Material Confirmation date in future though the material is in stock

Dear Gurus,
Please tell me why the system is giving the material confirmation date in future though the matl is  available in stock.
System creating two schedule lines one for 15/10 (15 oct) and the second one with the confirmation of quantity on 22/11 (22 Nov) as I have enough stock than the required for this order. In MRP1 view of same  matl Master of same material delivery planning time is 28 days. and in MRP3 view the Replenishment lead time is 20 days.  please tell me what date system considering to shift  the confirmation date in future. the factory calender has Sat-sunday off.
please tell me the possible reasons for confirmation date change.
regards,
Sandesh

Hi ,
Please check the  value at MM03-> Sales: General plant Tab ->Availability Check is '02'.
u201802u2019 will consider all the u2018Individual Requirementsu2019 done before and during the creation of Sales order for the combination of respective Material & Plant.
Even though Material stock will be visible for you at MMBe for respective plant double click on the Quantity, it will show you multiple Row with one of it will be " On Order Stock" these are the other orders for which Quantity is already confirmed but respective PGI is not yet done.
The next schedule line date always generated based on the Factory calendar (based on Holidays/Weekly Offs if any).
AT MD04 Tcode, based on the selection made at Material master for Availability Check you could see all the requirements related to Goods Issue Sales Orders , STO & Production Orders for Goods receipts.
Hope this will solve your query.
With Best Regards,
RB.

Similar Messages

  • Facing Schedule lines Material Confirmation date inconsisteny in order

    Hi Experts,
    We have created Material 100 (FERT) in Plant 1000 (in both Storage location - 0001 & 0002) as well as maintained in production time: 14days in MRP2 tab.
    When I attempt the material 100 in standard sales order Iu2019m receiving schedule confirmation date: next day (01.12.2011) for Plant 1000 and storage location 0002 combination (using Field user exit for automatic storage location determination).
    However when I change the storage location from 0002 to 0001 in the sales order item level manually u2026Iu2019m getting schedule Material Confirmation Date: 15.12.2011 Pop up...
    Expertsu2026 please guide me where I did the mistake for 0001 Storage location and right me.
    Thanking you !!!
    Vijaykumar K

    dear friend,
    in this case you would open 2 sessions in MM03:
    this material on Plant Data / stor.1
    and same material for same tab for the second Sloc
    and compare data
    say, for example, the difference might be in Container reqs field or someone else...
    compare Plantdata/stor. 2 for your SLocs as well
    good luck!

  • Material availability not coming even when the material is in stock

    Hi,
    My client is facing problems in creating a free of charge delivery order for a customer with a material with quantity 1.
    In MMBE, the material is available in the plant and storage location - quantity available is 1.
    Now when the client is creating the free of charge delivery order with the same material, the plant and storage locations are getting determined automatically but when the system runs the availability check for the requested delivery date i.e current date, the confirmed quantities is 0 and no further schedule lines are there for confirmed quantities.
    I checked in MMBE for the determined plant and storage location, the stock is available (quantity 1) but still there are no confirmed quantities.
    What should be the reason behind the same.
    Thanks and regards,
    Pavi Ranjan

    Hello,
    Review the order in CO06.
    Maybe run SDRQCR21 - stuck requirements in MD04.
    Mark as helpful.
    Regards
    Waza

  • To create a Material using BAPI with out passing the material number

    Hello Experts,
    I am using BAPI_MATERIAL_SAVEDATA to create a material of some Ztype. I am successfully creating a material if I am passing Material Number as input. I want the material number to generated internally.
    When I am doing material creation with same input data with out material number using BDC, it is working fine. It is generating the material number.
    But, not with the BAPI.
    Do, I need to specify this some where in the BAPI to generate the Material number internally? Please let me know.
    Please help me in this regard.
    Thanks & Regards,
    Naresh.

    Hi,
    Read the BAPI documentation regarding Internal Number range for materials.
    When you create material master data, the following fields must always
    contain a value in the structure:
    o   MATERIAL
        Only external number assignment is supported for the material number
        (MATERIAL). If you want the material number to be assigned
        internally, the method BAPI_MATERIAL_GETINTNUMBER must first be
        called. This method determines an internal number for the material
        to be created. You must enter this internal number in field
        HEADDATA-MATERIAL.
    Regards
    Vinod

  • Create Material Master Data with BAPI

    Hi,
    I don't know using of BAPI. I want using BAPI_MATERIAL_SAVEDATA bapi for creating material master data for Basic Data1, Basic Data2, Purchasing and MRP views. Does anybody can help me ?
    Thank you
    Good night

    Hi,
    Please refer to the documentation below:
    BAPI_MATERIAL_SAVEDATA
    Short Text
    Create and Change Article Master Data
    Functionality
    You use this method to create new material master data or to change existing material master data. The data on a material can be transferred for each call.
    When creating material master data, you must transfer the material number, the material type, and the industry sector to the method. You must also enter a material description and its language.
    When changing material master data, you need enter only the material number.
    In the header data, you must select at least one view for which data is to be created. Depending on the view selected, you must maintain other required parameters. If you do not enter values for all of the required parameters, the method is ended with an error message.
    The corresponding fields in the tables (such as CLIENTDATA) must first be supplied with data by the calling program. An indicator must also be set for each of these fields so that the data is written to the database by the method. This requires the calling program to supply the corresponding field with the indicator in a checkbox table (for example, CLIENTDATAX). Checkbox tables exist for tables that do not contain any language-dependent texts (MAKT, MLTX), International Article Numbers (MEAN), or tax classifications (MLAN). Several data records for a material can be created in these tables.
    If a structure contains fields for units of measurement (such as structure CLIENTDATA, field BASE_UOM), language indicators (such as structure MATERIALDESCRIPTION, field LANGU), or country indicators (such as structure TAXCLASSIFICATIONS, field DEPCOUNTRY), there is always a field of the same name with the ending _ISO. This makes it possible to transfer either the internally used SAP code or a standardized ISO code for the units of measurement, language indicators, or country indicators. ISO codes are converted to an SAP code internally for further processing. The ISO code is used only if the SAP code is not transferred. If you use ISO codes, there must be a unique assignment of the ISO code to the SAP code in the following activities in Customizing for Global Parameters:
    Check Units of Measurement
    Define Countries
    If you want to maintain long texts (basic data texts, internal comments, purchase order texts, material memos, or sales texts) or customer-defined fields for a material, some special conditions have to be observed. They are described in the documentation for parameters MATERIALLONGTEXT and EXTENSIONIN.
    Parameters
    HEADDATA
    CLIENTDATA
    CLIENTDATAX
    PLANTDATA
    PLANTDATAX
    FORECASTPARAMETERS
    FORECASTPARAMETERSX
    PLANNINGDATA
    PLANNINGDATAX
    STORAGELOCATIONDATA
    STORAGELOCATIONDATAX
    VALUATIONDATA
    VALUATIONDATAX
    WAREHOUSENUMBERDATA
    WAREHOUSENUMBERDATAX
    SALESDATA
    SALESDATAX
    STORAGETYPEDATA
    STORAGETYPEDATAX
    FLAG_ONLINE
    FLAG_CAD_CALL
    NO_DEQUEUE
    NO_ROLLBACK_WORK
    RETURN
    MATERIALDESCRIPTION
    UNITSOFMEASURE
    UNITSOFMEASUREX
    INTERNATIONALARTNOS
    MATERIALLONGTEXT
    TAXCLASSIFICATIONS
    RETURNMESSAGES
    PRTDATA
    PRTDATAX
    EXTENSIONIN
    EXTENSIONINX
    Exceptions
    Function Group
    1001UEB
    Thanks,
    Sandeep.

  • Creation of material using BAPI in LSMW without using material no.

    Hi SAP Gurus,
    I have a requirement of creating materials using the BAPI in LSMW.
    I tried to create a material using the BAPI (Business Object - BUS1001006 , and method - SAVEDATA) which should be created internally, but it is asking the material number to be given externally and my configuration is setup to create the material number internally.
    Even I looked into the material type which is associated with the number range and everything looks good.
    Is there any solution to create the material by using BAPI in LSMW without passing the material no. externally ?
    Appreciate your help.
    Kalikonda.

    Hi,
    it looks like it's not possible to call this BAPI wihtout material number. Here is a quote from BAPI documentation.
    When creating material master data, you must transfer the material
    number, the material type, and the industry sector to the method. You
    must also enter a material description and its language.
    Cheers

  • SAP standards for retriving the Material Master Data

    Can someone provide me list of all SAP standards for retriving the Material Master Data with respect to views.
    Standard Reports
    Function Modules
    RFC's
    BAPI's.
    T.codes
    Sample code's
    useful answers will surely be awarded.
    Regards
    Vinayak

    Hi,
    These are the standard BAPI's for Material master.
    BAPI_MATERIAL_DELETE Flag Material for Deletion
    BAPI_MATERIAL_DISPLAY Display Material
    BAPI_MATERIAL_EDIT Change Material
    BAPI_RETAILMATERIAL_CREATE Create Material
    BAPI_RETAILMATERIAL_DELETE Discontinue Material
    BAPI_STANDARDMATERIAL_CREATE Create/Extend Material
    BAPI_MATERIAL_SAVEREPLICA BAPI for Mass Maintenance of Material Data
    BAPI_MATERIAL_SAVEDATA Create and Change Material Master Data
    BAPI_MATERIAL_EXISTENCECHECK Check Existence of Material
    BAPI_MATERIAL_GETBATCHCERT Create Quality Certificate for Batch in Portable Document Format (PDF)
    BAPI_MATERIAL_GETBATCHES Create Batch List for a Material
    BAPI_MATERIAL_GETCHARMERCHHIER Supply Characteristics of Retail Material for Material Group Hierarchy
    BAPI_MATERIAL_GETINTNUMBER Assign New Internal Numbers for a Material Type
    BAPI_MATERIAL_GETINTNUMBERRET Assign New Internal Numbers for a Material Type for Retail Materials
    BAPI_MATERIAL_GETLIST Supply List of Materials for Search Criteria Transferred
    Thanks.,

  • Material Availabilty Date Determination in Sales Order

    Hi Gurus,
    When creating the sales order, if stock is not available then how the material availability date is determined.
    What are the inputs the system consider for calculating the material availability date.
    Even though I am giving the total replenishment leadtime, Inhouse processing time(Lot size independent), GR processing time and even the planned delivery time, the system proposing the current date as material availability date irrespective of the sales order quantity.
    All responses will be rewarded suitably.
    Thanks and Regards,
    Jejesh.
    Edited by: jejesh yal on Sep 12, 2008 6:33 PM

    Available checking rule in SD.
    It depends on the Availability group you have maintained in material master.
    The checking rule specifies the scope of the availability check for the respective transactions in sales and distribution by specifying precisely which stocks, receipt and issue elements should be taken into account during the availability check.
    Every checking rule is allocated to a checking group: together these two elements determine the final inspection requirements. In addition, the checking rule includes a specification whether or not an availability check should take into account the replenishment lead time ( i.e. Total time for the in-house production or for the external procurement of a product. In in-house production the replenishment lead time is determined to cover all BOM levels.)
    Items for which the delivery date falls within the replenishment lead time, but for which there is no inventory, are confirmed for delivery after the replenishment lead time. In the case of items for which the delivery date falls after the end of the replenishment lead time, the system assumes that everything can be confirmed.
    If you want the system to check the replenishment lead time, you should make sure that you have entered a value in at least one of the following three fields in the material master:
    GR (goods receipt) processing time (Purchasing view)
    Planned delivery time (MRP I view)
    GR processing time (MRP II view)
    Otherwise, the system confirms every requirement.
    Ava checking group what you have maintained in material master and the checking rule  for SD (in std system is A)
    --combination of above will decide how the ava check to be carried out and decide the delivery date. This sitting is available in SPRO in OVZ9.
    If you carry out the availability check using the replenishment lead time, you should plan ahead in regular intervals (on a daily basis for individual and daily requirements, on a weekly basis for weekly requirements) to prevent a shortage and therefore a possible delivery block. This shortage could occur if the delivery date of a sales order, which was confirmed the previous day for the replenishment lead time, is already within the replenishment period on the current day and therefore results in a shortage.
    Hence,
    1. Check the configurations for the checking groups which are contained in the standard SAP R/3 System.
    2. Make sure that the checking group is maintained in the material master records. Depending on the plant, you can specify a checking group for each material type
    3. Select the individual stock elements as well as the receipts and issues which should be taken into account during the availability check.
    4. Select the field for replenishment lead time if you do NOT want to take the replenishment lead time into account.
    Depending on above setting delivery date will e determined or delivery block in case no qty available can be designed.

  • Update material master data BAPI_MATERIAL_SAVE DATA

    Hi All,
    I am using BAPI_MATERIAL_SAVE DATA Fm to update the material master data .
    I want to change material type vend (which already existed) to HIBE material type .
    Even though Basic data view populated its not updating in Material master .
    Which views do i need to populate to change material type one value to other value?

    if you use FM - BAPI_MATERIAL_SAVE DATA ,you can not update material type , use bdc program to update material type ,
    See the transaction : MMAM - No BAPI to update material type
    you need to use BDC Program.
    Reward Points if it is helpful
    Thanks
    Seshu

  • Changing of material avilable date

    where i change the material avilable date in the sales order or any other place plz tell me the solution
    with regard ,
    phani

    Dear Phani,
    Logistics -> Sales and Distribution -> Sales ->Order -> Create
    Transaction Code: VA01
    Order type
    Sales organization
    Distribution Channel
    Division
    You do not need to specify the sales area at this point. The system derives the sales area when you enter the sold-to-party. If the sold-to-party has been defined in more than one sales area, the system requests you to select the appropriate sales area.
    Sold to pary
    PO (Please ensure that you use capital letters when you enter the PO number)
    Purchase order date
    Req Del Date
    Pricing Date
    Material and Quantity
    In the dialog box, you are requested to select an unloading point. Select one of the defaulted options, then choose Copy.
    If the goods ordered by the customer are not available on the requested delivery date, an availability check screen automatically appears. Here you can choose one of the delivery options, for example, Delivery proposal. The overview screen appears.
    If the system displays a dialog box, Click on the Tick mark
    On the overview screen, select the first item, then choose.
    On the Create Standard Order: Item Data screen, select the schedule line with the confirmed order quantity, then choose. Search icon
    Choose the Shipping tab page.
    Make a note of the Material availability date, as you will need this as a selection criterion to create the delivery. If the Transport planning date is earlier than the material availability date, you can create the delivery on this date.
    Choose (back icon) until the Create Standard Order: Overview screen appears.
    Select the first item and choose Goto  Item  Billing.
    You now see detailed sales, shipping, and billing data for the first item.
    Note that payment terms (ZB01) have been determined for this item.
    On the Create Standard Order: Item Data screen, to display the data for the second item, choose next.
    To view the pricing conditions for the second item, choose the Conditions tab page.
    Select the line for condition type PR00, then choose Condition rec.
    You now see the price agreed with the customer. The calculated price is less than the standard price for this pump. This is a special price for this customer.
    On the Display Price Condition: Condition Supplements screen, select the line with condition type PR00, then display additional data.
    On the Display (Price): Additional Sales Data screen, you can see that ZB02 was entered in the Payment terms field. These payment conditions are determined if an order item is processed with tis product for this customer.
    Click to Create Standard Order: Overview screen appears.
    Save
    Make a note of the order number.
    • Selct or view the overview tree
    • If a dialog box appears, choose No
    Visit the following link:
    http://help.sap.com/saphelp_crm40/helpdata/en/dd/5607e7545a11d1a7020000e829fd11/content.htm
    Creating a sales order(VAO1)
    http://help.sap.com/saphelp_46c/helpdata/en/e6/4a75329e0311d189b70000e829fbbd/frameset.htm
    Delivering a Sales order:(VLO1N)
    http://help.sap.com/saphelp_46c/helpdata/en/e6/4a75329e0311d189b70000e829fbbd/frameset.htm
    Billing the Sales order: (VFO1)
    http://help.sap.com/saphelp_46c/helpdata/en/e6/4a75329e0311d189b70000e829fbbd/frameset.htm
    Displaying the Document Flow: (VFO5)
    http://help.sap.com/saphelp_46c/helpdata/en/e6/4a75329e0311d189b70000e829fbbd/frameset.htm
    Regards,
    Naveen.

  • Sales Order Material Availability Date Data Source

    Hi,
    I'm sorry if this information is readily available, but I read ~20 discussions and couldn't find the answer.
    Can anyone help me understand how the material availability date is calculated?  Is it just based off the In-House Production or Planned Delivery Time of the material master?  What if the material has a routing?  Is there a way to update the Planned Delivery Time based on the routing?
    What about for multiple levels?  (e.g. purchase a part, modify it, then ship it)  If the BoM exists will it perform the explosion and sum the planned delivery time for the raw material and the in-house production time for the finished material?
    I'm asking because we are having many problems with Sales Orders for parts that we can not ship in time... so we must have something missing.
    Thanks for any help.
    Timothy

    Before that you need to understand the delivery scheduling process.
    For example customer requested date is 15.04 2014
    Order is created today i.e 28.03.2014.
    Here system always does backward scheduling first. If the backward scheduling failed then system does forward scheduling. Backward scheduling failed if the material availability date is going beyond the order creation date. then in that case system does forward scheduling.
    Backward scheduling does based on the customer requested date and forward scheduling does based on the order creation date.
    when system does forward scheduling it will get two scheduling date in the schedule line tab.
    Suppose Pick/Pack time is 1
    Loading date is 1
    transit time is 1
    transportation time is 1
    Here system will do the backward scheduling first for calculating the customer requested date
    Delivery date minus transit time (Route) = Goods issue date
    Goods issue date minus loading time (shipping point) = Loading date
    Loading date minus transportation lead time (Route )= Transportation Planning date
    Loading date minus pick/pack time (Shipping point) = Material availability date
    here material availability date is 12.04.2014. on that date system will check whether material is available or not. If yes, then system will confirmed the quantity. If not then system will again do forward scheduling.
    Suppose material available date is 13.04.2014 then system will add the all the above date to material availability date to calculate the actual customer delivery date
    So here the customer requested date is 16.04.2014
    Transportation lead time & pick/pack run parallely. system will consider the highest between both.

  • ALE:Material Master Data Distribution

    Hi
    I am new to ALE Material Master Data Distribution and if the questions are incorrectly worded, please accept my apologies. It is due to lack of knowledge.
    I am doing Material Master Data distribution and I am using standard basic type MATMAS03. The standard TCode MM01, MM02 has SAP tables and 3 custom tables.
    I have turned the active on using BD61 and change pointers to message type.
    Q: Is the change pointer, applicable to entire material master? i.e. if I change a field in Z table or standard material tables, can an IDOC be created for the entire material record?
    Q: What is the function of BD52? Does this override the option Activate Change pointers for message type? Does it mean, if the changes are made to those fields in BD52 a change pointer is created?
    Q: If I change Z table only, will there be a change pointer created? If not, how could I accomplish this using BD52.
    Q When do we use the enhancement MGV00001?
    Also, If you could add anything in addition to above queries, it will be helpful to me and I appreciate it.
    With regards,
    William

    Thank you Sudhakar.
    Your tips are good, but, I was not able to get the problem resolved.
    Let me explain what I have done based on your tips.
    1.  MATMAS uses MATMAS03. The basic type has NOT been modified to have z fields yet.
    2.  Using BD52, i have created the following fields
         MATERIAL    ZEMM_MARA_TECH   IM_ADVISORY_CODE
         MATERIAL    ZEMM_MARA_TECH   KEY.
    3.  Modified the MMR for IM_ADVISORY_CODE.
    I did not see a change pointer for this change.
    Q:  When I created above entry using BD52, was asking the table name. The table name is stored in TCD0B. What TCode is available the entries in TCDOB. For the time being, i created using SQL.
    Q. Is there a follow up configuration required to capture the changes?
    I will award the points in a couple of days time, even if I do not get the solution, because you have spent your precious time for the community. I will wait for a couple of days for other suggestions and close the Problem.

  • Material creation date for perticular plant

    Hello Experts,
    I have four plant have a same material,so i want to see the material creation date by plantwise.Please suggest me where can i see the material creation date by plantwise? Bcz. I want to develop report for this.
    Thanks & Regards,
    Vinay

    Hi,
    Go to T.Code: MM60,Then enter your required plant and execute.
    Now you can see the material with created date or last change date  and who created.
    If helpful then reward.
    Regards,
    Biju K
    Message was edited by:
            Bijay Kumar Barik

  • In PM order, can we change the material description for item category N?

    Hi,
    In Plant Maintenance work order, is there a way to change the material description while purchasing material (item category N) using a material master number? In config. the material description field is open for input. However on the work order components screen it becomes grey as soon as one enters a material master number.
    Background: We want to maintain generic material master records in the system and use them for purchasing materials (item category N) on work orders so that the purchasing data defaults from the material master. But we need to be able to change the description per the specific requirement.
    Similar functionality works on sales orders. Are we missing anything?

    Hi there,
    One solution would be to have some generic materials created and used them during work order processing. These generic materials needs to be extended to all the required plants.
    Hope this works,
    Cheers !!!

  • Sales order does not extract plant information from material master data

    Hi experts,
    I have created a sales order. However, the plant in the shipping tab can only be manually entered.
    I have made the check:
    the customer material master data does not have the plant info.
    the customer master data does not have it either.
    It is defined in the material master data: sales:general/plant
    But the sales order did not extract this information. Why does this happen?
    Thank you in advance.
    Best regards,
    Fan

    Hello Friend,
    As right stated by you,
    The Plant will be copied from the master data to the sales order, if not it should be manually entered
    The Sequence System will search for the Plant is as follow..
    1. Customer material infor record, If it was not maintained then it will search in
    2. Customer master, if the entre was not maintained in the SHIPPING TAB
    3. Finally it will search in the Material master in the Sales organisation data 1 in the field DELVERING PLANT field.
    So please search whether the entry was maintained in that field at the sales:sales organisation data 1.
    This might be the issue.
    Please revert if you want further details
    regards,
    santosh

Maybe you are looking for

  • How do I change the password for IMAP access?

    I have changed my AppleID/iCloud password at appleid.apple.com. Now, in order to log in to iCloud.com, or to log into the iCloud control panel on my PC, I have to use the new password I have chosen. The old password is not accepted. However I access

  • Cannot click on Sub menus at this site

    I am unable to click on the sub topics on this web page. As an example, when I click on SPORTS the sub Topic menus appear....so you can select which sport team you want to review their articles, but as soon as you drop the Mouse Pointer to select a s

  • Modify EXIF date?

    iPhoto '11 (9.2.2) lets me set a date for photos, but apparently this new date is known only to iPhoto. Even if I check the "Modify original files" box when I set the date, the original date of the photo in its EXIF data is unchanged. This can be a p

  • Setting WAN port MTU?

    I mentioned in another thread that I had been having some problems with NAT on the AEBS. I think I narrowed it down to something going on between my DSL router and the AEBS. I believe the DSL router needs to have an MTU of 1460 or fewer bytes per pac

  • Regarding printpreview of a smartform

    Dear Gurus,      my requirement is i want insert a button in the smartform print preview. Is it possible in the print program. Please help me. Thanks