Material availability  check for production order

Hello,
Is there any functional module to check the material availability of production order. So that it can be used in developments.
Regards,
Ganesh

Hi,
Following are the available Function Modules for avaibility checks in Production orders,
BAPI_PRODORD_CHECK_MAT_AVAIL -  BAPI: Execute Material Availability Check for Production Orders
And for Process Orders,
BAPI_PROCORD_CHECK_MAT_AVAIL - BAPI: Execute Material Availability Check for Process Orders
Regards,
Dhaval

Similar Messages

  • Material Availablity check for production order - function module?

    I have a production order with Material BOM, which has more than 30 components in it. Please suggest me if there is any function module to do the material availability check of a production order. I need the missing component list as output of that function module, with quantities if possible.
    thanks,
    Subbareddy

    You might want to look at these FMs:
    CO_ZA_AVAILABILITY_CHK_ORDER
    ISA_AUC_MATERIAL_AVAILABILITY
    Thanks,
    Santosh

  • Material Availability check during work order creation and Release

    Hello All,
    We are checking material availability at creation as well as release
    Say we have Material XYZ=100 in stock MMBE
    Now XYZ =100 is say at normal storage location =75
    and scrap storage location=05 and serviceable =20
    Currently when availability check is performed it checks for 95 (It excludes scrap storage location 05 )
    but we want  Availability check to be only for normal stock =75 and not for Serviceable and Scrap location
    how to do this in configuration or via exits
    Since if the material is under Scrap location it is not counting in Availability check at work order creation this logic is working fine but I do know from where this control is put that when the material is in the stock of scrap it is not counting in Availability check for work orders.Same thing I want to extend it to Serviceable stock .
    Why not it is consider it for Scrap storage location , what is config or any MM enhancement
    So that when Availability check run it will not consider Materials at SCRAP as well as SERVISABLE storage location also.
    Please have your views on this
    Regards
    pratap

    Hello
    There are two option for your requiement
    1. Changing the status of the servisable storage location stock to restricted use stock . You can include or exclude this stock status material in OPJJ. This solution is not storage location dependent. It is stock status dependent.
    2. Please refer the enhancement for the storage location determination. I am not sure about this funtionality:
    For production orders the following enhancement is available:
    PPCO0005 enhancement for storage loc. determination/backflushing
    You can use this enhancement to change the storage location and the indicator 'backflushing' in the reservation.
    The enhancement PPCO0005 contains the following enhancement components:
    Function exit
    EXIT_SAPLCOSD_001 storage location determination/backflushing
    You can find the description in modification text of the function exit.
    You can find an example of the user exit in the function group XC01 in the include LXCO1F05.
    warm regards
    Ramakrishna

  • Authorization check for production order settlement

    Hi All,
    Production order settlement currently can be done by any user of any company code. there is a high risk involved in the same since unauthorized postings may happen. Hence we need to add authorization check for production order settlement. Can we maintain the same at the plant or the company code level?
    Waiting for your replies. Thanks in advance!
    Regards,
    Aman Goel

    hi
    What venki has told abt the exit, its absolutely correct.Even i have used the same exit
    •     From table CAUFV pick Material(PLNBEZ),Basic Start Date(GLTRP),Plant(WERKS) .
    •     Pass parameter Material(PLNBEZ) and Plant(Werks) in table MBEW in respective fields i.e. Material(MATNR) and Plant(WERKS).
    •     Pick the latest record for the current period(LFMON) and year(LFGJA).
    •     Pick Product Cost Estimate number(KALN1) from the record and pass it to table KEKO.
    •     Check if Production Order Basic Start Date(GLTRP)<= BIDAT, if NO post Error Message.
    This is the FS for EXit PPco0007
    Reward if useful
    Amit

  • Collective ATP check for production orders

    Hi Gurus,
    I tried the MDVP tcode, but I can only do the collective ATP check for planned orders. we wanted to do the collective check with production orders, can you tell me how I can do this?
    Thanks.

    I've posted this question but didn't get any response. Can some one please give me an idea how to do the collective ATP check for production orders.
    Thanks
    Vijaya

  • Material Availability Check for material launched in the future

    This is the requirement;
    We are launching a product in the future. Lets use August 19th as our launch date This means that on August 19th our material can be goods issued. It cannot be shipped before then. There is no loading time etc. so our GI date usually = our material availability date
    Our production & procurement activities are executed allowing us to build our stocks so we have on hand stock of the material. We are receiving customer orders. Availability check is run and it is being confirmed for dates before the GI date (As we have stock in the system). For example, a sales order is created with a requested delivery date = 19th August; Would be acceptable if there was no transit time. But what if there is a route determined with a transit time for 2 days. This brings us to a material availability date of 17th August (And therefore a GI date of 17th August) which is before our product launch date. This needs to be avoided; the earliest material availability date must be 19th August as this will then be the earliest GI date.
    Therefore, the requirement is that availability is not confirmed for a date before our launch date. But is confirmed for the launch date.
    For example, how do Apple launch their products (like iPads)in future dates but entertain customer orders well before the date & then confirm the future dates to end customers? At the time when they receive the orders from end customers, I am sure that they would be holding stock of sufficient iPads for future deliveries.

    There may be more than one way you can fulfill the requirement. First is use of user exit. In enhancement ATP00001 (User exits in the availabity check), you can try using EXIT_SAPLATPC_002 (processing results of actual check). Here you can add logic that if the system date is less than Aug 19th 2011, then propse confirm date (material available date) as 19th of August 2011.
    The second option would be use of Replishment time (RLT) in the material master MRP3 view. You can maintain certains days to match August 19th (of course you need to reduct one day when the days go-by). At the same time in t.code OVZ9, you need to uncheck the box check without RLT for the combination of availability check rule and availabity check group. After August 19th, you can check the box again after removing the RLT time in material master. My preference is to go with first option.
    Regards,

  • Availability Check  in production order

    hi everyone!
    there is a finished product A, whose compoent is B, and A:B=1:1. now, B's stock is 100PC. we created a production order which product A 80PC, and availability check is "all material is availability".
    then we created a new production order, which product A 70PC, and availability check is "all material is availability" too.
    but in fact, B is shortage.
    Therefore, please tell me how I do material availability check?
    thanks!
    DanDan

    Hi Dandan,
    Check RLT mark in OPJJ, (replenishment lead time)
    That use during availability check,during the availability check, the system checks the replenishment lead time.In your case B items for which the delivery date falls after the end of the replenishment lead time, the system assumes that everything can be available.
    Regards,
    R.Brahmankar

  • Reg: Error in availability check in production order

    Dear all,
    I am facing a problem during availability check. After creation of production order, when i am clicking 'Materials' it is showing a error message as 'Incorrect check'. When i click log, the error msg is "Order type xxxx, plant xxxx: Checking rule missing (see long text)".
    But in OPJK i checked it. Availabilty check is '2', checking rule is 01, Release material is '1'
    Please help me in this case.

    Hi krishnachandra,
    I think that you still don't assign any checking rule for your Order type.
    FIrst, please check what production order type is. (On production order header: CO03)
    Second, go to OPJK to create new entry and assign appropriate checking rule to that Order type.
    Then go to your production order and check Material to see the result.
    In case you just maintain one entry only with availability check 2 (check availability during order release). You have to release you production order to check material availability check.
    Hope it helpful for you.
    Edited by: dennydang on Jan 11, 2012 4:43 PM

  • Availability check during production order creation - Missing parts details

    Hai Gurus,
    I have one problem during Availability check when converting Planned order to production order.
    1) A- is the finished material, which has A1 to A7 components.
    2) A2 is the procured item with safety stock and it has safety stock also.
    3) When sale order is created , the material A2 is reserved against the planned order for finished material - A.
    4) so when availability is checked during planned order stage , system says no missing parts, when planned order
         is converted to production order system says missing parts for component A2, which is stock and reserved against
         planned order
    5) Checking rule for Production order is maintained as follows,
         a) Include safety stock.
         b) Include reservation.
         c) Include sales requirement
         d) Include deliveries.
         e) Include dependent reservations.(x)
         f) Include production orders.(X)
         g) Check release for stock transport orders only.( A)
    So now i don't know where I went wrong , so that the system could consider the safety stock of Component A2 which is in stock and already reserved against planned order and it does not show missing parts when planned order is checked.
    Waiting for your positive feed back.
    Regards,
    Sekar chand

    Dear,
    What checking rule you have maintained for planned order.???
    As what i can understand by your question that you have maintained to check reservation only in production order not in planned order. Or one important thing mostly people configure to reserve material only after release or creation of production order. Are you reserving material at planned order stage.?
    Check these things. you will automatically find the answer. Hope it will help you. Revert back for more clarification.
    Regards,
    Alok Tiwari

  • Material Availability Check in Process Order Issue

    Guys, I need some help in understanding the folowing issue:
    I have a FG and 2 components.I created a process order and tried to release the order. Automatic availability check is done and a dailog box appeared to list out the missing parts. Missing parts list shows both the components. But one of the componet has unrestricted stock to use in the storage location. why did the availabity check show missing part for that component?
    I checked pp checking rule and it says for business rule 2 "no check" is unchecked. so that means checking is done. and this pp checking rule is assigned in OPJJ and also assigne dto the material master of the component.
    please let me know if you need more information. Thx

    Dear you are absolutely correct if you uncheck No check box in material availability in Order control OPJK  per plant and order type that no automatic material availability check is to be executed for the specified business transaction (order creation or order release).
    But further please note that the option of calling up a material availibility check manually and also of executing a collective availability check is not affected by setting this indicator. This indicator is also ignored if you work with Assembly orders and you have defined in Customizing for Sales Orders that a material availability check is to be carried out.
    Cheers
    kK

  • Re: Availability check fpr production order after released.

    Prodsuction order is released. Materials pertainig got reserved for the order, goods issue not posted getting error saying availability check when checked the log. Kindly help me to solve my issue. Thanks in advance.

    Hi,
      you might not have defined the proper settings for availability check.
      following is the logic in defining the settings.
    Availability check for a material is carried out only if the material is
    1. A stock item
    2. Not a phantom item
    3. Not a bulk material.
    This can be carried out
    1. during order creation
    2. during order release
    3. when a created order is saved.
    Availability check can be triggered either manually or automatically.
    For this we need to define in checking control(opjk)
    First define a checking group(ovz2) and checking rule and this
    must be assigned to checking scope.(opjj)
    In the checking scope(opjj) we should define
    1. which Mrp elements are to be considered during check
    2. which inventory categories are to be taken into account
    3. whether Replinishment lead time is to be taken into account or not
    4. whether check is also to be carried at storage location level.
    This checking rule must be linked to checking control(opjk)in which you can say
    1.No availability check for the material
    2.Availability check when saving the order
    3.What type of check is to be carried
    whether ATP CHECK or Check against PIR quantities
    4. Whether order should be released or not if there is
    any missing parts.
    The checking group is assigned to material master MRP3 view
    Regards,
    nandha

  • Check for Production Order

    Hi experts
    i want to put a check while Production order creation such that without Standard cost estimate(costing),It should not allow to create Production order.
    Regards
    Sandeep Patil

    hi
    What venki has told abt the exit, its absolutely correct.Even i have used the same exit
    •     From table CAUFV pick Material(PLNBEZ),Basic Start Date(GLTRP),Plant(WERKS) .
    •     Pass parameter Material(PLNBEZ) and Plant(Werks) in table MBEW in respective fields i.e. Material(MATNR) and Plant(WERKS).
    •     Pick the latest record for the current period(LFMON) and year(LFGJA).
    •     Pick Product Cost Estimate number(KALN1) from the record and pass it to table KEKO.
    •     Check if Production Order Basic Start Date(GLTRP)<= BIDAT, if NO post Error Message.
    This is the FS for EXit PPco0007
    Reward if useful
    Amit

  • Bapi or Function Module to do the availability check for Planned Orders

    Hi all,
    I need a Bapi or a Function Module to do the availability check for a Planned Orders. Anyone knows how?
    I will use it in an Exit.
    Thanks in advance
    Points will be given

    I think I found it.
    If anyone is searching for it too, we will use these one:
    CO_ZA_AVAIL_CHK_ORDER_MULTI

  • BADI for MIGO ( Material document change for Production Order goods Receipt

    Hey experts,
    I am actually stuck up with MIGO BADI.
    There are many BADI's available but i dont think any one would suit my requirement.
    here goes my requirement.
    When a Production Order is created in transaction CO01 , the system picks the value of the moving  material and multiplies it with the quantity .
    But when the production order is being confirmed thru CO11N , again the system picks the present moving price of the material and multiplies it with the quantity. This goods receipt is done through MIGO transaction by selecting goods receipt for order that is 101 movement type. I have been asked to get the value of the material at the time of production order create and then change the dmbtr value of MSEG table, this can be done in the badi at the time of creation of material document number but the BADI's MB_DOCUMENT_BEFORE_UPDATE,  MB_DOCUMENT_UPDATE do not allow me to change the values .
      The BADI MB_DOCUMENT_BEFORE_UPDATE does not allow any changes to be made for XMSEG table
    and MB_DOCUMENT_UPDATE is passed by value and hence the changes are not affected after it comes out of the method.
    Guys please help me as this creating a hell lot of problem here and i would surely reward the max points if answered.
    here is the example to be more precise.
    Material : Pen
    Quantity : 10.
    date : 01.06.2008.
    TYransaction co01.
    lets say at the time of creation the value of the material was 5 rs
    a material document would be created with the value  : 50 rs.
    Now for this prod. order goods receipt is being done on 01.07.2008.
    Let the value be 4 rs now.
    so the Material document would be created with a value of 40 rs.
    I need to make this 50 rs.
    I have got all the data to do it but i am not gettin the coreect BADI, i just want the BADI name to change the DMBTR value at the time of creation of material Document.
    Thanks in Advance.

    User-exit /BADI to change mseg during migo
    https://forums.sdn.sap.com/click.jspa?searchID=-1&messageID=5435559
    try this links

  • Availability check for sales order stock

    Hi,
    We use sales order stock in sales order which creates purchase requisition automatically.Movement types for GR 101E, for GI 601E. Material master data has on MRP2 view as GR processing time 2 days for example. I create sales order with requested delivery date today.After saving SO, PR is created and I create PO with delivery date today and post goods receipt document for today. System gives as confirmation date today + 2 days. although the material is in stock.
    We use also project stock in sales order which creates purchase requisition automatically.Movement types for GR 101Q, for GI 601Q.I run the same scenario for the same material. As soon as I create the purchase order system confirms the open quantity in sales order for today. (Scope of availability check is the same for both sales orders and includes PO)
    What can be the reason?
    Thanks

    Hi Murat,
    i guess the problem is with the 'Check without RLT' indicator' in Availability check control. For the MTO (checking rule AE) i guess this indicator is not set but for the Project systems (Checking rule PS) this indicator is set. This makes the difference. Do the changes as desired in transaction OVZ9.
    Please check and revert back if you are still facing the same problem.
    regards,
    Kathir

Maybe you are looking for

  • Using CLOBs in oracle Report Builder

    I want to select all the data in a CLOB column using SQL Navigator by just doing select entry_note from chartentries; just as you say in your example by it just gives me back a result of (ORACLOB). If I do select to_char(entry_note) from chartentries

  • How do I transfer my pics from the ipad to my computer

    I am not a big fan of the ipad. It closes apps in the middle of everything. I need to know how to get my pics off of it onto my laptop because I am thinking of selling it!

  • Huge load on Database server

    Hello all, Good day. We are using oracle standard edtion 9.2.0. We have sun machine with dual cpu and have 8G memory. We use decicated server for our web applications. We also use SharePlex for replication. The average number of logins (users) in the

  • Recordset navigation code bug

    If you insert a Recordset Navigation Bar for a recordset called (say) Images the following code is generated (by CS6 and previous, at least): if (isset($_GET['totalRows_rsImages'])) {   $totalRows_rsImages = $_GET['totalRows_rsImages']; } else {   $a

  • Suddenly I cannot open any of my PPC apps

    some of which I use on a weekly basis. Reinstalled Snow Leopard + updates + Rosetta and repaired permissions and still no go on Quicken 2007, Filemaker Pro 8, etc etc. Can I go backward in O/S updates, as I really need these apps to work, at least fo