Hello,
I have the following situation at hand in a Client.
They use Process Orders and want to do material staging of the components.
The Production Supply área is an IM managed storage location but the storage location of the components is WM managed.
The staging should take place as pick parts (control cycle) transfering the components from the WM storage location to the IM production Storage location.
Im not sure we need to use Deliveries instead of Transfer Requirements.
Is this escenario posible and if so, how to configure it.
Thanks for any reply.
Aart

Aart,
For Transfer requirement creation for production order components WM staging please follow below steps.
1.Activate PP interface in Warehouse number control for PP interface in Logistic execution.
2.You need to assign WM replenishment movement type 319 against the production supply storage type.
3.In production scheduling profile all necessary WM TR/TO configuration to be done based on your requirement.
4.Create PSA in PK05.
5.Create Control cycle in LPK1.
6.Assign the PSA to production work centers.
With above settings once production order is released TR gets created which could be converted to TO manually or automatically for further process.
Br
KK

Similar Messages

  • Difference between Production Supply Area and a Storage Location

    Hello Experts,
    Basic question but wanted to get more clarity on the concept as i never worked on the PSA
    Can someone tell me the exact difference between PSA and a SL. I understand PSA is a Kanban, WM and SL is an IM concept. Can a work center have a storage location assigned or just a PSA? Can a GI be done from PSA or just from a storage location.

    Hello
    The production supply area is a master data used by WM, while the storage location is used by MM-IM.
    Check this link for details:
    Production Supply Area - Warehouse Management System (WMS) - SAP Library
    The goods issue is done with reference to the storage location
    It is possible to assigne a storage location to a production supply area and assign the production supply area to the work center.
    BR
    Caetano

  • WM Material Staging  for Production Order

    Hi,
    In the process order txn Cor3, Go to > List > WM pick list>  the initial screen is  Display WM Material Staging  for Production Order. In the All parts tab, could you please help me on how to be able to populate the fields in the  BSI, Category and Storage Bin. Your help is greatly appreciated.
    Thanks

    Dear Ellen,
    If you set the cursor on 'BSI' field and push F1 you'll get an explanation about the meaning of each category.
    '"<i>1" pick list item
    This materials are picked according to the required quantity specified in the production order.
    '2': Crate or kanban parts
    These materials are always removed from the warehouse in full cases. These can be ordered, for example, as soon as a case of needed parts is emptied in production.
    '3': Release order parts
    Release order parts are scheduled individually and the quantities are supplied manually to replenishment storage bins based on the requirements of production orders and the stock levels in the scheduled production supply areas.
    "0" not relevant to WM-PP
    These materials are not relevant for WM production supply and cannot be requested using the WM system.</i>'
    For instance:
    You can set raw materials / SFG as pick parts if warehouse workers have to collect those parts from high racks (from different places) and they have to provide an exact qty for the PrdOrd.
    We use '4' (manual staging) for huge alu rolls that are near the machine and WH workers have nothing to do with it - the operators, who deal with the machine, have to put the new rolls on it.
    When we issue the PrdOrd the requirements of this material won't appear in LB10 since WH has nothing to do with them.
    'Storage bin' filed will contain a value automatically, if your settings are proper.
    E.g. you have to define the default 'stock removal' & 'stock placement' storage type on WM view of material master.
    Additionally you have to define control cycles for materials you use for your production. (LPK1)
    The control cycle says from which storage type & bin you want to consume the components.
    BR
    Csaba

  • Material Staging for Production Order

    Hi,
    I am doing Material Staging against production Order using T Code MF60. We don't have WM setup in the enterprise structure so the Staging is done via IM Mvmt. Type 311. My problem is that the material document created using MF60 does not have a reference of Production order or vise versa. Can anyone suggest a configuration or a user exit that can be used to make a reference link between the Production Order and the Staging Document?
    Thanks
    Arvind

    Hi!,
    Though whatever you are asking for is not possible with standard SAP but you can try this work around solution:
    Click on replenishment element.
    Now in MF60  Menu > View > Table column > Select " All Column" (after clicking ).
    Now system will show some open fields (like Goods recipient, unloading point etc) on replen. element.
    There in one of the field like unloading point (which you are not using elsewhere) you can enter the production order number so when you stage the same that order number will be saved in that document and you can get it from RESB table against the reservation number.
    To automate the same you can use some enhancement with above logic.
    I hope this helps in resolving your problem.
    regards,
    Uday
    Edited by: Uday Parchure on Jul 29, 2009 12:50 PM

  • How to get receiving and sending storage location in material document?

    Hi, guys,
    I am now writing a report about material document.  I need to get receiving storage location and sending storage location from material document  in MSEG table , Is there any function module for this ?
    Thanks.
    Justin

    I don't know, but there is a SELECT statement that lets you read any desired column from the database.
    Thomas

  • Best practice - material staging for production order

    Hi Experts,
    could any of You pls, support me with some hints of best practice how to handle material staging WM-PP interface in a certain case?
    Up till now we had a system, where production had no separate location in IM, but one location existed including raw material wh and production. In the same time in WM we had separate storage types for production and raw materials u2013 hence we did material staging transferring goods only inside one IM location between different WM storage types. The material staging should be done based on separate prd. orders.
    Now this need to be changed and separate location need to be handled in IM for production u2013 which means the staging should be done between different IM locations and WM administration also need to be handled.
    Up till now we used LP10 for staging, then LB13 for TO creation etc. We can keep going like that, but if do so, there is another step required in IM u2013 movement 311, where material numbers and qty need to be added manually to finish the whole procedure. I would like to avoid this u2013 which makes the administrational procedure quite long.
    I have been checking the following possibilities:
    1.     Set released order parts-staging at control cycle and use MF60 for staging u2013 but I can not select requirements based on pro ordders here (only able to find demand if component including into selection)
    2.     Two step transfer 313/315 u2013 but this not a supported procedure u2013 313 TI /TO / 315
    3.     Try to find solution how to create 311 movement based on TO or based on WM stock at certain storage type / dynamic bin.
    I have failed.
    So, could any of You pls, support me with some useful ideas, how to handle material staging where 311 included and definetly the last step of procedure, but administrator does not need to enter items manually one by one in MIGO.
    All answers will be appreciated

    Hi,
    Storage location control should be able to take care of your problem.
    If you want to stage the material to a different IM location then the WM location then make the following settings
    If location xxxx is your WM location and location yyyy is your Production location.
    You have defined Production storage type ZZZ for production storage location YYYY and have maintained the supply area for the same
    In WM configuration - For interfaces - IM interface-Control of Assignment "Plant / Stor.Loc. - Whse Number"
    Assign location XXXX as the Standard Location. Maintain entry donot copy sloc in TR for location YYYY
    In WM configuration - For interfaces - IM interface-  Storage Location control for WH
    This entry ensures that there will be a WM tarnsfer Posting between your WM and Production storage Location automatically when you confirm your TO. You can have this done via a btach job also if you want cumulative posting. (schedule job RLLQ0100)

  • Material Staging for Production

    Hi,
    When WM is implemented, is it really necessary to use Production supply area and Control Cycle? or only Interim storage area 100 is sufficient? We are not using any KANBAN features,,
    Regards
    Shrinivas

    When WM is implemented, is it really necessary to use Production supply area and Control Cycle? or only Interim storage area 100 is sufficient? We are not using any KANBAN features,,
    1.
    If you use WM/PP interface, you use interim storage type 100 for material staging. In this case production supply area is a must.
    In this scenario you move the pick parts to the interim storage type (100) by processing the TR that is created at the time of PrdOrd release (e.g.).
    Please notice that no IM movement is posted at that time. When you get the parts in interim storage type you post IM-mvt 261 and consume the components (so, first WM movements and after that comes IM movmement). Storage type 100 behaves like an interim storage type.
    2.
    If you don't use WM/PP interface you use interim storage type 914. First you post IM-mvt 261 and after that processing the TR (that is created as a consequence of IM booking) you will get the TO and move the parts from normal storage type to 914.
    So, in this case WM movements come after IM movement.
    Regards,
    Csaba

  • LTP excludes materials with MRP indicator of storage location

    Hi All,
    SAP Note 208017 explains the reason for LTP not taking into account the MRP
    indicator of a storage location for a material. Has anyone tried a work around for this issue?
    <b>We basically are looking for a snapshot of operative MRP a week back from current date</b> and I thought LTP can be used, but it plans at the plant stock level. Since we have service inventory managed at storage location level and its exculded in operative MRP, we cant have consistent results with LTP being used for my purpose.
    Any inputs appreciated
    Thanks

    Hi,
    1. I dont think we should use the LTP Forthe purpose of your requriement
    2. Since i think you will be runing the MRP at certain frequency say daily,weekly etc
    3. LTP is a strong functionality for the forward planning , which means for a medium or long term in the forward direction
    4. For the purpose of snap shot we shouldnot use this ...
    may be pp gurus in the forum will be giving  us some reply which you are looking for
    reg
    dskumar

  • Material Master Record - How to remove or delete storage location

    Dear all,
    Is there a way to remove or delete a storage location accidentally extended via MM01 due to extending the general plant view?
    I've tried the following:
    1. I've used MM06 to flag the particular storage lcoation for deletion. However, when go to MM02 and select the plant view, the storage location that already been flag still exist for selection. I only get the warning prompt "The storage location has been flag for deletion".
    2. I tried MMSC attempt to delete and I get either messages with different material master record:
    a) "Material not fully maintained for this transaction/event"
    OR
    b) "Storage location 60BF already exists and cannot be deleted"
    P/S: If this question has been asked before by others, please point me to that thread.
    I'm grateful for any suggestion. Thanks.
    Steven

    Hi Jurgen,
    I've gone through the data archiving project in the past. I was actually hoping I don't have to go through this big exercise for this minor situation.
    The storage locations in the SAP system are fine. The problem is that when I came in to this organization, I found out that the procurement users have accidentally extended material master record to those storage location irrelevant to them. Those users don't post any stock to those accidentally extended storage location. They admit that it was a mistake. So, I don't really have to do stock movement or GI out from those affected storage location because there's nothing in them.
    Now that I've initially flag for deletion (MM06) of those mistakes done by those procurement users over the few years counting to 2000+ material master records affected. But the standard behavior of the SAP system allows change to proceed in MM02 except for that warning message MM081. So, I was actually asking around to explore if there's actually an option to make it an error prompt instead and stop the whole change process at MM02 transaction level.
    If I may re-confirm, what I've done so far via flaging for deletion of material master record at storage location level - is this the only correct solution available?
    Hope this clarifies my intention of opening this thread. Sometimes, users are quite tough in accepting the results from standard SAP system behavior.
    Thanks for the time in explaining.
    Steven

  • IMovie cannot share and no storage location set

    I am using iMovie 10.0.6 on a Retina iMac running Yosemite.
    iMovie suddenly developed the following maddening behavior, which I have yet to resolve despite trying many of the usual tricks:
    Attempting to import to an event using my isight camera or my Canon HV20 camera in a library on my internal SSD results in the following popup message: "No storage location set: Cannot start ingest because there is not storage location set. Please set one under Storage in Preferences and try again."
    It is possible to import by loading a file to my local library.  However creating a project with that file results in the strange behavior that the clips from that file remain blue and don't fill in with the preview.
    I cannot share or export any project.  Clicking "Share" in file or the "Share" button displays the options, by when I click on the share option, nothing happens.
    Importing to library in an external hard drive succeeds without the error message.  The clips in the projects created in the external libarary do fill in with the preview pictures.   However, I am not able to share or export a project in the external library either.
    When I log into my son's account on the same machine, iMovie works fine.  I am able to import to his accounts library and I'm able to share, the share button works as normal.
    I have tried the following remedies, none have worked:
    1)delete the iMovie app and reinstall.
    2)delete every iMovie preference in ~/Library/preferences
    3)delete iMovie caches
    4)delete iMovie receipts
    5)repair permissions using disk utility
    6)reset user permissions and ACLs using "reset user password" in terminal
    7)reinstall Yosemite from recovery (preserving user files)
    8) reset pram and SMC
    There must be some very hidden persistent setting corrupted that is either verry hidden or not explicitly part of iMovie; perhaps a common sharing or video import application?  Does anyone have any ideas?

    Brilliant - it worked for me, although I had to look around inside the
    /var/folders/
    and found it under another with two letter
    Thank you ultrahertz

  • Can you send msgs from any apple device using imessage to any non apple product with imessage and is it worth getting 3g for a ipad?

    Question says it all

    No you cannot:
    " Text messaging with iMessage is now on iPad and it’s unlimited between all iOS 5 users. "
    http://www.apple.com/ipad/built-in-apps/messages.html
    It ONLY works between iphones/ipod/ipad with ios 5.

  • Material staging for production orders- NO TR

    Dear Experts,
    I have created a Planned Order for which Component materials are to be supllied.
    I am not able to see the Transfer request for the same.
    Kindly help.
    Please also let me know if there are any configurations for this?
    regards,
    Shetty

    Any suggestions pls?

  • Server 2012 with HQ and 2 branch locations - Best practice?

    Hello.  I'm trying to plan a domain for a company with 1 Headquarters and 2 branch offices.<o:p></o:p>
    Currently both branch offices are communicating with headquarters via site-to-site VPN.  However, most if not all of our services are cloud based.  The routers in each
    location are performing DHCP and DNS.  The speed at each location is good, 10 mbps at the branches and 70 at HQ. Both branch offices have about 30 people at them.  HQ has around 80-100<o:p></o:p>
    We want to implement a domain so there is user authentication for accessing the computers and preferably a print server at HQ for HQ printers.  We may want to move DHCP to
    a domain controller.  We also want to utilize group policy.<o:p></o:p>
    My questions are the following:<o:p></o:p>
    1. Since we are primarily cloud based, would putting a DC on Amazon EC2 or other product be advisable?<o:p></o:p>
    2. Should I put RODC at the remote locations?<o:p></o:p>
    3. If I have redundant DC's at HQ on 2 different Xenservers and have credential caching, would only have the 2 DC's at HQ be advisable?<o:p></o:p>

    1. Makes sense to put DCs in each location. That way, even when the network to the internet is down, resources are still available locally.
    2. Dependent on applications you are installing in remote offices.  Most applications are okay, but some require access to a rewritable domain controller.
    3. Two DCs are HQ is the minimum you should have at HQ.  Then one in each remote site.
    . : | : . : | : . tim

  • Help with Multiple libraries and one storage location for files

    I cannot get an answer to this question anywhere and was really hoping that The [H] would be able to help.
    Here is my current set up that allows my wife and I to have completely independent libraries and ratings, but use the same files:
    -Shared folder with MP3s on a network drive.
    -Two PCs, each with it's own Ipod associated to it with individual libraries but all pointing to the same network share for MP3 Files.
    -Each PC is using the SAME Itunes account for downloads.
    -Each account has it's own library folder also on a network share.
    Now to my question(s)/problem with downloaded content:
    (1) Is there any way to have a file that is downloaded from Itunes be automatically placed in a shared location accessible to both Libraries? (Say if I download the latest Jack Johnson album, can it automatically show up in my wife's library and vice versa?)
    (2) Is there any way to share the album artwork versus having two copies of everything(one for each library)?
    So my goal is to have two libraries with a central location for ALL files, including anything downloaded from Itunes by each individual user. Is this possible?

    Have your wife transfer all purchases from the iPad into iTunes, backup her iPad and then sync with iTunes. Everything ... All media and other content will be available in that iTunes library and she will have a current backup.
    Assuming that your son will still be sharing your wife's Apple ID (he is too young to have one of his own) .... When you set up his iPad, restore the iPad from your wife's backup and then select only the content that you want your son to have on his iPad in the iTunes library and then sync that iPad with iTunes.
    The game progress is stored in the backup and should transfer onto his device when you restore from your wife's backup. You can always delete any content (apps, movies, music) that you don't want your son to have on the iPad, if you missed it when you synced with iTunes after setting the device up for him.
    You can set your sync preferences - any way that you want to - for both devices and still use the same iTunes library for both iPads. So ... Yes you can sync any apps that you want to his iPad and any apps that your wife wants to her iPad. You just need to restore your son's iPad from your wife's backup in order to get his game progress onto his iPad.
    In case you need these....
    Transfer purchases.
    http://support.apple.com/kb/HT1848
    How to backup and restore from a backup
    http://support.apple.com/kb/HT1766
    Remember to have your wife backup her iPad just before you restore his iPad from the backup so that his most recent progress will be available in the backup.

  • Manual staging from IM managed Storage location

    Hello all,
    I have a client process where i want to do a manual staging from a IM based storage location to production.
    Is it possible to do a manual staging to production from an IM based storage location and if there are any process pl. let me know. post the t-code and the process and any documents/links related to it.
    Thanks,
    Maxx

    Can i use the Transfer posting for manual material staging to move the stock from IM based storage location to production.
    Is it possible as i am not sure whether production has a separate storage location.
    Please define your question... How can you expect an answer w/o knowing yourself what are you asking???
    You asked about material staging from storage location to production. You can use MF60 (or MF60+MF65) for this purpose.
    If there's no production storage location you can post only GI (mvt 261) e.g in CO27, MIGO, MB1A, etc.
    Edited by: Csaba Szommer on Jan 17, 2010 8:37 PM