receive it back..
    >
    > Both options dont affect the accounting.
    Goods issue to cost center or goods movement 309 to a dummy material will both affect accounting and create accounting documents.
    of course, if everything works well then you will get  accounting documents with opposite value after you have changed the profit center and you write on the quantity again.

  • Incorrect Profit Center in Cost Center Master

    Hi
    An incorrect Profit Center was updated in the cost center master and later more than 500 documents have been posted to the wrong Profit Center.
    Now we need to change the Profit Center in the Cost Center master to the correct one. Also, the already posted documents needs to be revised with the correct Profit center.
    Is there a way to do this?
    Regards
    Abhishek Kumar

    Hi Eli
    So in my present case, would u suggest me to do the following (Iam giving you an example below):
    I had posted salary to the Cost Center (CC) - 1000 (Admin Bangalore) linked to Profit Center 'PCA'
    The Entry was:
    Dr  Salary GL           Rs.10,000 (CC 1000)(PCA)
    Cr Salary Payable    Rs.10,000 (CC 1000)(PCA)
    But PC attached to CC is incorrect and I need to change it. Therefore,
    1) Do I have to first reverse the above document in FI,
    2) Then, change the PC in the CC master to the correct one, and then finally,
    3) Repost the entries to the CC (which will then pick up the correct PC).
    I have more than 100 such entries to reverse. And ofcourse, I would not repost the same in PCA module again.
    Or is there any other wise and quick way to do it.
    Regards
    Abhishek Kumar

  • Profit center in Cost center master data

    dear sap expert,
    I have cost center (1100) with validity period 01.07.2010 to 31.12.9999.
    and a profit center (1000) with validity period 01.07.2010 to 31.12.9999.
    User want to extend the cost center from 19.08.1982.
    First, I change the validity period of the profit center so it became 19.08.1982 to 31.12.9999 .
    But when I create cost center 1100 again (KS01) with different period which is : 19.08.1982 to 30.06.2010, system give an error message " Changing profit center from  to 1000 is not permitted " when I fill up profit center field (which is 1000).
    Can you help how do I deal with this error?
    regards

    Changing profit center from  to 1000 is not permitted
    Message no. FAGL_ORG_UNITS011
    Diagnosis
    You want to change the profit center from  to 1000. However, this is not permitted because transaction data either already exists for the account assignment object or could exist at the time when the change takes effect in the system. Changing the profit center in this instance can lead to inconsistencies in FI.
    Examples:
    1. There are costs on a cost center (WBS element) to which profit center A is assigned. If the profit center in the cost center master record were now changed to B and the costs then distributed to other cost centers, the currently assigned profit center - that is, profit center B - would be credited. Profit center A, however, would still have a debit posting.
    2. There are not yet any costs on a cost center to which profit center A is assigned. For this cost center, an additional time slice needs to be created for a future period with profit center B. However, there is always a chance that transaction data continues to be entered in the cost center until the time when postings can be made to the affected period. This can lead to similar inconsistencies as those described in point 1.
    System Response
    The action is terminated.
    Procedure
    If you want the change in profit center to be possible, you can convert this error message into a warning message. You do this in the IMG activity Change Message Control (work area FAGL_ORG_UNITS, message number 011).

Maybe you are looking for

  • Flash To Flash Lite Game Files

    I have existing Flash games, what would be involved in converting them to Flash Lite to be playable on a cell phone. I have Flash CS3? Thank you for your help.

  • Troubble With Ati dri lib32

    Hi, So i had FGLRX installt, but recently with the improvents to the ati open source driver (UVD, powerplay) i decidet to switch back to OSS. Everything works except 32bit applications. Glxgears32 outputs: libGL: OpenDriver: trying /usr/lib/xorg/modu

  • Airport disconnecting and reconnecting...

    Hi, I've already posted a thread with the same issue but nobody really helped. So, I my airport has started to behave really weird. It drops the connection, and then reconnects in a matter of seconds. I have Thompson router and an Airport express, an

  • How do I delete a loading app?

    I installed Solar Walk last year on my iPhone 4.  It's a fairly sizable application - 150MB - but loaded just fine.  It was the update that started the problem off. The update has been loading for around six months and nothing I do will halt it!  Her

  • PeopleSoft Upgrade(DB2 8.46 to Oracle 8.49)

    Hello, We are trying to change database platform from DB2 to Oracle and tools release from 8.46 to 8.49 so far we are following Oracle Testmove methodology but the mail issue here is that we are spending lot of time doing this and so planning for alt